Toyota Production System

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 50

THE TOYOTA

PRODUCTION SYSTEM
WHY STUDY TOYOTA?
 Total annual profit on March 2003 was $8.23 billion-
larger than combined earnings of GM, Chrysler and
Ford. Profit margin is 8.3 times higher than industry
average.
 Toyota shares rose 24% from their 2002 values. Market
capitalization was $105 billion as of 2003 – higher than
total of Big 3.
 In 2002, Lexus outsold BMW, Cadillac and Mercedes
Benz in the US for the third year in a row.
 In 2003, sold more vehicles than Ford and Chevrolet.
 The company has made profit every year over the last 25
years and has approximately $20-$30 billion in cash on a
consistent basis. 2
MORE LAURELS
 In 2003, Toyota recalled 79% fewer vehicles in US than
Ford and 92% fewer than Chrysler.
 According to Consumer Reports, 15 out of the 38 most
reliable models from any manufacturer over the last
seven year came from Toyota/Lexus.
 According to J.D. Powers ranking for initial quality and
long-term durability, Lexus was #1 most reliable car in
2003 followed by Porsche, BMW and Honda.
 Not a single Toyota car is on the dreaded “vehicles to
avoid” list published by Consumer Reports. About 50%
of the GMs and more than 50% of the Chryslers are to be
avoided.

3
HOW DID IT HAPPEN?
 Incredible consistency comes from operational
excellence.
 The operational excellence is based on the quality
improvement tools and methods developed by Toyota
(under the TPS): such as JIT, kaizen, one-piece-flow,
jidoka, and heijunka!
 These technique triggered a “lean revolution” in the
manufacturing sector.
 Of course, Toyota system is much deeper and in fact is at
a philosophical level!
 Toyota Way – 14 principles which constitute this
philosophy.
4
THE TOYOTA WAY
“4P” model
 Philosophy (Long-term thinking)

 Process (eliminate waste) Kaizen

 People and partners (Respect, Challenge them to achieve


more, Grow leaders)
 Problem-solving (Continuous improvement and
learning) Genchi genbutsu

5
WHAT IS “TOYOTA” LEAN?
End result of applying the TPS to all areas of business. A
five-step process:
 Defining customer value
 Defining value stream
 Making it “flow”
 “Pulling” from the customer and back
 Striving for excellence.

Taiichi Ohno (founder of TPS) “All we are doing is looking


at the time line from the moment the customer gives us
an order to the point when we collect the cash. And we
are reducing that time line by removing the non-value-
added waste.” 6
TRUTHS FROM THE TPS
PHILOSOPHY
 Often the best thing you can do is to idle a machine stop
producing parts.
 Often it is best to selectively add and substitute overhead
for direct labor.
 It may not be a top priority to keep your workers busy
making parts as fast as possible.
 It is best to selectively use information technology and
often better to use manual process even when automation
is available and would seem to justify its cost in reducing
your headcount.

“Identify activities that add value to raw material, and get


rid of everything else.”
7
TRUTHS FROM THE TPS
PHILOSOPHY
 Start with the customer, by asking yourself– “what value
are we adding from the customer’s perspective?”
 The only thing that adds value in any type of process, is
the physical or information transformation of that
product, service or activity into something the customer
wants.

 Comparison of people and material in your shop – don’t


make them wait. Because it transforms into your internal
and external customer becoming impatient.
8
STORY FROM THE BEGINNING
 Starts with Sakichi Toyoda who grew up in
predominantly farming community in late 1800s.
Weaving was a major industry promoted by the Japanese
government.
 By 1894, Sakichi began to make manual looms that were
cheaper but of better quality (more features and less
failures).
 Started working on his own to develop power-driven
loom. This approach of learning and doing yourself
became integral part of TPS (genchi genbutsu).
 Among his inventions was a special mechanism to
automatically stop a loom whenever a thread broke –
building in quality as you produce the material (jidoka or 9
poka-yoke).
TOYOTA STORY
 The “mistake-proof” loom became Toyoda’s most
popular model and in 1929, his son Kichiro, negotiated
the sale of patent rights to Platt Brothers of England for
£100,000.
 In 1930, these funds were used to start building the
Toyota Motor Corp.
 Kichiro’s contribution to the Toyota philosophy – JIT.

