The development of a healthy environment for our community necessitates actions to improve the physical and socio-economic environment affecting health, helping one another to evolve their maximum potential. With the impact of globalization, new patterns of consumption and communication, environmental degradation, urbanization and changes in the pattern of diseases and in the social determinants of health, there is a need for us to take a fresh look on the concept of health, and to adopt new approaches and strategies to improve health. Despite the relatively low incidence of reported cases of Legionnaires disease in Hong Kong when compared with overseas countries, effective protection of the community from this disease is vital. The establishment of Prevention of Legionnaires Disease Committee (PLDC) can surely provide an effective platform for medical and engineering professionals to join hands for offering expert advices to formulate strategies for preventing Legionnaires disease. The Code of Practice for Prevention of Legionnaires Disease was firstly published in 1994 and subsequently revised in 2000 and 2007. Taking into account the experience and the evolving knowledge of other countries and lessons from major cases in recent years, this revised edition is featured with enhanced precautions in association with hot and cold water supply systems, use of spas and other general updates, from which broader practical guidelines for proper design, operation, maintenance and handling of related facilities or materials to avoid the spread of Legionella bacteria can be provided. We are confident that this revised code of practice can surely safeguard our environment and enhance the quality of our lives.

Prevention of Legionnaires Disease Committee, Hong Kong April 2012

-1-

Content
1. Background 2. Medical Aspects 3. The Hong Kong Situation 4. Guidelines on Design, Operation and Maintenance of Water Using Apparatus 4.1 4.2 Water Safety Plan for Water Using Apparatus Cooling Towers 4.2.1 4.2.2 4.3 Design Precautions Operation and Maintenance Precautions

Design, Operation and Maintenance Precautions of Other Components in Air-conditioning Systems 4.3.1 4.3.2 4.3.3 4.3.4 Condensate Drain Trays of Air Handling Unit / Fan Coil Unit (AHU / FCU) Air Duct and Air Filters Humidifiers Air Washers Centralized Hot Water Supply Systems Localized Water Heater for Hot Water Supply Design Precautions Operation and Maintenance Precautions Design Precautions Operation and Maintenance Precautions General Design Precautions Operation and Maintenance Precautions

4.4

Hot Water Supply Systems 4.4.1 4.4.2

4.5

Cold Water Supply Systems 4.5.1 4.5.2

4.6

Architectural Fountains 4.6.1 4.6.2

4.7

Spa Pools (Whirlpools) 4.7.1 4.7.2 4.7.3

4.8

Design, Operation and Maintenance Precautions of Other Water Using Apparatus

5. Collection of Water Samples from Water Using Apparatus for Testing Legionella, Heterotrophic Colony Count (HCC) and Other Water Quality Parameters 6. Control Measures during Outbreak of Legionnaires Disease 7. Design, Operation and Maintenance Records 8. Handling Garden Soils, Composts and Potting Mixes 9. References
-2-

Annex 1 Annex 2 Figure 1

FORM 2 Prevention and Control of Disease Ordinance (Cap. 599) Occupational Safety and Health Ordinance (Cap. 509) Notification of Occupational Diseases Relationship between Proliferation of Legionella and Temperature of Water Systems when in Use and when Other Growth Factors are Present Transmission of Legionnaires Disease Organization of The Prevention of Legionnaires Disease Committee Composition of The Prevention of Legionnaires Disease Committee and Terms of Reference Longitudinal Section of a Typical Cooling Tower Schematic Diagram of a Typical Cooling Tower System AHU/FCU Drain Tray Air Break and U-trap (Water Seal) at AHU/FCU Condensate Drain Pipework Pumped Circulation in Calorifier to Reduce or Eliminate Temperature Stratification Thermostatic Mixing Valve Schematic Diagram of a Typical Spa System Overview of the Key Steps in Developing a Water Safety Plan

Figure 2 Figure 3A Figure 3B Figure 4A Figure 4B Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10

-3-

1. Background 1.1 Legionnaires' disease (LD) was first recognised in July 1976 when an outbreak occurred among delegates attending an American Legion Convention in Philadelphia in which more than two hundred cases were reported and 34 people died. After medical investigations, it was identified that the responsible bacterium of the disease was previously unknown, and was subsequently given the name Legionella pneumophila. Since the identification of Legionellae, cases ranging from sporadic infection to outbreak were subsequently reported in USA, Canada, UK, Australia, Singapore, etc. Based on past records, LD is more active in the said countries than in Hong Kong.

1.2

2. Medical Aspects 2.1 LD typically manifests as severe pneumonia, with patients presenting symptoms of malaise, muscle pains, cough, breathlessness, headache and fever, often culminating in respiratory failure. The disease has an incubation period of 2 to 10 days. The bacteria that cause LD are small coccobacilli measuring up to 0.5m by 1-3m, with occasional longer forms of 10-15m or more, within the genus Legionellae. Over 42 species of Legionellae have been identified and the Legionella pneumophila serogroup 1 is most commonly responsible for LD outbreaks. Legionellae survive and multiply in natural fresh water, including lakes, rivers, streams, ponds, mud and soil, as well as man-made water systems. The optimum temperature for proliferation of the bacteria is around 20C to 45C, and particularly in the range of 35C to 43C. The proliferation ceases above 46C and below 20C, while the survival time decreases to a few minutes at above 60C. At 70C the organism is killed virtually instantaneously. The organism appears to be insensitive to pH but requires as nutrition the presence of simple organic life (such as algae and microorganism in sludge, scale, biofilm, etc.), inorganic substances (such as nitrogen based substances, small concentration of iron, zinc, etc. in fresh water piping systems), and organic substances (such as certain types of rubber) for survival. Nevertheless the bacteria can hardly survive in salt water and domestic water supplies which are well chlorinated. Transmission of the bacteria to the human bodies is mainly by inhalation of airborne droplets (i.e. aerosols) or particles in fine mist containing the bacteria into the lungs where they are deposited. According to the previous reported cases, the sources of the aerosols causing an outbreak were mainly traced to water systems in buildings including evaporative cooling towers and humidifiers of air-conditioning systems, hot and cold water services, whirlpool spas, industrial heating and cooling processes, etc. Normal range of operation temperature of these systems is conducive to the growth of Legionellae.

