Psbr01 Art g1 m3 ST Gexxx Area 10 041324

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE

DRAWING LIST (BUILDING G1 AREA 10) PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
NO SHEET NUMBER Sheet Name BEFORE PROCEEDING THE WORK.

1 PSBR01_ART_G1_DR_ST001_GE010 AREA 10 DRAWING LIST


2 PSBR01_ART_G1_DR_ST100_LL010 AREA 10 LOADING PLAN AT LEVEL -4.90, LEVEL +0.00 & LEVEL 1.60
3 PSBR01_ART_G1_DR_ST100_FOU10 AREA 10 FOUNDATION PLAN
4 PSBR01_ART_G1_DR_ST100_FRA19 AREA 10 GROUND FLOOR FRAMING PLAN
5 PSBR01_ART_G1_DR_ST100_FRA20 AREA 10 ROOF FRAMING PLAN
6 PSBR01_ART_G1_DR_ST100_FRA21 AREA 10 ROOF PURLIN PLAN
7 PSBR01_ART_G1_DR_ST100_COL13 AREA 10 RC WALL PLAN
8 PSBR01_ART_G1_DR_ST100_COL14 AREA 10 STEEL COLUMN PLAN
9 PSBR01_ART_G1_DR_ST100_COL15 AREA 10 ANCHOR BOLT PLAN
10 PSBR01_ART_G1_DR_ST200_FRA10 AREA 10 FRAMING ELEVATION
11 PSBR01_ART_G1_DR_ST300_FRA13 AREA 10 FRAME SECTION
12 PSBR01_ART_G1_DR_ST500_FOU10 AREA 10 FOUNDATION DETAILS
13 PSBR01_ART_G1_DR_ST500_COL09 AREA 10 COLUMN SCHEDULE REINFORCEMENT
14 PSBR01_ART_G1_DR_ST500_BEA08 AREA 10 BEAM SCHEDULE REINFORCEMENT
15 PSBR01_ART_G1_DR_ST500_SLA07 AREA 10 TANK TOP FLOOR_TOP AND BOTTOM REINFORCEMENT PLAN
16 PSBR01_ART_G1_DR_ST900_GE010 AREA 10 3D MODEL

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 10 DRAWING LIST

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 09/08/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST001_GE010 1:100

SHEET SIZE REV. NO.


A1
G1 AREAS KEY PLAN NORTH

10.A 10.B 10.C 2 4 6


5

10.A 10.B 10.C 3 7


9
10
1
14
8

11050
23
11 12 & 13

11050 5550 5500 KEY PLAN


15 22
20 21

5550 5500 17

19

16 18
K10
K9 L2 K12

PART OF BUILDING PART OF BUILDING B2 CD2

G1 AREA 5 G1 AREA 5 G2
K11

10.1 10.1 P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1

BUILDING G1 AREA 9 BUILDING G1 AREA 9


G1
K7

CENTRIFUGE SYSTEM, O

CENTRATE TANK, MIXER &


CENTRATE TRANSFER PUMPS

6950

6950
NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
CENTRIFUGE SYSTEM, PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
11500

11500
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
CENTRATE TANK, MIXER & SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
CENTRATE TRANSFER PUMPS BEFORE PROCEEDING THE WORK.

10.2 10.2

650

650
g1.3 g1.3
4800 450 EQUIPMENT
1190

(400 kgs)
4550

4550
3900

2460
2710

MF=-2600.000
4800

4800
10.3 10.3

2340
2090

3035 2465

1415 5550 3035 OPENING FOR


10000 GRATING COVER
1415
10000

g1.4 g1.4
g1.O g1.P g1.O g1.P

AREA 10 LOADING PLAN AT LEVEL -4.90M AREA 10 LOADING PLAN AT LEVEL 0.00
1 Scale 1 : 100 2 Scale 1 : 100

10.A 10.B 10.C


I S S U E S

11050
5550 5500

No. Date Description Chk'd By


PART OF BUILDING R E V I S I O N
G1 AREA 5
10.1 PROJECT :

PURE SALMON LAND-BASED


PART OF BUILDING ATLANTIC SALMON FARM
G1 AREA 9
CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
CENTRATE TRANSFER PUMPS
6950

EQUIPMENT
(3450 kgs)
11500

CONSULTANT :

10.2
ARTELIA Singapore Pte. Ltd.
650

g1.3 6 Shenton Way – 39-02 OUE Downtown 1


SINGAPORE 068809
4550

3900

DETAILED DESIGN PHASE


BUILDING G1
LEGENDS: STRUCTURAL DRAWINGS

10.3
PLOT NO. LOCATION
4650 kg/m2 Kg Sabun, Mukim Serasa,
(1030 kg/m3 x 7.0m ) Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :
1415 5550 3035
10000 Specific load as indicated
AREA 10 LOADING PLAN AT LEVEL
-4.90, LEVEL +0.00 & LEVEL 1.60
g1.O g1.P
500 kg/m2
Eurocode 1 - Tab.6.2
DRAWN BY CHECKED BY APPROVED BY DATE

AREA 10 LOADING PLAN AT LEVEL 1.60M g1.4 PM CR/RB LG 09/08/2024


1 0 1 2 3 4 5
3 Scale 1 : 100 1000 kg/m2 JOB NO. DRAWING NO. SCALE
SCALE m Eurocode 1 - Tab.6.2 PSBR01 1:100
1: 100 ST100_LL010
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

