This document provides an overview of the manufacturing facilities and support services at Reliance Industries Limited's Hazira Manufacturing Division in Hazira, India. It includes a plot plan showing the layout of the various plants and describes the progression of plants built at the site since 1991. It also summarizes the functions of key support services including utilities, logistics, health/safety/environment, engineering, maintenance, management information systems, and fire fighting systems.
This document provides an overview of the manufacturing facilities and support services at Reliance Industries Limited's Hazira Manufacturing Division in Hazira, India. It includes a plot plan showing the layout of the various plants and describes the progression of plants built at the site since 1991. It also summarizes the functions of key support services including utilities, logistics, health/safety/environment, engineering, maintenance, management information systems, and fire fighting systems.
This document provides an overview of the manufacturing facilities and support services at Reliance Industries Limited's Hazira Manufacturing Division in Hazira, India. It includes a plot plan showing the layout of the various plants and describes the progression of plants built at the site since 1991. It also summarizes the functions of key support services including utilities, logistics, health/safety/environment, engineering, maintenance, management information systems, and fire fighting systems.
This document provides an overview of the manufacturing facilities and support services at Reliance Industries Limited's Hazira Manufacturing Division in Hazira, India. It includes a plot plan showing the layout of the various plants and describes the progression of plants built at the site since 1991. It also summarizes the functions of key support services including utilities, logistics, health/safety/environment, engineering, maintenance, management information systems, and fire fighting systems.
Download as PPT, PDF, TXT or read online from Scribd
Download as ppt, pdf, or txt
You are on page 1of 20
Reliance Industries Limited
Hazira Manufacturing Division
Hazira Manufacturing Facilities 220 KV Switch yard Tankages CPP&U MEG 1 PVC VCM PE 1 Guest House PP CPP ETP Cracker C K R
T F
Tank Farm Aromatics PE-2 PTA-2 M P P 2 ( P O Y / P S F )
M E G - 2
MEG-3 Cracker C K R
T F
N Reliance Industries Limited , Hazira Overall Plot Plan PTA-1 4 Hazira progression Plants Licensor Startup Capacity ( KTA ) Technology Installed CPP & U May 1991 60 MW MEG 1 Shell Sep. 1991 100 PVC Geon Dec. 1991 160 VCM Geon Apr. 1992 160 PE 1 Du Pont Jul. 1992 160 POY Du Pont Dec. 1995 120 PP UCC Sep. 1996 360 PSF Du Pont Sep. 1996 160 PTA 1 ICI Jan. 1997 350 5 Plants Licensor Startup Capacity ( KTA ) Technology Installed CPP 2 1996-1998 190 MW Cracker S & W Mar. 1997 750 Aromatics HRI/Mobil Mar. 1997 350 MEG 2 Shell Mar. 1997 120 PE 2 Nova May 1997 200 PET Sinco Oct. 1997 80 PFF Du Pont Oct. 1997 30 MEG 3 Shell Oct. 1997 120 PTA 2 ICI Nov. 1997 350
Hazira progression 6 CPP-Utility is providing utility services to all plants in complex. These utilities are generated and supplied from :
A. Captive Power Plant :- 1. Steam generation and distribution 2. Power receipt, generation, sale and distribution
B. Utilities 1. Raw water treatment and distribution 2. Cooling water treatment and circulation. 3. DM water production and distribution. 4. Compressed air and instrument air generation and distribution.
Hazira - CPP and Utility 7 Major Equipment Supplier in CPP/Utility : Gas Turbines by M/s. Thomassen International BV of Holland and BHEL of India. Heat Recovery Steam Generators (HRSGs) and one Aux. Boiler by M/s. Stork BV of Holland. DM Water Plant by M/s. Thermax Ltd. Cooling Tower by M/s. Paharpur Cooling Towers. Air Compressors are supplied by M/s. Elliot U. K. Air drying units by M/s. Lloyds Steel Industries Ltd. Raw water treatment and Effluent treatment plants by M/s. Hindustan Oliver Ltd.