2.2

2.3

2.4

2.5

-4-

2.6

The correlation between the proliferation temperature of the bacteria and the operating temperature of commonly found water systems is shown in Figure 1. There is no evidence that LD is transmitted by person to person contact. The following types of people are more susceptible to LD : (a) patients who have low resistance to infection, especially those with respiratory disease, or on renal dialysis or immuno-suppressant drugs; (b) smokers; (c) people of increasing age, particularly over 50 years old; (d) males (3 times more susceptive than females); and (e) drinkers.

2.7 2.8

2.9

To summarise, the infection of LD is due to a combination of the following factors as shown in Figure 2 : (a) aerosol containing Legionellae; (b) inhalation of the aerosol; and (c) susceptible person.

3. The Hong Kong Situation 3.1 Following the outbreak of LD in 1985 at Stafford District Hospital, UK, the Prevention of Legionnaires Disease Committee was set up in Hong Kong. The Committee is chaired by the Electrical and Mechanical Services Department, and it comprises members from the Department of Health, the then Works Bureau, The University of Hong Kong, The Chinese University of Hong Kong, the Architectural Services Department and the Water Supplies Department. Initially, the terms of reference of the Committee were confined to areas of immediate concern, especially on the preventive measures against LD in government hospitals. Starting from 1987 the recommendations of the Committee were gradually implemented in government hospitals. A set of the recommendations was also sent to all subvented hospitals and private hospitals in July, 1989. In January, 1990, a technical guideline was issued to the project design teams and operation and maintenance teams of Government buildings to ensure that they are aware of the issue and will adopt proper attitude and appropriate measures in handling the relevant design, operation and maintenance of engineering plants/equipment. To further promote the awareness of the public on the disease, the Committee published the pamphlet "Understanding Legionnaires' Disease" and this Code of Practice so as to present guidelines to the public on prevention of LD and to allay unnecessary alarm and fear
-5-

3.2

3.3

caused by the overwhelming publicity of the issue. Furthermore, Subcommittees were established to assist in the publicity launch and to advise the Committee on technical matters, such as preparation of publicity materials, drawing up investigation procedures and plans to handle an outbreak, collection and analysis of technical information, etc. In order to strengthen the representation, the Committee was reorganised in 2002 and chaired by a public health expert with members representing government bureau and departments concerned and experts nominated from the medical faculty of universities and the engineering profession. The organisational relationship, the membership of the Committee and the terms of reference are shown in Figures 3A and 3B. 3.4 In March 1994, LD has been listed as a notifiable disease under the former Quarantine and Prevention of Disease Ordinance (Cap. 141) (subsequently replaced by the Prevention and Control of Disease Ordinance (Cap. 599) in July 2008). Medical practitioners are required by law to notify the Department of Health when they have reasons to suspect the existence of a case of the disease in accordance with the latest 'FORM 2' of the Prevention and Control of Disease Ordinance, a copy of which is reproduced in Annex 1. There were 150 reported cases of LD between 1994 and 2011. All were sporadic cases with no evidence of clustering. Table 1 shows a summary of the cases.
Table 1: Summary of Notified Cases of Legionnaires Disease 1994 2011

3.5

Year 1994 1995 1996 1997 1998 1999 2000 2001 2002

No. of Cases 3 1 2 2 1 1 2 3 4

Year 2003 2004 2005 2006 2007 2008 2009 2010 2011

No. of Cases 3 3 11 16 11 13 37 20 17

3.6

LD was added into the list of notifiable occupational disease under the Occupational Safety & Health Ordinance (Cap. 509) in June 1999. Medical practitioners are required to notify the Commissioner of Labour of any cases of LD if the patients occupation involves repair, maintenance or service of either cooling system that uses fresh water, hot water service system, or other water using apparatus. A copy of the notification form is attached in Annex 2. Moreover, it is also prescribed for compensation under the Employees Compensation Ordinance (Cap. 282).

-6-

4. Guidelines on Design, Operation and Maintenance of Water Using Apparatus Water using apparatus shall mean an apparatus or equipment utilizing or consuming water in its normal operation. Under all circumstances, the first option to be considered is to avoid, where reasonably practicable, the use of equipment which can create a spray of contaminated water. Where the use of such equipment cannot be avoided, the risk should be prevented or controlled by measures to reduce exposure to contaminated water droplets and to prevent conditions which allow the proliferation of Legionellae in water. 4.1 Water Safety Plan for Water Using Apparatus 4.1.1 Developing a Water Safety Plan (WSP) for water using apparatus is the preferred approach to manage specific health risks of exposure to Legionellae. Owners or operators of water using apparatus should develop the specific WSPs for their systems. Major benefits of developing and implementing WSP are the systematic and detailed assessment and prioritization of hazards (biological, chemical or physical agents, or water conditions, with the potential to cause adverse health effects), and the operational barriers and control measures. The steps involved in developing a WSP are shown in Figure 10. WSP should consist of the following key components: (a) System assessment determination of whether the water quality at the point of potential exposure or use meets the health-based target, based on a risk assessment for the population likely to be exposed. Monitoring identification and monitoring of control measures used to ensure water quality (e.g. biocide, temperature, pH). Management and communication to document the results of system assessment and monitoring, and describe actions to be taken during normal operation and after incidents, including documentation and communication (e.g. a plan for remedial actions after adverse monitoring results, such as low residual biocide levels, and listing those to be informed of an event). The actions should be taken as soon as practicable.

4.1.2

4.1.3

(b)

(c)

4.1.4

The WSP should be prepared in conjunction with the relevant parties (e.g. building facility managers, system operation and maintenance staff, water treatment service providers, etc.). The WSP should be reviewed on a regular basis to reflect changes and ongoing improvements in the system, the available evidence base and the surrounding environment. Finally the WSP should be amended if control is not maintained.
-7-

4.1.5

The relevant details of the WSP can be referred to Legionella and the prevention of legionellosis published by World Health Organization in 2007 (Item [1] in the References (Paragraph 9 of this Code)).

