Presentation UPPTCL 400KV Substation Motiram Adda, Gorakhpur
Presentation UPPTCL 400KV Substation Motiram Adda, Gorakhpur
Presentation UPPTCL 400KV Substation Motiram Adda, Gorakhpur
ON
400KV SUBSTATION
UTTAR PRADESH POWER TRANSMISSION CARPORATION
LIMITED
MOTTIRAM ADDA,GORAKHPUR(U.P.)
SUBMITTED BY:
RAHUL NAIN (EE)
FINAL YEAR(1204210045)
Electric substation and its overview
Single Line Diagram
Isolator and switches
Circuit breaker
Lightning arrestor
Current transformer
Capacitive voltage transformer
Protective relays
Power transformer
Control room and Relay room
Battery room
Wave trap
Reference
Electrical Substation are mainly three
types:-
1.Generating substation (Thermal , hydroelectric ,nuclear)
2.Transmission substation
maintain symmetric configuration of conductor in each phase with proper
transposition , use ACSR bundled conductor .
3.Receiving and Distribution substation
Use ring main and radial distribution system.
The whole substation is divided in two parts: 400kv & 220kv site. The civil work is
completed by L&T Company. Other part of project Design, Engineering,
Manufacture, Supply, Erection, Testing and Commissioning of Bays is completed
by CGL.
In 400/220kv switchyard following outdoor instrument used:
Two 165MVA 220/132kv autotransformers one 315MVA 400/220kv
autotransformer, one 250MVA autotransformer, Two 31.5MVAR shunt reactor,15
lighting tower, SF6 circuit breaker, Capacitor voltage transformer(CVT) Current
transformer(CT).
In switchyard one room for emulsifire system and one for generator system is also
present. In 400kv switchyards following lines are present for incoming and
outgoing power.
400kv Incoming 1. PGCIL I 2. PGCIL II (GIDA Sahjanwa) 3. UPPCL
Azamgarh
220kv Outgoing 1. Deoria 2. Baraunhua
ISOLATORS USED IN SUB-STATION
2. Earth switch:
Connected between line conductor and earth. Normally it is
open. When line is disconnected the earth switch is closed
so as to discharge the voltage trapped on the line
Across capacitance between line and earth .
3.Differential relay
4.Directional relay
5. Buchholz relay
6. IDMT relay
Overcurrent Relay: The relay which operates
when the current exceeds the preset value is
called the overcurrent relay. The preset value is 4.very inverse relay
called the pickup value.
Types here core does not saturate easily and on higher
1.Instantaneous overcurrent relay. value of current time of operation become
As soon as fault occur relay operate. constant.
Operating time = .1 sec
3.Shunt capacitor
Installed at receiving end to make
receiving end voltage equal to sending
end voltage.
CIRCUIT BREAKERS :-
Electrical circuit breaker is a switching device
which can be operated manually as well as
automatically for controlling and protection of
electrical power system .
In this substation almost all the circuit breakers
are SF6 type circuit breakers.
There is a switchable series resistance along
with the C.B. as shown here. It is inserted while
closing the circuit breakers for a short time.
This resistor, hence, limits the charging current
of the lines stray capacitance.
2.Power transformer efficiency is design for full load operation so iron loss has
higher value than distribution transformer.
Wikipedia