GENERAL SUMMARY

SECTIONS Carried from Page SECTION NO. 1 - PRELIMINARIES SECTION NO. 2 - M&E INSTALLATIONS SECTION NO. 3 - SEATINGS AREA SECTION NO. 4 - SUB TENANT KIOSKS AREA SECTION NO. 5 - BACK OF HOUSE AND COMMON AREA SECTION NO. 6 - PELMET AND COLUMNS SECTION NO. 8 - SUPPLY OF LIGHT FIXTURES SECTION NO. 9 - SUPPLY OF LOOSE FURNITURES SR 8/1 SR 1/3 SR 2/2 SR 3/8 SR 4/6 SR 5/4 SR 6/3 #REF! AMOUNT (US$) AMOUNT (S$)

Note : Compulsory 10% VAT has not be included into the BOQ

TOTAL SUM CARRIED :

#REF!

Prepared by : Sebrina Tan, Kingsmen

GS

Page 1

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION Section NO. 1 PRELIMINARIES GENERAL NOTES A The Contractor shall refer to the "Preliminaries Specification" when pricing this Schedule. All variations and additional works shall not be adjusted for Preliminaries and the Contractor shall make allowance in this regard. PRELIMINARIES 1 2 Site Management, Site Survey, Supervision and Setting Out Attendance on and Coordination with all Nominated and/or Direct/ Separate Contractors, Sub-Contractors and Suppliers Insurance (CAR and Third Party Liability) Hoarding - including all staged hoarding where necessary. Dismantle of existing structures and removal of debris Working Hours Limitation and Site Constraints Permits, Fees and Charges (If applicable) Safety equipment Temporary Light, Power, Water and Facilities Storage and Delivery for procurement items (If applicable) Staging, scaffoldding, temporary railing Site Security Daily site cleaning during construction Finished floor protection Final Cleaning Sessions Samples and Mock-up Shop Drawings As Build Drawings and Operation & Maintenance Manuals Structural Calculation and Submission Warranties and Guarantees 1 1 Sum Sum Note QTY UNIT RATE

Note

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Carried to Collection :

SR1-Prelim

Page 2

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION SECTION NO. 1 PRELIMINARIES (CONT'D) 23 24 25 Maintenance Crew within DLP Government and Building Permit Submission Other Employer's and Landlord's Requirements 1 1 1 Sum Sum Sum QTY UNIT RATE

Carried to Collection :

SR1-Prelim

Page 3

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION SCHEDULE NO. 1 PRELIMINARIES (CONT'D) COLLECTION Page: SR 1/1 Page: SR 1/2 QTY UNIT RATE

Total Carried To GENERAL SUMMARY :

SR1-Prelim

Page 4

167765240.xlsx.ms_office

Bill of Quantities
AMOUNT (US$)

SR1-Prelim

Page 5

167765240.xlsx.ms_office

Bill of Quantities
AMOUNT (US$)

By others

SR1-Prelim

Page 6

167765240.xlsx.ms_office

Bill of Quantities
AMOUNT (US$)

SR1-Prelim

Page 7

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION Section NO. 2 M&E INSTALLATIONS GENERAL NOTES A The Contractor shall refer to the M&E Specification Documents and all relevant drawings for the full extent of works and pricing of this Schedule. The Contractor must refer to the Fit-Out Guide for any Landlord's Approved/ Nominated Contractors for carrying out below works, where appropriate. The Contractor shall direct contract with these Landlord Contractors as his own sub-contractors and fully responsible for their works under this Contract. The Contractor shall include and price all these works under this Contract. All other M&E sub-contractors shall be subject to the final approval by the Project Manager prior to commencement of the Works. Total sum build up for each individual system shall be brought forward from Part 1 of Schedules under Appendice section of the M&E Specification. The Contractor shall also fill in Part 2 - Sectional Costs and Part 3 - Schedule of Unit Rates. The Contractor is required to complete the Schedule of Delivery Period and Proposed Manufacturers for Major Equipment/ Materials as attached in Part 4 of Schedules under Appendice section of the M&E Specification. Please note that Supply ONLY of all light fixtures to Ceiling and BOH/ Stock/ Office areas shall be priced under Schedule No. 6 - Supply of Light Fixtures. Please note that Supply and Install of all light fixtures and M&E Installations to External and Internal Shop Front Faade System are carried out by others and not forming part of this Contract. M&E INSTALLATIONS Electrical Services Installations Sum lot Note QTY UNIT RATE AMOUNT (US$)