4.2

Cooling Towers Cooling towers are commonly used as heat rejection equipment for air conditioning and industrial cooling processes. The operation temperature of the coolant water is optimal to the growth of Legionellae (Figure 1) and the generation of aerosol during the cooling process in the cooling tower easily leads to the dispersion of aerosol to the surroundings. Improperly designed, operated and maintained cooling towers have been one of the main causative agents causing LD. The longitudinal view of a typical cooling tower and a typical cooling tower system are shown in Figure 4A and 4B respectively. 4.2.1 Design Precautions (a) The cooling tower shall be sited sufficiently far away from fresh air intakes of a building or an air conditioning system, operable windows, outlets of air exhaust system, and public thoroughfare. Minimum separation distances are given in the latest edition of Code of Practice for Water-cooled Air Conditioning Systems Part 1: Design, Installation and Commissioning of Cooling Towers. The cooling tower system shall be provided with water treatment facilities, physical and/or chemical, to prevent the installation from corrosion and scale deposition and to suppress the growth of micro-organisms in cooling water. The cooling tower shall be equipped with effective drift eliminator, which shall also be extended across the air stream without any bypass. The permissible drift emission is given in the latest edition of Code of Practice for Watercooled Air Conditioning Systems Part 1: Design, Installation and Commissioning of Cooling Towers. The fill and drift eliminator shall be easily removable for cleaning or replacement and the materials shall have adequate strength to withstand cleaning by water jet. The surfaces of all cooling tower construction materials shall be non-porous and easy-to-clean. The water pipework of the cooling tower shall be designed to avoid dead legs. If the existence of dead legs cannot be avoided, mitigation measures, such as manual/automatic drain valve for periodic drain-off, shall be provided. Louvres, where appropriate, shall be provided to prevent water from spilling out and to obstruct direct sunlight from entering the cooling water basin.
-8-

(b)

(c)

(d)

(e) (f)

(g)

(h)

The water basin shall be smooth, without dirt trapping pattern, accessible, cleanable, and provided with drains of adequate size at the lowest point and at screeners. The cooling tower shall be provided with easy access to all internal surfaces for inspection and removal of components. Ladder, handrail, platform and toe board shall also be provided to facilitate cleaning, maintenance and inspection. A water tap shall be fitted at the pipework for the collection of water samples for testing the water quality. The location of the water tap shall be at a representative sampling point, preferably where the warm cooling water enters the cooling tower, and not adjacent to the make-up water inlet or the chemical dosing point(s).

(i)

(j)

4.2.2

Operation and Maintenance Precautions

4.2.2.1 Water Treatment (a) A comprehensive water treatment programme shall be adopted to continuously or intermittently filter and treat the water with corrosion inhibitors, surfactants, and anti-fouling chemicals, or other proven physical methods. The water treatment programme shall aim at controlling the fouling of the cooling tower system due to silt, scale and microbial growth in order to maintain efficient heat transfer at metal surfaces, ensure free flow of water throughout the system, and control the proliferation of bacteria. The selection of water treatment systems (physical or chemical) for eliminating and controlling general biological growth shall be based on the following criteria: (i) The water treatment system or the water treatment chemicals shall preferably be proprietary products manufactured by a manufacturer to an international or national standard, and have proven record when used or dosed in accordance with the manufacturers recommendations in respect of frequency, dose strength, preparation, etc. The water treatment system or the water treatment chemicals shall be chemically and physically compatible with the cooling water. The water treatment chemicals shall be compatible and non-corrosive to piping materials. The water treatment chemicals shall be safe and easy to use. The water treatment chemicals and their end-products shall be environmentally friendly and have no mammalian toxicity. They shall be chemically and
-9-

(b)

(ii)

(iii) (iv) (v)

biologically degradable. They shall not cause any hazards or adverse impacts on the environment through drainage and meet all relevant requirements and regulations of the Environmental Protection Department. (vi) The water treatment chemicals shall be compatible with each other, and shall remain effective under a wide range of temperature changes, varying flow velocities, pH, conductivity, total dissolved solids and suspended matters commonly found in water circuit of a cooling tower system. The chemicals shall be capable of penetrating foam, sludge, slime and scale.

(c)

Water treatment chemicals should be added to turbulent zones within the water system to assist in rapid dilution and mixing. Also, if there are possible interactions between the treatment chemicals used, separate dosing points should be used to ensure dilution of one potentially reactive chemical prior to adding a second chemical. The method of dosing shall either be: (i) Automatic continuous drip feed or metered dosing with dosing rate and concentration control. This dosing method is highly recommended. Manual slug dosing on regular basis (e.g. daily, twiceweekly, weekly, biweekly, etc.) Automatic metered dosing controlled by timers or make-up water flowmeter, etc.

(d)

(ii) (iii) (e)

The following water treatment strategies may also be considered: (i) To use two chemicals, each of which shall comply with the criteria aforementioned, alternatively at periodic intervals. To use a combination of two compatible chemicals to provide better control against a range of microorganisms. To carry out occasional slug dosing or intermittent shock dosing with a high level of chlorine.

(ii)

(iii) (f)

The water treatment work should be carried out under the direction of suitably qualified and experienced persons. Chemicals should be handled with care by personnel wearing appropriate protective clothing, including goggles, gloves, face-shield and chemical-proof apron to prevent contact with these agents. Personnel involved in the work procedures should be trained in safety procedures, including the use and maintenance of protective equipment. They
- 10 -

should wash and thoroughly dry hands before eating, drinking and smoking. 4.2.2.2 Bleed-off (a) Water in the cooling tower circuit evaporates during normal cooling tower operation, leaving the dissolved substances behind in the water circuit and thus increasing the total dissolved solids (TDS) in the cooling water. This increase in TDS will lead to metal corrosion, chemical sedimentation, as well as growth of those bacteria which depend on the dissolved solids as nutrients. To overcome these problems, some amount of cooling water should be bled off and replaced with make-up water, thus limiting the concentration of the total dissolved solids. Bleed-off can be achieved by continuously draining to waste with the flow rate controlled by a water conductivity meter, which is highly recommended, or by intermittent discharge. Intermittent discharge can be executed by a manually operated drain valve. In order to conserve water, the cycle of concentration in designing bleed-off system shall not be less than 6.

(b)

(c)

(d)

4.2.2.3 Routine Cleaning and Disinfection (a) Cooling towers shall be cleaned, desludged and disinfected regularly. The frequency of cleaning should be based on tower cleanliness and the particular site environment. As a guide, the frequency of cleaning should be half-yearly. Less frequent cleaning intervals, but not exceeding yearly, is acceptable if the relevant performance is good. If not, more frequent cleaning may be required. Cleaning, desludging and disinfection should also be carried out if the cooling tower has been: (i) (ii) (iii) (iv) contaminated during construction, inorganic or organic matters. or by dusts,

(b)

shut down for a prolonged time, say more than 4 months. mechanically altered or disrupted in a manner which may lead to contamination. infected or may have been infected by an adjacent cooling tower which has been confirmed as a source of LD case or outbreak.

