Ie 550 Capp
Ie 550 Capp
Ie 550 Capp
04/04/16
13 - 1
04/04/16
13 - 2
PRODUCT REALIZATION
Product design
Process planning
Process,
machine
knowledge
Operation programming
Verification
Scheduling
Scheduling
knowledge
Execution
04/04/16
13 - 3
PROCESS
PLANNING
Design
Machine
Tool
Process
Planning
04/04/16
13 - 4
PROBLEMS FACING
MANUFACTURING INDUSTRY
Fact:
Only 11% of the machine tools in the U.S. are programmable.
More than 53% of the metal-working plants in the U.S. do not have
even one computer-controlled machine.
Some problems:
Cannot justify the cost
Lack of expertise in using such machines
Too small a batch size to offset the planning and programming costs
Source: Kelley, M.R. and Brooks, H., The State of Computerized Automation in US Manufacturing,
J.F. Kennedy School of Government, Harvard University, October 1988.
13 - 5
DOMAI
N
One-of-a-kind and Small batch
Objectives: Lead-time, Cost
Approaches: process selection, use
existing facilities.
Mass production
Objective: Cost
Approaches: process design, optimization,
materials selection, facilities
design
04/04/16
13 - 6
04/04/16
13 - 7
04/04/16
13 - 8
04/04/16
Machining methods
Pressworking
Welding/fabrication
Casting
Powder materials
Layered deposition
Others
13 - 9
Welding/fabrication:
Additive techniques
Initial
Stock
04/04/16
Weld
Add-on
Weld
Add-on
Final Product
13 - 10
Machining Methods:
Subtractive techniques
Initial
Stock
04/04/16
Slotting
Drilling
Final Product
13 - 11
Casting:
Form Methods
04/04/16
13 - 12
2"+0.01
0.01
ENGINEERING DESIGN
MODELING
0.001 AB
10"+0.01
0.01
4"+0.01
0.01
7"+0.05
0.05
1'4"+0.01
0.01
3"+0.01
0.01
5"+0.01
0.01
U*
S.F.64uinch
Fa c e
- *
Lo o p
Ed g e
V e rt e x
CSG MODEL
B-REP MODEL
04/04/16
13 - 13
INTERACTION OF
PLANNING
FUNCTIONS
SETUP PLANNING
GEOMETRIC REASONING
global & local geometry
PROCESS SELECTION
process capability
process cost
CUTTER SELECTION
available tools
tool dimension and geometry
geometric constraints
04/04/16
feature relationship
approach directions
process constraints
fixture constraints
FIXTURE PLANNING
fixture element function
locating, supporting, and
clamping surfaces
stability
CUTTER PATH GENERATION
feature merging and split
path optimization
obstacle and interference
avoidance
13 - 14
PROCESS
PLAN
Also called : operation sheet, route sheet, operation planning
summary, or another similar name.
The detailed plan contains:
route
processes
process parameters
machine and tool selections
fixtures
How detail the plan is depends on the application.
Operation: a process
Operation Plan (Op-plan): contains the description of an operation,
includes tools, machines to be used, process parameters,
machining time, etc.
Op-plan sequence: Summary of a process plan.
04/04/16
13 - 15
EXAMPLE PROCESS
PLANS
Route Sheet
Mtl Rm
Mill02
Drl01
Insp
Time(min)
04/04/16
5
4
1
PROCESS PLAN
Part No. S0125-F
Part Name: Housing
Original: S.D. Smart Date: 1/1/89
Checked: C.S. Good Date: 2/1/89
No.
Operation
Description
10
ACE Inc.
Workstation
Setup
Tool
Time
(Min)
Millbottomsurface1
MILL01
seeattach#1
forillustration
Facemill
6teeth/4"dia
3setup
5machining
20
Milltopsurface
MILL01
seeattach#1
Facemill
6teeth/4"dia
2setup
6machining
30
Drill4holes
DRL02
setonsurface1
twistdrill
1/2"dia
2"long
2setup
3machining
13 - 16
FACTORS AFFECTING
PROCESS
PLAN SELECTION
Shape
Tolerance
Surface finish
Size
Material type
Quantity
Value of the product
Urgency
Manufacturing system itself
etc.