Note

Note

Note

Note

Note

Note

1 1.1

1.1.1 Take down and remove all existing installations that are not required for the works. (If applicable) 1.1.2 Supply and installation of L.V. distribution system from landlord switch room to retail shop, including: - 200 main distribution system. - Trunking, cable tray, conduit and accessories for - Main distribution MCCB board and MCCB units. - Main cable from Landlord switch room to the shop: Switch 200A TPN Main distribution board DB-M - MCCB 200A TPN - MCCB 80A TPN - MCCB 63A TPN - 6 way MCCB board & Accessories 4x120 sqmm 1/c PVC Cu Cable + E

lot

a b

pcs panel pcs pcs pcs lot m

SR2-M&E Installations

Page 8

167765240.xlsx.ms_office

Bill of Quantities
ITEM d e DESCRIPTION Trunking 100x100x1.5 mm Hanger, Support & Accessories QTY UNIT m lot Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) Electrical Services Installations (cont'd) 1.1.3 Supply and installation of LV distribution system for - Main distribution system. - Trunking, cable tray, conduit and accessories for - Main distribution MCCB board and MCCB units. - Emergency cut-off power control system. Distribution board DB-1L a - MCCB 80A TPN - MCB 10A SP - Contactor 3P-16A - Timer 24h - Switch & Button - 16 way MCCB board & Accessories Distribution board DB-1P b - MCCB 63A TPN - MCB 16A SP - MCB 20A SP - RCB 20A DP - MCB 16A TP - 12 way MCCB board & Accessories Distribution board DB-2L c - MCCB 63A TPN - MCB 10A SP - Contactor 3P-16A - Timer 24h - Switch & Button - 12 way MCCB board & Accessories Distribution board DB-2P d - MCCB 63A TPN - MCB 16A SP - MCB 20A SP - RCB 20A DP - MCB 16A TP - 12 way MCCB board & Accessories 4x35 sqmm 1/c PVC Cu Cable + E e 4x25 sqmm 1/c PVC Cu Cable + E f Trunking 100x100x1.5 mm g Hanger, Support & Accessories h 1.1.4 Supply and installation of final circuit power installation for retail shop, including: - MCB boards and accessories. - Trunking and accessories. - Cable, conduit and accessories. - Socket outlets. - Connection units. - Power point as specified on the drawings: 13A 1 gang flush mounted switch socket outlet 13A 1 gang flush mounted switch socket outlet 13A 2 gang flush mounted switch socket outlet 13A 2 gang flush mounted switch socket outlet 13A 1 gang floor mounted switch socket outlet c/w 13A 2 gang floor mounted switch socket outlet c/w Recessed Wall / Ceiling / Flush Floor mounted Recessed Wall / Ceiling / Flush Floor mounted lot RATE AMOUNT (US$)

panel pcs pcs pcs pcs lot lot panel pcs pcs pcs pcs lot lot panel pcs pcs pcs pcs lot lot panel pcs pcs pcs pcs lot lot m m m lot lot -

nos nos nos nos nos nos nos nos

SR2-M&E Installations

Page 9

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION Junction Box for Showcase Light Switch QTY UNIT nos RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) Electrical Services Installations (cont'd) 1.1.4 Supply and installation of final circuit power installation for retail shop, including: 13A switched fused connection unit with DP switch Fused connection unit with DP switch and Pilot lamp 20A Double Pole Switch 16A TPN Isolator GI Conduit D25 Cu/PVC (1x4.0) sqmm Cu/XLPE/PVC (5x4.0) sqmm Accessories 1.1.5 Supply and installation of final circuit lighting installation for retail shop, including: - Switches. - Lighting points for all lighting fittings as shown on - Timer and contactors. - Trunking, cable, conduit and accessories: Lighting Switch Trunking 100x100x1.5 mm GI Conduit D25 Cu/PVC (1x2.5) sqmm Accessories 1.1.6 Supply and installation of final circuit lighting installation for internal facade, including: - Switches. - Lighting points for all lighting fittings as shown on - Timer and contactors. - Trunking, cable, conduit and accessories: Lighting Switch Trunking 100x100x1.5 mm GI Conduit D25 Cu/PVC (1x2.5) sqmm Accessories 1.1.7 Installation of all light fittings for retail shop, either supplied by the Client or the Contractor, including wiring, conduit / trunking, switch points and battery pack for light fittings of emergency purpose. 1.1.8 Supply and installation of trunking and conduit installation for extra low voltage systems, such as A/V system, computer system, POS system and telephone system: - Recessed Speaker Point - Video Outlet Conduit Point - Data & Tel Conduit Point - Trunking 100x100 mm - GI Conduit D25 - Accessories lot nos nos nos nos m m m lot lot Incl.

