Pradhan Mantri Krishi Sinchayee Yojana

 Major objectives of PMKSY

• To achieve end to end water use system and convergence of investments in


irrigation at field level,
• Expand cultivable area under assured irrigation,
• Improve on-farm water use efficiency to reduce wastage of water
• Enhance the adoption of precision-irrigation and other water saving
technologies.
Major Components of PMKSY
AIBP • To focus on faster completion of ongoing Major and Medium Irrigation including National
by MoWR Projects.

• Creation of new water sources through Minor Irrigation (both surface and ground
Har Khet ko Pani water)
by MoWR • Repair, restoration and renovation of water bodies; strengthening carrying capacity of
traditional water sources, construction rain water harvesting structures

Per drop more crop • Promoting efficient water conveyance and precision water application devices like
DAC&FW, MoA drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);

Watershed Management • Water harvesting structures such as check dams, nala bund, farm ponds, tanks etc.
by Dept. of Land Resources, MoRD • Capacity building, entry point activities, ridge area treatment, drainage line treatment
LAND USE PATTERN IN ARUNACHAL PRADESH
(Lakh Hectare)

80%

4% 11% 5%
Sl Classification Area %
(Lakh Ha)
1 Area under 3.53 4%
cultivation
2 Area under forest 67.23 80%

3 Area under waste 3.77 5%


land Area under cultivation Area under forest
4 Area under other 9.21 11%
uses Area under waste land Area under other uses
Total 83.75 100%
CLASSIFICATION IN TERMS OF IRRIGABLE LAND
(Lakh Hectare)

70%

21% 8%

Sl Classification of Land Area (Lakh Ha) % of geographical area


1 Area fit for Wet Rice Cultivation 7.00 8%
(WRC)
2 Area fit for Micro Irrigation 18.00 22%
3 Area under Forest and other uses 58.74 70%
Total 83.74 100%
Irrigable
AREA AVAILABLELand Resource
FOR CONVENTIONAL of Arunachal
IRRIGATION Pradesh
SYSTEM IN ARUNACHAL PRADESH

Very Good category area 4,27,000 Ha

Good category area 2,71,300 Ha

Moderate category area 1,60,500 Ha


5% 3%
2%
Other area 75,15,600 Ha

90%
ACTIONS INITIATED UNDER PMKSY

1. District Irrigation Plans (DIP) have been prepared


for all districts.
2. State Irrigation Plan (SIP) formulated for Rs 17,700
Crore with an average annual projection of about
Rs 3500 Crore for 5 years w.e.f. 2016 to 2021.
3. Annual Action Plans of about 30% of SIP’s annual
projected amount are regularly submitted to GoI
with the approval of the SLSC.
Year Wise: STRATEGIC ACTION PLAN

Percentage of Allocation
2020-21 15%
Year Amount (Rs. Lakhs)

2016-17 206581.64 2019-20 25%

2017-18 223796.78 2018-19 35%


2018-19 602529.79
2017-18 13%
2019-20 430378.42
2020-21 258227.05 2016-17 12%

Total 1721513.68 0% 5% 10% 15% 20% 25% 30% 35% 40%

Percentage of Allocation
POTENTIAL
• LAND RESOURCES : 25 Lakh Hectare (30% of geographical area)
• WATER RESOURCES : Plenty (per capita availability of over 2 Lakh cum)

AREA UNDER FOREST (59 Lakh Ha)


70%
AREA SUITABLE FOR MICRO
IRRIGATION (18 Lakh Ha)

21% 8%
AREA SUITABLE FOR CONVENTIONAL
IRRIGATION (7 Lakh Ha)
WATER BUDGET FOR 2022
MCM
25000
20074
20000
Water demand for 20074
15000
Irrigation during 2022 MCM
Water availability out of 3697 10000
existing water MCM
infrastructure 5000 3697

Water gap during 2022 16377 0


MCM Water availability Water demand
(Surface + Ground) (Surface + Ground)
GAPS
DESCRIPTION STATUS
1. CROPPED AREA INCLUDING 3.52 Lakh Ha (14% of cultivable area)
HORTICULTURAL CROPS Gap: 86%

2. IRRIGATED AREA 0.55 Lakh Ha (16% of cropped area)


Gap: 84% of cropped area

3. PRESENT RICE PRODUCTION DEFICIT 25%

4. PRESENT WATER GAP OUT OF


EXISTING WATER INFRASTRUCTURE (2017) 12500 MCM

5. PROJECTED WATER GAP IN 2022 16400 MCM


Details of achievement under PMKSY Arunachal Pradesh
(Rs in Lakh)
Grant Utilized 2019-20 Unspent Balance
Central Grant
Sl No. Programme component Released Central State Farmer’s Prior to 2019- Total
2019-20 Total 2019-20
Share Share Share 20