10.A 10.B 10.C

11050
5550 5500

F3 F1
400.00 400.00
-1650.00 -1650.00

PART OF BUILDING
G1 AREA 5 F3
10.1

1500 500
FTB1 FTB1

2000

2000
3500
BUILDING G1 AREA 9
750 750 MF-2
600.00 2000
500
-600.00

6950
2000
3500
300

2690
FTB1
11500

FTB1

FTB1
MF-2

4490
10.2

650
MF-1 g1.3

1800
1840 600.00
-3800.00
4550

4000 606

3900
MF-1
F3 F2
F4

750 500 750


FTB1 FTB1 I S S U E S
4800

2000

2500

2000
10.3

250 1750 2000


2000 2500

3835 965
4800
No. Date Description Chk'd By
1415 5550 3035
R E V I S I O N
10000
PROJECT :

g1.4 PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
g1.O g1.P

AREA 10 FOUNDATION PLAN


1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


LEGENDS: BUILDING G1
MF - MAT FOOTING MARK STRUCTURAL DRAWINGS
600 - MAT FOOTING THICKNESS (mm)
VARIES BOTTOM OF MAT FOOTING LEVEL (m)
-
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
F1 - FOOTING MARK Daerah Brunei - Muara,
Negara Brunei Darussalam
400 - FOOTING THICKNESS (mm)
-1.650 - BOTTOM OF FOOTING LEVEL (m) DRAWING TITLE :

AREA 10 FOUNDATION PLAN


NOTE:
- SOIL SHALL BE MEET THE FOLLOWING
PROPERTIES:
+ ALLOWABLE BEARING CAPACITY: 200 KPA
DRAWN BY CHECKED BY APPROVED BY DATE
+ ALLOWABLE SETTLEMENT LIMIT: 50 MM
- SOIL IMPROVEMENT SHALL BE DONE AS STATED PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5 IN CONSTRUCTION DRAWINGS BY SUPPLIER
EXPERTISE JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 - ALL RELEVANT CONTRACTORS SHALL ST100_FOU10
COORDINATE TOGETHER BEFORE PROCEEDING SHEET SIZE REV. NO.
THE WORKS, ESPECIALLY PIPING SYSTEM. A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

10.A 10.B 10.C

11050
10.A 10.B 10.C 5550 5500

11050 1 2
ST300_FRA13 ST300_FRA13
5550 5500

PART OF BUILDING PART OF BUILDING


G1 AREA 5 G1 AREA 5
10.1 10.1

PART OF BUILDING
BUILDING G1 AREA 9 SSL=+0.000 G1 AREA 9
CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
CENTRATE TRANSFER PUMPS 416
6950

6950
7600
G3 G3 G3 SB1 SB2

369
SB1

SB1
G3

G3
G3

G3

G3
G3 G3 G3 SB1
11500

11500
SB2

314
SB1
SB2
MF=0.000

SB1
SB1

SB1
SB1
10.2 10.2 SB1 SB1 SB2

650

650
OPENING FOR 2 3
GRATING COVER 4800
g1.3 G3 G3 G3 SB2 g1.3
ST500_FOU10 ST500_FOU10

SB1
G3
G3
G3
G3
G3
G3
G3
SB1

373
3 G3 G3 G3 SB1
4550

4550
3900

3900
ST300_FRA13
SB2
-
2710

--- I S S U E S
4800

B1
B1

10.3 10.3
2090
UP

1415 5550 3035


10000
3835
1415 5550 3035

No. Date Description Chk'd By


10000
g1.O g1.P R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


g1.4 g1.4 ATLANTIC SALMON FARM
g1.O g1.P

AREA 10 GROUND FLOOR FRAMINGPLAN AT LEVEL 0.00 AREA 10 FRAMINGPLAN AT LEVEL 1.60M
1 Scale 1 : 100 2 Scale 1 : 100
AREA 10 STEEL BEAM SECTION SCHEDULE ...
NAME WEIGHT MATERIAL
SECTION
(kg/m) CONSULTANT :
SB1 U16b 19.8 S275
SB2 L75x6 6.9 S275 ARTELIA Singapore Pte. Ltd.
U10 U10 10.0 S275 6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

LEGENDS:
DETAILED DESIGN PHASE
MF - MAT FOOTING MARK BUILDING G1
500 - MAT FOOTING THICKNESS (mm) STRUCTURAL DRAWINGS
VARIES - TOP OF MAT FOOTING GRADE LEVEL (m)

SOG - SLAB ON GRADE MARK PLOT NO. LOCATION


150 - SLAB ON GRADE THICKNESS (mm) Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
0.000 - TOP OF SLAB ON GRADE LEVEL (m) Negara Brunei Darussalam

DRAWING TITLE :
ALL RELEVANT CONTRACTORS SHALL
COORDINATE TOGETHER BEFORE PROCEEDING AREA 10 GROUND FLOOR FRAMING
THE WORKS, ESPECIALLY PIPING SYSTEM. PLAN

LEGENDS:
DRAWN BY CHECKED BY APPROVED BY DATE
COLUMNS & WALLS ABOVE
PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5
COLUMNS & WALLS BELOW JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST100_FRA19
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7

