4th DAY (PLC+Automation) Update 4.2.18

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 46

AUTOMATION SYSTEM

Day Four SUMMIT POWER LIMITED 1


INSTRUMENTATION

Convert to Read by
Physical Quantity Measure/Detect
signal instrument
Sensor
Advantage of instrumentation?
Automation & Manual Control? In a process plant Exam.
Physical Quantity?
Automation are: Control, Protection &
Monitoring/measurement.
Instrumentation: Application of automation
Control system are? To achieve a desired output by a set of activities.
What is regulator.

Day Four SUMMIT POWER LIMITED 2


INSTRUMENTATION ADVANTAGE

•Increase Efficiency and Accuracy


•Save time

Physical Quantity:
Temperature
Pressure
Level
Light
Flow
Viscosity

Electrical Quantity
I, V, R…………..mA,mV,
Without effective communication…. Automation fail

Day Four SUMMIT POWER LIMITED 3


WOIS MONITOR Typical Automation for Wartsila Power Plant

Day Four SUMMIT POWER LIMITED 4


WOIS MONITOR Engine Automation System

Day Four SUMMIT POWER LIMITED 5


WOIS MONITOR Automation Overview

Day Four SUMMIT POWER LIMITED 6


PLC (Programmable Logic Controller)

Day Four SUMMIT POWER LIMITED 7


Analog and Digital

What is analog and Digital: Time dound


0 to 1, High-Low, True-False, Continuous
Communication……. Optical, satellite, EM, Radio
Analog Signal
Digital Signal
Analog Sensor
Digital Sensor
Temp sensor output: RTD type-resistance, Thermocouple type-mV which Called?
Pressure & Temperature transmitter: 4 to 20mA
Switch output: ????????

Day Four SUMMIT POWER LIMITED 8


Signal

Analog Signal: 0 to 20mA, 4 to 20mA, 0 to 10V


Digital Signal: ON/OFF, (0 or 24V or 12V DC)
Analog INPUT
Analog OUTPUT
Digital INPUT
Digital OUTPUT

Transmitter & Receiver which one?

Day Four SUMMIT POWER LIMITED 9


BLOCK DIAGRAM

Monitoring/me
INPUT CPU-Logic part Output
asuring device

Actuator/valve
Sensor

Transmitter-------------- sensor part


Receiver ---------------------- Actuator part
AI/DI
AO/DO
Actuator, human body control, regulator IN/OUT
Use block: temp sensor, pressure transmitter, IP converter,regulator,MC, S/W.
controller,Push-button,ammeter, voltmeter, temperature meter,solenoid

Day Four SUMMIT POWER LIMITED 10


LOGIC

Digital:::: see book details


Logical gate: Knowledge of digital?
Logical Block: Define a process output…….
Ladder logic & Functional block are…………….?
Logical gate output & Boolean Algebra
Decimal to binary converter
Hardwire: PLC,cable,programmable device.
Softwire:Includes the set of instruction or programs that direct hardwire.
Memory size: 1K=……….. Bits
Memory device: ROM,RAM, EPROM etc
Communication:
Eathernet,modbus,Profibus, RS-232,PC/PPI(special type cable for PLC
programming), fiber optic

Day Four SUMMIT POWER LIMITED 11


Motor On logic

1. Level OK/NOT
2. Delivery valve open/close
3. Magnetic contactor condition
Logic application
AND, OR, NOR gate output
Adder, subtractor, multiplex, demultiplex, timer
Logical block: Ladder logic, functional block is programming
language

Day Four SUMMIT POWER LIMITED 12


Programmable logic controller (PLC)

A programmable logic controller (PLC) or


programmable controller is a digital
computer used for automation of
electromechanical processes, such as
control of machinery on factory assembly
lines, amusement rides, or light fixtures.
PLCs are used in many industries and
machines.

PLCs are used in many industries and machines. Unlike general-purpose computers, the PLC is
designed for multiple inputs and output arrangements, extended temperature ranges,
immunity to electrical noise, and resistance to vibration and impact. Programs to control
machine operation are typically stored in battery-backed-up or non-volatile memory. A PLC is
an example of a hard real time system since output results must be produced in response to
input conditions within a bounded time, otherwise unintended operation will result.

