Rigging Fundamentals
DEFINITION OF
TERMS
Overhead lifting refers to an object
raised more than six feet above the
ground.
50% 50%
1. True
2. False
se
ue
l
Tr
Fa
Overhead Lifting
Process of lifting that
would elevate a freely
suspended load to such a
position that dropping a
load would present a
possibility of bodily injury
or property damage.
Working Load Limit (W.L.L.)
The MAXIMUM load
that shall be applied in
direct tension to
undamaged straight
length of a sling or
hoisting equipment
The Working Load Limit [WLL] is
____ of the rigging equipment.
33% 33% 33%
.
...
..
t..
b.
e
n
th
ha
th
n
rt
ha
t o
e
st
at
al
u
e
s
Le
Gr
Eq
Design Factor
A ratio of the breaking
strength to the working
load limit
Example: If a chain sling
has a breaking strength
of 28,400# and a W.L.L.
of 7,100#; it would have
a design factor of 4:1
Design Factor
Minimum
Component Design Factor
Nylon rope sling 5:1
Polyester rope sling 5:1
Polypropylene rope sling 5:1
Alloy steel chain sling 4:1
Wire rope sling 5:1
Metal mesh sling 5:1
Synthetic web sling 5:1
Synthetic round sling 5:1
Elongation
The ability of a piece of
load bearing material to
permanently increase in
length before it fails or
breaks
Expressed as a
percentage of increase
over its original length
Reach
The distance measured
from the top of the
master link to the bowl
of the load hook.
Sling Hitches
Vertical
Sling Hitches
Vertical
Choker
Sling Hitches
Vertical
Choker
Basket
Who Are These People?
Designated person
Competent person
Qualified person
OSHA Says
The term "designated"
personnel means
selected or assigned by
the employer or the
employer's
representative as being
qualified to perform
specific duties.
OSHA Says
Competent Person Qualified Person
29 CFR 1926.32(f) states: 29 CFR 1926.32(l) states:
"Competent person" means "Qualified" means one who,
one who is capable of by possession of a recognized
identifying existing and degree, certificate, or
predictable hazards in the professional standing, or who
surroundings or working by extensive knowledge,
conditions, which are training and experience, has
unsanitary, hazardous, or successfully demonstrated his
dangerous to employees, and ability to solve or resolve
who has authorization to take problems relating to the
prompt corrective measures to subject matter, the work, or
eliminate them. the project.
Unattended
A condition in which the
operator of a hoist is
NOT at, or within 26
feet of, the operating
control devices.
OSHA 1910.179(n)(3)(x).
HOIST
hoist (hoist) v. hoisted, hoisting, hoists
1. To raise or haul up with or as if with the help
of a mechanical apparatus.
2. To raise to one's mouth in order to drink:
hoist a few beers.
Regardless of The Load You Hoist
Or What You Hoist It With
The Objective is to Hoist It Safely.
HOISTSAFE
HOISTSAFE
H
O
I
S
T
S
A
F
E
HOISTSAFE
How H heavy is the load?
O
I
S
T
S
A
F
E
Determining Load Weight
Actual or calculated
weight of object or
materials being lifted
Include weight of
rigging equipment and
hardware
1. 800#
2. 2,400#
3. 4,800#
4. 12,800#
#
0#
0#
0#
00
80
40
80
,8
2,
4,
12
Worksheet Problem #1
4 x 4 x 16 = 256 cubic feet
Wood weighs 50 pounds per cubic foot
256 c.f. x 50#/c.f. = 12,800#
Worksheet Problem #2
25% 25% 25% 25%
1. 1,415#
2. 3,150#
3. 9,900#
4. 39,565#
#
5#
0#
0#
65
41
15
90
,5
1,
3,
9,
39
Worksheet Problem #2
Outside Diameter 66 cubic feet of
3.14 x (4 x 4 x 12) / 4 concrete
150.72 Cu. Ft. 150 pounds per cubic
Inside Diameter foot
3.14 x (3 x 3 x 12) / 4 66 x 150
84.78 Cu. Ft. TOTAL WEIGHT
Total Volume 9,900 pounds
65.94 Cu. Ft.
Worksheet Problem #3
25% 25% 25% 25%
1. 120#
2. 140#
3. 240#
4. 480#
0#
0#
0#
0#
12
14
24
48
Worksheet Problem #3
4 x 3 = 12 square feet
steel plate = 20 lbs/sq. ft.
12 s.f. x 20 lbs/sq. ft. = 240#
Determining Load Weight
Known Estimated
Data plate Volume of object
Engineering Density of materials
specifications Adjusted for voids (air)
Shipping papers
Tribal Knowledge
I
S
T
S
A
F
E
HOISTSAFE
SLING CAPACITY
SYNTHETIC SLINGS
S
T
S
A
F
E
HOISTSAFE
SLING INSPECTION
1. True
2. False
se
ue
l
Tr
Fa
OSHA 1910.184
ASME B30.9
Reasons Record Keeping
Ensure safe equipment Most recent report
Gain knowledge and Test certificates
experience:
Nature of lifts being made
Sling usage
Operator competence
Inspections
Daily / Periodic before use
(NO records)
Minimum annual with
records
Frequently, as warranted
1. True
2. False
se
ue
l
Tr
Fa
Daily / Period Inspection
A thorough periodic Wear
inspection of slings shall be Deformation
performed by a competent Elongation
person designated by the
employer and shall include Sharp traverse nicks and
a thorough inspection for: gouges in chain
Cuts
Corrosion
Heat damage
Hardware
Latches for proper seating,
operation and distortion
Hooks for wear and distortion
When was the last INSPECTION performed?
