BOQ For Civil Works (Annexure-I)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ANNEXURE-I

TB-349-607-003 PKG I Rev. 00 BILL OF QUANTITIES


Name of Project Name of Work : 765/400kV Substation at Raichur. : Yard & Building Civil Works Unit Rate (Rs) Amount (Rs)

Item Description of Item Unit Quantity No. A WORKS BASED ON EMPLOYER/BHEL SUPPLIED DRAWINGS 1 Excavation in all types of soil and rock including Cu Mtr 46000 backfilling disposal etc. for all leads and lifts 2 Providing and laying of Plain Cement Concrete (PCC) Cu Mtr 4000 (1:4:8) 3 Providing and laying of Plain Cement Concrete (PCC) Cu Mtr 700 (1:2:4) 4 Providing and laying of Reinforced Cement Concrete Cu Mtr 11600 (M25) including pre cast, shuttering, Grouting of pockets & underpinning but excluding steel reinforcement 5 Providing and laying Plain Cement Concrete 1:5:10 (1 Cu Mtr cement : 5 sand : 10 brick aggregate) 6 Steel Reinforcement MT 11000 850 160

0.00

0.00

0.00

7 Misc. Structural steel including rails, embedments, edge MT protection angles, gratings etc. but excluding the reinforcement steel and steel for lattice and pipe structures. 8 Stone spreading in switchyard excluding PCC Sq. m. 9 Concrete road as per drawing except reinforecement & concrete (a) Road 3.75m wide (switchyard road) Sq.m (b) Road 5.5 m wide (switchyard road) (c) Road 3.75m wide (Township road) (d) Road 5.5 m wide (Township road) 10.0 Chain Link fencing (a) Chain Link fencing excluding concrete 11.0 Supplying & laying hume pipe of grade (NP-3) excluding concrete and reinforcement (a) 250 mm dia (b) 300 mm dia (c) 450 mm dia (d) 600 mm dia 12.0 Supplying and dewatering pumps (a) 5 HP (b) 0.5 HP 13.0 Drain including culverts but excluding concrete & reinforcement steel (a) Section A-A (b) Section B-B (c) Section C-C (d) Section D-D 14.0 Gate excluding concrete RM RM RM RM Nos Nos RM Sq.m Sq.m Sq.m

148800

0.00

15000 4000 200 800

0.00

0.00

0.00 520

100 300 50 60 2 2

0.00 0.00 0.00

0.00 0.00

RM RM RM RM Nos

5000 1000 1000 500 3

0.00

0.00 0.00

1.3

ANNEXURE-I

TB-349-607-003 PKG I Rev. 00


Item Description of Item No. 15.0 Supplying and laying of external water supply system (a) 80 mm dia pipe (b) 50 mm dia pipe (c) 40 mm dia pipe (d) 25 mm dia pipe 16.0 External sewerage system (a) NB 150mm 17 All civil works as per drawing and specifcation but excluding excavation, PCC, RCC, reinforcement and external finishing of the following buildings (a) Control Room Building (b) FFPH Building (c) Water Tank for fire fighting (d) Transit camp (e) Car Parking shed (i) for 8 cars (f) Switchyard Panel Room (i) 765 kV (ii) 400 kV 18 External finish as per specification for following buildings: (a) Control Room Building (b) FFPH Building (c) Transit camp (d) Car Parking shed (i) for 8 cars (f) Switchyard Panel Room (i) 765 kV (ii) 400 kV 19 Septic Tank and soak pit complete as per the drawing (a) Transit camp (b) Control Room Building 20 Rain water harvesting 21 Fixing (all dia & length) foundation bolts in position with help of proper templates including nuts and washers all complete as per drawings & directions of Engr-in-Charge. (See Note No:3) Total Amount (Rs.) Note: 1 The rates shall be deemed to be inclusive of cost against all activities covered in specification & drawings against that item. 2 PGCIL drawings provided may not be totally exhaustive. Any minor details required as per site requirement or for the sake of system completion shall be issued by PGCIL during construction stage. The rates shall be deemed to be inclusive of such contingencies. 3 Foundation bolts set shall be supplied by BHEL free of cost at site. Fixing shall be paid under Item No:21 1.4 LS LS LS MT 1 1 1 115 Nos Nos 3 4 0.00 No 1 No No No 1 1 1 0.00 0.00 0.00 Nos Nos 3 4 0.00 0.00 No 1 No No No No 1 1 1 1 0.00 0.00 RM 200 0.00 Unit Quantity Unit Rate (Rs) Amount (Rs)

RM RM RM RM

100 200 100 100

0.00

0.00

0.00

You might also like