Cogeneration Plant At Hazira :- The Cogeneration Plant was commissioned in September, 1991. Cogeneration is the combined production of Heat and Electric Power. Each cogeneration plant has Gas Turbines and 125 TPH Heat Recovery Steam Generator. The fuel for the Congeneration plant is natural gas and HSD.
Hazira - CPP and Utility 8 PRIMARY FUNCTIONS : Receipt of material from plant// Bagging in 25 Kg. Bag and Jumbo Bag on automatic bagging machine// Storage in the Warehouse // Documentation // Dispatch as per marketing advise & Payment of Excise Duty
FEATURES : Solid movement about 550 truck per day - POY, PSF, PP, PE, PVC, etc. // Liquid movement -- about 475 truck per day - MEG, Bz, Xy, EDC, etc // Provision for moving out polymers and polyesters in bulk / containers // Provision for hopper car loading // Adequate tankages and warehousing capacities / loading-unloading facilities // Drumming facility for DEG and TEG
Support Services : Logistics 9 Support Services : HSE HSE Management based on Responsible Care Focus on safety during Engineering, Construction, Startup & Operation Ongoing training and validation for all the employees including contractors 100% compliance with all pollution control norms Periodic health checkup for all employees Regular audits, both internal & external Community awareness & emergency response / disaster management plan Safety of Person Overrides All Production Targets Commitment Accountable ility Performance measure- ment Information Sharing Incident Investigation CAER Integration Siting Codes and Standards Emergency Management Multiple Safe Guard Safety Revies Maint. and Inspection FACILITY MANAGEMENT LEADERSHIP TECHNOLOGY PERSONNEL Design Documentation Management of Change Process Hazard Analysis Process Hazard information Health Surveillance Medical Mutual Aid Emergency Treatment CPR Training/ Hazcom HEALTH ENVIRONMENT PROTECTION Env. Protection Measures Env. Monitoring Statutory Compliance Reduction/ Recycle of Waste/ Safe Disposal Job Skills Consumer Premises Audit Tanker Driver's Training Tanker Inspection Transport Emergency Team PRODUCT STEWARDSHIP Employee Proficiency Initial Training Safe Work Practice Fitness for Duty Contractors Based on Responsible Care TOP Managemen Support HSEReporting Level Quantity / Quality of Resources Line Responsibility for HSEManagement On going HSE Awareness & Training Continuous Improvement 10 Support Services : CTS Benchmarking Product development Quality assurance Pinch Technology Process Safety management Cost reduction Process evaluation Process Engineering Test runs & debottlenecking Energy Conservation Functions & Activities 11 Support Services : CES Functions & Activities 1.0 MECHANI CAL 1.1 Planning 1.2 Inspection & Corrosion 1.3 Condition Monitoring 1.4 Contract Lineup 1.5 Drawing & FCOs 1.6 Documentation / Technical Library 1.7 Machining & Overhauling
2.0 ELECTRI CAL 2.1 Motor Over Hauling 2.2 Relay Testing & Calibration 2.3 Transformer Oil Filtration & Oil Checking
12 Support Services : CES Functions & Activities 3.0 I NSTRUMENTATI ON 3.1 Testing & Calibration of Instruments / Control Valves 3.2 Maintenance of Analyzer 3.3 Maintenance of DCS 3.4 Maintenance of PLCs 3.5 Import Substitution
4.0 POWER ELECTRONI CS 4.1 Telecommunication 4.2 Plant Address System 4.3 Fire Protection System 4.4 Maintenance of UPS 4.5 Power Electronics
5.0 CI VI L 5.1 Maintenance of Buildings & Roads 5.2 Mini Projects Execution 5.3 Town Ship Maintenance
13 Support Services : About Maintenance Maintenance Systems Through IT Maintenance Work Order System PreventiveMaintenance Schedules Equipment Data Sheets Shutdown Planning and Monitoring Reliability Studies Maintenance Cost Failur e Analysis Equipment Tag Meter Equipment Service Schedules Equipment History Material Management Inventory Control TPM Benchmarked against World Standards by A T Kearney Special attention to -Technician productivity -ERV tracking and control -Reliability and uptime Contracting strategies Least cost maintenance Material management improvements -Stocking policy/JIT -Procurement cycle time reduction -Vendor development/rating World Class Maintenance 14 Support Services : MIS Set Up & Activities The MIS/IT department at hazira is centralised function for whole site looking after the followings Installation and maintenance of infrastructure required for IT Development, implementation and support of application system for areas of manufacturing and commercial (Now apart from SAP) Providing central help desk support to overcome user' problems in relation to computerised system