nos

pcs m m m lot lot -

nos

pcs m m m lot set -

lot

nos nos nos m m lot

SR2-M&E Installations

Page 10

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) Electrical Services Installations (cont'd) 1.1.9 Supply and installation of trunking and conduit installation for security system. Conduit and power point shall be allowed as follows. - 50 conduit points - 20 power points Dome type colour camera with wide angle lens point Alarm Key Pad Point Door Lock Point Security Motion Detector Point Traffic People Counter Point GI Conduit D25 Accessories 1.1.10 Supply and installation of the earthing protection including protective conductor for the low voltage distribution system and equipotential bonding to all extraneous conductive parts in the site area. 1.1.11 Supply and installation of all fluorescent fittings, with necessary ballast and all light box. (T5 type) 1.1.12 Supply and installation of lighting dimming panel - Dimming Panel - Lutron GRX-3504-T-AU-WH - 8 button control panel - EGRX-8S-WH - 2 button control panel - EGRX-2B-SL-WH - GRX-TVI 1.1.13 Provision of miscellaneous items such as - Testing and commissioning - Liaison and applications for approval to utility - Provision of completion certificates to suit the - Instructing employers staff, - Provision of Operating and Maintenance manuals, - Maintenance during the Defects Liability Period, - As-fitted drawings, - Painting and labelling, - any other incidentals not specifically listed and which 1.1.14 Other items if any (to be stated by Tenderer) lot NA lot

nos nos nos nos nos m lot lot -

set

lot set set set pcs lot

SR2-M&E Installations

Page 11

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) 1.2 Fire Services Installations Sum lot

1.2.1 Alteration and addition to the existing sprinkler system for retail shop, including supply and installation of sprinklers, pipeworks and all necessary fittings. - Galvanized mild steel pipe f40 - Galvanized mild steel pipe f32 - Pipe fittings - Sprinkler head - Supply & installation Concealed type, 68oC, K8.0 Stainless steel conceal type, 68oC, K8.0 - Relocation Concealed type - Hanger, support - Testing - Accessiries 1.2.2 lteration and addition to the existing automatic and manual fire alarm system for retail shop, including supply and installation of alarm bells, smoke detectors, extended indicating lights, conduits, wirings and all necessary accessories. Smoke Detector Fire Alarm Panel 4 zones Alarm belts Strobe light Fire alarm manual call point 2x1.5 mm2 FR Cu/PVC GI Conduit DN 25 Flexible GI Conduit DN 20 Accessories T&C 1.2.3 Supply and installation of all electrical works for fire services systems including conduit, trunking, wiring and all necessary equipment. Galvanized mild steel pipe f50 PIpe fitting Fire hose reel box 1000x600 Angle valve DN 50 Hose reel 30m , DN 50 Nozzle DN 50 Hanger support Accessiries Testing 1.2.4 Supply and installation of portable fire extinguishers c/w mounting bracket. Powder Fire Extinguisher ABC 4 kg Co2 Fire Extinguisher 4kg

m m lot

nos nos

lot lot lot lot -

nos nos nos nos nos m m m lot lot lot -

m lot set set set set lot lot lot lot nos nos -

SR2-M&E Installations

Page 12

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) Fire Services Installations (cont'd) 1.2.5 Provision of miscellaneous items such as: - Testing and commissioning - Liaison and applications for approval to utility companies, regulatory and licensing authorities, - Provision of completion certificates to suit the requirements of utility companies, regulatory and licensing authorities, - Instructing employers staff, - Provision of Operating and Maintenance manuals, - Maintenance during the Defects Liability Period, - As-fitted drawings, - Painting and labelling, - any other incidentals not specifically listed and which may be required for the completion of the whole works. lot

SR2-M&E Installations

Page 13

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) 1.3 MVAC Services Installations Sum lot -