(c)

Cleaning, desludging and disinfection shall be carried out as follows:

- 11 -

(i)

To chlorinate the water and circulate for four hours, maintaining a minimum level of free residual chlorine at 5 ppm through the entire cooling tower water circuit. To drain the entire water circuit and the make-up tank. To manually clean the tower, sump, fill, eliminator, make-up tank and the water circuit system. Accessible areas of the towers and the fill pack shall be adequately washed. Cleaning methods which create excessive spray such as high pressure water jetting shall be avoided as far as possible. Staff involved in water jetting shall be adequately trained, wear suitable respiratory protective equipment such as a cartridge respirator containing a particulate filter of appropriate efficiency. They should wash and thoroughly dry hands before eating, drinking and smoking. To refill with water, rechlorinate and recirculate for at least six hours, maintaining a minimum level of free residual chlorine at 5 ppm. To drain and flush the system. To refill with water and dose with the appropriate startup level of treatment chemicals.

(ii) (iii)

(iv)

(v) (vi)

(vii) To re-commission the system. 4.2.2.4 Important Points for Collecting Water Samples for Bacterial Tests (a) Water samples shall be collected from the water sampling point of the cooling tower system and away from the chemical dosing point, water inlet and bleed-off position. Sampling tap and hose, if provided, shall be run with cooling water for at least 30 seconds prior to sampling. When a sampling point is not available, water shall be collected from the cooling tower basin, or from where water falls from the fill into the basin.

(b)

4.3

Design, Operation and Maintenance Precautions of Other Components in Air-conditioning Systems 4.3.1 Condensate Drain Trays of Air Handling Unit / Fan Coil Unit (AHU / FCU) Design, operation and maintenance precautions shall include the following: (a) (b) Drain valves shall be provided at the lowest points of the drain pipework to facilitate flushing. Adequate sloping at AHU / FCU condensate collection pan shall be provided and the drain pipe shall be connected at
- 12 -

the lowest position of the drip tray to avoid accumulation of water (Figure 5). (c) (d) Condensate drain trays for AHU/FCU shall be properly connected to the building drainage pipework. An air break and a U-trap shall also be provided at the condensate drain pipework before it is connected to the building drainage pipework to prevent backflow of drain from other AHU/FCU (Figure 6). Drain trays shall be regularly inspected, cleaned and disinfected. Horizontal drain pipes shall be regularly inspected for possible clogging.

(e) (f) 4.3.2

Air Duct and Air Filters Design, operation and maintenance precautions shall include the following: (a) (b) Appropriate air duct cleaning points/assess panels shall be provided to facilitate inspection and cleaning. Air duct servicing access points or panels shall be provided at air duct at intervals of around 3 metres between centres in accessible positions. Access points or panels shall also be provided at positions such as around duct bends, tees, branches, duct heaters/reheaters, air mixing boxes, variable air volume (VAV) boxes, duct humidifiers, in-line booster fans, dampers, silencers, etc. to facilitate cleaning and inspection. Air duct servicing access panels shall preferably be of size not less than 250 mm x 250 mm. They shall not cause dripping or condensation at their surfaces even at the worst condition under the prevailing weather in Hong Kong. In this connection, adequate thermal insulation shall be provided between the cooling air flowing in the air duct and the metalwork of the servicing access panels against the hot and humid surrounding air around the access panels. In particular all metalwork forming a bridge through the insulation from the hot surrounding air to the cooled metal parts shall be avoided or properly insulated and complete with an overall vapour barrier. Air filters in air conditioning system shall be regularly inspected, cleaned or replaced to minimize the collection of dust and micro-organisms, so as to ensure good indoor air quality and to prevent the spread of bacteria causing infectious diseases.

(c)

(d)

- 13 -

4.3.3

Humidifiers Design, operation and maintenance precautions shall include the following: (a) (b) Steam humidifier shall be the first choice to be used for humidification. Water spray type humidifier and humidifier that operates on the principle of evaporation of cold water will generate fine mists and would become an infectious source of LD if water contains Legionellae. Such humidifiers shall be avoided in new installations, and shall be replaced if used in existing installations. Recirculating water spray humidifiers shall preferably be equipped with sidestream ultraviolet radiation for recirculating water. Recirculating water spray humidifiers shall be cleaned frequently. The water reservoir shall be drained each day and the system shall be disinfected at least once every six months. If the humidifier is shut down for over a month, it shall be disinfected before being brought into use again.

(c)

(d)

4.3.4

Air Washers Design, operation and maintenance precautions shall include the following: (a) Because of utilizing high pressure nozzles for producing small water droplets for air cleaning, the air washer shall be designed and operated below or above the temperature range suitable for proliferation of Legionellae. Dead end piping and any area in the water distribution system where water may become stagnant shall be avoided. Water filters and air filters for the system shall be regularly cleaned or replaced. Appropriate disinfectant device, such as photochemical ozone generator or ultraviolet radiation device, shall be used to control microbiological growth in water. The complete air washer system shall be cleaned not less than once a month.

(b) (c) (d)

(e) 4.4

Hot Water Supply Systems1 4.4.1 Centralized hot water supply systems usually operate at 35C to 50C. These temperatures are ideal for the growth of Legionellae.

