Yanbu WWTW Process Group Presentation
Yanbu WWTW Process Group Presentation
Yanbu WWTW Process Group Presentation
Imran Baloch
28 June 2016
Contents
Project scope
Design criteria
Plant performance
Conclusions
Project
PROJECT TITLE:
Yanbu WwTW Rehabilitation and Expansion (Kingdom of Saudi Arabia)
CLIENT:
Marafiq - Power and Water Utility Company in Yanbu and Jubail (Kingdom
of Saudi Arabia)
JACOBS ROLE:
Project Management Consultant
(including scope of works, bid management,
contract documents, engineering support,
construction supervision)
CONTRACT:
Type: Engineering, Procurement & Construction
(Client Bespoke Contract)
Engineering Main Responsibilities
Review of Client Basis of Design
Design parameters and conditions
Design flows
Criteria Unit Flow rate Comments
Design average flow. The design include a
factor of 1.15 x average daily flows, referred as
maximum daily flows (54,050 m3/d). The
Daily average /d 47,000 process units downstream of Equalisation
Tanks are designed to treat average and
maximum daily flows.
Original Plant
Wastewater Stream
Inlet Screens Primary Biological Treatment Secondary
Equalisation
pumping Grit Settling (4 stage Bardenpho Settling
Tanks
Station removal Tanks process ) Tanks
Chlorine
Dosing
Chlorine Plant Irrigation via Existing Emergency
Sand
Contact Irrigation Storage Tanks Storage
Filters
Tanks Do Tank
Conditioning Red Sea
Tanks
Sludge
Thickening &
Dewatering Irrigation
Storage
Tanks
Primary (existing)
Settlement
Tanks
(refurbished)
Inlet
Pumping
Station
(refurbished)
Secondary
Equalisation Biological Process Settlement
Inlet Screens Tanks Tanks Emergency Storage
Also there are number of pumping stations, tanks, blowers
Grit Chamber and other miscellaneous items not highlighted above
Tank
Flows (Measured at Equalisation Tanks Outlet, m3/d)
EQT Outflow
35,000
30,000
25,000
m3
10,000
5,000
-
42436 42438 42440 42442 42444 42446 42448 42450
42435 42437 42439 42441 42443 42445 42447 42449 42451
2 No. units
Aerated grit chambers are designed to handle peak hourly flows
Site can operate with only one grit chamber in operation
Aerated Grit Chambers (cont.)
Diffuser density in first zone of aeration tank is 50%, 30% in second zone
and 20% in third zone
Diffusers were tested for their SOTE(%) at test facility clean water oxygen
transfer test
Aeration Tanks
Pipework arrangement
Pressure filters (cont.)
2 No. backwash tanks to hold filtered effluent from pressure filters. This is to
provide filtered effluent for a minimum of two backwashes
2 No. chlorine contact tanks to provide minimum of 30 mins chlorine contact time
Chlorine Contact Tanks
DO Conditioning Tanks (required for Red Sea
discharge)
2 No. tanks to achieve minimum DO levels of 5 mg/l for Red Sea discharge
standards
Tanks provide retention time of ~ 30 mins
DO Conditioning Tanks (cont.)
Emergency Pumping Station
Alum dosing for phosphorus removal Methanol dosing for nitrate nitrogen removal
Dosed at the outlet of biological Dosed on the feed to post anoxic tanks
tanks (i.e. feed to secondary
settlement tanks)
Irrigation to Red Sea control mode
Sludge Cake
Any Questions?