04/04/16
13 - 17
13 - 18
REQUIREMENTS IN
MANUAL PROCESS
ability to interpretPLANNING
an engineering drawing.
familiar with manufacturing processes and
practice.
familiar with tooling and fixtures.
know what resources are available in the shop.
know how to use reference books, such as
machinability data handbook.
able to do computations on machining time and
cost.
familiar with the raw materials.
know the relative costs of processes, tooling, and
raw materials.
04/04/16
13 - 19
INDUSTRIAL SOLUTION
.
2"+0.01
0.01
0.001 AB
10"+0.01
0.01
.01
4"+0
0.01
7"+0.05
0.05
1'4"+0.01
0.01
3"+0.01
0.01
5"+0.01
0.01
S.F.64uinch
PRODUCT
CONCEPT
CAD
CAM
CUTTER
PATH
13 - 20
PROCESS PLANNING
STEPS
Study the overall shape
of the part. Use this
04/04/16
13 - 21
PROCESS PLANNING
STEPS
(continue)
Sequence the operations
determined in the
previous step.
04/04/16
13 - 22
COMPUTER-AIDED
PROCESS
PLANNING
ADVANTAGES
1. It can reduce the skill required of a planner.
2. It can reduce the process planning time.
3. It can reduce both process planning and
manufacturing cost.
4. It can create more consistent plans.
5. It can produce more accurate plans.
6. It can increase productivity.
04/04/16
13 - 23
WHY AUTOMATED
PROCESS
PLANNING
Manufacturability feedback
Lowering the production cost
Consistent process plans
04/04/16
13 - 24
PROCESS
PLANNING
Design
Machining features
Workpiece Selection
Process Selection
Tool Selection
Feed, Speed Selection
Operation Sequencing
Setup Planning
Fixturing Planning
Part Programming
04/04/16
13 - 25
part
family
formation
standard
plan
preparation
part
coding
part
family
search
process
plan
retrieval
finished
process
plan
Standard
process
plans&
individual
process
plans
process
plan
editing
13 - 26
04/04/16
13 - 27
ADVANTAGES OF THE
VARIANT APPROACH
1. Once a standard plan has been written, a variety
of components can be planned.
2. Comparatively simple programming and
installation (compared with generative systems) is
required to implement a planning system.
3. The system is understandable, and the planner
has control of the final plan.
4. It is easy to learn, and easy to use.
04/04/16
13 - 28
GENERATIVE APPROACH
A system which automatically synthesizes a
process plan for a new component.
MAJOR COMPONENTS:
(i) part description
(ii) manufacturing databases
(iii) decision making logic and
algorithms
04/04/16
13 - 29
ADVANTAGES OF THE
GENERATIVE APPROACH
1. Generate consistent process plans rapidly;
2. New components can be planned as easily as
existing components;
3. It has potential for integrating with an
automated manufacturing facility to provide
detailed control information.
04/04/16
13 - 30
KEY DEVELOPMENTS
1. The logic of process planning must be
identified and captured.
2. The part to be produced must be clearly and
precisely defined in a computer-compatible
format
3. The captured logic of process planning and the
part description
04/04/16
13 - 31
PRODUCT REPRESENTATION
Geometrical information
Part shape
Design features
Technological information
Tolerances
Surface quality (surface finish, surface integrity)
Special manufacturing notes
Etc.
"Feature information"
Manufacturing features
e.g. slots, holes, pockets, etc.
04/04/16
13 - 32
04/04/16
13 - 33
04/04/16
13 - 34
SPECIAL LANGUAGE
1
1.2
+.001
-.001
K5
3
2.5
10 CYLINDER/3,1/
11 DFIT/K,5/
12 CHAMFER/.2,2.6/
20 CYLINDER/2.5,1.2/
21 LTOL/+0.001,-0.001/
.2x2.6
AUTAP
04/04/16
13 - 35
CIMS/PRO REPRESENTATION
X
a2
a3
a4
a1
a5
Y
04/04/16
a6
sweep
direction
13 - 36
GARI REPRESENTATION
0 1.