10.A 10.B 10.C g1.O 10.A 10.B g1.P 10.C 9


10
1
14
8

23
11 12 & 13

KEY PLAN
11050 11050 15
21 22
20

5550 5500
17

5550 5500 19

16 18
K10
K9 L2 K12

1 2 1 2 B2 CD2
G2

ST300_FRA13 ST300_FRA13 ST300_FRA13 ST300_FRA13


K11
P
K5 K6
RV

E F
A B1 C1 D1
K4
PART OF BUILDING PART OF BUILDING J M

G1 AREA 5 G1 AREA 5
K2 K3 U

10.1 10.1
K1
L1
G1
K7

G2 G2 SB3 SB3 O

BUILDING G1 AREA 9 BUILDING G1 AREA 9


NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
6950

6950
SB3 SB3 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

SB3
SB3

SB3
11500

11500
G2

G1

G2
10.2 10.2
SB3 SB3

650

650
g1.3 g1.3

3 3
4550

4550
3900

3900
ST300_FRA13 ST300_FRA13

G2 G2 SB3 SB3
10.3 10.3

1415 5550 3035 2465


1415 5550 3035 2465
10000
10000

g1.O g1.P

g1.4 g1.4

AREA 10 FRAMING PLAN @ EL +6.50M AREA 10 ROOF FRAMING PLAN


1 Scale 1 : 100 2 Scale 1 : 100

10.A 10.B 10.C

12465
1415 5550 3035 2465

1 2
ST300_FRA13 ST300_FRA13
I S S U E S

10.1 SB4
6950

No. Date Description Chk'd By


SB4
R E V I S I O N
PROJECT :
11500

SB4

SB4
PURE SALMON LAND-BASED
ATLANTIC SALMON FARM
10.2

650
SB4
g1.3

3
4550

3900
ST300_FRA13

CONSULTANT :
SB4
10.3
ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
g1.4 Negara Brunei Darussalam

DRAWING TITLE :
g1.O g1.P
AREA 10 ROOF FRAMING PLAN

AREA 10 ROOF CANOPY FRAMING PLAN @ EL +4.00M


3 Scale 1 : 100 AREA 10 STEEL BEAM SECTION SCHEDULE ... DRAWN BY CHECKED BY APPROVED BY DATE
LEGEND: PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5 NAME WEIGHT MATERIAL
SECTION
(kg/m) JOB NO. DRAWING NO. SCALE
SCALE m : FULLY RESTRAINED CONNECTIONS TYPE R SB3 HA 300x250x8x12 64.4 S355 PSBR01 ST100_FRA20 1:100
1: 100
SB4 HA 300x200x6x10 44.6 S355 SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

Hole Type (Beam):STD 2 4 6


5

Hole Type (Connector):STD 3 7


9

4Bolts:M24 Gr 4.8
10
1
Hole Type (Beam):STD 8
14

S 275 Hole Type (Connector):STD


PL 10x200x450 4Bolts:M24 Gr 4.8 11 12 & 13
23

KEY PLAN
15 22

60 80 60
20 21
17

19

200
g1.O 10.A 10.B g1.P 10.C 16 18

11050 K9
K10
L2 K12

5550 5500
B2 CD2
G2
K11
P

FRAME STEEL RAFTER 60 95 140 95 60 FRAME STEEL RAFTER


K5 K6
RV

(VARIES) 450 (VARIES) A B1 C1 D1


K4
E F

J M
K2 K3 U

K1
L1
G1

DETAIL - TOP VIEW


K7

PART OF BUILDING
G1 AREA 5 O

10.1 250 200


ADD Z15024, 60
LAP 900 ADD Z15024, 50 150 50 10
Slope angle 5% S 275 PL 10x200x450 NOTES
LAP 900

10
PART OF BUILDING THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
G1 AREA 9 Hole Type (Beam):STD NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,

100
S 275 PL 10x250x175 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE

50 75 50
Hole Type (Connector):STD PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
BRACING C 4Bolts:M20 Gr 4.8 DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE

175

100

300
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
Hole Type (Beam):STD

PURLIN LYSAGHT Z15024


6950

BEFORE PROCEEDING THE WORK.

@MAX 1200, LAP 900


Hole Type (Connector):STD
BRACING C 2Bolts:M20 Gr 4.8

100
S 355
HA 300x200x6x10 60 95 Hole Type (Beam):STD

10
Hole Type (Connector):STD
S 275 S 355 50 100 50
11500

LYSAGHT 2Bolts:M24 Gr 4.8


PL 8x250x200 HA 300x200x6x10
2C15024

10.2 SPLICING DETAIL - LATERAL VIEW DETAIL - FRONT VIEW

650
g1.3
BRACING C

ADD Z15024 (ALL)


@MAX 1200
TYPICAL MOMENT CONNECTION SPLICING DETAIL (BEAM TO BEAM)
4550

3900
Scale 1:10
LYSAGHT 2C15024

10.3

1415 5550 3035


10000 2465
FRAME STEEL RAFTER
(VARIES)
PL 6x250x200mm (S355)
FRAME STEEL COLUMN
(VARIES)

g1.4
AREA 10 ROOF PURLIN PLAN
1 Scale 1 : 100

75 75 100 100 75 75
250 250

TOP VIEW
200
z10 mm
z10 mm
I S S U E S

110
PROJECTION MIN 5MM Hole Type (Beam):STD
L
(OR 2 THREAD PICH)

60 80 60

60 80 60
T1 L1 Hole Type (Connector):STD
T2 LOCK NUT

300
4Bolts:M20 Gr 4.8

200

200

80
400
Pipe D
DxP

110
50 300 50 FRAME STEEL RAFTER
150 150 (VARIES)
TACK WELD @3POINT S.A.B WASHER NUT
75 75 100 100 75 75
H (MIN 12xD) PRO FRAME STEEL COLUMN
125 75 75 125 250 250 (VARIES)
No. Date Description Chk'd By
FRAME STEEL RAFTER
50

BOLT DIMENSION PLASTIC CAP R E V I S I O N


(VARIES)
150

CONCRETE COLUMN PROJECT :


ANCHOR BOLT 4M16 (Gr. 8.8) DxP FRAME STEEL COLUMN
200
200

CAST-IN-BOLTS PRO Pipe D L1 (VARIES)


SIZE THREAD PICH T1 (mm) T2 (mm) L (mm) LATERAL VIEW FRONT VIEW
PURE SALMON LAND-BASED
100

(mm) (mm) (mm)


