Basics of OIl Refinery
Basics of OIl Refinery
Basics of OIl Refinery
IOCL
EPCM-1 EPCM-2 PMC-3/EPCM-3 EPCM-4 EPCM-7 PMC-5 PMC-8 PMC-9 PMC-6 PMC-10 PMC-11
FWEL UHDE JACOBS/TOYO TOYO DCPL TCIL PDIL FEDO SPAN EIL EIL
Basrah Light & Oman Export crude (50 wt% each) : light crude
Feed
Kuwait & Maya crude (60 : 40 wt%) : heavy crude
Turndown 50%
ATMOSPHERIC VACUUM UNIT (AVU) : UNIT NO. 010
ATMOSPHERIC VACUUM UNIT (AVU) : UNIT # 010
UNIT CONFIGURATION
C3 LPG to Storage
SR LPG TREATMENT UNIT : UNIT # 011
Licensor UOP
• SR LPG ex AVU
Feed
• VGO-HDT LPG
Turndown 50%
SR LPG TREATMENT UNIT : UNIT # 011
ATF/ KERO TREATMENT UNIT : UNIT # 12
NHT : prepare feed for CCRU with sulphur & nitrogen < 0.5 ppmw
NFU : split hydrotreated naphtha from NHT to Light Naphtha (HGU
feed) & Heavy Naphtha (CCR-P feed)
Objective
CCR-P : produce high octane gasoline & H2 (by-product) in presence
of catalyst
CCR-R : regenerate CCR-P catalyst
Produce ultra low sulphur diesel (10 ppmw max.) and cetane
Objective
improvement of diesel
Turndown 50%
DHDT
DOCUMENTATION
4. Safety plan
5. SOPs
PFD
P&ID
PLOT PLAN
LIST OF SYSTEMS
MARKED-UP SYSTEM
ON-GOING ACTIVITIES
Review of graphics
Training
Participation in FAT
Check that control valves and associated bypass valves have been installed as per
proper flow direction.
Witness motor trial run of rotary equipment (including all fans) in decoupled
condition; confirm for proper direction of rotation.
Ensure proper segregation of OWS and CRWS network and marking of manholes
Carry out/ witness flushing and blowing activities for pipelines including
associated offsite facilities and other UG systems.
Finalizing passivation of cooling water system, degreasing of amine circuit,
acid cleaning of lube oil circuits
Checking associated offsite storage facilities and line up to unit battery limit.
CPP BFW/ Start up fuel (HSD/FO) / 2 GTs & HRSG + 2 UBs/ 1STG/
Steam Network
BALANCE
VGOHDT/ INDMAX/ DCU/ 2nd ARU & SWS/ 2nd SRU/ Balance of
PROCESS
Power Plant (1GT + HRSG & 2 UBs)/ Alkylation/ Butamer/ SARU
UNITS