1.3.1 Dismantle, and modify the existing A/C supply system to suit the interior decoration. 1.3.2 Supply and installation of electrical and control system for the shop including main switchboard, motor control panels, and control devices and necessary accessories, conduit and wiring, etc. Duct type temperrature sensor Probe type smoke detector Differential Presure switch HVAC control panel Display Panel VSD 3 KW VSD 1.5 KW Chilled water meter flow rate Cu/PVC/PVC 3x4mm3+1x2.5mm2 Cu/PVC/PVC 2x2.5mm3+1x2.5mm2 Cu/PVC 1x1.5mm2 Sielded Cu/PVC/PVC 2x1.5mm2 Conduit GI D20 Conduit GI D25 Trunking 100x50x1.5 mm Accessories 1.3.3 Supply and installation of air conditioning and fresh air duct work system including insulation, dampers, air grilles and all necessary fittings. Duct 0,8mm Fiber glass insulation 32kg/m3, 25mm Attennuator VCD 200 Flexible canvas connector Flexible duct cw insulation 200 Air distribution device * Plenum box for with 50(H) & 40(H) outlet * 100(W) Al. linear air diffuser w/30 deflection Hanger and support Accessories 1.3.4 Supply and installation of AHUs and exhaust air fan Air Handling Unit - 2000l/s - 1500l/s Exhaust air fan, ceiling mounted type, 15L/s Hanger, support Antivibrator SUS mainternance platform Accessories

lot

nos nos nos set set nos nos set m m m m m m m lot lot -

m2 m3 nos nos nos m nos nos lot lot lot nos nos pcs lot lot lot lot -

SR2-M&E Installations

Page 14

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) MVAC Services Installations (cont'd) 1.3.5 Supply and installation of chilled water pipes and condensate drain pipe system including gate valves, insulation and all necessary fittings. Chilled water pipe c/w insulation PU 50 mm * 40 mm * 50 mm * 65 mm * 80 mm Condensation drain pipe c/w insulation 25mm * 32 mm * 40mm * 50mm Pipe fitting Gate valve * 40 mm * 50 mm * 65 mm * 80 mm Auto Air Vent * 20 mm Strainers * 40 mm * 50 mm Two- way on/off control valve actuator * 25mm Two- way modulating control valve with actuator * 40 mm * 50 mm Balancing valve with commissioning set * 40 mm * 50 mm Flexible joint * 25 mm * 40 mm * 50 mm Drain cock Temperature gauge Pressure gauge Secondary drain pan Hanger and support Accessories 1.3.6 Provision of miscellaneous items such as: - Testing and commissioning - Liaison and applications for approval to utility companies, regulatory and licensing authorities, - Provision of completion certificates to suit the requirements of utility companies, regulatory and licensing authorities, - Instructing employer s staff, - Provision of Operating and Maintenance manuals, - Maintenance during the Defects Liability Period, - As-fitted drawings, - Painting and labelling, lot

m m m m m m m lot nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos lot lot lot -

SR2-M&E Installations

Page 15

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION - any other incidentals not specifically listed and which may be required for the completion of the whole works. Carried to Collection : SCHEDULE NO. 2 M&E INSTALLATIONS (CONT'D) MVAC Services Installations (cont'd) 1.3.7 Other items if any (to be stated by Tenderer) Chilled water pipe c/w insulation PU 50 mm * 80 mm 1.4 Audio Visual System Installation Allowance for supply and install new AV System:a) b) c) d) e) f) g) h) 1.5 a) 2 DVD player Conceal ceiling speaker Multi -Channel Power Amplifier Equalizer Samsung 40 OUTn-UD, LCD (RTW) c/w brackets. Samsung ME 40B, LED Screen (Staircase Screen & Screen Vitrine) c/w Wall mount bracket Magic Info Video wall (Software for LED Video wall) Testing and commissioning of AV system Security System Installation Allowance for supply and install new Security System BUILDER'S WORKS IN CONNECTION WITH M&E INSTALLATIONS Allowance for all builder's works in connection with M&E Services installations Sum By Other No. No. No. No. No. No. Lot Sum lot m QTY UNIT RATE AMOUNT (US$)

2.1

SR2-M&E Installations

Page 16

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO.2 M&E INSTALLATIONS (CONT'D) COLLECTION Page: SR 2/1 Page: SR 2/2 Page: SR 2/3 Page: SR 2/4 Page: SR 2/5 Page: SR 2/6 Page: SR 2/7 Page: SR 2/8 Page: SR 2/9

Total Carried To GENERAL SUMMARY :