 What is JIT? – marriage between the Ford’s idea of


assembly line and US supermarket system of replacing
products on the shelves just in time as customer
purchased them.
10
 Not much later WWII started.
TOYOTA STORY
 Post-WWII, rampant inflation meant getting paid by
customers was very difficult. Cash-flow problems lead to
pay cuts.
 When situation worsened, 1600 workers were asked to
“retire voluntarily.”
 The resultant work stoppages and public demonstrations
by workers led to resignation of Kichiro.
 Eiji Toyoda took over as president.
 Eiji’s main contribution – leadership towards
development of the TPS.
 Eiji hired Taiichi Ohno as the plant manager and asked
him to improve Toyota’s manufacturing process so that it
11
equals the productivity of Ford.
TOYOTA STORY
 Taiichi Ohno benchmarked the competition by visiting
Ford and studied Henry Ford’s “book.”
 Impressed with Ford’s philosophy of eliminating waste.
Ford itself didn’t seem to practice it.
 Took idea of reducing inventory by implementing “pull”
system from the US supermarkets.
 “Pull” system was implemented by Kanban cards.

 Ohno also took ideas from Deming when he was


lecturing in Japan about quality and productivity.

12
TOYOTA STORY
 Deming told the Japanese industry about meeting and
exceeding customer satisfaction. Also broadened the
definition of customer to include both internal as well as
external customers.
 “The next process is the customer” became the most
significant expression for JIT, because in a pull system it
means the proceeding process must always do what the
subsequent process says. Otherwise JIT won’t work.
 Deming’s PDCA cycle led to Kaizen.

13
FORD VS. TOYOTA
 Ford’s mass production system was designed to make
huge quantities of limited number of models.
 Toyota needed a system to make low volumes of
different models using the same assembly line.
 Ford had cash and a large market.

 Toyota needed to turn cash around quickly.

 Toyota didn’t have the resources for huge volumes of


inventory and economies of scale afforded by Ford’s
mass production system.

14
FORD VS. TOYOTA
 The mass production system was focused on short-term
costs.
 “Make bigger machines and through economies of scale
drive down cost.”
 “Automate to replace people if it can be justified in
terms of cost.”
 Then the business world got the quality religion from
Deming, Juran, Ishikawa and other quality gurus.
 Combining these Toyota developed the TPS which
focused on speed in the supply chain:
“Shortening lead time by eliminating waste in each step of
a process leads to best quality and lowest cost, while
15
improving safety and morale.”
FORD VS. TOYOTA
 Toyota system demonstrates that focusing on quality
actually reduced cost more than focusing only on cost.

16
14 TOYOTA-WAY PRINCIPLES
Section I – Long-term philosophy
 Principle 1: Base your management decisions on a long-
term philosophy, even at the expense of short-term
financial goals.

Section II – The Right processes will produce the right


results
 Principle 2: Create continuous process flow to bring
problem to the surface.
 Principle 3: Use “pull” system to avoid overproduction.
 Principle 4: Level out the workload (heijunka). (work
like a tortoise not the hare.)
 Principle 5: Build the culture of stopping to fix problems
17
to get quality right the first time.
14 TOYOTA-WAY PRINCIPLES
 Principle 6: Standardize tasks are the foundation for
continuous improvement and employee empowerment.
 Principle 7: Use visual control so no problems are
hidden.
 Principle 8: Use only reliable, thoroughly tested
technology that serves your people and processes.

Section III – Add value to the organization by developing


your people and partners
 Principle 9: Grow leaders who thoroughly understand the
work, live the philosophy, and teach it to others. 18
14 TOYOTA-WAY PRINCIPLES
 Principle 10: Develop exceptional people and teams who
follow your company’s philosophy.
 Principle 11: Respect your extended network of partners
and suppliers by challenging them and helping them
improve.