For the parts of the system storing cold water (e.g. inlet water to the hot water system) or connected to the cold water supply system, please refer to Section 4.5. - 14 -

4.4.1.1 (a)

Design Precautions The hot water storage device of the system (e.g. direct or indirect heated calorifier, storage vessel, etc.) shall be designed to operate at 60C or above to effectively kill the bacteria and the water temperature in all the distribution pipework before reaching the thermostatic mixing valve or the tap outlet (for systems without mixing valve) shall be at least 50C. However, in places where persons with decreased self-care ability may use hot water (such as paediatric, geriatric and psychiatric wards of hospitals elderly homes, Residential Care Homes for Persons with Disabilities, etc.), the hot water supply temperature at outlets shall not exceed 43C to prevent accidental scalding. The water supply system and the size of the hot water storage device shall be so designed that the water within the device shall have reached 60C for at least 5 minutes prior to being discharged to the distribution system under normal loading conditions. Drain outlets shall be provided at the lowest points of hot water storage devices for flushing away settled sludge. The system shall be easy to drain and clean. In order to overcome the problem of stratification and stagnation of water in hot water storage devices and pipework, circulation pumps shall be provided where necessary (Figure 7). The junction where cold and hot water mixes before reaching the outlet (e.g. at the thermostatic mixing valve) shall be installed as near to the tap outlets as possible. Thermostatic mixing valves shall be used for mixing hot and cold water automatically to provide water at a preset temperature (Figure 8). Typically such thermostatic mixing valves shall comply with the following:(i) The mixed water at the outlet of the tap shall be within +2C of the preset outlet temperature while the hot water supply temperature changes from 50C to 65C. The outlet temperature, if adjustable, shall be resettable only with the aid of tools or else the mechanism for adjusting the temperature shall be concealed and inaccessible to the users. The valve shall be fail-safe such that in case the cold water supply fails, the valve shall automatically shut off the water supply within 4 seconds once the outlet water temperature is 10C above the preset temperature.

(b)

(c)

(d)

(e)

(f)

(ii)

(iii)

- 15 -

(iv)

The valve shall be of durable design and be able to react quickly to hot and cold water temperature changes, as well as fluctuations in supply water pressure and back pressure from the final hot water outlets. The valve shall be installed as near to the tap outlets as possible and the manufacturer's recommendations regarding the maximum number of tap outlets to be supplied by each thermostatic valve shall be strictly followed.

(v)

(g)

Dead legs and stagnant corners in the hot water pipework shall be avoided. The number and length of spur-fed hot water tap outlets shall be minimized. The use of natural rubber, porous and organic matters (e.g. leathers) as parts of the pipework (e.g. as materials for washers) shall be avoided since these materials provide nutrients and a favourable environment for the growth of micro-organisms. Materials such as neoprene and suitable synthetic materials which do not support microbial growth shall be used instead. Hot water storage devices shall be well insulated to prevent loss of heat down to a temperature (i.e. below 60C) at which Legionellae may survive. Short circuiting of the cold make-up water through the hot water storage devices should not be possible and the system shall be designed to ensure that water is adequately heated to a temperature at 60 C or above prior to leaving the storage devices. Tap diffusers shall not be installed in high risk areas, such as hospitals. Mixing valves shall be installed as close to the water outlets as possible, and shower fittings shall be detachable so that they can be regularly cleaned and disinfected. All new piping systems and associated hot water storage devices, including existing systems undergoing major extensions or alterations subsequently, shall be flushed clean to remove rust, sludge and sediment and disinfected upon commissioning. Where a system is not brought into use immediately after commissioning, it shall also be disinfected before bringing into use unless it has been flushed at regular intervals of up to 30 days.

(h)

(i)

(j)

(k)

(l)

(m) New piping system and hot water storage devices are recommended to follow Water Supplies Department (WSD)'s current guidelines on cleaning and disinfection. Details of WSD's guidelines are available at the following:

- 16 -

http://www.wsd.gov.hk/en/pldc1/index.html (WSDs guide for fresh water mains of inside services) http://www.wsd.gov.hk/en/pldc2/index.html (WSDs guide for fresh water storage tanks) 4.4.1.2 (a) Operation and Maintenance Precautions Hot water storage devices shall be operated at 60C or above and the temperature before reaching the thermostatic mixing valve or at the tap outlet (for systems without mixing valve) shall be maintained at least at 50C in all areas except those specified in 4.4.1.1 (a) above. Hot water storage devices shall be regularly cleaned and drained to avoid contamination, sludge, slime, algae, fungi, rust, scale, dust, dirt and other foreign materials. The frequency of cleaning shall depend on the accumulation rate of sediments, which is primarily dependent on the quality of the inlet water. Under normal circumstances, the cleaning frequency shall be at least once per year. The following modifications/improvements shall be carried out as necessary: (i) (ii) (iii) To remove redundant pipework that may lead to stagnant water; To retrofit existing hot water storage devices so as to provide drains at the lowest point of the devices; To provide secondary pumped circulation where necessary to reduce temperature stratification within the hot water storage devices (Figure 7); and To provide purge valves at the pipe ends of all unavoidable spurs or stagnant points in the pipework for draining/purging the dead ends for a minimum period of one minute at least on a weekly basis.

(b)

(c)

(iv)

(d)

Hot water outlets which are infrequently used or are connected to stagnant water supply pipework shall be flushed at full flow for a minimum period of one minute at least on a weekly basis and before use. It is important that this procedure is carried out with minimum production of aerosols, e.g. additional piping may be used to purge contaminated water to drain. When thermostatic mixing valves are used, the following maintenance practices are recommended: (i) To check the outlet water temperature with a thermometer monthly or at least quarterly to detect any shift in the outlet temperature from the required setting;
- 17 -

(e)

(ii)

To carry out comprehensive maintenance involving inspection, dismantling for cleaning, replacing faulty parts and other parts as recommended by the manufacturer yearly. In areas with poor water quality, more regular servicing may be required; and To perform fail-safe test on each valve after comprehensive servicing by shutting down the cold water supply to the valve. Water flow from the valve shall cease in accordance with 4.4.1.1 (f)(iii).

(iii)

4.4.2 Localized Water Heater for Hot Water Supply Hot water may be supplied by the installation of a localized water heater, which may be of instantaneous type or storage type, and mixed with cold water supply through a mixing valve for supply to water outlets. The following preventive measures shall be observed: (a) Dead legs and stagnant corners in the hot water pipework shall be avoided. Length of hot water pipe shall be minimized. (b) The mixing valve shall be installed as close to water outlets as possible. (c) Water taps and shower heads connecting to water heaters if not frequently used shall be flushed at full flow for a minimum period of one minute at least on a weekly basis and before use. It is important that this procedure is carried out with minimum production of aerosols, e.g. additional piping may be used to purge contaminated water to drain. (d) For storage type localized water heater, hot/warm water inside the storage tank shall be heated to 60C or above before use. 4.5 Cold Water Supply Systems Legionellae can also exist in the cold water supply systems when there are increased temperatures, appropriate nutrients and stagnated water in the systems. 4.5.1 Design Precautions The following preventive measures on the design of cold water supply systems shall also be observed for prevention of LD: (a) Fresh water storage tanks shall be fitted with a tight-fitting lid, and an appropriately sized drain valve and associated pipework to facilitate flushing, cleaning and decontamination. Overflow pipes and air vents shall be fitted with a mesh to exclude vermin, dusts and other extraneous materials. Fresh water storage tanks shall be installed at a shady location and insulated, if necessary, to ensure that the bulk of water stored does not rise to temperatures where Legionellae will proliferate. Sufficient space, access,
- 18 -