(mm)
ATLANTIC SALMON FARM
500

PL 300x400x16mm
TYPICAL SHEAR CONNECTION DETAIL (COLUMN WEB TO BEAM)
100

M16 M16 x 2.5 90 15 300 65 D55 60


4
200
200

FRAME STEEL COLUMN Scale 1:10


(VARIES)
STRAIGHT ANCHOR BOLT DETAIL
150
50

PLAN VIEW
Stiffener Plate (S355 300x100x10)
200 300
CONSULTANT :
z10 mm
z10 mm
ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
z10 mm SINGAPORE 068809
z10 mm
FRAME STEEL COLUMN FRAME STEEL COLUMN
z10 mm
PL 300x400x16mm (S355) PL 300x400x16mm (S355) z10 mm DETAILED DESIGN PHASE
TOC @ ELEV +5.000 TOC @ ELEV +5.000
SIKA GROUT 25mm THK. SIKA GROUT 25mm THK. BUILDING G1
STRUCTURAL DRAWINGS
40

40

ANCHOR BOLT 4M16 (Gr 8.8) ANCHOR BOLT 4M16 (Gr 8.8) FRAME STEEL RAFTER
CAST-IN-BOLTS CAST-IN-BOLTS SLOPE ANGLE 5%
(VARIES)
FRAME STEEL RAFTER
(VARIES) PLOT NO. LOCATION
REINFORCEMENT REINFORCEMENT Kg Sabun, Mukim Serasa,
CONCRETE COLUMN CONCRETE COLUMN FRAME STEEL COLUMN Daerah Brunei - Muara,
FRAME STEEL COLUMN Negara Brunei Darussalam
(VARIES)
(VARIES)
DRAWING TITLE :
Stiffener Plate (S355 300x100x10) Stiffener Plate (S355 300x100x10)
CROSS SECTION VIEW LONGITUDINAL SECTION VIEW AREA 10 ROOF PURLIN PLAN
TOP VIEW LATERAL VIEW

TYPICAL MOMENT CONNECTION DETAIL ( COLUMN FLANGE TO BEAM )


TYPICAL BASE PLATE DETAIL 5
2 Scale 1:10
Scale 1:10 DRAWN BY CHECKED BY APPROVED BY DATE
AREA 10 PURLIN SECTION SCHEDULE PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5
NAME WEIGHT MATERIAL JOB NO. SCALE
SECTION DRAWING NO.
SCALE m (kg/m)
PSBR01 ST100_FRA21 1:100
1: 100 C15024 C15024 5.7 AS1397 G450
SHEET SIZE REV. NO.
Z15024 Z15024 5.7 AS1397 G450
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

10.A 10.B 10.C

11050
5550 5500
PART OF BUILDING
G1 AREA 5
10.1

500

500
600
C2 C3 C2
250 300 250
600
500 500
BUILDING G1 AREA 9 CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
CENTRATE TRANSFER PUMPS

6950
1790 2600 1160

C1 C1

990
758
C1 C1

11500
C1 C1

1550

1195
3700 758
10.2

650
C1 C1

355
400 4000 400 g1.3

1840
C1 C1

1000
450
C1 C1

400
4550
2600 1160

3900
W1
250
W1

4000

600
500

500
10.3 C2 C3 C2
250 300 I S S U E S
W1
W1
400

1415 5550 3035

10000

No. Date Description Chk'd By


R E V I S I O N
g1.4 g1.O g1.P
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
AREA 10 RC COLUMN AND WALL PLAN
1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 10 RC WALL PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

1 0 1 2 3 4 5
LEGENDS: PM CR/RB LG 09/08/2024

W1-600 JOB NO. DRAWING NO. SCALE


SCALE m PSBR01 1:100
1: 100 WALL THICKNESS (mm) ST100_COL13
SHEET SIZE REV. NO.
WALL MARK
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

10.A 10.B 10.C

11050
5550 5500
PART OF BUILDING
G1 AREA 5
10.1

375
379

379
SC2 150SC2 SC2
150 150

BUILDING G1 AREA 9

CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &

6950
CENTRATE TRANSFER PUMPS

1092 3700
SC1 SC1

11500

1195
10.2 SC1 SC1

295

650
g1.3
4550 1092 3700 758

3900
SC2 SC2 SC2

125

125

125
10.3 I S S U E S
150 150 150

1415 5550 3035

10000

No. Date Description Chk'd By


R E V I S I O N

g1.O g1.P PROJECT :


g1.4

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

AREA 10 STEEL COLUMN PLAN


1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 10 STEEL COLUMN PLAN

AREA 10 STEEL COLUMN SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5 NAME WEIGHT MATERIAL
SECTION JOB NO. SCALE
(kg/m) DRAWING NO.
SCALE m PSBR01 1:100
1: 100
SC1 SHS 150x6 26.4 S275 ST100_COL14
SC2 HA 300x250x8x12 64.4 S355 SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

10.A 10.B 10.C

11050
5550 5500
PART OF BUILDING
G1 AREA 5
10.1

375
379

379
AB1 150 AB1 AB1
150 150

BUILDING G1 AREA 9

CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &

6950
CENTRATE TRANSFER PUMPS

1092 3700
AB1 AB1
11500

1195
10.2 AB1 AB1

295

650
g1.3
1092 3700 758
4550

3900
AB1 AB1 AB1
125

125

125
10.3 I S S U E S
150 150 150

1415 5550 3035

10000

No. Date Description Chk'd By


R E V I S I O N
PROJECT :
g1.4

PURE SALMON LAND-BASED


g1.O g1.P ATLANTIC SALMON FARM

AREA 10 ANCHOR BOLT PLAN


1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 10 ANCHOR BOLT PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST100_COL15
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

10.3 10.2 10.1 16 18


K10
K12
10.1 10.2 10.3
K9 L2

B2 CD2
G2
K11
P
K5 K6
RV

E F
11500 A B1 C1 D1

11500
K4

M
4550 6950
J
K2 K3 U

6950 4550 L1
K1
G1
K7

C15024 C15024
+7.750 +7.750 O

g1.10 TOP OF ROOF SB3 g1.10 TOP OF ROOF

1250

1250
SC2 SC2
+6.500 +6.500 SC2 SB3 SC2
NOTES
g1.10 TOP OF BEAM G2 g1.10 TOP OF BEAM G2
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
Z15024 BEFORE PROCEEDING THE WORK.

