Financial Proposal - 10kW OnGrid Solar System - Mr. Jawad

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

ENGINEERING

WORKS

MFB
ENGINEERING
WORKS
FINANCIAL &
TECHNICAL PROPOSAL

Our Office

+92 336 6644574


MFBENGINEERINGWORKS
Office # 3/4 HADI ARCADE-1, Business
mfbengineeringworks District, Bahria Town Phase VIII,
[email protected] Rawalpindi, Pakistan
MFB Engineering Works
Office # 3,4 Hadi Arcade - I, Business District, Bahria Town

Phase VIII, Rawalpindi


10 kW On Grid System Quotation

Attn: Mr. Jawad Date: 26-Jan-24


Company: Residential Validity: 3 Days
Address: Rawalpindi Quotation ID: OG-10-10-EL
City: Rawalpindi Prepared by: Ammar Arshad
Contact: +92 320 5500637 Contact No. 0318-5820519

Solar System: On-Grid (Elevated/Raised Structure)


Solar System: On-Grid (N-Type Solar Panels)
9.86 kW PV Modules + 1 x 10 kW On-Grid Inverter(s)
# Parts Specs QTY Price (PKR)

PV Modules (N- Type Mono PERC HC) Tier 1, Grade A -


1 575/580 Wp 17
Jinko/Canadian Solar

2 Mounting Structure - Elevated Structure - 10 Guage MS Painted Job

3 On Grid Inverter - Growatt/Solis 3-ph (5Y) 10 kW 1


4 Inverter Manager / Comm Device WiFi Enabled Included
5 Cables - AC, DC Fast / Pakistan Job 1,270,000
6 Ducting and Accessories Adamjee / Turk / GM Job
7 Protective Equipment (Breakers, SPD, etc.) SunTree / Tomzn Job

8 Tranportation & Lifting Rawalpindi Included

DC Earthing, DISCO Costs (Fees + 2-way meter), Lightning Arrestor, External


9 Job
Disconnector (NEPRA Requirements)

10 Net Metering (Inspection, Documentation, Modifications, etc.) <25 kW FOC

Total Amount 1,270,000

Terms & Conditions:

60% advance with order to confirm delivery timelines and lock prices, 30% after material delivery, 10% after net meter installation
Delivery: 2-4 weeks after order confirmation
Inverter warranty: 5 years, as per manufacturer policy
Solar Panels Warranty: 12 years manufacturing and 30 years performance
1 Year After Sales Support included
Currency conversion calculated at PKR/$ 280; price subject to change with currency variation beyond +- 2%
Prices are exclusive of Government Taxes
Note: This system will not work during electricity outage.
Net Metering
MFB Engineering Scope: Inspection, Documentation, Modifications, DC Earthing, External Disconnect
DISCO Costs (Fees + 2-way meter), Lightning Arrestor
Client Scope: Meter Name/Sanction Load Change, 3 Phase connection, AC Earthing

THANK YOU FOR YOUR BUSINESS


MFB Engineering Works

On-Grid Solar Solution - Payback Calculation

Electricity Tariff Assumptions Solar Solution Assumptions

Grid Cost Per Unit (bill analysis) 43.11 Rs / kWh Installed Modules 9.86 kWp
Total System Cost 1,270,000
Tariff Inflation 5.0% per year Annual Maintenance 1.0% % of System cost

Grid Electricity Annual Cost


Utilized Energy Annual Maint. Cost Net Cost Saving Cumulative Saving
Year Price Saving
(KWh) (PKR) (PKR) (PKR)
(PKR) (PKR)
1 13,680 43.1 589,700 12,700 577,000 577,000
2 13,580 45.3 614,700 13,300 601,400 1,178,400
3 13,480 47.5 640,700 14,000 626,700 1,805,100 BREAK-EVEN
4 13,390 49.9 668,200 14,700 653,500 2,458,600
5 13,300 52.4 696,900 15,400 681,500 3,140,100
6 13,210 55.0 726,800 16,200 710,600 3,850,700
7 13,120 57.8 758,000 17,000 741,000 4,591,700
8 13,028 60.7 790,300 17,900 772,400 5,364,100
TOTAL (25yrs) 315,000 25,462,500 606,500 24,856,500

Monthly Saving (in first year): 48,100

Payback Period (years) 2.15