Psbr01 Art g1 m3 ST Gexxx Area 10 041324
Psbr01 Art g1 m3 ST Gexxx Area 10 041324
Psbr01 Art g1 m3 ST Gexxx Area 10 041324
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
DRAWING LIST (BUILDING G1 AREA 10) PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
NO SHEET NUMBER Sheet Name BEFORE PROCEEDING THE WORK.
I S S U E S
CONSULTANT :
DRAWING TITLE :
11050
23
11 12 & 13
5550 5500 17
19
16 18
K10
K9 L2 K12
G1 AREA 5 G1 AREA 5 G2
K11
10.1 10.1 P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
CENTRIFUGE SYSTEM, O
6950
6950
NOTES
11500
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
CENTRATE TANK, MIXER & SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
CENTRATE TRANSFER PUMPS BEFORE PROCEEDING THE WORK.
10.2 10.2
650
650
g1.3 g1.3
4800 450 EQUIPMENT
1190
(400 kgs)
4550
4550
3900
2460
2710
MF=-2600.000
4800
4800
10.3 10.3
2340
2090
3035 2465
g1.4 g1.4
g1.O g1.P g1.O g1.P
AREA 10 LOADING PLAN AT LEVEL -4.90M AREA 10 LOADING PLAN AT LEVEL 0.00
1 Scale 1 : 100 2 Scale 1 : 100
11050
5550 5500
EQUIPMENT
(3450 kgs)
11500
CONSULTANT :
10.2
ARTELIA Singapore Pte. Ltd.
650
3900
10.3
PLOT NO. LOCATION
4650 kg/m2 Kg Sabun, Mukim Serasa,
(1030 kg/m3 x 7.0m ) Daerah Brunei - Muara,
Negara Brunei Darussalam
DRAWING TITLE :
1415 5550 3035
10000 Specific load as indicated
AREA 10 LOADING PLAN AT LEVEL
-4.90, LEVEL +0.00 & LEVEL 1.60
g1.O g1.P
500 kg/m2
Eurocode 1 - Tab.6.2
DRAWN BY CHECKED BY APPROVED BY DATE
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
11050
5550 5500
F3 F1
400.00 400.00
-1650.00 -1650.00
PART OF BUILDING
G1 AREA 5 F3
10.1
1500 500
FTB1 FTB1
2000
2000
3500
BUILDING G1 AREA 9
750 750 MF-2
600.00 2000
500
-600.00
6950
2000
3500
300
2690
FTB1
11500
FTB1
FTB1
MF-2
4490
10.2
650
MF-1 g1.3
1800
1840 600.00
-3800.00
4550
4000 606
3900
MF-1
F3 F2
F4
2000
2500
2000
10.3
3835 965
4800
No. Date Description Chk'd By
1415 5550 3035
R E V I S I O N
10000
PROJECT :
CONSULTANT :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
11050
10.A 10.B 10.C 5550 5500
11050 1 2
ST300_FRA13 ST300_FRA13
5550 5500
PART OF BUILDING
BUILDING G1 AREA 9 SSL=+0.000 G1 AREA 9
CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
CENTRATE TRANSFER PUMPS 416
6950
6950
7600
G3 G3 G3 SB1 SB2
369
SB1
SB1
G3
G3
G3
G3
G3
G3 G3 G3 SB1
11500
11500
SB2
314
SB1
SB2
MF=0.000
SB1
SB1
SB1
SB1
10.2 10.2 SB1 SB1 SB2
650
650
OPENING FOR 2 3
GRATING COVER 4800
g1.3 G3 G3 G3 SB2 g1.3
ST500_FOU10 ST500_FOU10
SB1
G3
G3
G3
G3
G3
G3
G3
SB1
373
3 G3 G3 G3 SB1
4550
4550
3900
3900
ST300_FRA13
SB2
-
2710
--- I S S U E S
4800
B1
B1
10.3 10.3
2090
UP
AREA 10 GROUND FLOOR FRAMINGPLAN AT LEVEL 0.00 AREA 10 FRAMINGPLAN AT LEVEL 1.60M
1 Scale 1 : 100 2 Scale 1 : 100
AREA 10 STEEL BEAM SECTION SCHEDULE ...