7750

7750
6500

6500
W1
100mm THK. ZOCALO WALL
C2 +0.000 C2 +0.000 +0.000
+0.000 +0.000 C2 C2
1500 150

1500 150
g1.10 +0.000 g1.10 +0.000
1650

1650
-0.150 -0.150
FTB1
g1.10 -0.150 2 g1.10 -0.150
F4 FTB1
ST100_FRA19
950
600 600 950

-2.600
-1.650 -1.650
F4
g1.10
g1.10 -2.600
-1.650 g1.10 -1.650
1200

400.00 LEAN CONCRETE (TYP.)


-3.200 -1650.00 3900 650
g1.10 -3.200
-3.800
g1.10 -3.800
MF-1
LEAN CONCRETE (TYP.) 600.00
-3800.00 g1.3

650 3900

g1.3

AREA 10 FRAMING ELEVATION @ GRID 10.A AREA 10 FRAMING ELEVATION @ GRID 10.C
1 Scale 1 : 100 2 Scale 1 : 100

10.A 10.B 10.C


I S S U E S

11050
5550 5500

C15024 Z15024
+7.750 5%
g1.10 TOP OF ROOF SB3
1250

SC2 SB3
+6.500 SC2 SC2
g1.10 TOP OF BEAM G2 G2 No. Date Description Chk'd By
R E V I S I O N
Z15024 C15024
PROJECT :

5%
PURE SALMON LAND-BASED
7750

SB4 ATLANTIC SALMON FARM


6500

W1
F4
400.00
+0.000 -1650.00
+0.000 C2 C3 C2
150
1500 150

g1.10 +0.000
-0.150 CONSULTANT :
g1.10 -0.150
2450

-1.650 FTB1 F2 FTB1 F4


g1.10 -1.650 ARTELIA Singapore Pte. Ltd.
600 600 950

-2.600 6 Shenton Way – 39-02 OUE Downtown 1


SINGAPORE 068809
g1.10 -2.600
1200

-3.200
g1.10 -3.200
DETAILED DESIGN PHASE
-3.800 MF-1
g1.10 -3.800 BUILDING G1
LEAN CONCRETE (TYP.) 600.00
-3800.00 STRUCTURAL DRAWINGS

1415 5550 3035 2465 PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
10000 Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

g1.O g1.P AREA 10 FRAMING ELEVATION

AREA 10 FRAMING ELEVATION @ GRID 10.3


3 Scale 1 : 100
DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST200_FRA10
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

10.3 10.2 10.1 10.3 10.2 10.1 11 12 & 13


23

KEY PLAN
15 22
20 21
17

19

16 18

11500 11500
K10
K9 L2 K12

B2 CD2
4550 6950 4550 6950 G2
K11
P
K5 K6
RV

E F
A B1 C1 D1

+7.750 +7.750 K4

M
g1.10 TOP OF ROOF g1.10 TOP OF ROOF
J
K2 K3 U

1250

1250
SB3 L1
K1

SC2 SC2 SC2 G1


K7

+6.500 +6.500
g1.10 TOP OF BEAM g1.10 TOP OF BEAM G2 G2 O

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL

7750

7750
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE

6500

6500
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

+1.600 +1.600
g1.10 +1.600 g1.10 +1.600
SB1 G3 +1.500 G3 G3

1500 150 1600

1600
+1.500

1500

1500
g1.10 +1.500 100mm THK. ZOCALO WALL SC1 SC1 +0.000 g1.10 +1.500 SC1SC1
+0.000 C1 C1 C1 C1 C2 +0.000 C3 C1 C1 C1 C1 C1 C1 C3

1500 150
W1 W1
g1.10 +0.000 g1.10 +0.000

600

600
400 1250
1650

1650
-0.150 -0.150
g1.10 -0.150
2600

g1.10 -0.150
FTB1 F2 FTB1
-0.600 -0.600
g1.10 -0.600 -2.600 MF-2 g1.10 -0.600
-1.650 600.00 MF-2
-1.650
600600

g1.10 -1.650 -600.00 600.00


1200

-2.600 g1.10 -1.650 3900 650


LEAN CONCRETE (TYP.) -600.00
g1.10 -2.600
-3.200
g1.10 -3.200
-3.800 MF-1
g1.10 -3.800 LEAN CONCRETE (TYP.) 600.00 g1.3
-3800.00