1 Per Drop More Crop


(Agriculture)
a) Micro irrigation 540.00 540.00 60.00 466.50* 600.00 Nil Nil Nil

b) Other interventions 360.00 360.00 40.00 -- 400.00 Nil Nil Nil

Nil Nil Nil


Total 900.00 900.00 100.00 1000.00

2 Per Drop More Crop


(Horticulture)
a) Micro Irrigation 540.00 Yet 60.00 Yet Nil 540.00 416.66 956.66
to to
b) Other Interventions 360.00 utilize 40.00 utilize Nil 360.00 277.77 637.77

Total 900 100.00 900.00 694.44 1594.43

*Awaited report from district


Details of achievement under PMKSY Arunachal Pradesh
(Rs in Lakh)
Grant Utilized 2019-20 Unspent Balance

Central
Grant
Sl
Programme component Released
No. Central State Farmer’s Prior to
2019-20 Total 2019-20 Total
(Lakh) Share Share Sshare 2019-20

Integrated Watershed
1 Management Programme 5503.04 1040.00 135.92*
5571.00 0.00 67.96 0.00 67.96
(RD)

Total 5571.00 0.00 67.96 0.00 67.96 5503.04 1040.00 135.92

* Central Grant amount of Rs 6475.08 Lakh has been utilized in 1st qrtr of 2020-21
Details of achievements under PMKSY Arunachal Pradesh
(Rs in Lakh)

Grant Utilized 2019-20 Unspent Balance (CS)

Central
Sl Grant
N Programme component Released State
o. 2019-20 Central Prior to
Share Total 2019-20 Total
(Lakh) Share 2019-20

HKKP (WRD)
2411.42
a) 604 Surface MI 3974.04 1562.62 173.62 1736.24 Nil 2411.42
1
3882.60
b) 473 Ground Water MI 4861.00 978.40 -- 978.40 Nil 3882.60

Total 8835.04 2541.02 173.62 2714.64 6294.02 Nil 6294.02


Summary of achievements under PMKSY Arunachal Pradesh (Rs in Lakh)
Programme component Central Grant Utilized 2019-20 Unspent Balance (Central Share)
Grant
Sl Released
No 2019-20 Central State Farmer’s Prior to
. Total 2019-20 Total
(Lakh) Share Share Share 2019-20

Per Drop More Crop


(Agriculture +
Horticulture)
a) Micro irrigation 1080.00 540.00 120.00 -- 660.00 540.00 416.66 956.66
1
b) Other interventions
720.00 360.00 80.00 -- 440.00 360.00 277.77 637.77

Sub-Total 1800.00 900.00 200.00 -- 1100.00 900.00 694.43 1594.43

HKKP (WRD) 8835.04 2541.02 173.62 NA 2714.64 6294.02 Nil 6294.02


2

IWMP (RD) 5571.00 0.00 67.96 0.00 67.96 5503.04 1040.00 135.92
3

Grand Total 16206.04 3441.02 441.58 3882.6 12697.06 1734.43 8024.37


Proposal under PMKSY Arunachal Pradesh for the year 2020-21
Sl Programme component Proposal for 2020-21
No.
Financial (Lakh) Physical (in ha/units)

1 Per Crop More Drop(Agriculture)


a) Micro Irrigation 1985.96 6620
b) Other interventions 1355.61 1680
c) Human Resource Development 30.50 --
Total 3372.06 13658
2 Per Crop More Drop (Horticulture)
a) Micro Irrigation 1800.00 5885
b) Other interventions 1200.00 703 Nos.
Total 3000.00 6588
3 IWMP (RD) 14541.08 96941
IWMP (RWD) 5000.00 33000
Total 19541.08 96941
4 HKKP (WRD)
a) 604 Surface Minor Irrigation 27777.78 11111
b) 473 Ground Water Minor Irrigation 1812.22 725
c) 130 Surface Minor Irrigation 1139.91 456
d) 519 Ground Water Minor Irrigation 4994.44 1998
Total 35724.35 14290
Grand Total 61637.49
ISSUES

1)The process of release of Central Grants to the implementing


agencies need to be expedited within 15 days as prescribed in
the release orders of GoI. This would facilitate accrual of more
Central Grants as subsequent installment in the same financial
year.

2) The unspent Central Grant of Rs 8024.37 Lakh lying in the


State exchequer is to be released to the implementing
agencies at the earliest.
Thank You