SR2-M&E Installations

Page 17

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION Section NO. 3 SEATINGS AREAS GENERAL NOTES A This Section is for the fit-out works to Seating Areas Only. Sub-Tenant Kiosks and Back of House/ Stock/ Office areas shall be priced under Schedule No.4 and 5 respectively. The Contractor shall allow for design calculation duly endorsed by Registered Engineer and submit to the Project Manager where appropriate. The Contractor must liaise and co-ordinate closely with all Employer's/ Landlord's Direct Contractors for necessary staging and programme of the fit out works. MODIFICATION AND ALTERATION WORKS TO BASE BUILDING Allowance for calculation and safe loading check on base building slab for Safe Installation Allowance for installation of Safe (Safe to be supplied by others) FLOORING Preparation of floor level and apply floor screeding to receive new floor finishes To supply and install 900x150mm White Horse Tile (HD95014) To supply and install 5mm stainless steel inlay WALL AND PARTITIONS Make good existing brick wall to receive new wall finishes Supply and install timber structure backing to receive Groove Line Panel Supply and install 200x100mm HT. selected metal in powdered coat finishing (Color to be selected) to receive existing glass wall by owner 318.1 m2 530 m2 Note QTY UNIT RATE AMOUNT (US$)

Note

Note

1 1.1

Sum

1.2

Sum

2 2.1

2.2 2.3 3 3.1

583

m2

166.9

ml

3.2

83.4

m2

3.3

50.8

ml

3.2 Wall Finishing 3.2.1 Supply and install Groove Line Panel as specified 3.2.2 Selected 1/P paint finish 3.2.3 Bare brick wall in lacquor finish

83.4 183.2 96.7

m2 m2 m2 ml

3.2.4 Supply and install 150mm stainless steel skirting in hair- 139.5 line finish 3.2.5 Supply and install selected black sticker 3.2

m2

SR3-Seatings

Page 18

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION SECTION NO. 3 SEATINGS AREA (CONT'D) 3.2.6 Supply and install selected sticker with cut-out lettering 7 sets QTY UNIT RATE AMOUNT (US$)

4 4.1

CEILING Exposed ceiling in selected spray paint finish 530 m2

4.2

To supply and install plaster ceiling at 3500mm in selected paint finish Provide labor to install recess light coves To supply and install hollow steel support structure for recessed light coves To supply and install 8mm metal rods support for lightings Allowance for access panel, forming openings for M&E services etc. HAND RAILS To supply and install stainless steel hand rail frame in hair-line finishing To supply and install 850x850x12mm thk tempered glass (incl. aluminium U channel to receive glass) PLAYGROUND Playground mats by specialist

756.6

m2

4.3 4.4

1 141.4

sum ml

4.5

TBC

ml

4.6

Sum

5 5.1

25.5

ml

5.2

12

pcs

6 6.1

SECTION NO. 3 SEATINGS AREA (CONT'D) COLLECTION Page: SR 3/1 Page: SR 3/2 #REF! -

Total Carried To GENERAL SUMMARY :

#REF!

SR3-Seatings

Page 19

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION SCHEDULE NO. 4 KIOSK AREA GENERAL NOTES A This Schedule is for the fit-out works to Kiosk Area Only. Seatings Area and Back of House/ Stock/ Office areas shall be priced under Schedule No. 3 and 6 respectively. The Contractor shall allow for design calculation duly endorsed by Registered Engineer and submit to the Project Manager where appropriate. The Contractor must liaise and co-ordinate closely with all Employer's/ Landlord's Direct Contractors for necessary staging and programme of the fit out works. MODIFICATION AND ALTERATION WORKS TO BASE BUILDING Allowance for calculation and safe loading check on base building slab for Safe Installation Allowance for installation of Safe (Safe to be supplied by others) FLOORING Preparation of floor level and apply floor screeding to receive new floor finishes Supply and apply 3 layers water proof in wet works area 322.3 m2 Note QTY UNIT RATE AMOUNT (US$)

Note

Note

1 1.1

Sum

1.2

Sum

2 2.1

2.2

136.9

m2

2.3 2.4

To supply and install 300mm SQ Ceramics Tiles Seasera 20A rough surface To supply and install 5mm stainless steel inlay

354

m2

65.6

ml

3 3.1

WALLS AND PARTITIONS Make good existing brick wall to receive new wall finishes Supply and install timber structure backing to receive Groove Line Panel 358.7 m2

