BTS Commissioning: Prepared & Presented By: Thushara Karunarathna
BTS Commissioning: Prepared & Presented By: Thushara Karunarathna
BTS Commissioning: Prepared & Presented By: Thushara Karunarathna
1. Introduction to GSM
2. BTS Commissioning
3. Hardware Settings
4. BTS from OMC Point
3 | Presentation Title | Month Year Copyright © XXXX Alcatel-Lucent. All rights reserved.
GSM Architecture
6 | Presentation Title | Month Year Copyright © XXXX Alcatel-Lucent. All rights reserved.
Group Task Sequence
Site
Hardware Tools
Basic kit
Trace mobile
Software Tools
Ensure that The protective earth is connected to the equipment earth terminal .
The electrical power to the equipment is disconnected from the site power panel
Check or set the switch positions. Check that breakers are in the power OFF position,
marked ’0’. If they are not, set them to the ’0’ position.
1. At the site power panel, check that the power supply line to the BTS is
disconnected.
2. Remove the rubber protective caps from the power supply terminals (on the right,
at the top of the connection area)
3. Check that nothing can provoke a short circuit between the 0 and 48 V
connectors.
4. At the site power panel, set up the power supply line, operate fuse holder 1
(e.g.: BS X-1 in which X is the BTS rack number).
5. Check with the multimeter that the 0V and -48V voltages are on the right
terminals
6. At the site power panel, disconnect the power supply line, operate the
fuseholder.
7. Replace the rubber protective caps on the power supply terminals (rack
top).
7. Replace the rubber protective caps on the power supply terminals (rack
top).
7. Enter the name of the folder in which you want to place the
BTS NEM installation files.
8. Click on [ Install ] to continue with the installation or click
on [ Cancel ] to abort the installation.
Copyright © XXXX Alcatel-Lucent. All rights reserved.
Prepare BTS NEM
2. Enter your user name in the ’User Name’ field in the "BTS NEM
Startup”window.
3. Enter your password in the ’User Password’ field in the "BTS NEM
Startup” window.
4. If you want to set up the interface, click on [ Interface Settings ] to
display the"BTS Interface settings" panel, as shown in the following figure.
This window contains general data specific to the selected BTS. All
information displayed is read-only. Select the tree navigation view to
modify the BTS settings or parameters.
2. Select the required master file, the CPF file and the CODA file
using the
folder icon button.
3. Click on [ OK ] to start the software download.
To change the logical site name from the "BTS Commissioning" window:
The "Logical Site Name" window is displayed, as shown in the following figure.
2. Select the logical site name, if it is already listed, or enter a new logical
site name.
corresponding to the Edit TMA Settings task.The "Modify TMA Settings" window
is displayed, as shown in the following figure.
If the same parameters must be added for all ports the information can be
entered in the fields in ’Clipboard TMA Data’ area, then select the ’Overwrite’
option for the concerned antenna ports and click on [ Copy Values ].
6. Click on [ OK ].
A confirmation window opens.
7. Click on [ OK ] to confirm the message.
4. Enter for power down timer ’0’ for all ACRI_BCB-xxx modules
9100/9110/9110-E TRE.
ANX Device:
UT_ANX**
Frequency: See Site Specific Information (Section 1.3.2) for allowed frequency.
Measuring Period: 10 s
1. Click on [ Start ].
3. Click on [ Stop ].
1. Choose the VSWR Threshold Alarm Definition for both fields (Port A and Port
B), if available:
VSWR1 <= 1.5 AND Fault on feeder or Inform the operator that
VSWR2 <= 1.2 antenna (when present). the VSWR is within a
critical range.
VSWR1 > 1.5 AND Fault on antenna or Report the high reading
VSWR2 <=1.2 feeder (when present). to the Site Manager.
2. Select all the ’Available Modules’ from the list on the left to enter them
in the ’Selected Modules’ list.
3. Click on [ >> ] or [ > ] for all the modules on the left (if any).
4. Click on [ OK ].
For Indoor BTS: Disconnect the loops between the transmit and receive terminal
blocks at the DDF side.
For Outdoor BTS:Check if the PCM cable (the link from the BSC) is connected on
the Abis connector on the COAR/OUTC board .Connect the SUMP cable (carrying
the Abis) link from the COAR/OUTC board to the ABIS connector on the SUM/SUMA
board.
2. Check the link. Check that there are no PCM alarms (wait a few seconds for
the connection
3. Check the OML state. On the SUM/SUMA board, check that the OML LED is
Name Description
Name Description
2. From the BTS NEM Online Mode menu, follow the menu path:
3. If this is the last TGTx of the sector, use the BTS NEM to disable BTS_TEL.
Enter a WTC = 3 minutes to ensure an orderly shutdown of the BTS. Wait three minutes
before continuing to the next step.If this is not the last TGTx of the sector, go directly to the
next step.
6. Disconnect all the cables from the front panel of the TRE, carefully noting their
positions for reconnection.
7. Loosen the quarter-turn Camloc fasteners on the front panel of the TRE.
The "Remove Hardware" window is displayed. Only modules in the state SOS, FOS, or OPR
are displayed.
12. Click on [ OK ].
The text pane on the bottom of the window displays: <module name> successfully
removed. In the SBL Module States window, the module is removed.
16. Tighten the M3 Torx screw on the front panel of the RIT in the subrack, if
loosen for RIT removal.
17. Re-connect all the cables from the front panel of the TRE, as noticed in step 6.
18. To inform the OMU of the HW Modification, from the Online Mode menu bar,
select:
If Twin TREs are equipped the "TWIN TRE Mode Configuration" window opens.
If the TGTx software is not available in the OMU, the OMU request the software from
the BSC and start the download. This may take several minutes.
20. The BTS Monitoring window opens with the following dialog box:
Wait for the Hardware and Alarm Audit at the OMC-R to finish or for or for HW-
RESYNCH message in BTS NEM alarms window. This may take several minutes.
24. In the "Remote Inventory" window double click on the line for the
replacement TRE.
information:
Network identity
27. In the "Modify Remote Inventory - TRE-xx" window click on[ OK ] to save
the changes.
28. Using the BTS NEM, check that there are no remaining alarms on the
Start HW Modification
Add HW
2. To supervise that the new modules are supported by the BSC, at BTS NEM in
the tree view select Hardware Modules.
Remove HW
To remove hardware:
displayed.
3. Use the [ >> ] or [ > ] keys to move the modules in the "To be removed
modules" window.
4. Click on [ OK ].
Remove Hardware... success. In the "Hardware Modules" window, the module state
is set to NEQ.
66 | Presentation Title | Month Year Copyright © XXXX Alcatel-Lucent. All rights reserved.
RNUSM VIEW
74 | Presentation Title | Month Year Copyright © XXXX Alcatel-Lucent. All rights reserved.