(b)

cleaning and drainage facilities shall be available to permit easy inspection and maintenance. (c) The use of natural rubber, porous and organic matters (e.g. leathers) as parts of the pipework (e.g. as materials for washers) shall be avoided since these materials provide nutrients and a favourable environment for the growth of micro-organisms. Materials such as neoprene and suitable synthetic materials which do not support microbial growth shall be used instead. Dead legs and stagnant corners in the cold water pipework shall be avoided. The number and length of spurs of the piping shall be minimized. All new piping systems and associated fresh water storage tanks, including existing systems undergoing major extensions or alterations subsequently, shall be flushed clean to remove rust, sludge and sediment and disinfected upon commissioning. Where a system is not brought into use immediately after commissioning, it shall also be disinfected before bringing into use unless it has been flushed at regular intervals of up to 30 days. New piping system and fresh water storage tanks are recommended to follow WSD's current guidelines on cleaning and disinfection. Details of WSD's guidelines are available at the following: http://www.wsd.gov.hk/en/pldc1/index.html (WSDs guide for fresh water mains of inside services) http://www.wsd.gov.hk/en/pldc2/index.html (WSDs guide for fresh water storage tanks) 4.5.2 Operation and Maintenance Precautions The following preventive measures on the operation and maintenance of cold water supply systems shall also be observed for prevention of LD: (a) Fresh water storage tanks shall be drained and cleaned regularly to avoid contamination, sludge, slime, algae, fungi, rust, scale, dust, dirt and other foreign materials. The tanks are recommended to follow WSD's current guidelines on cleaning and disinfection. The frequency of cleaning of fresh water storage tanks shall be on a quarterly basis, or more frequent depending on the level of corrosion, sludge and sediment experienced. Details of WSD's guidelines are available at the following: http://www.wsd.gov.hk/en/pldc2/index.html (WSDs guide for fresh water storage tanks)

(d)

(e)

(f)

- 19 -

(b) (c)

Any corroded covers of fresh water storage tanks shall be replaced to remove possible nutrients for microbial growth. Cold water outlets which are infrequently used or are connected to stagnant water supply pipework shall be flushed at full flow for a minimum period of one minute at least on a weekly basis and before use. Redundant pipework that may lead to stagnant water shall be removed. Purge valves shall be provided at the pipe ends of all unavoidable spurs or stagnant points in the pipework for draining/purging the dead ends for a minimum period of one minute at least on a weekly basis.

(d) (e)

4.6

Architectural Fountains In man-made water fountains (including indoor decorative fountains and those installed in the indoor environment, such as shopping centres for visual excitement), water is either sprayed in the air to form different features or splashed on the rocks to form cascades and returns to the man-made pool. A system that is operated intermittently may have greater chance to be detected with Legionellae in the water. 4.6.1 Design Precautions (a) (b) Pipe runs shall be as short as practicable to avoid dead legs and stagnant water in the pipework. Drain valves shall be provided and situated at the lowest levels of the basin and the piping to facilitate flushing, cleaning and disinfection. Filters or strainers shall be installed to remove sediments, dirt and debris in water. A water treatment system, such as physical methods, dosing of biocides and other chemicals, shall be provided to control the microbial growth, scale formation and corrosion in the system, as well as to disinfect the circulating water. Adequate access for pipework, pumps and filters shall be provided for maintenance.

(c) (d)

(e) 4.6.2

Operation and Maintenance Precautions (a) (b) The installation shall be regularly and visually inspected for general cleanliness. The installation, including filters and strainers, shall be regularly cleaned or replaced to reduce the accumulation of dirt, organic matter and other debris.

- 20 -

(c) (d) 4.7

A small volume of pool water shall be drained regularly and replenished with fresh water. The water treatment programme to control microbial fouling shall be regularly reviewed for monitoring its effectiveness.

Spa Pools (Whirlpools) 4.7.1 General (a) Spa pools (whirlpools) utilize treated warm water at approximately 35C to 40C, mixing with air and flowing through water jets to produce turbulence and create aerosols. The aerosol produced is likely to be inhaled by the spa users. A schematic diagram of a typical spa pool system is shown in Figure 9. Spa pools are drained, cleaned or refilled regularly. There are whirlpool baths for personal use in commercial or residential premises, which are designed for one or two users and to be filled and emptied after each use.

(b)

4.7.2

Design Precautions (a) The pipework surface area shall be smooth to minimize colonization by biofilm bacteria. The use of flexible corrugated plastic pipes shall be avoided because the surface area in the valleys between the ridges of the corrugations is difficult to clean. The pipework shall be designed to minimise the length of pipe runs, the surface area and the number of pipe fittings. Dead legs of pipework, which cause stagnant water, shall be avoided to prevent microbial growth. Provision shall be made in the design to facilitate ease of access to all pipework for maintenance, draining, cleaning and disinfection. The system shall be designed to have water continuously circulated, filtered, chemically and/or physically treated and heated. Chemicals added to the spa pool water as a solution shall normally be added by dosing pumps, which can be adjusted to vary the volume of the chemicals dosed per stroke and the number of strokes per hour.

(b)

(c)

(d)

(e)

4.7.3

Operation and Maintenance Precautions (a) The spa pool water shall be continuously recirculated, filtered and disinfected, and with pH control to minimize the proliferation of micro-organisms. It is recommended to

- 21 -

maintain a pH value of 7.2 to 7.8 disinfectants. (b)

for chlorinating

When chlorinating disinfectants are used, a free chlorine residual of 3 to 5 ppm shall be maintained in the pool water3. Other biocides of effective concentration can also be used. The spa pool system shall be checked daily before opening the spa pool, periodically throughout the day and at the end of the day after closing the spa pool for water clarity, condition of water filters, condition of automatic chemical dosing equipment, pool equipment cleanliness, residual disinfectant concentration, etc. Monthly, quarterly and annual programmes for checking and cleaning all equipment of the spa pool shall be drawn. The spa pool system shall be drained and cleaned, normally once a week. Excessive use of pools can lead to accumulation of soluble matter in the water. Any body fats deposited on the sides of the pool shall also be removed. The system shall be refilled with clean water at intervals. If the spa pool is equipped with jets, they shall be removed, inspected and cleaned at least once a month.