NAME WEIGHT MATERIAL
SECTION
(kg/m) CONSULTANT :
SB1 U16b 19.8 S275
SB2 L75x6 6.9 S275 ARTELIA Singapore Pte. Ltd.
U10 U10 10.0 S275 6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809
LEGENDS:
DETAILED DESIGN PHASE
MF - MAT FOOTING MARK BUILDING G1
500 - MAT FOOTING THICKNESS (mm) STRUCTURAL DRAWINGS
VARIES - TOP OF MAT FOOTING GRADE LEVEL (m)
DRAWING TITLE :
ALL RELEVANT CONTRACTORS SHALL
COORDINATE TOGETHER BEFORE PROCEEDING AREA 10 GROUND FLOOR FRAMING
THE WORKS, ESPECIALLY PIPING SYSTEM. PLAN
LEGENDS:
DRAWN BY CHECKED BY APPROVED BY DATE
COLUMNS & WALLS ABOVE
PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5
COLUMNS & WALLS BELOW JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST100_FRA19
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH
5
2 4 6
3 7
23
11 12 & 13
KEY PLAN
11050 11050 15
21 22
20
5550 5500
17
5550 5500 19
16 18
K10
K9 L2 K12
1 2 1 2 B2 CD2
G2
E F
A B1 C1 D1
K4
PART OF BUILDING PART OF BUILDING J M
G1 AREA 5 G1 AREA 5
K2 K3 U
10.1 10.1
K1
L1
G1
K7
G2 G2 SB3 SB3 O
6950
SB3 SB3 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
SB3
SB3
SB3
11500
11500
G2
G1
G2
10.2 10.2
SB3 SB3
650
650
g1.3 g1.3
3 3
4550
4550
3900
3900
ST300_FRA13 ST300_FRA13
G2 G2 SB3 SB3
10.3 10.3
g1.O g1.P
g1.4 g1.4
12465
1415 5550 3035 2465
1 2
ST300_FRA13 ST300_FRA13
I S S U E S
10.1 SB4
6950
SB4
SB4
PURE SALMON LAND-BASED
ATLANTIC SALMON FARM
10.2
650
SB4
g1.3
3
4550
3900
ST300_FRA13
CONSULTANT :
SB4
10.3
ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809
DRAWING TITLE :
g1.O g1.P
AREA 10 ROOF FRAMING PLAN
4Bolts:M24 Gr 4.8
10
1
Hole Type (Beam):STD 8
14
KEY PLAN
15 22
60 80 60
20 21
17
19
200
g1.O 10.A 10.B g1.P 10.C 16 18
11050 K9
K10
L2 K12
5550 5500
B2 CD2
G2
K11
P
J M
K2 K3 U
K1
L1
G1
PART OF BUILDING
G1 AREA 5 O
10
PART OF BUILDING THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
G1 AREA 9 Hole Type (Beam):STD NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
100
S 275 PL 10x250x175 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
50 75 50
Hole Type (Connector):STD PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
BRACING C 4Bolts:M20 Gr 4.8 DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
175
100
300
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
Hole Type (Beam):STD
100
S 355
HA 300x200x6x10 60 95 Hole Type (Beam):STD
10
Hole Type (Connector):STD
S 275 S 355 50 100 50
11500
650
g1.3
BRACING C
3900
Scale 1:10
LYSAGHT 2C15024
10.3
g1.4
AREA 10 ROOF PURLIN PLAN
1 Scale 1 : 100
75 75 100 100 75 75
250 250
TOP VIEW
200
z10 mm
z10 mm
I S S U E S
110
PROJECTION MIN 5MM Hole Type (Beam):STD
L
(OR 2 THREAD PICH)
60 80 60
60 80 60
T1 L1 Hole Type (Connector):STD
T2 LOCK NUT
300
4Bolts:M20 Gr 4.8
200
200
80
400
Pipe D
DxP
110
50 300 50 FRAME STEEL RAFTER
150 150 (VARIES)
TACK WELD @3POINT S.A.B WASHER NUT
75 75 100 100 75 75