All the computer system and plant process control systems are connected to a system of network comprising of following
15 Support Services : MIS Set Up & Activities Hazira site is network is connected to Reliance group through settalite Insat 1C for the office of Makers-Mumbai, Patalganga and Jamnagar. This connection is also used for video conferencing between the offies working at these locations. The IT department is dividied in two sections
1, Infrastructure support activities Network extension and modification project Desktop support System operation support Network management E-Mail administration 2, Application Development and technical support activities Recording of system requirements Approval by HOD System analysis and design Programming, testing, implementation and documentation Testing Implementation and User' training Documentation
16 All the plants are designed and erected / constructed with due regards to the appropriate fire protection measures, [under relevant / adapted standards & codes of practices] broadly in terms of (i) safety distances between equipment as well as between the plants, (ii) fire / safety risk analysis including hazard operability study (hazop) and hazard analysis (hazan) (iii) isolation of process equipment including of emergency shut-down systems & (iv) passive fire protection viz. fire doors, fire barriers, fire resistant coatings & sealant etc.
Support Services : Fire Fighting & Control System 17 PROVISIONS :-
Two full-fledged fire stations manned by qualified and experienced fire service personnel including officers (i.e. total complement of 65 personnel). Availability of six major / mobile fire fighting appliances viz. Foam Tenders (04), DCP Tender (01) & Emergency cum Rescue Tender (01). Fixed fire fighting installations viz. Deluge valves, water spray system, pressurized fire water / hydrant system, riser system, water / foam monitors, foam system, modular DCP, CO 2 system, Halon system, heat shield water spray units etc. Fire alarm panels [installed in plant control rooms as well as in control rooms of fire stations] interfaced with automatic detectors viz. smoke detectors, heat detectors, UV / IR detectors, & LEL detectors. Portable fire extinguishers, trailer / trolley mounted extinguishers as well as monitors (water / foam).
Support Services : Fire Fighting & Control System 18 PROVISIONS :-
Reservoirs / storages of fire water for carrying out fire fighting operations [at a stretch] for 9 hrs. Dedicated fire pumps are installed at two separate locations to feed / convey this water through the net-work of pressurized fire water mains / headers protecting the plants / complex. Adequate inventories of other special extinguishing media viz. foam concentrates / DCPs. Availability of adequate Breathing Apparatus sets, emergency escape sets, special PPEs & emergency tool kits. Mutual Aid agreements with the neighboring industries viz. KRIBHCO, ONGC & NTPC. Well defined On-site & Off-site emergency plans. [which also include predetermined emergency escape routes & occupancy wise evacuation plans]
Support Services : Fire Fighting & Control System 19 ACTIVITIES :-
The following activities are normally carried out :-
Hot work permit / site monitoring by fire service personnel. Deployment of fire tender(s) and crews [at various plants / areas] for standby duties. Fire prevention audits as per checklist. Detailed investigation into cause of fire / explosion. Daily surveillance round by shift fire officer / personnel. Maintenance of round the clock watch and ward by security department [which includes, inter-alia, fire watch from arson / sabotage angles].
Support Services : Fire Fighting & Control System 20 ACTIVITIES :-
Tactical Functions Of Fire Service Personnel :-
(a) Handling of Fire Emergencies (b) Handling of Non - Fire Emergencies [i.e. Spillage, Leakages Etc.] :- (c) Special Services Maintenance of Fire Protection Systems :- Communication Systems :- Preparedness :- Training :- Support Services : Fire Fighting & Control System