3.2

69.9

m2

3.2 To supply and build: 3.2.1 Full height brick wall (4000mm) 3.2.2 1200mm height brick wall 3.2.3 RC Kerb 3.3 To supply and install 3.3.1 1200x12mm thick clear glass 3.3.2 300x12mm thick clear glass 3.3.3 Support system to hold signage

267.5 61.8

m2 m2

28.3 6.3 7

m2 m2 set

SR4-Kiosks

Page 20

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION 3.4 Wall Finishing 3.4.1 To supply and install 300x300 selected Ceramic wall tile QTY UNIT RATE AMOUNT (US$)

781.3

m2

3.4.2 Supply and install Groove Line Panel as specified 3.4.3 Selected spray paint finish 3.4.4 Selected tile finish (1/T) 3.4.5 4 4.1 4.2 4.3 Supply and install 150mm stainless steel skirting in hairline finish CEILING Exposed ceiling in selected spray paint finish 2'x4' HCCP Ceiling at 2700mm Allowance for access panel, forming openings for M&E services etc. To supply and install 8mm metal rods support for lightings FRONT COUNTER DETAILS MISSING

69.9 93.2 1.8 23.3

m2 m2 m2 ml

82.11 182.9 1

m2 m2 Sum

4.4 5

TBC

ml

Carried to Collection : SECTION NO. 4 KIOSK AREA (CONT'D) 7 DOORS Supply and Install the following doors including finishes, ironmongeries, fittings and accessories as specified:-

DETAILS MISSING

sets Carried to Collection : #REF!

SECTION NO. 4 KIOSK AREA (CONT'D) COLLECTION Page: SR 4/1 Page: SR 4/2 Page: SR 4/3 Page: SR 4/4 Page: SR 4/5 #REF! #REF! #REF! #REF! -

SR4-Kiosks

Page 21

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Total Carried To GENERAL SUMMARY :

#REF!

SR4-Kiosks

Page 22

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION SECTION NO. 5 BACK OF HOUSE AREA GENERAL NOTES A This Schedule is for the fit-out works to Back of House/Service Corridor and Common Area only. The Contractor shall allow for design calculation duly endorsed by Registered Engineer and submit to the Project Manager where appropriate. The Contractor must liaise and co-ordinate closely with all Employer's/ Landlord's Direct Contractors for necessary staging and programme of the fit out works. FLOOR FINISHES Preparation of floor level and apply floor screeding to receive new floor finishes To supply and install 300mm SQ Ceramics Tiles Seasera 20A rough surface To supply and install Cemkrete S-Crete HF MF Light Grey To supply and install 5mm stainless steel inlay WALL AND PARTITION Make good existing brick wall to receive new wall finishes Supply and build full height brick wall (4000mm) Wall Finishing 45.2 134.3 m2 m2 318.5 m2 0 252.5 m2 0 Note QTY UNIT RATE AMOUNT (US$)

Note

Note

1 1.1

1.2

74.2

m2

1.3

179.3

m2

1.4 2 2.1

15.4

ml

2.2 2.3

53.4

m2

2.3.1 Selected 1/P paint Finish 2.3.3 To supply and install 300x300 selected Ceramic wall tile

2.3.4

Bare brick wall in lacquor finish

123.3 45.2

m2 ml

2.3.5 Supply and install 150mm stainless steel skirting in hairline finish 3 3.1 3.2 CEILING Exposed ceiling in selected spray paint finish To supply and install 8mm metal rods support for lightings DOORS DETAILS MISSING

535.2 TBC

m2 ml

0 #VALUE!

4 4.1

set

SR5-BOH

Page 23

167765240.xlsx.ms_office

Bill of Quantities
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

Carried to Collection : SCHEDULE NO. 5 BACK OF HOUSE AREA (G/F & B/F) (CONT'D) COLLECTION Page: SR 5/1 Page: SR 5/2

#REF! 0

Total Carried To GENERAL SUMMARY :

#REF!