Day Four SUMMIT POWER LIMITED 13


Programmable logic controller (PLC)

Simatic S7-300 CPU

• Two different types CPU 3xx and CPU 3xx-2DP


• 31x-2DP with integrated Profibus DP interface
• CPU type 315-2DP used for Wärtsilä standard
projects
• Hardware
• Communication
• Software
CPU Indication LED: RUN, Stop,5V,BF
PLC trouble shoot: RUN LED-Green, power supply
on/off.Stop LED-Flashing need memory reset.

Day Four SUMMIT POWER LIMITED 14


Programmable logic controller (PLC)

Simatic S7-300 power supply

• Power supply units for Siemens:


– PS305 2A
– PS307 5A
– PS307 10A
• Siemens PLC can be supplied directly
from 24 V DC-panel (normally used in in Wärtsilä projects)

Day Four SUMMIT POWER LIMITED 15


Programmable logic controller (PLC)

Simatic remote I/O module ET 200M

• Remote I/O rack is Profibus DP slave


• Used for auxiliary units and panels
• Same measurement modules as in main rack

Day Four SUMMIT POWER LIMITED 16


Programmable logic controller (PLC)
Back Plane

• DIN rail, made from Aluminium


• Dummy plate for connecting CPU and
measurement cards to panel wall

• Communication between cards


is made with Bus connectors

Day Four SUMMIT POWER LIMITED 17


Programmable logic controller (PLC) Analog Input module

• Same module for different measurement types: mA, V, R, PT-


100 and TC (N, E, J, K)
• PT-100 measurement use 2 channels/measurement
• 8-channel cards for Wärtsilä projects
• Red LEDs for group faults/errors
• Maximum cable length 200m
• Mechanical coding element for the wiring connector to
avoid connecting to wrong type of card

Day Four SUMMIT POWER LIMITED 18


Programmable logic controller (PLC) Analog Output module

• Same module for different signal types ±10V; 0 ... 10V;


±20mA ; 0 ... 20mA; 4 ... 20mA
• 4-channel cards for Wärtsilä projects
• Red LEDs for group faults/errors
• Maximum cable length 200m
• Mechanical coding element for the wiring connector to
avoid connecting to wrong type of card

Day Four SUMMIT POWER LIMITED 19


Programmable logic controller (PLC) Digital Input modules

• Input types: 24 VDC, 120 VAC and 120/230 VAC


• Inputs are optically isolated
• Green LEDs to indicate signal statuses at the inputs
• Maximum cable length:
– Unshielded 600m
– Shielded 1000m
• Mechanical coding element for the wiring connector to avoid
connecting to wrong type of card

Day Four SUMMIT POWER LIMITED 20


Programmable logic controller (PLC) Digital Output modules

• Output types: 24 VDC, 120 VAC and 120/230 VAC


• Green LEDs to indicate signal statuses at the outputs
• Mechanical coding element for the wiring connector to
avoid connecting to wrong type of card

Day Four SUMMIT POWER LIMITED 21


Programmable logic controller (PLC)

ETHERNET

Communication modules
• CP 343-1 TCP
– Ethernet communication
• CP 342-5
– Profibus DP communication
• CP 343-5
– Profibus FMS communication

Day Four SUMMIT POWER LIMITED 22


Analogue Input Connection Diagram

Day Four SUMMIT POWER LIMITED 23


Analogue Output Connection Diagram

Day Four SUMMIT POWER LIMITED 24


Digital Input Connection Diagram

Day Four SUMMIT POWER LIMITED 25


Digital Output Connection Diagram

Day Four SUMMIT POWER LIMITED 26


Operating Modes

Day Four SUMMIT POWER LIMITED 27


PID Area
A proportional–integral–derivative controller (PID controller) is a generic control loop feedback mechanism (controller)
widely used in industrial control systems – a PID is the most commonly used feedback controller. A PID controller calculates
an "error" value as the difference between a measured process variable and a desired setpoint. The controller attempts to
minimize the error by adjusting the process control inputs.