HOISTSAFE
How H heavy is the load?
T
S
A
F
E
Sling Angle
A 24-can case of beer weighs
1. 10 pounds
2. 15 pounds
3. 20 pounds
4. 25 pounds
ds
ds
ds
ds
un
un
un
un
po
po
po
po
10
15
20
25
Beer Facts
One can of beer weighs
13.1 ounces
13.1 oz. x 24 cans =
314.4 oz.
The cardboard box
weighs 7 ounces
314.4 + 7 = 321.4 oz.
321.4 oz. 16 oz. per
pound
20 pounds
How much does it weigh?
7#
0#
8#
6#
56
70
26
26
1,
2,
2,
Worksheet Problem #4
How many legs will
actually carry the load?
Three
Worksheet Problem #4
What is the share of the
load?
1,133.3333333333#
Worksheet Problem #4
What is the load factor?
3 1.5 = 2.0
Worksheet Problem #4
What is the tension in
each sling leg?
2.0 x 1,133# = 2,266#
2.0 x 1,134# = 2,268#
Worksheet Problem #5
1. 1,746# 25% 25% 25% 25%
2. 5,856#
3. 5,888#
4. 6,400#
6#
6#
8#
0#
74
85
88
40
1,
5,
5,
6,
Worksheet Problem #5
What is the share of the
load?
6,400# 2 = 3,200#
Worksheet Problem #5
What is the load factor?
5.5 3 =
1.83333333333333
1.83
1.84
2.00
Worksheet Problem #5
What is the tension in
each sling leg?
3,200# x 1.833333333 =
5,866.6666666667#
5,856#
5,888#
6,400#
Worksheet Problem #5
What other factors
might affect sling
capacity?
Wet environment for
synthetic slings
Dynamic loading as
object enters and leaves
water
Grade 80 Alloy Chain Slings
Single
Chain
Trade Chain
Size Size Working Load Limit (lbs)
9/32 .279 3,500
.529 12,000
.801 28,300
1 1.000 47,700
S1 = 5 S2 = 8
H = 4
D1 = 3 D2 = 7
L = 1,000#
S1 = 875# S2 = 600#
L = 1,000#
S
A
F
E
HOISTSAFE
LOAD STABILITY
A
F
E
HOISTSAFE
STANDARD
HAND SIGNALS
Move the load with SMOOTH AND STEADY actions.
Standard Hand Signals
F
E
Area Clear
Personnel
Barriers and warning signs
May distract crane operator
Security personnel
Vehicles and equipment
Block visibility
E
Flying the Load
Is there a clear,
unobstructed path from
lift point to landing?
Do NOT fly the load
over people.
Maintain clearance
from objects such as
buildings, vehicles and
utilities.
1. True
2. False
se
ue
l
Tr
Fa
Weather
Wind
Tag lines shall be used
unless their use creates
an unsafe condition
[OSHA
1926.550(g)(6)(iii)]
1. Below -40 F
2. Below 32 F
3. Above 190 F
4. Above 400 F
F
0
0
32
-4
19
40
w
w
ve
ve
lo
lo
Be
o
Be
Ab
Ab
Weather
Wind
Temperature
Chain and wire rope
affected below -40 F
Synthetic affected above
190 F
Wire rope affected
above 300 F
Chain affected above
400 F
SAFE RIGGING
PRACTICES
The Thought Process of Rigging
What is to be done with the load?
What tools are needed to perform the
assigned task?
Is the capacity of the tools adequate to handle
the loads and forces involved in lifting and
moving?
How can the hookup be made?
What will happen when the load is lifted?
Safe Rigging Practices
Whenever possible, avoid sharp, inefficient sling
angles by using longer slings or a spreader beam.
Do not pull slings from under a load when the
load is resting on the sling.
Do not drag slings over sharp objects or abrasive
surfaces.
Do not leave slings lying where heavy loads may
be set down on top of them, or where vehicles
may drive over them.
Safe Rigging Practices
Slings should be stored in an assigned area.
The storage should be such that the slings will not be
subject to kinking or other mechanical damage,
corrosive atmosphere, or excessive temperature.
Damaged slings should always be repaired before
they are placed in the assigned storage area.
Do NOT make temporary repairs of slings with
miscellaneous or makeshift parts.
Fiber-rope slings should not be made from ropes
less than inch in diameter.
Safe Rigging Practices
Do not use metal-mesh slings in which the
spirals are locked or do not move freely.
Do NOT hammer a metal-mesh sling to
straighten a spiral or cross rod, or to force a
spiral into position.
If metal-mesh slings are used in pairs, they
should be attached to a spreader beam.
Who is responsible for safe
rigging?
25% 25% 25% 25%
1. OSHA
2. ANSI
3. Competent person
4. Everyone
associated with the
movement of the
HA
.
SI
.
s. .
..
load
AN
oc
er
OS
ss
tp
ea
en
n
t
yo
pe
er
m
Ev
Co
Make
Every Day
a Safe
Workday!