Section IV – Continuously solving root problem drives


organizational learning
 Principle 12: Go and see for yourself to thoroughly
understand the situation (genchi genbutsu).
 Principle 13: Make decisions slowly by consensus,
thoroughly considering all options, implement decisions
19
rapidly.
14 TOYOTA-WAY PRINCIPLES
 Principle 14: Become a learning organization through
relentless reflection (hensei) and continuous
improvement (kaizen).

 So we see that the JIT, Lean, 5S etc. are just tools that
enable quality and productivity. TPS is much more than
that!

20
HOUSE OF TOYOTA

21
THE TPS HOUSE DIAGRAM
 Two main pillars:
1. JIT (the most visible and highly publicized
characteristics of TPS)
2. Jidoka (never letting a defect pass to the next station;
and freeing people from machines)

 Base: Heijunka – Leveling out production schedule for


both volume and variety. A leveled production is
necessary to keep the system stable and to allow for
minimum inventory. Big spikes in the production of
certain variety while excluding others will create part
shortages unless huge inventory is maintained.

22
THE TPS HOUSE DIAGRAM
 JIT means removing, as much as possible, the inventory
used to buffer operations against problem that may arise
in production.
 The ideal one-piece flow is to make one unit at the rate
of customer demand or takt (German for meter).
 Using smaller buffer means quality defects become
immediately visible.
 This will reinforce jidoka which can halt the production
(Andon).
 The production line restarts once workers resolve the
problem.
23
THE TPS HOUSE DIAGRAM
 Less inventory and the Andon forces urgency among the
workers.
 If the same problem happens repeatedly the management
realizes the critical situation and invests in Total
Productive Maintenance, where everyone learns how to
clean, inspect and maintain equipment.
 In traditional system, if the machine is down, the
urgency is missing because the maintenance department
is scheduled to fix it while production continues through
the depletion of inventory.

24
THE TPS HOUSE DIAGRAM
 People are the center of the house because only through
continuous improvement can the operation ever attain
the system stability.
 People must be trained to see waste and solve problem at
the root cause by repeatedly asking why the problem
really occurs.

25
ELIMINATING WASTE (MUDA)
 First question the TPS asks is “What does the customer
want from this process?” (both internal as well as
external customers). This defines value.
 Through the customer’s eyes, we can then observe the
process and separate the value-added steps from the non-
value added steps.
 This can be applied to any process – manufacturing, or a
service.

26
TYPES OF WASTE
 Overproduction: Producing items for which there are no
orders, which generates such wastes as overstaffing and
storage and transportation costs because of excess
inventory.

 Waiting: Workers having to stand around waiting for the


next processing step, tool, part etc. Or no work because
of stock-outs, lot processing delays, equipment
downtime, and capacity bottlenecks.

 Unnecessary transport: Carrying WIP long distances,


creating inefficient transport, or moving parts in and out
of storage facility.
27
TYPES OF WASTE
 Over-processing or incorrect processing: Taking
unneeded steps to process the parts. Inefficient
processing due to poor tools and product design, causing
unnecessary motion and producing defects. Waste
generated when providing higher-quality products than is
necessary.
 Excess inventory: Excess raw material, WIP or finished
goods causing longer lead times, obsolescence, damaged
goods. Extra inventory hides problems such as
production imbalances, late deliveries from suppliers,
defects, equipment downtime, and long set-ups.
 Unnecessary movements: Any wasted motion employees
have to perform during the course of their work, such as
looking for, reaching for, or stacking parts, tools etc.
Walking is a waste. 28
TYPES OF WASTE
 Defects: Production of defective parts or correction.
Repair or rework, scrap, replacement production, and
inspection mean wasteful handling, time and efforts.
 Unused employee creativity: Losing ideas, skills,
improvements, and learning opportunities by not
engaging or listening to your employees.