H (MIN 12xD) PRO FRAME STEEL COLUMN
125 75 75 125 250 250 (VARIES)
No. Date Description Chk'd By
FRAME STEEL RAFTER
50
PL 300x400x16mm
TYPICAL SHEAR CONNECTION DETAIL (COLUMN WEB TO BEAM)
100
PLAN VIEW
Stiffener Plate (S355 300x100x10)
200 300
CONSULTANT :
z10 mm
z10 mm
ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
z10 mm SINGAPORE 068809
z10 mm
FRAME STEEL COLUMN FRAME STEEL COLUMN
z10 mm
PL 300x400x16mm (S355) PL 300x400x16mm (S355) z10 mm DETAILED DESIGN PHASE
TOC @ ELEV +5.000 TOC @ ELEV +5.000
SIKA GROUT 25mm THK. SIKA GROUT 25mm THK. BUILDING G1
STRUCTURAL DRAWINGS
40
40
ANCHOR BOLT 4M16 (Gr 8.8) ANCHOR BOLT 4M16 (Gr 8.8) FRAME STEEL RAFTER
CAST-IN-BOLTS CAST-IN-BOLTS SLOPE ANGLE 5%
(VARIES)
FRAME STEEL RAFTER
(VARIES) PLOT NO. LOCATION
REINFORCEMENT REINFORCEMENT Kg Sabun, Mukim Serasa,
CONCRETE COLUMN CONCRETE COLUMN FRAME STEEL COLUMN Daerah Brunei - Muara,
FRAME STEEL COLUMN Negara Brunei Darussalam
(VARIES)
(VARIES)
DRAWING TITLE :
Stiffener Plate (S355 300x100x10) Stiffener Plate (S355 300x100x10)
CROSS SECTION VIEW LONGITUDINAL SECTION VIEW AREA 10 ROOF PURLIN PLAN
TOP VIEW LATERAL VIEW
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
11050
5550 5500
PART OF BUILDING
G1 AREA 5
10.1
500
500
600
C2 C3 C2
250 300 250
600
500 500
BUILDING G1 AREA 9 CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
CENTRATE TRANSFER PUMPS
6950
1790 2600 1160
C1 C1
990
758
C1 C1
11500
C1 C1
1550
1195
3700 758
10.2
650
C1 C1
355
400 4000 400 g1.3
1840
C1 C1
1000
450
C1 C1
400
4550
2600 1160
3900
W1
250
W1
4000
600
500
500
10.3 C2 C3 C2
250 300 I S S U E S
W1
W1
400
10000
CONSULTANT :
DRAWING TITLE :
1 0 1 2 3 4 5
LEGENDS: PM CR/RB LG 09/08/2024
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
11050
5550 5500
PART OF BUILDING
G1 AREA 5
10.1
375
379
379
SC2 150SC2 SC2
150 150
BUILDING G1 AREA 9
CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
6950
CENTRATE TRANSFER PUMPS
1092 3700
SC1 SC1
11500
1195
10.2 SC1 SC1
295
650
g1.3
4550 1092 3700 758
3900
SC2 SC2 SC2
125
125
125
10.3 I S S U E S
150 150 150
10000
CONSULTANT :
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
11050
5550 5500
PART OF BUILDING
G1 AREA 5
10.1
375
379
379
AB1 150 AB1 AB1
150 150
BUILDING G1 AREA 9
CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
6950
CENTRATE TRANSFER PUMPS
1092 3700
AB1 AB1
11500
1195
10.2 AB1 AB1
295
650
g1.3
1092 3700 758
4550
3900
AB1 AB1 AB1
125
125
125
10.3 I S S U E S
150 150 150
10000
CONSULTANT :
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
B2 CD2
G2
K11
P
K5 K6
RV
E F
11500 A B1 C1 D1
11500
K4
M
4550 6950
J
K2 K3 U
6950 4550 L1
K1
G1
K7
C15024 C15024
+7.750 +7.750 O
1250
1250
SC2 SC2
+6.500 +6.500 SC2 SB3 SC2
NOTES
g1.10 TOP OF BEAM G2 g1.10 TOP OF BEAM G2
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
Z15024 BEFORE PROCEEDING THE WORK.