(c)

(d) (e)

(f)

[Note: Separately, on general hygiene of public spa pools, operators may find it useful to refer to the Guidelines on Management of Commercial Spa Pools (2008) published by the Centre for Health Protection of the Department of Health. Please note that the Guidelines are for reference on the general hygiene and prevention of spread of recreational water illnesses in public spa pools. The Guidelines are not intended for prevention of Legionnaires' disease.] 4.7.4 Whirlpool Baths Whirlpool bath water is normally untreated and is drained after each session. It is recommended to disinfect the baths at least daily for commercial use or weekly for residential use by water with 20 ppm of chlorine for at least 2.5 hours4 . 4.8 Design, Operation and Maintenance Precautions of Other Water-using Apparatus 4.8.1 Dental equipment, misting devices for fruit and vegetable display cabinets in retail outlets, swimming pools, vehicle washers, emergency showers and eye wash sprays and respiratory therapy equipment are known water-using apparatus that have been suspected or confirmed in association with LD.

Ref.: s.8.4.1, page 132, Legionella and the Prevention of Legionellosis, WHO, 2007 Ref.: para. 2.4.2, Management of SPA Pools: Controlling the Risk of Infection, Health Prevention Agency, UK, 2006. 4 Ref.: section 2.6, Management of SPA Pools: Controlling the Risk of Infection, Health Prevention Agency, UK, 2006
3

- 22 -

4.8.2

The pipework of the apparatus listed in 4.8.1 shall be cleaned and disinfected regularly. The water in use shall be treated chemically or physically to control bacterial growth, scale formation and to remove silt, dirt, sludge, etc. Sterile water shall be used to operate the respiratory devices and also be used for rinsing and cleaning these devices.

4.8.3

5. Collection of Water Samples from Water Using Apparatus for Testing Legionella, Heterotrophic Colony Count (HCC), and Other Water Quality Parameters 5.1 Regular collection of water samples from water using apparatus for testing Legionella, HCC and other water quality parameters (such as total dissolved solids, suspended solids, conductivity, pH, total alkalinity, calcium hardness, inhibitors concentration, biocide concentration and residual chlorine) are important to monitor and validate the effectiveness of the water treatment programme in order to prevent the proliferation of Legionella in the system. The frequency of collection of water samples from cooling towers for testing Legionella, HCC, other water quality parameters, the testing methods, the target ranges, and the associated actions required when their testing results were found falling outside the predetermined target ranges should be referred to the Code of Practice for Water-cooled Air Conditioning Systems, Part 2 Operation and Maintenance of Cooling Towers ([4] in References Paragraph 9 of this Code). The collection of water samples from water using apparatus, other than cooling towers, for testing Legionella, HCC and other water quality parameters should also be carried out regularly according to the WSP already developed. To monitor all control measures, to validate effectiveness of the WSP, and to implement the required actions when the testing results outside the target ranges are important to prevent the proliferation of Legionella in the system. The testing methods or procedures for Legionella and HCC shall comply with the latest version of internationally recognised standards, such as: Legionella AS/NZS 3896 BS 6068-4.12 ISO 11731 Heterotrophic Colony Count AS 4276.3.1 BS 6068-4.5 BS EN ISO 6222 APHA 9215B

5.2

5.3

5.4

5.5

The methods for collecting water samples and preservation and handling of water samples for testing Legionella and HCC shall comply with relevant internationally recognised standards, such as AS 2031, BS 7592, BS EN ISO 5667-3, or BS 6068-6.3. The laboratory which carries out the above tests shall be accredited by the Hong Kong Laboratory Accreditation Scheme (HOKLAS) or any equivalent accreditation authority.
- 23 -

5.6

6. Control Measures during Outbreak of Legionnaires Disease The authority concerned may impose more stringent control measures to all water-using apparatus being suspected to be the potential sources during the outbreak of LD. 7. Design, Operation and Maintenance Records 7.1 A formal design, operation and maintenance record for the system with accurate and adequate information shall be kept and be made available for inspections if demanded by Government appointed officials. The record shall include, but not limited to: (a) the name, contact phone and address of the person and/or company who is responsible for design, operation and maintenance of the system. a description of the system such as location, make, model, capacity and year of manufacture/installation as well as details on the correct and safe operation. a schematic layout plan of the plant or system. a programme for routine water treatment, cleaning, desludging and disinfection of the system. details of maintenance such as: (i) (ii) (iii) (iv) (v) (f) 7.3 date and result of visual inspection; date of cleaning, desludging and disinfection; date of water treatment with details on the treatment carried out; maintenance work and date executed; method of bleed-off and details of the automatic bleed-off controls, if any.

7.2

(b)

(c) (d) (e)

Each activity listed in (i) to (v) shall be authenticated by the signature of the person who has carried out the task.

Record books shall be kept for at least 24 calendar months. The name, contact phone and address of the person or company who is holding the record book shall be indicated by a durable label attached to or painted on the system.

- 24 -

8. Handling Garden Soils, Composts and Potting Mixes 8.1 Garden soils, composts and potting mixes can be harmful to human health if people handling them do not take precautions. Soil surveys in Australia and Japan found that the soil samples were positive for Legionellae. Infections with one species, Legionella longbeachae, have been associated with gardening and use of potting soil in Australia, Japan and United states. The likely routes of transmission of L. longbeachae are from contaminated hands to mouth and by breathing in aerosol and dust from contaminated materials. However, there is no known effective way of preventing proliferation and multiplication of L. longbeachae in garden soils, composts and potting mixes. To help prevent infection, the following precautions shall be taken when handling such materials: (a) (b) (c) (d) (e) (f) 9. References [1] [2] [3] [4] Legionella and the Prevention of Legionellosis, World Health Organisation (WHO), 2007 Occupational Safety & Health Administration (OSHA) Technical Manual, Chapter 7, Department of Labour, USA Guidelines for the Control of Legionnaires Disease, Department of Human Services, Victoria, Australia, 1999 Code of Practice for Water-cooled Air Conditioning Systems Part 1 to Part 3, Electrical and Mechanical Services Department, Hong Kong Special Administrative Region, China, 2006 Code of Practice for the Control of Legionnaires Disease, New South Wales Department of Health, Australia, 2004 Code of Practice for the Control of Legionella Bacteria in Cooling Towers, Institute of Environmental Epidemiology, Ministry of Environment, Singapore, 2001. Read the warning on bagged garden soils, composts and potting mixes. Wear gloves and a face mask. Carefully dampen contents in the bag before opening it fully. Avoid breathing garden soils, composts and potting mix dust. Wash hands immediately after using garden soils, composts and potting mixes. Dispose of gloves and face mask carefully.