SR5-BOH

Page 24

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION SECTION NO. 6 PELMET AND COLUMNS GENERAL NOTES A The Contractor shall refer to all relevant Drawings & Specification for the standard of quality, workmanship and pricing the Faade Works. All proposed faade contractors shall be subject to the final approval by the Project Manager prior to the commencement of the Works. The Contractor is required to refer to the Specification Preliminaries of the Tender Documents for all Guarantee/ Warranty requirements for the Faade Works. The Contractor shall allow for all FRP provisions and associated Landlord's requirements applicable to the Works. The Contractor shall allow for design calculation duly endorsed by Registered Engineer and submit to the Project Manager where appropriate. The Contractor must liaise and co-ordinate closely with all Employer's/ Landlord's Direct Contractors for necessary staging and programme of the Faade Works. FAADE PELMET Note QTY UNIT RATE AMOUNT (HK$)

Note

Note

Note

Note

Note

1.1 Entrance Pelmet 1.1.1 To supply and install 40x40mm steel hollow sections for reinforcement to concrete slab 1.1.2 To supply and install 275x45x5mm 'U' profile in selected metal (4/MF) to receive 20mm thk glass 1.1.3 To supply and install 12mm MDF backing to receive 20mm thk glass 1.1.4 To supply and install 20mm thk clear tempered glass 1.2 Kiosk and Seatings Area Pelmet

21

ml

6.2

m2

4.1

m2

9.6

m2

1.2.1 Hollow Section Pelmet 1.2.1a Supply and install 40x40mm selected metal hollow section in powder coat finish (Color to be selected) to form pelmet structure as specified 1.2.1b Supply and install 10mm thk. metal plates in powder coat finish 1.2.1c Supply and install 6mm thk mirror (3/G) 1.2.1d Supply and install 12mm thk clear glass (1/G) 1.2.2 Timber Strips Pelmet

398.4

ml

11.1

m2

8.2 10.7

m2 m2

SR6-Pelmet and Columns

Page 25

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY 18 UNIT m RATE AMOUNT (HK$) 1.2.2a Supply and install 8mm metal rods support to hang pelmet system 1.2.2b Supply and install 150x50mm Timber Strips in Lacquor finish 1.2.2c Supply and install 50x25mm Timber Strips in Lacquor finish 1.2.2d Supply and install Decorative nuts & bolts 1.2.3 Metal Strips Pelmet 1.2.3a Supply and install 18mm thk MDF backing, reinforced by 50x100mm steel hollow section dropped down from concrete slab @ 500mm/each 1.2.3b Supply and install 1600x150x30mm thk Decorative Metal Strips in powder coat finish (Color to be selected)

101.3

ml

20.2

ml

lot

107.3

m2

105.7

m2

SECTION NO. 6 PELMET AND COLUMNS (CONT'D) 2 2.1 COLUMNS To supply and install metal stud Box-Up with 9mm Gypsum Board in selected white Jotun paint finish (2/P) 111.9

Carried to Collection :

m2

2.2

To supply and install 90x180mm timber strips to receive selected LED light finish and metal strips To supply and install 300x9mm thk selected metal strips (3/MF) in Chrome finish To supply and install 150x5mm stainless steel in hairline finish. C/w MDF backing. To supply and install timber backing to receive Photo Frame by others SIGNAGE To supply and install 350mm HT. cut-out lettering in Clear Acrylic finish (1/AC). C/w 8mm metal rods support

38.2

ml

2.3

38.7

ml

2.4

30.8

ml

2.5

Sum

3 3.1

set

3.2

To supply and install 350mm HT. x 50mm THK. stainless steel Signage Frame in hair-line finish, with cut out lettering. C/w Clear Acrylic backing and LED lightings. (For 20mm thk glass pelmet)

set

SR6-Pelmet and Columns

Page 26

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (HK$)

Carried to Collection : SCHEDULE NO. 7 SHOP FRONT FAADE SYSTEM (CONT'D) COLLECTION Page: SR 7/1 Page: SR 7/2 Page: SR 7/2 #REF!

SR6-Pelmet and Columns

Page 27

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (HK$)

Total Carried To GENERAL SUMMARY:

#REF!

