Aircraft Go Bag
Aircraft Go Bag
Aircraft Go Bag
BREAK - 15 MINUTES
BREAK – 15 MINUTES
8. ADJOURNMENT
1.
(B) For the Duration: Until award is made, the ONLY allowed government
person that can be contacted is the Contracting Officer.
Aircraft Wireless
Aircrew Survival Intercom System
Egress Knife Holster
Helmet Hear-Through
System
HGU-56/P Helmet
System Body Armor
Microclimate Cooling System
?
Go-Bag w/integrated
Hydration System Portable Helicopter
Oxygen Delivery
System
Microclimate Cooling
100% Small Business Set Aside – 51% of the work must be performed by the small business or
small business lead
Firm Fixed Price Range quantities – alternate ranges, if beneficial to your business model and
the government, may be offered – make sure you are responsive to the government’s ranges
first, then make the alternate offer in Section B and the Attachment 003 Pricing Sheets
(Volume II).
A Pre-Award Survey, conducted by AMCOM and DCMA personnel, may be required. This can
delay award for 30-60 days
First Articles will be required. FAT is NOT to be confused with the demo models submitted
with your proposal – it is an post award milestone. This means that authorization to begin
production and acquire the material necessary for production will not be given until there is
successful FAT. To do otherwise is at the contractor’s own risk. First billings and payments can
be delayed many months.
Hydration Carrier
M-4 Magazine
Go Bag DTL-10836-2 Gear Insert
Pouches (QTY 2)
DTL-10836-1 (as required by DTL-10836-12
P/N 1005945-1
Configuration)
No GOVT drawings
Built IAW AVNS-DTL-10836
• Cargo Tie-Down
• Provide price for any unique items that bidder’s design may include
beyond items listed in CLIN 1008.
• Gear Carrier
– Go Bag filled with ALSE Mandatory
– Go Bag filled with mission-specific
gear
– 2 Magazine pouches with 4 M-4
magazines
• Tie-down Assembly
– Double Loop Strap, 1005978-3
– Shackle Strap, 1005979-1
• Anchorage
– Aircraft Cargo Rings
• Gear Carrier
– Go Bag filled with ALSE Mandatory
– Go Bag filled with mission-specific gear
– Magazine pouches
– Can accommodate RFI Modular Sleep
System
• Tie-Down Assembly
– Cargo Tie-Down Strap 1005980-1
• Anchorage
– Shackle on seat bar
– Choice of lower attachment point include
10K ring on floor or seat belt attachment
ring
– Alternate location is between floor cargo
rings, 36 inches apart
• Tie-down Assembly
– Double Loop Strap, 1005978-3
– Shackle Strap, 1005979-1
• Tie-down Assembly
– Double Loop Strap, 1005978-3
– Shackle Strap, 1005979-1
• Anchorage
– New brackets provided by Air Warrior
– CONSIDERATIONS:
- GOVT control of Detail Specification AVNS-DTL-10836,
Interface Control Drawings (ICDs), and M-4 Magazine Pouch
TDP
Scope of Work
• Meetings & Reviews:
– Start of Work
– Bi-weekly telecon assess progress toward
production and delivery
– Program Review once per year at contractor
facilities assess program accomplishments
• Minutes required for Start of Work and
Program Reviews
W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01
Production
• Pilot Line Validation – Government team
visits manufacturing facility for each
product
– Assessing readiness for production that
tooling is in place
– Review Work Instructions
– Review of Process Control & documentation
– Review of receiving and inspection
– Supplier Control
W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01
– Shipping
Quality Management System
• Established, documented, implemented,
and maintained quality management
system
– Quality policy and objectives
– Quality manual
– Controlled procedures and records
– Management committed to quality objectives
– Competence, Training and awareness
W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01
Quality Management System
• Consistency of processes with the quality management system
• First Article Test (FAT) required on the Go Bag, Hydration Carrier, Gear Insert,
M-4 Pouch, Double Loop Strap, Shackle Strap, and Cargo Tie-Down Strap prior
to approval to go into production.
• Plan must be submitted and approved by the Government.
• FAT will be performed by the contractor. The Government may choose to witness all or
part of the FAT and review any of the build and FAT documentation.
• Report must be submitted and approved by the Government.
• Conformance Inspection (or Lot Acceptance) Test required during production.
• Plan must be submitted and approved by the Government.
• Required to meet material certifications, in-process inspection, visual inspection,
dimensional inspection, and performance requirements IAW PD1006008,
PD1006006, AVNS-DTL-10836, and drawings supplied with the RFP.
• Tensile Tests required for Double Loop Strap and Cargo Tie-Down Strap IAW PD.
• Proof Load required for Go Bag and Hydration carrier handles, tie-down channels, and
interface to sleep system IAW Specification.
5. In your proposals:
Section B Hardware
W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01
5.
H-6 Ordering – Note C – 30 Day Rule for economy of pricing, when possible.
H-8 Proposal Validity – 120 days after proposal, or final proposal, submission.
Follow the instructions – it takes two proposal volumes (tabbed and labeled) that
contain what is required in Section L and your demo models, submitted within the
time frame required to be in the competition.
The Technical Volume, or Volume I – supporting raw test data referencing the
specification or purchase description paragraph. Product Demonstration Models
(bid samples) are discussed at length beginning on Section L, page 100.
PRICE TAB: The Section B and Attachment 003 Pricing data for all 5 years,
ADM MATTERS TAB: Signed pages one from the RFP and any amendments,
completed certifications and representations from the solicitation’s Section K
if not current in the ORCA database
PAST PERFORMANCE TAB: Provide the information described in Section L
for 3 relevant contracts you have performed in the last 3 years.
Ratings are discussed in Section M as Go/No Go and or Acceptable. This is the lowest
level of the Best Value Evaluation continuum and results in a “technically acceptable,
lowest price” determination.
PDM Narrative
Discuss compliance/non-compliance of PDMs with
requirements documents. Narrative shall be in
Tabular Format per the specification for Go Bag
and Gear Insert and per the drawing for the Cargo
Tie Down Strap.
Describe features that are not self-evident.
Test Data
Specific requirements must be verified by Offeror
and results presented in proposal
Volume, Weight, and Loads for Go Bag
Tensile Test for Cargo Tie- Down Strap
Schedule
Webbing (SKRAM Go-Bag A-A-55301, Type III 3 YDS Plastic Bag 1-49
and Hydration
Carrier) 50 - 100
UNIT
P
R
Required I
Pricing C
CLIN DESCRIPTION Range E
Go Bag with
First
Article
0101 AA Test DTL-10836-1 500-1500
1501-5000
5001-8500
8501-10000
10,001+
Total CLIN Price (for evaluation purposes only)
Go Bag without
First
Article
0101 AB Test DTL-10836-1 500-1500
1501-5000
5001-8500
8501-10000
10,001+
Total CLIN Price (for evaluation purposes only)