7750
7750
6500
6500
W1
100mm THK. ZOCALO WALL
C2 +0.000 C2 +0.000 +0.000
+0.000 +0.000 C2 C2
1500 150
1500 150
g1.10 +0.000 g1.10 +0.000
1650
1650
-0.150 -0.150
FTB1
g1.10 -0.150 2 g1.10 -0.150
F4 FTB1
ST100_FRA19
950
600 600 950
-2.600
-1.650 -1.650
F4
g1.10
g1.10 -2.600
-1.650 g1.10 -1.650
1200
650 3900
g1.3
AREA 10 FRAMING ELEVATION @ GRID 10.A AREA 10 FRAMING ELEVATION @ GRID 10.C
1 Scale 1 : 100 2 Scale 1 : 100
11050
5550 5500
C15024 Z15024
+7.750 5%
g1.10 TOP OF ROOF SB3
1250
SC2 SB3
+6.500 SC2 SC2
g1.10 TOP OF BEAM G2 G2 No. Date Description Chk'd By
R E V I S I O N
Z15024 C15024
PROJECT :
5%
PURE SALMON LAND-BASED
7750
W1
F4
400.00
+0.000 -1650.00
+0.000 C2 C3 C2
150
1500 150
g1.10 +0.000
-0.150 CONSULTANT :
g1.10 -0.150
2450
-3.200
g1.10 -3.200
DETAILED DESIGN PHASE
-3.800 MF-1
g1.10 -3.800 BUILDING G1
LEAN CONCRETE (TYP.) 600.00
-3800.00 STRUCTURAL DRAWINGS
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
KEY PLAN
15 22
20 21
17
19
16 18
11500 11500
K10
K9 L2 K12
B2 CD2
4550 6950 4550 6950 G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
+7.750 +7.750 K4
M
g1.10 TOP OF ROOF g1.10 TOP OF ROOF
J
K2 K3 U
1250
1250
SB3 L1
K1
+6.500 +6.500
g1.10 TOP OF BEAM g1.10 TOP OF BEAM G2 G2 O
NOTES
7750
7750
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
6500
6500
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
+1.600 +1.600
g1.10 +1.600 g1.10 +1.600
SB1 G3 +1.500 G3 G3
1600
+1.500
1500
1500
g1.10 +1.500 100mm THK. ZOCALO WALL SC1 SC1 +0.000 g1.10 +1.500 SC1SC1
+0.000 C1 C1 C1 C1 C2 +0.000 C3 C1 C1 C1 C1 C1 C1 C3
1500 150
W1 W1
g1.10 +0.000 g1.10 +0.000
600
600
400 1250
1650
1650
-0.150 -0.150
g1.10 -0.150
2600
g1.10 -0.150
FTB1 F2 FTB1
-0.600 -0.600
g1.10 -0.600 -2.600 MF-2 g1.10 -0.600
-1.650 600.00 MF-2
-1.650
600600
g1.3
11050
I S S U E S
5550 5500
1250
SB3
+6.500
g1.10 TOP OF BEAM
C15024
5% No. Date Description Chk'd By
Z15024
R E V I S I O N
7750
SB4
PROJECT :
6500
2261
PURE SALMON LAND-BASED
+1.600 SB1 ATLANTIC SALMON FARM
g1.10 +1.600 W1 W1
+1.500 SC1 SC1
1600
1500 150 1500
G3
g1.10 +1.500
+0.000 C1 C1 C1 C1
g1.10 +0.000
-0.150
1650
1650
g1.10 -0.150 W1
2600
-0.600
g1.10 -0.600
-2.600 MF-2 CONSULTANT :
-1.650
g1.10 -2.600
600 600
600
-600.00
ARTELIA Singapore Pte. Ltd.