29
ELIMINATING WASTE
 First step in removing non-value added steps from a
process is to map the process. Map the value stream
following the actual path taken by the part in the plant.
 Walk the full path yourself (genchi genbutsu).
 One can draw the path on a layout and calculate the time
and distances traveled (spaghetti diagram).
 Traditional cost saving focuses on value-added items and
try to improve those.
 TPS focuses on the entire value stream to eliminate the
non-value adding items.

30
TRADITIONAL PROCESS
IMPROVEMENT VS. TPS
 Traditional approach focuses on identifying local
efficiencies. “Go to the equipment, the value-added
processes, and improve uptime, or make the cycle faster,
or replace the person with automated equipment.”
 In TPS, large number of non-value-added steps are
squeezed out.
 One way to achieve this is through cell formation
(cellular manufacturing), which should ideally result in
one-piece flow of products or services.

31
BENEFITS OF ONE-PIECE FLOW
 Builds in quality – Every operator is an inspector and
works to fix problems in station before passing them on.
If defects do get passed on, they are detected quickly and
problem can be immediately diagnosed and corrected.
 Creates flexibility – If shorter lead times, more
flexibility to respond and make what customer really
wants. Pushes for set-up time reduction.
 Creates higher productivity – Every easy to spot the busy
or idle station and easier to calculate the value-added
work.
 Frees up floor space – Because of inventory storage
reduction.
32
BENEFITS OF ONE-PIECE FLOW
 Improves safety – Smaller batches means simpler
transportation system and less accidents because of
forklifts.
 Improves morale – People do high percentage value-
added work and can see the results of their work faster.
 Reduces cost of inventory – Obvious!

33
“PULL” SYSTEM TO AVOID
OVERPRODUCTION
 Milk example – weekly batch or daily purchase?
 Next purchase triggered when you start using the only
bottle of milk you have.
 Not an example of zero-inventory, but still a pull system.
 Because of demand uncertainty and lead-times, in many
cases inventory is necessary to allow for smooth
production.
 Hence TPS follows the supermarket model or keeping a
small amount in stock. As soon as customers take
products away, they are replenished.
 Each demand instance triggers a part being pulled from
upstream.
 The triggering mechanism is called “Kanban” which
means cards, signboard or a poster. 34
KANBAN SYSTEM
 At Toyota, empty bin (a kanban) is send upstream after a
demand instance.
 It is a signal to refill it with a specific number of parts or
send back a card with detailed information about the part
location.
 Even today, one can see Kanban cards and bins moving
on the shop-floor.
 Instead of using sophisticated computer scheduling
techniques, this is a simple, effective and visual system
of managing and ensuring the product flow and JIT
production system.
35
KANBAN SYSTEM
 Gas tank example.
 Toyota philosophy about kanban:

“Kanban is an organized system of inventory buffers and


as per TPS, inventory is waste, whether it is in pull
system or push system. So kanban is something you
strive to get rid of.”
 Toyota uses kanban to force process improvements.

36
KANBAN SYSTEM
 Suppose we have four kanban cards for a particular
products. One each for four bins of products. TPS will
conduct studies in which one of the kanban cards (along
with the corresponding bin) is thrown away.
 Now, if the machine breaks down, the downstream
process will run out of parts 25% faster.
 The stress in the system will cause production
shutdowns, and will force teams to come up with process
improvements.

37
NOT JUST PULL
 Purely from the production perspective, it should be
noted that Toyota also uses push system where pull
simply cannot be implemented.
 Examples?
 In such cases, the emphasis in on lead-time reduction.
 Nowadays, because of Toyota experimenting e-kanban
cards, combination of push and pull system is used
whenever necessary.