0 3.0
F2
.5
2
F1
F3
3.0
X
(F1 (type face) (direction xp) (quality 120))
13 - 37
CONCEPT OF FEATURE
13 - 38
vs
Manufacturing Feature
13 - 39
DESIGN FEATURES
For creating a shape
For providing a function
Motion
04/04/16
Slot feature
13 - 40
MANUFACTURING FEATURES
For process selection
For fixturing
Manufacturing
is feature based.
Drilling
04/04/16
Round hole
Turning
Rotational
feature
End milling
Plane surface,
Hole, profile, slot
pocket
Ball end mill
Free form
surface
Boring Cylindrical shell
Reaming
Cylindrical shell
13 - 41
04/04/16
13 - 42
A Slot
Surface finish
Function
04/04/16
13 - 43
Dimension
Location
Approach
Tolerance
Surface finish
Relations with other features
Approach directions
04/04/16
13 - 44
FEATURE RECOGNITION
Extract and decompose features from a geometric
model.
Syntactic pattern recognition
State transition diagram and automata
Decomposition
Logic
Graph matching
Face growing
04/04/16
13 - 45
DIFFICULTIES OF FEATURE
RECOGNITION
Potentially large number of features.
Features are domain and user specific.
Lack of a theory in features.
Input geometric model specific. Based on
incomplete models.
Computational complexity of the algorithms.
Existing algorithms are limited to simple
features.
04/04/16
13 - 46
Design
Bore hole
Process Planning
Turn profile
04/04/16
Drill hole
Bore hole
13 - 47
Cons
Hinder the creative thinking of designers.
Use the wrong talent (designer doing process
planning).
Interaction of features affects processes.
04/04/16
13 - 48
BACKWARD PLANNING
.
B o rin g
Fi n is h e d
p a rt
Drillin g
Mi l l i n g
Wo rk p ie c e
04/04/16
13 - 49
PROCESS KNOWLEDGE
REPRESENTATION
Predicate logic
Production rules
Semantic Nets
Frames
Object Oriented Programming
04/04/16
13 - 50
SOME RESEARCH
ISSUES
Part design representation: information contents,
data format
Geometric reasoning: feature recognition, feature
extraction, tool approach directions, feature
relations
Process selection: backward planning, tolerance
analysis, geometric capability, process knowledge,
process mechanics
Tool selection: size, length, cut length, shank length,
holder, materials, geometry, roughing, and finishing
tools
04/04/16
13 - 51
SOME RESEARCH
ISSUES
(continue)
04/04/16
13 - 52
Geometric Reasoning
Application-Specific Features (e.g. manufacturing features)
blind slot, through slot, step, etc.
approach direction, feed direction
feature relations: precedence and intersection type
Principle:
Provide designer with the freedom to describe shape avoid constraining manufacturing planning
or requiring detailed manufacturing knowledge.
04/04/16
13 - 53
04/04/16
13 - 54
CAD
04/04/16
SOME
APPROACHES
ProcessPlanner
CAM
2D
Drafting
drawinginterpretation
varianttypeplangeneration
interactivepartprogramming
NCcontrol
2D
Drafting
automaticdrawinginterpretation
gen.typeplangeneration
Automaticpart
programming
3DCAD
Model
interactivedrawinginterpretation
gen./varianttypeplan
generation
cannedcutter
pathcycles
3D
SolidModel
geometricreasoning
expertplanner
nohumandecision
automaticpart
programming
Featurebased
solidmodel
featurerefinement
limitedgeometricreasoning
generativeplanning
seqmaydictatedbydesign
canned/auto.cutter
pathcycle
13 - 55
geometric
reasoning
Data
base
manual
planning
1960
04/04/16
GT
variant
system
1970
elementary
machine
learning
expert
system
1980
1990
2000
13 - 56