SR6-Pelmet and Columns

Page 28

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION SECTION NO. 6 SUPPLY OF LIGHT FIXTURES GENERAL NOTES A Unless otherwise stated, the Contractor shall price the installation ONLY of light fixtures under Schedule No. 3 - M&E Installations, Schedule No. 3 - Retail Area (1/F), Schedule No. 4 Retail Area (2/F) and Schedule No. 5 - Back of House Area respectively. Reference shall be made to the M&E Specification Documents and all relevant drawings for the specification of light fixtures and its requirement. The Contractor shall refer to the Approved Quotation given by the Employer and inserted under Specification Section for pricing the supply of specified light fixtures. All quantities in the quotation are for reference ONLY and it is the sole responsibility for the Contractor to check and verify the quantities according to the drawings and specification requirements in the tender. The Contractor is deemed to include due allowance in the Contract Sum for all the exclusion items & qualification offered in these quotations by respective nominated suppliers. No adjustment to the Contract Sum is allowed resulting from his ignorance of this requirement. D When pricing the supply of light fixtures, the "supply rates" shall, unless otherwise excluded in the Approved Quotation, include cost of packing, carriage and delivery to Site, contractor's warehouse or factory, where further production is required. The Contractor shall allow all other costs for installation under Schedule No. 3, 4, 5 & 6 respectively. Supply and installation of light fixtures for External and Internal Shop Front Faade (including Light Boxes, Window Displays and Backlit Logo) are carried out by others and not forming part of this Contract. Supply and install the following light fixtures including all necessary bulbs, transformers, accessories and spares as specified (Unless otherwise supplied direct by the Employer) :Light Fixtures to CEILING (1F & 2F) C3 Halogen lights for ceiling to all BOH/ Stock/ Office areas Set 0 Note QTY UNIT RATE AMOUNT (US$)

Note

Note

Note

Note

Note

1.1 a)

Carried to Collection :

SR6-Light Fixtures

Page 29

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$) SCHEDULE NO. 6 SUPPLY OF LIGHT FIXTURES (CONT'D) 1 Supply and install the following light fixtures including all necessary bulbs, transformers, accessories and spares as specified (Unless otherwise supplied direct by the Employer) :(CONT'D)

1.2 a)

1.3 a) 2 2.1 Delivery and Handling Charges (PROVISIONAL) Logistic for delivery, handling and all associated expense etc. for all light fixtures supplied by Nominated Suppliers above [Note: Warranty and maintenance for all fluorescent tube within Defect Liability Period and LED lights with supplier's warranty are deemed to be included as per Preliminaries Specification requirement.] 1 Sum Refer to Prelim

Carried to Collection :

SR6-Light Fixtures

Page 30

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$) SCHEDULE NO. 6 SUPPLY OF LIGHT FIXTURES (CONT'D) COLLECTION Page: SR 6/1 Page: SR 6/2 0 0

Total Carried To GENERAL SUMMARY :

SR6-Light Fixtures

Page 31

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$) SCHEDULE NO. 8 - PC SUM FOR MATERIAL SUPPLY 1 Allowance for PC SUM for SUPPLY ONLY of the following materials:-

Carried to Collection :

SR8-PC Sum

Page 32

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

SCHEDULE NO. 8 - PC SUM FOR MATERIAL SUPPLY (CONT'D) 8a 8b 8c 9a 9b 9c 10a 10b 10c 11a 11b 11c 12a 12b 12c 13a 13b 13c 14a 14b 14c 15a 15b 15c 16a 16b 16c 17a 17b 17c Carried to Collection : 0.00

SR8-PC Sum

Page 33

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

SCHEDULE NO. 8 - PC SUM FOR MATERIAL SUPPLY (CONT'D)

18a 18b 18c 19a 19b 19c 20a 20b 20c 21a 21b 22a 22b 23a 23b 23c 24a 24b 24c 25a 25b 25c 26a 26b 26c

Carried to Collection :

0.00

SR8-PC Sum

Page 34

167765240.xlsx.ms_office

SCHEDULE OF RATES
ITEM DESCRIPTION QTY UNIT RATE AMOUNT (US$)

SCHEDULE NO. 8 - PC SUM FOR MATERIAL SUPPLY (CONT'D) COLLECTION Page: SR 8/1 Page: SR 8/2 Page: SR 8/3 0 0 0

Total Carried To GENERAL SUMMARY:

SR8-PC Sum

Page 35

SCHEDULE OF RATES
ITEM DESCRIPTION SCHEDULE NO. 8 DAYWORK SCHEDULE GENERAL NOTES A The Contractor shall submit a set of daily wages rates for the following types of workers: General labour (skilled) General labour (non-skilled) Carpenter Plasterer Painter Decorator Metal worker Electrician M&E worker Plumber 1 1 1 1 1 1 1 1 1 1 Day Day Day Day Day Day Day Day Day Day QTY UNIT RATE AMOUNT (US$)

1 2 3 4 5 6 7 8 9 10

Total Carried To GENERAL SUMMARY :