8.2

8.3

[5] [6]

- 25 -

[7] [8] [9]

Approved Code of Practice and Guidance The Control of Legionella Bacteria in Water Systems, Health and Safety Executive, UK, 2004 TM13:2002 Minimising the Risk of Legionnaires Disease, CIBSE, UK, 2002 ASHRAE Guideline 12-2000 Minimizing the Risk of Legionellosis Associated with Building Water System, American Society of Heating, Refrigeration and Air Conditioning Engineers, USA, 2000 Government of South Australia. Enjoy gardening without the risk of Legionella. http://www.dh.sa.gov.au/pehs/PDF-files/enjoy-gardening.pdf Management of SPA Pools: Controlling the Risk of Infection, Health Prevention Agency, UK, 2006 National Guidelines for the Control of Legionellosis in Ireland, 2009, Health Protection Surveillance Centre, Ireland, 2009 BS 6700:2006+A1:2009 Design, installation, testing and maintenance of services supplying water for domestic use within buildings and their curtilages Specification, The British Standards Institution, UK, 2009

[10]

[11] [12] [13]

- 26 -

Annex 1

A1

Annex 2 OCCUPATIONAL SAFETY AND HEALTH ORDINANCE NOTIFICATION OF OCCPATIONAL DISEASES

A2

FIGURE 1 Relationship between Proliferation of Legionella and Temperature of Water Systems when in Use and when Other Bacterial Growth Factors are Present

A3

FIGURE 2 Transmission of Legionnaires Disease

A4

FIGURE 3A Organisation of The Prevention of Legionnaires Disease Committee


Development Bureau Policy Directives

Prevention of Legionnaires Disease Committee

Advisory & Executive Role

Publicity Sub-committee Advisory & Executive Role

EMSD Legionnaires Disease Working Team Executive Role

Technical Sub-Committee Advisory & Executive Role

Publicity Sub-committee Members 1. EMSD 2. DH 3. ISD Members Attending on as-and-when Required Basis 1. Members of Medical Profession 2. Members of Engineering Profession

Technical Sub-Committee Members 1. EMSD 2. DH 3. ArchSD Members Attending on as-and-when Required Basis 1. BD 2. FEHD 3. LD 4. WSD 5. Members of Medical Profession 6. Members of Engineering Profession

Note ArchSD BD DH EMSD FEHD ISD LD WSD

Architectural Services Department Buildings Department Department of Health Electrical and Mechanical Services Department Food and Environmental Hygiene Department Information Services Department Labour Department Water Supplies Department

A5

FIGURE 3B Composition of Prevention of Legionnaires Disease Committee and Terms of Reference


Composition of Prevention of Legionnaires Disease Committee
Terms of Appointment 3 years Chairman : Vice-chairman : Members : A renowned medical professional (#) An Assistant Director of Electrical & Mechanical Services Department Non-official Members (#): A nominee from the Faculty of Medicine, the Chinese University of Hong Kong A nominee from the Li Ka Shing Faculty of Medicine, the University of Hong Kong
A nominee from the Hong Kong Federation of Electrical & Mechanical Contractors

A nominee from the Hong Kong Institution of Engineers

Official Members : A representative of the Secretary for Development A representative of the Director of Architectural Services A representative of the Director of Buildings Two representatives of the Director of Health A representative of the Director of Water Supplies Secretary : Membership List A Senior Professional of Electrical & Mechanical Services Department http://www.emsd.gov.hk/emsd/eng/pps/oa_ld_sab.shtml http://www.emsd.gov.hk/emsd/chi/pps/oa_ld_sab.shtml

# appointed on an ad personum basis

Terms of Reference
To advise the Government from the public health, microbiology and engineering services perspectives on: (a) (b) the minimization of the risk of Legionnaires' disease; and the promotion of good practices to the building owners and associated practitioners to prevent the outbreak of Legionnaires' disease. () ()
A6

FIGURE 4A Longitudinal Section of a Typical Cooling Tower

A7

FIGURE 4B Schematic Diagram of a Cooling Tower System

A8

FIGURE 5 Air Handling Unit / Fan Coil Unit (AHU / FCU) Drain Tray /

A9

FIGURE 6 Air Break and U-trap (Water Seal) at AHU/FCU Condensate Drain Pipework / U

A 10

FIGURE 7 Pumped Circulation in Calorifier to Reduce or Eliminate Temperature Stratification

A 11

FIGURE 8 Thermostatic Mixing Valve

A 12

FIGURE 9 Schematic Diagram of a Typical Spa System

A 13

FIGURE 10 Overview of the Key Steps in Developing a Water Safety Plan


Assemble the team Assemble the team to prepare the water safety plan System Assessment Document and describe the system Document and describe the existing system Assess hazards and prioritise risks Undertake a hazard analysis and risk characterization to identify and understand how hazards can enter into the water supply

Assess the system Assess the existing proposed system including a description of the system and a potable water flow diagram

Identify control measures Identify the means by which risks may be controlled Monitoring Monitor control measures Define the limits of acceptable performance and how these are modified

Validate effectiveness of WSP Establish procedures to verify that the WSP is working effectively and will meet the predetermined targets (e.g. health-based targets)

Management and communication

Develop supporting programmes Provide a programme of support for staff and infrastructure (training, upgrade and improvement, research and development, etc)

Prepare management procedures Prepare management procedures (including corrective actions) for normal and incident conditions

Establish documentation and communication procedures Establish documentation of the WSP and procedures for communicating with other parties