3900 650 6950

g1.3

AREA 10 FRAMING SECTION 1 AREA 10 FRAMING SECTION 2


1 Scale 1 : 100 2 Scale 1 : 100

10.A 10.B 10.C

11050
I S S U E S
5550 5500

U10 C15024 5% Z15024


+7.750
g1.10 TOP OF ROOF SB3 U10

1250
SB3
+6.500
g1.10 TOP OF BEAM

C15024
5% No. Date Description Chk'd By
Z15024
R E V I S I O N

7750
SB4
PROJECT :

6500
2261
PURE SALMON LAND-BASED
+1.600 SB1 ATLANTIC SALMON FARM
g1.10 +1.600 W1 W1
+1.500 SC1 SC1

1600
1500 150 1500
G3
g1.10 +1.500
+0.000 C1 C1 C1 C1
g1.10 +0.000
-0.150

1650

1650
g1.10 -0.150 W1
2600

-0.600
g1.10 -0.600
-2.600 MF-2 CONSULTANT :
-1.650
g1.10 -2.600
600 600

600

g1.10 -1.650 600.00


1200

-600.00
ARTELIA Singapore Pte. Ltd.
-3.200 6 Shenton Way – 39-02 OUE Downtown 1
g1.10 -3.200 SINGAPORE 068809
MF-1
-3.800 600.00
LEAN CONCRETE (TYP.)
g1.10 -3.800 -3800.00
DETAILED DESIGN PHASE
BUILDING G1
STRUCTURAL DRAWINGS
1415 8585
10000
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

g1.O g1.P DRAWING TITLE :

AREA 10 FRAME SECTION

AREA 10 FRAMING SECTION 3


3 Scale 1 : 100
DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST300_FRA13
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

50 3500 50 2 4 6
5

3 7
9
10
1
14

50
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

600 19

500 16 18
K10
K9 L2 K12

CONCRETE B2 CD2

CONCRETE
G2

COLUMN P
K11

50 2000 50 COLUMN K5 K6
RV

CONCRETE E F

CONCRETE
A B1 C1 D1

SLAB K4

0.000 SLAB J M

50
K2 K3 U

±0.000 0.000 L1
K1

±0.000 G1
K7

-0.150

150
-0.150 O

COLUMN TIES.
3500

COLUMN TIES.
COLUMN NOTES
REINF. COLUMN

1100
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
REINF. NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE

2000
ST500-FOU10

1500
T12-250 T12-250 PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S

1550
2

DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE


SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
STARTER BARS
STARTER BARS

ST500-FOU10
6
400
1.650
1.650

50
LEAN CONCRETE

50
T12-250 LEAN CONCRETE
T12-250
3500
2000
50

FOUNDATION PLAN F1 SECTION F1 DETAIL FOUNDATION PLAN F3 SECTION F3 DETAIL


4 5 8 9

600 500
50 2500 50
CONCRETE CONCRETE
COLUMN COLUMN
50 2000 50
50

CONCRETE CONCRETE
SLAB SLAB

50
0.000 0.000
±0.000 ±0.000
-0.150 -0.150

COLUMN TIES. COLUMN TIES.

COLUMN COLUMN
REINF. REINF.
1100

1100
2500

2000
1500

1500
T12-250 T12-250

STARTER BARS STARTER BARS


ST500-FOU10

ST500-FOU10
4

400

400
8
1.650 1.650
50

50
LEAN CONCRETE LEAN CONCRETE

50
T12-250 T12-250
2500
50

I S S U E S

FOUNDATION PLAN F2 SECTION F2 DETAIL FOUNDATION PLAN F4 SECTION F4 DETAIL


6 7 10 11

AREA 10 FOOTING DETAIL


10.A 10.B 10.C Scale 1 : 25

11050
5550 5500 No. Date Description Chk'd By
PART OF BUILDING R E V I S I O N
G1 AREA 5
10.1 PROJECT :

PURE SALMON LAND-BASED


10.2 10.3
ATLANTIC SALMON FARM
10.3 10.2
BUILDING G1 AREA 9
4000

4550
4550
6950

+0.000 +0.000
150

150
g1.10 +0.000 g1.10 +0.000
T16-200
T16-200

-0.150 -0.150
2690
11500

g1.10 -0.150 g1.10 -0.150


2600

2600
CONSULTANT :
2450

2450
4490

3050
T16-200
10.2 T16-200 T16-200 ARTELIA Singapore Pte. Ltd.
650

2 3 T16-200 -2.600 -2.600 6 Shenton Way – 39-02 OUE Downtown 1


g1.3 g1.10 -2.600 g1.10 -2.600
600 600

600
1800
1840

ST500_FOU10 ST500_FOU10 SINGAPORE 068809


1200

-3.200
-3.200
g1.10 -3.200 T16-200 STARTER BARS
g1.10 -3.200
4550

-3.800 STARTER BARS T16-200 3900 650 DETAILED DESIGN PHASE


3900

g1.10 -3.800 650 LEGENDS:


T16-200
T16-200

- BUILDING G1
--- REINFORCEMENT NOTATION: STRUCTURAL DRAWINGS
4800

TOP REINFORCEMENT
10.3 g1.3
g1.3 BOTTOM REINFORCEMENT
PLOT NO. LOCATION
T16-200 T25-200 Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam
T16-200
TYPE OF STEEL
AREA 10 FOUNDATION SECTION DETAIL A AREA 10 FOUNDATION SECTION DETAIL B DRAWING TITLE :
3835 965 2 Scale 1 : 100 3 Scale 1 : 100
(T=HIGH YIELD STEEL) SPACING
(R=MILD STEEL) BAR SIZE AREA 10 FOUNDATION DETAILS
4800
1415 5550 3035 - T25-200 TO BE PROVIDED IN THE WHOLE AREA
10000 OF THE FOUNDATION IN BOTH WAYS FOR TOP LAYER.
- FOUNDATION REINFORCEMENT SHOWN EXCEED 11.7m
SHALL BE PROVIDED WITH TENSION LAP UNO. DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 09/08/2024
g1.4 g1.O g1.P
JOB NO. DRAWING NO. SCALE
PSBR01 ST500_FOU10 As indicated
AREA 10 FOUNDATION TOP AND BOTTOM REINFORCEMENT PLAN Notes:
1 Scale 1 : 100 1. ALL FOOTINGS SHALL BE COATED WITH BITUMINOUS MATERIAL.
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

