Rs. P.
Concrete m25 grade., use mixture all type of
1 12,25,663 15,84,475
concreting work.
2 Reinforcement 22,29,610 22,29,610
Form work, shuttering, probs all complete
3 7,46,636 7,46,636
concreting
Balance amount payable 42,01,909 45,60,722
(Authorized Signatory)
-
Name of the Project: Proposed Building Site, Bhattedada.
2 of 6
-
Name of the Project: Proposed Building Site, Bhattedada.
Use RMC
Item No Description of Work Rate Unit
Qty Amount
A Rs. P. Rs. P.
1 Concrete m25 grade., use mixture all type of concreting work. 13000.00 Cum 121.88 15,84,475.39
B Reinforcement
1 BBS For all complete for second basement 105.00 Kg 21234.38 22,29,609.83
2 Form work, shuttering, probs all complete concreting 120.00 ft2 6221.97 7,46,636.40
Total 3814085.22
RA03/ABS 3 of 6
-
Name of the Project: Proposed Building Site, Bhattedada.
DIA OF NO OF C/L (M) UNIT WT 8MM 10MM 12MM 16MM 20MM 25MM QTY/kg
S.NO DESCRIPTION NOS
BAR BAR
Second Basement
1 COLUMN
C1 25# 6 4.00 3.15 3.85 291.22 291.22
20# 6 8.00 3.15 2.47 372.76 372.76
C2 20# 1 12.00 3.15 2.47 93.19 93.19
C3 25# 1 8.00 3.15 3.85 97.07 97.07
20# 1 4.00 3.15 2.47 31.06 31.06
C4 20# 7 12.00 3.15 2.47 652.33 652.33
C5 20# 4 12.00 3.15 2.47 372.76 372.76
C6 25# 2 4.00 3.15 3.85 97.07 97.07
20# 2 8.00 3.15 2.47 124.25 124.25
C7 25# 2 12.00 3.15 3.85 291.22 291.22
C8 25# 3 4.00 3.15 3.85 145.61 145.61
20# 3 8.00 3.15 2.47 186.38 186.38
C9 25# 1 4.00 3.15 3.85 48.54 48.54
20# 1 8.00 3.15 2.47 62.13 62.13
C10 25# 1 4.00 3.15 3.85 48.54 48.54
20# 1 8.00 3.15 2.47 62.13 62.13
C11 16# 4 8.00 3.15 1.58 159.04 159.04
Latteral ties
Type-1 8# 28 26.00 1.86 0.39 534.12 534.12
Type-2 8# 28 26.00 1.54 0.39 442.23 442.23
Type-3 8# 28 26.00 1.14 0.39 327.36 327.36
Type-4 8# 4 26.00 1.54 0.39 63.18 63.18
Type-5 8# 4 26.00 1.06 0.39 43.48 43.48