Informational - Successful DSF Submission - 1-11726698023 - Cbrz07352
Informational - Successful DSF Submission - 1-11726698023 - Cbrz07352
Informational - Successful DSF Submission - 1-11726698023 - Cbrz07352
Customer Information
Customer Name
1-11726698023 CBRZ07352
CBRZ07352 10 SP 06
Schedule: Installation Checklist Install EVair compressor (if installed) PM Checklist (Every 12 Months)
PM Checklist (Every 24 Months) PM Checklist (Every 48 Months) PM EVair compressor (if installed)
PM Airway Module (If Installed Every 12 months) PM Airway Module (Every 48 months) CR
Refer to the CARESCAPE R860 Technical Reference Manual 2065496-001 for detailed test and
maintenance instructions.
/
Check that casters are Casters roll and lock Pass
>
not loose or damaged. as needed and are
See "Replacing the firmly mounted to the
cart caster" in the machine base.
Technical Reference Display unit fan filter is
Manual for detailed clean.
information.
Vent engine fan filter is
Visually inspect the clean.
display unit fan filter.
No physical damage.
Visually inspect the
O2 and Air filters are
vent engine fan filter.
clean.
Visually inspect the
Arm is in good
exhalation valve
condition and
assembly.
tightened.
Visually inspect the
Check movement of
gas inlet filters (O2
patient module rack
and Air).
arm. If necessary, use
Check movement of hex wrench to adjust
the display unit arm tension.
joints.
Accessory
Check movement of components are
the patient monitoring securely attached.
module rack.
Air and O2 are
Check that accessory securely connected to
components are gas inlets.
securely attached (if
equipped).
Check that pipeline or
compressor gas
supplies are
connected (if
equipped).
Power Cords
/
Verify AC power cord Power cord Pass
>
configuration. configuration is
Check that all AC correct.
power cords are fully All power cords are
seated. seated correctly.
Check and if Power clamp screws
necessary tighten the are tightened to 1.0
following: power clamp Nm and the retainer
screws to 1.0 Nm; and outlet screws are
tighten the inlet power tightened to 0.45 Nm.
cord retainer (1503-
3033-000) screw to
0.45 Nm; tighten the
outlet power cord
retainer (1505-3041-
000) screw to 0.45
Nm.
Verify Annunciators
/
Perform the vent No debris in vent Pass
>
engine debris clean engine.
out.
Expected
Task Results Actual Readings Results Comments
Expected
Task Results Actual Readings Results Comments
Expected
Task Results Actual Readings Results Comments
/
Calibrate airway pressure transducer Zero and Span
Expected
Task Results Actual Readings Results Comments
Free-breathing valve
Expected
Task Results Actual Readings Results Comments
/
Inspiratory effort valve test
Expected
Task Results Actual Readings Results Comments
>
buzzer test.
Expected
Task Results Actual Readings Results Comments
Touchscreen calibration
calibration calibrated.
>
calibration.
>
calibration.
>
valve calibration.
Checkout procedure
Expected
Task Results Actual Readings Results Comments
Actual
Procedure Spec Readings Results Comments
/
Measure the ground < 0.2 Ω 0.1 Pass
resistance
Actual
Procedure Spec Readings Results Comments
FE Info
GE Representative
Number of Signers
1
>
Name: SSO #: SR #
Date complete
2024-10-02
Customer Signature
Tools used /
Description Serial Number Bar Code Cal Due Date
Attachments
Choose Files No file chosen
Attached Documents :