Ldt TOP LEVEL NOTES


SLAB/BEAM
LEVEL + 1.350M
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
400 NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
OUTSIDE OF THE TANK INSIDE OF THE TANK PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S

LINK SPACING (S1)


+0.000

S1
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
g1.10 +0.000 SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

300

lcr
REINF. (REFER SCHEDULE)

8T25

300
STOREY HEIGHT

LINK SPACING (S)

SPACING

LINK
FOUDATION

S
SPACING OF LINKS AT LAP NOT

50
GREATER THAN:

Iₒ
∅ OF LONGITUDINAL BAR
- 12∅


- 0.6 x LESSER DIM OF COLUMN/WALL

Lt
- 100
LINKS (S)

50
T10-200 T10-200 T10-200

LINK SPACING (S1)


LEVEL

MAX(lcr;Lt)
C1

Lt
COLUMN

S1
KICKER 100
LEVEL (X+1)
4900

50
R8-600(600)

S1
LINK SPACING (S1)
REINF. (REFER SCHEDULE) LEVEL + 6.500M

lcr
T16-200
400
500
T12-150

STOREY HEIGHT

SPACING

LINK
S
LINK SPACING (S)
16T25

500
SPACING OF LINKS AT LAP

Iₒ
NOT GREATER THAN:

 50
∅ OF LONGITUDINAL BAR
- 12∅
FOUDATION


- 0.6 x LESSER DIM OF COLUMN/WALL

Lt
- 100
-4.900

50
g1.10 -4.900 A-A I S S U E S

LINK SPACING (S1)


600

MAX(lcr;Lt)
LINKS (S) T10-200 T10-200 T10-200

Lt

S1
KICKER 100
LEVEL X
LEVEL

50
C2
TYPICAL WALL REINFORCEMENT W1 DETAIL COLUMN

S1
No. Date Description Chk'd By
45 Ø

R E V I S I O N

100MAX
PROJECT :

S1
WALL DETAILS AREA 10
Scale 1 : 25 PURE SALMON LAND-BASED
ATLANTIC SALMON FARM

TYPICAL COLUMN/ WALL DETAIL

CRANKED UPPER COLUMN/WALL BARS CONSULTANT :

LOWER COLUMN/WALL BARS 24T25


ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
A-A SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS
NOTES:
1. S: REFERS TO LINK SPACING IN COLUMN/WALL
SCHEDULE
2. S1 = MIN(bo/2; 100; 8dbL) PLOT NO. LOCATION
bo: MINIMUM DIMENSION OF THE CONCRETE Kg Sabun, Mukim Serasa,
CORE (THE CENTERLINE OF THE HOOPS) Daerah Brunei - Muara,
Negara Brunei Darussalam
dbL: MINIMUM DIAMETER OF THE LONGITUDINAL
BARS (mm) DRAWING TITLE :
3. lcr = MAX(hc; lo/6; 450)
hc: THE LARGEST CROSS-SECTIONAL DIMENSION
OF THE COLUMN/WALL (mm). AREA 10 COLUMN SCHEDULE
4. THE TIE C IN THE WEB (FOR RC WALL ONLY) REINFORCEMENT
SHALL BE ALTERNATED ALONG WALL HEIGHT

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 09/08/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST500_COL09 NTS

SHEET SIZE REV. NO.


A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

REINFORCEMENT BEAM SCHEDULE


BEAM SIZE SINGLE SPAN END SPAN INTERIOR SPAN CANTILEVER LINKS
BEAM
BEAM SIZE (BxH) TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. LINK TYPE SIDE BARS REMARK
MARK B (mm) H (mm) S1 S2 S3
T11 T12 T13 B11 B12 B13 T21 T22 T23 B21 B22 B23 T31 T32 T33 B31 B32 B33 T41 T42 B41
B1 B1 250x400 250 400 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 - - - 10@100mm 10@200mm 10@100mm TYPE 1 - -
FTB1 FTB1 300x400 300 400 - - - - - - 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 - - - 10@100mm 10@100mm 10@100mm TYPE 1 - -
5T25 5T25 5T25 5T25 5T25
G1 G1 500x700 500 700 3T25 3T25 3T25 3T25 - - - - - - - - - - - - - - - 10@150mm 10@150mm 10@150mm TYPE 1 - -
+3T25 +3T25
3T25 3T25 2T25 2T25 3T25 3T25 2T25 2T25 3T25 3T25 2T25 2T25
G2 G2 300x500 300 500 3T25 3T25 3T25 3T25 3T25 3T25 - - - 10@150mm 10@150mm 10@150mm TYPE 1 - -
+2T25 +2T25 +3T25 +3T25 +2T25 +2T25 +3T25 +3T25 +2T25 +2T25 +3T25 +3T25
G3 G3 300x400 300 400 3T25 3T25 3T25 3T25 3T25 3T25 3T25 3T25 3T25 3T25 3T25 3T25 - - - - - - - - - 10@150mm 10@150mm 10@150mm TYPE 1 - -

W W
0.25L1 0.25L1 0.5L1 Max(L1 & 0.25L2)
(Min. Lt)
S1 S2
(Min. Lt)
S3 S2
(Min. Lt)
S1
(Min. Lt)
Max(0.5L1 & 0.25L2)
NORMAL LINK
e.g. 2R8-100/200
TORSION LINK
e.g. 2R8-100/200
NOTES:
2
(Min. Lt) 1. * U.N.O. LAPPINGS ARE INDICATE ONLY. NO LAPPING IF THE