38
LEVEL OUT THE WORKLOAD
(HEIJUNKA)
 Demand uncertainty may lead to bumpy production
schedule if one-piece-flow is followed literally.
 TPS realizes that strict build-to-order system will
again build-up inventory and increase waste (Muda).
 Hence TPS tries to even out the production by
consolidating orders. Three-pronged approach:
Elimination of –
1. Muda (non-value-added)
2. Muri (overburdening people or equipment)
3. Mura (unevenness)
 Toyota achieves the combination of JIT and heijunka
by following the principle of change-to-order (not 39
build-to-order) by delayed customization.
CULTURE OF STOPPING PRODUCTION
TO FIX PROBLEMS (JIDOKA)
 Traditional production view: “Do not shut down the
assembly line!” The managers are judged by their ability
to deliver the numbers.
 TPS view: “If you are not shutting down the assembly
plant, it means that you have no problems. All
manufacturing plants have problems. So you must be
hiding problems. Please take out inventory so that
problems surface. Then you will have to shut down the
assembly line and fix the problems.”
 If we continually follow this view, we can make even
better-quality products more efficiently.
40
JIDOKA
 Hence we need a method to detect defects when they occur
and automatically stop production so an employee can fix
the problem before the defect continues downstream.
 Jidoka is also referred to as autonomation – equipment
endowed with human intelligence to stop itself when it has
a problem.
 In-station quality is much more effective and less costly
than inspecting and repairing quality problem after the
fact.
 Lean manufacturing dramatically increases the importance
of building things right the first time.
 With very low levels of inventory, there is little buffer to
fall back on in case there is quality problem. 41
ANDON SYSTEM
 When the equipment shuts down because of a quality
problem, flags or light, usually with accompanying
music, signal that help is needed to solve the problem.
 This signaling system is called the andon system.

 At Toyota, the andon is called a “fixed-position line stop


system.”
 When a workstation in the assembly line signals a
problem, the production line is not stopped immediately.
 The manufacturing team has until the product moves to
the next workstation to respond and address the problem,
before the andon turns red and stops the assembly line.
42
ANDON SYSTEM

43
ANDON SYSTEM
 If the problem is small enough that can be solved in the
lead-time between two workstation, 100% quality is
achieved without stopping the line.
 If the problem is complex, the team leader can conclude
that the line should stop.
 In TPS, the workstation detects the defects by using
countermeasures and error-proofing (poka-yoke).
 Applications of andon system to service organizations
like call-center are obvious!

44
USE VISUAL CONTROLS
5S program
1. Sort (seiri) – sort through items and keep only what is
needed while disposing what is not.
2. Straighten (seiton) – “A place of everything and
everything in its place.”
3. Shine (seiso) – the cleaning process often acts as a
form of inspection that exposes abnormal and pre-
failure conditions that could hurt quality or cause
machine failure.
4. Standardize (seiketsu) – develop systems and
procedures to maintain and monitor first three S’s.
5. Sustain (shitsuke) – maintain a stabilized workplace is
45
an ongoing process of continuous improvement.
VISUAL MANAGEMENT
ANDON LAMP
 Red - line stoppage
 Yellow - call for help

 Green - normal
operation

46
USE VISUAL CONTROLS
 Like traffic signals – well-designed which don’t require
you to study them; their meaning is immediately clear.
Examples at Toyota:
 A shadow of a tool painted on the wall to indicate the
correct position of the tool.
 Outwardly pasted SOPs.
 Kanban cards.
 Andon signals.
 Office auditing system at Toyota.
 One-page reporting system.

47
48
5WHYS: FINDING THE ROOT CAUSE
OF A PROBLEM.
 5 Whys analysis as an effective problem-solving technique. It is also used in Six Sigma.
Example:

 Why is our client, Hinson Corp., unhappy? Because we did not deliver our services when we
said we would.

 Why were we unable to meet the agreed-upon timeline or schedule for delivery? The job
took much longer than we thought it would.

 Why did it take so much longer? Because we underestimated the complexity of the job.

 Why did we underestimate the complexity of the job? Because we made a quick estimate of
the time needed to complete it, and did not list the individual stages needed to complete the
project.

 Why didn't we do this? Because we were running behind on other projects. We clearly need
to review our time estimation and specification procedures. 49
Quality is free, but only to those who
are willing to pay heavily for it.
---Philip Crosby 1926 -2001,
American business philosopher and writer on quality

50

You might also like