Day Four SUMMIT POWER LIMITED 28


PID (error value)

Set Value(u) Process value (y) Err value(e)


5 3 2
5 4 1
5 5 0 Execution
stop

Day Four SUMMIT POWER LIMITED 29


Operating Mode

Day Four SUMMIT POWER LIMITED 30


Power Conversion
Mechanical to electrical power
Where 2 and π are constants by nature and the n
(speed) we like to keep as constant as possible.
The goal off course is the stable grid frequency
(50 or 60 Hz) which leads to the stable engine speed
(rpm >>1/s). PN=120f
P = ωT
What is mechanical power
in the rotating engines?
ω=2πn
ω = angular speed, rad/s
P= ωT=2 π n*T
(T=F*l=PA*l)

Day Four SUMMIT POWER LIMITED 31


Pressure, Force, Torque
That formula from previous page leaves us only one adjustable
parameter to control the power of the rotating machine.
T = torque
Torque is the power with which the piston(s)
turns the crankshaft and so rotates the engine.
How to adjust the
mechanical power ?

Pressure, force and torque


F = pA , force is pressure multiplied by area
T = Fl , torque is force multiplied
by the length of the arm (stroke/2)
Area of the piston and the length of the
stroke is up to the design, pressure is the
only thing which we can adjust while running
the engine.
Torque can be adjusted by adjusting the pressure over the
piston (BMEP) and that’s adjusted by the amount of fuel and
the timing of combustion.
(Main gas valve duration/ignition or governor and actuator)

Day Four SUMMIT POWER LIMITED 32


Operation devices
1. WOIS: Its function?
2. Operation Desk: CFC, CFA, CRP panel
3. Main Control unit, Synchronizing control unit
4. Name of module on CFC panel:…………………….
5. Engine start/stop sequence.
6. Synchronize condition. Button on synchronoscope.

WOIS function:1.To view and interact with the performance of the entire plant through graphical
presentation of production & propulsion.
2. Provide an integrated view
3. Enable fault diagnostic. Trend analysis.

Operation: Start, loading, stop


Interface??

Day Four SUMMIT POWER LIMITED 33


Operating Mode

Type of Installation

Day Four SUMMIT POWER LIMITED 34


Operating Mode
What to control at Power Plant ?

Day Four SUMMIT POWER LIMITED 35


Operating Mode
Speed Droop Control

Day Four SUMMIT POWER LIMITED 36


Operating Mode
Speed Droop Control

Day Four SUMMIT POWER LIMITED 37


Operating Mode
Speed Droop Control

• Droop control is a universal load sharing mode and it can be used both for parallel operation in
an island system and for parallel operation with the utility.

Speed droop control in island mode operation


In island/speed droop controlled system, changes in active load will be shared (proportionally)
equally between parallel units.
4% droop means: → 0,04 * 50Hz = 2Hz → ±1Hz frequency deviation at 50Hz system.
Speed droop control in parallel with grid operation
• When operating parallel with grid, the grid determines the system frequency. A droop
controlled generating set can be operated parallel with the grid in base load principle.

Day Four SUMMIT POWER LIMITED 38


Operating Mode
True kW Control

Day Four SUMMIT POWER LIMITED 39


Operating Mode
True kW Control

• Base loading means that a unit is running at a constant load and its output will not
be affected by system changes.
• Base loading is used in parallel operation with the grid and it can be accomplished
by kW control.
• Only for base load against grid

• Eliminates grid fluctuations from the engine output


• Full output can be obtained
• Minimized thermal stress
• Improved stability
• Ramp control for kW reference (mA set point)

Day Four SUMMIT POWER LIMITED 40


Operating Mode
Speed Droop/ kW Control

» when in kW control the speed reference is


following, i.e. bumpless change over to droop
control
» parallel with utility always use kW control

Day Four SUMMIT POWER LIMITED 41


Operating Mode
Island operation mode

Day Four SUMMIT POWER LIMITED 42


Operating Mode
Isochronous speed control

Day Four SUMMIT POWER LIMITED 43


Operating Mode
DG-set control at base
load system

Day Four SUMMIT POWER LIMITED 44


Operating Mode
DG-set control at base
load system

Day Four SUMMIT POWER LIMITED 45


Operating Mode
Generator control methods

Island system Utility system


• On ships and power plants which are isolated • Base load stations
from other systems; mine sites and small islands • System voltage is determined by utility,
• System voltage is determined by generators generators usually cannot affect the
and their voltage control system voltage
• Generator reactive load varies depending on • Generator reactive load is proportional
system loading to engine load
• Goal: stable system voltage • Goal: stable power factors on generators
• Parameter: voltage • Parameter: power factor

Day Four SUMMIT POWER LIMITED 46