H
* LAP * LAP * LAP 1 REINFORCEMENT ARE OF SAME SIZE AND LENGTH OF REINFORCEMENT NOT
T11 T12 T13 T41 T42 EXCEEDING 11.7M. REFER TO GENERAL NOTES FOR LOCATION AND LAP LENGTH.
DETAIL OF LINKS
TYPE 1 TYPE 2 2. ORIENTATION OF REBARS IN BEAMS (FROM LEFT TO RIGHT, BOTTOM TO TOP)
W SHALL SAME THAT OF BEAM MARKS.
W W
PROVIDE 1T10 @800 (MAX) 3. REFER TO GENERAL NOTES AND STANDARD DRAWINGS
WHEN 600 < D1 < 1000 FOR OTHER DETAILING REQUIREMENTS.
0.08L1 * LAP B12 SB * LAP 0.08L1 * LAP I S S U E S

H > 700
B11 B13 B41 SB 2 1 2 SB SB 4. Lt: TENSION LAP LENGTH.
1 PROVIDE 2T10 @800 (MAX)

H
3 3 4

D1
SPAN L1 SPAN L1 SPAN L2 SB SB WHEN 1000 < D1 < 2000

2/3H
SB SB
SINGLE SPAN CANTILEVER TYPE 3 TYPE 4

TYPES OF SHEAR LINKS TYPICAL BEAM SECTION WITH SIDE BARS

No. Date Description Chk'd By


0.25L1 Max(0.25L1 & 0.25L2) Max(0.25L1 & 0.25L2) Max(0.25L2 & 0.25L3) Max(0.25L1 & 0.25L2) 0.25L2 R E V I S I O N
(Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt)
S1 S2 S3 S1 S2 S3 S1 S2 S3 U.N.O SIDE BARS(SB) FOR BEAM DEPTH (H) > 700 PROJECT :

* LAP * LAP * LAP * LAP * LAP * LAP PURE SALMON LAND-BASED


BEAM DEPTH (H) NO. OF "SB" "SB" SIZE &
T21 T22 T23 T31 T32 T33 T21 T22 T23 EACH FACE SPACING ATLANTIC SALMON FARM

700 < H ≤ 900 2 WHERE W < 400


900 < H ≤ 1200 3 PROVIDE T12-200
SIDE BARS
1200 < H ≤ 1500 4
0.08L1 * LAP B22 SB * LAP 0.15L1 0.15L2 * LAP B32 SB * LAP 0.15L2 0.15L2 * LAP B22 SB * LAP 0.08L2 WHERE W ≥ 400
B21 B23 B31 B33 B21 B23 1500 < H ≤ 1800 5 PROVIDE T16-200
1800 < H ≤ 2000 6 SIDE BARS
SPAN L1 SPAN L2 SPAN L1 SPAN L2 SPAN L3 SPAN L1 SPAN L2
CONSULTANT :
END SPAN - LEFT INTERIOR SPAN END SPAN - RIGHT
ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 10 BEAM SCHEDULE


REINFORCEMENT

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 09/08/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 NTS
1 : 50
1: 100 ST500_BEA08
SHEET SIZE REV. NO.
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

10.A 10.B 10.C

11050
5550 5500

PART OF BUILDING
G1 AREA 5
10.1

BUILDING G1 AREA 9 SSL=+0.000


CENTRIFUGE SYSTEM,
CENTRATE TANK, MIXER &
CENTRATE TRANSFER PUMPS

6950
11500
10.2

650
g1.3

4550

3900
T12-200
T12-200
10.3

1500MM X 1500MM I S S U E S
MANHOLE OPENING
T12-200
T12-200
1415 5550 3035

10000

No. Date Description Chk'd By

g1.O g1.P R E V I S I O N
g1.4
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

AREA 10 TANK TOP FLOOR, TOP AND BOTTOM REINFORCEMENT PLAN


1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


LEGENDS: 6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809
REINFORCEMENT NOTATION:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT DETAILED DESIGN PHASE
T12-200 BUILDING G1
STRUCTURAL DRAWINGS
TYPE OF STEEL
(T=HIGH YIELD STEEL) SPACING
PLOT NO. LOCATION
(R=MILD STEEL) BAR SIZE Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam
- T12-200 TO BE PROVIDED IN THE WHOLE AREA
OF THE FOUNDATION IN BOTH WAYS FOR TOP LAYER. DRAWING TITLE :
- FOUNDATION REINFORCEMENT SHOWN EXCEED 11.7m
SHALL BE PROVIDED WITH TENSION LAP UNO. AREA 10 TANK TOP FLOOR_TOP AND
BOTTOM REINFORCEMENT PLAN

LEGENDS: DRAWN BY CHECKED BY APPROVED BY DATE

IJ : ISOLATION JOINT IJ ( REFER TO DWG "ST001_GE008" ) PM CR/RB LG 09/08/2024


1 0 1 2 3 4 5
EJ : EXPANSION JOINT EJ ( REFER TO DWG "ST001_GE008" ) JOB NO. DRAWING NO. SCALE
SCALE m SCJ : REFER DETAILS TO DWG "ST001_GE008". PSBR01 1:50
1: 100 ST500_SLA07
D01,D02,D03,D04,D05 : REFER TO DWG "ST001_GE008". SHEET SIZE REV. NO.
RAMP : REFER DETAILS TO DWG "ST001_GE008". A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K1
L1
G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

DETAILED DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


AREA 10 3D MODEL Kg Sabun, Mukim Serasa,
1 Scale
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 10 3D MODEL

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 09/08/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST900_GE010 NTS

SHEET SIZE REV. NO.


A1

You might also like