-3.200 6 Shenton Way – 39-02 OUE Downtown 1
g1.10 -3.200 SINGAPORE 068809
MF-1
-3.800 600.00
LEAN CONCRETE (TYP.)
g1.10 -3.800 -3800.00
DETAILED DESIGN PHASE
BUILDING G1
STRUCTURAL DRAWINGS
1415 8585
10000
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam
50 3500 50 2 4 6
5
3 7
9
10
1
14
50
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
600 19
500 16 18
K10
K9 L2 K12
CONCRETE B2 CD2
CONCRETE
G2
COLUMN P
K11
50 2000 50 COLUMN K5 K6
RV
CONCRETE E F
CONCRETE
A B1 C1 D1
SLAB K4
0.000 SLAB J M
50
K2 K3 U
±0.000 0.000 L1
K1
±0.000 G1
K7
-0.150
150
-0.150 O
COLUMN TIES.
3500
COLUMN TIES.
COLUMN NOTES
REINF. COLUMN
1100
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
REINF. NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
2000
ST500-FOU10
1500
T12-250 T12-250 PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
1550
2
ST500-FOU10
6
400
1.650
1.650
50
LEAN CONCRETE
50
T12-250 LEAN CONCRETE
T12-250
3500
2000
50
600 500
50 2500 50
CONCRETE CONCRETE
COLUMN COLUMN
50 2000 50
50
CONCRETE CONCRETE
SLAB SLAB
50
0.000 0.000
±0.000 ±0.000
-0.150 -0.150
COLUMN COLUMN
REINF. REINF.
1100
1100
2500
2000
1500
1500
T12-250 T12-250
ST500-FOU10
4
400
400
8
1.650 1.650
50
50
LEAN CONCRETE LEAN CONCRETE
50
T12-250 T12-250
2500
50
I S S U E S
11050
5550 5500 No. Date Description Chk'd By
PART OF BUILDING R E V I S I O N
G1 AREA 5
10.1 PROJECT :
4550
4550
6950
+0.000 +0.000
150
150
g1.10 +0.000 g1.10 +0.000
T16-200
T16-200
-0.150 -0.150
2690
11500
2600
CONSULTANT :
2450
2450
4490
3050
T16-200
10.2 T16-200 T16-200 ARTELIA Singapore Pte. Ltd.
650
600
1800
1840
-3.200
-3.200
g1.10 -3.200 T16-200 STARTER BARS
g1.10 -3.200
4550
- BUILDING G1
--- REINFORCEMENT NOTATION: STRUCTURAL DRAWINGS
4800
TOP REINFORCEMENT
10.3 g1.3
g1.3 BOTTOM REINFORCEMENT
PLOT NO. LOCATION
T16-200 T25-200 Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam
T16-200
TYPE OF STEEL
AREA 10 FOUNDATION SECTION DETAIL A AREA 10 FOUNDATION SECTION DETAIL B DRAWING TITLE :
3835 965 2 Scale 1 : 100 3 Scale 1 : 100
(T=HIGH YIELD STEEL) SPACING
(R=MILD STEEL) BAR SIZE AREA 10 FOUNDATION DETAILS
4800
1415 5550 3035 - T25-200 TO BE PROVIDED IN THE WHOLE AREA
10000 OF THE FOUNDATION IN BOTH WAYS FOR TOP LAYER.
- FOUNDATION REINFORCEMENT SHOWN EXCEED 11.7m
SHALL BE PROVIDED WITH TENSION LAP UNO. DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 09/08/2024
g1.4 g1.O g1.P
JOB NO. DRAWING NO. SCALE
PSBR01 ST500_FOU10 As indicated
AREA 10 FOUNDATION TOP AND BOTTOM REINFORCEMENT PLAN Notes:
1 Scale 1 : 100 1. ALL FOOTINGS SHALL BE COATED WITH BITUMINOUS MATERIAL.
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
S1
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
g1.10 +0.000 SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
300
lcr
REINF. (REFER SCHEDULE)
8T25
300
STOREY HEIGHT
SPACING
LINK
FOUDATION
S
SPACING OF LINKS AT LAP NOT
50
GREATER THAN:
Iₒ
∅ OF LONGITUDINAL BAR
- 12∅
- 0.6 x LESSER DIM OF COLUMN/WALL
Lt
- 100
LINKS (S)
50
T10-200 T10-200 T10-200
MAX(lcr;Lt)
C1
Lt
COLUMN
S1
KICKER 100
LEVEL (X+1)
4900
50
R8-600(600)
S1
LINK SPACING (S1)
REINF. (REFER SCHEDULE) LEVEL + 6.500M
lcr
T16-200
400
500
T12-150
STOREY HEIGHT
SPACING
LINK
S
LINK SPACING (S)
16T25
500
SPACING OF LINKS AT LAP
Iₒ
NOT GREATER THAN:
50
∅ OF LONGITUDINAL BAR
- 12∅
FOUDATION
- 0.6 x LESSER DIM OF COLUMN/WALL
Lt
- 100
-4.900
50
g1.10 -4.900 A-A I S S U E S
MAX(lcr;Lt)
LINKS (S) T10-200 T10-200 T10-200
Lt
S1
KICKER 100
LEVEL X
LEVEL
50
C2
TYPICAL WALL REINFORCEMENT W1 DETAIL COLUMN
S1
No. Date Description Chk'd By
45 Ø
R E V I S I O N
100MAX
PROJECT :
S1
WALL DETAILS AREA 10
Scale 1 : 25 PURE SALMON LAND-BASED
ATLANTIC SALMON FARM
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
W W
0.25L1 0.25L1 0.5L1 Max(L1 & 0.25L2)
(Min. Lt)
S1 S2
(Min. Lt)
S3 S2
(Min. Lt)
S1
(Min. Lt)
Max(0.5L1 & 0.25L2)
NORMAL LINK
e.g. 2R8-100/200
TORSION LINK
e.g. 2R8-100/200
NOTES:
2
(Min. Lt) 1. * U.N.O. LAPPINGS ARE INDICATE ONLY. NO LAPPING IF THE
H
* LAP * LAP * LAP 1 REINFORCEMENT ARE OF SAME SIZE AND LENGTH OF REINFORCEMENT NOT
T11 T12 T13 T41 T42 EXCEEDING 11.7M. REFER TO GENERAL NOTES FOR LOCATION AND LAP LENGTH.
DETAIL OF LINKS
TYPE 1 TYPE 2 2. ORIENTATION OF REBARS IN BEAMS (FROM LEFT TO RIGHT, BOTTOM TO TOP)
W SHALL SAME THAT OF BEAM MARKS.
W W
PROVIDE 1T10 @800 (MAX) 3. REFER TO GENERAL NOTES AND STANDARD DRAWINGS
WHEN 600 < D1 < 1000 FOR OTHER DETAILING REQUIREMENTS.
0.08L1 * LAP B12 SB * LAP 0.08L1 * LAP I S S U E S
H > 700
B11 B13 B41 SB 2 1 2 SB SB 4. Lt: TENSION LAP LENGTH.
1 PROVIDE 2T10 @800 (MAX)
H
3 3 4
D1
SPAN L1 SPAN L1 SPAN L2 SB SB WHEN 1000 < D1 < 2000
2/3H
SB SB
SINGLE SPAN CANTILEVER TYPE 3 TYPE 4
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
11050
5550 5500
PART OF BUILDING
G1 AREA 5
10.1
6950
11500
10.2
650
g1.3
4550
3900
T12-200
T12-200
10.3
1500MM X 1500MM I S S U E S
MANHOLE OPENING
T12-200
T12-200
1415 5550 3035
10000
g1.O g1.P R E V I S I O N
g1.4
PROJECT :
CONSULTANT :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K1
L1
G1
K7
NOTES
I S S U E S
CONSULTANT :
DRAWING TITLE :
AREA 10 3D MODEL