G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
DRAWING LIST (BUILDING G1 AREA 14) SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

NO SHEET NUMBER Sheet Name

1 PSBR01_ART_G1_DR_ST001_GE014 DRAWING LIST


2 PSBR01_ART_G1_DR_ST100_LL014 AREA 14 LOADING PLAN AT LEVEL 0.00
3 PSBR01_ART_G1_DR_ST100_FOU14 AREA 14 FOUNDATION PLAN
4 PSBR01_ART_G1_DR_ST100_FRA27 AREA 14 GROUND FLOOR FRAMING PLAN
5 PSBR01_ART_G1_DR_ST100_FRA28 AREA 14 ROOF FRAMING PLAN
6 PSBR01_ART_G1_DR_ST100_FRA29 AREA 14 ROOF PURLIN PLAN
7 PSBR01_ART_G1_DR_ST100_COL15 AREA 14 RC COLUMN PLAN
8 PSBR01_ART_G1_DR_ST100_COL16 AREA 14 STEEL COLUMN PLAN
9 PSBR01_ART_G1_DR_ST200_FRA014 AREA 14 FRAMING ELEVATION
10 PSBR01_ART_G1_DR_ST300_FRA32 AREA 14 FRAME SECTION
11 PSBR01_ART_G1_DR_ST500_FOU14 AREA 14 FOUNDATION DETAILS
12 PSBR01_ART_G1_DR_ST500_COL14 AREA 14 COLUMN SCHEDULE REINFORCEMENT
13 PSBR01_ART_G1_DR_ST500_BEA14 AREA 14 BEAM SCHEDULE REINFORCEMENT
14 PSBR01_ART_G1_DR_ST900_GE0014 AREA 14 3D MODEL

UPDATED DRAWING LIST

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

DRAWING LIST

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST001_GE014 NTS

SHEET SIZE REV. NO.


DATE PRINTED 15/05/2024 11:58:55 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C

10500 EQUIPMENT
(1000 kgs) -
5950 4550
ASSUMED AND TO BE VERIFIED

14.1

SSL=+0.200

EQUIPMENT
(4500 kgs) EQUIPMENT
(6500 kgs)
SSL=+0.200 SSL=+0.200 SSL=+0.200

8800

SSL=+0.000
POLYMER
PREPARATION ROOM

I S S U E S
14.2

AREA 14 LOADING PLAN AT LEVEL 0.00 No. Date Description Chk'd By


1 Scale 1 : 75 R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

LEGENDS: AREA 14 LOADING PLAN AT LEVEL


0.00

1000 kg/m2
Eurocode 1 - Tab.6.2
DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 03/26/2024
0.5 0 0.5 1 1.5 2 2.5
SPECIFIED LOAD JOB NO. DRAWING NO. SCALE
SCALE m AS INDICATED PSBR01 1:50
1: 50 ST100_LL014
SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:58:55 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C

10500

F1
400
-1650
F1 F1

850 300 850


14.1 FTB1 FTB1

2000

2000
2000
850 300 850 2000 2000
2000

FTB1

FTB1
FTB1
8800

F1 F1 F1
I S S U E S
FTB1 FTB1
2000

2000

2000
14.2

2000 2000 2000

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
AREA 14 FOUNDATION PLAN
1 Scale 1 : 75

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

LEGENDS:
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
F1 - FOOTING MARK Daerah Brunei - Muara,
Negara Brunei Darussalam
400 - FOOTING THICKNESS (mm)
-1.500 - BOTTOM OF FOOTING LEVEL (m) DRAWING TITLE :

AREA 14 FOUNDATION PLAN


NOTE:
- SOIL SHALL BE MEET THE FOLLOWING
PROPERTIES:
+ ALLOWABLE BEARING CAPACITY: 200 KPA
DRAWN BY CHECKED BY APPROVED BY DATE
+ ALLOWABLE SETTLEMENT LIMIT: 50 MM
- SOIL IMPROVEMENT SHALL BE DONE AS STATED PM CR/RB LG 03/26/2024
0.5 0 0.5 1 1.5 2 2.5 IN CONSTRUCTION DRAWINGS BY SUPPLIER
EXPERTISE JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:50
1: 50 - ALL RELEVANT CONTRACTORS SHALL ST100_FOU14
COORDINATE TOGETHER BEFORE PROCEEDING SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:58:56 am
THE WORKS, ESPECIALLY PIPING SYSTEM. A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C

10500
5950 4550

14.1

SSL=+0.200

1880
400 1700 830 1900 355 1900 2160

SSL=+0.200 SSL=+0.200 SSL=+0.200

4226
8800
CREATE SLAB ON GRADE DETAIL

SSL=+0.000
2694

POLYMER
I S S U E S
PREPARATION ROOM

14.2

No. Date Description Chk'd By


AREA 14 GROUND FLOOR FRAMING PLAN R E V I S I O N
1 Scale 1 : 75 PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

LEGENDS:
PLOT NO. LOCATION
- SLAB ON GRADE MARK Kg Sabun, Mukim Serasa,
SOG Daerah Brunei - Muara,
150 - SLAB ON GRADE THICKNESS (mm) Negara Brunei Darussalam

0.000 - TOP OF SLAB ON GRADE LEVEL (m) DRAWING TITLE :


ALL RELEVANT CONTRACTORS SHALL
COORDINATE TOGETHER BEFORE PROCEEDING AREA 14 GROUND FLOOR FRAMING
THE WORKS, ESPECIALLY PIPING SYSTEM. PLAN

LEGENDS:
DRAWN BY CHECKED BY APPROVED BY DATE
COLUMNS & WALLS ABOVE
PM CR/RB LG 03/26/2024
0.5 0 0.5 1 1.5 2 2.5
COLUMNS & WALLS BELOW JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:50
1: 50 ST100_FRA27
SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:58:57 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C

ADD SB1 AT THE MIDDLE 10500


5950 4550

SB1 SB1
14.1

SB1

8800

SB1
SB1

SB1
I S S U E S

SB1 SB1

14.2

No. Date Description Chk'd By

AREA 14 ROOF FRAMING PLAN R E V I S I O N


1 Scale 1 : 75 PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CREATE FRAMING PLAN AT ELEVATION +5.00M

CONSULTANT :

G1 G1 ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
G1 500X300 SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
G2 Daerah Brunei - Muara,
G2 Negara Brunei Darussalam

AREA 14 STEEL COLUMN SCHEDULE DRAWING TITLE :

NAME WEIGHT MATERIAL AREA 14 ROOF FRAMING PLAN


SECTION
(kg/m)
SC1 HA 300x300x10x16 96.6 S355

AREA 14 STEEL BEAM SECTION SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024
0.5 0 0.5 1 1.5 2 2.5 NAME WEIGHT MATERIAL
SECTION
(kg/m) JOB NO. DRAWING NO. SCALE
SCALE
1: 50
m G1 G1 SB1 HA 300x300x10x16 96.6 S355 PSBR01 ST100_FRA28 1:50

SHEET SIZE REV. NO.


DATE PRINTED 15/05/2024 11:58:57 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C


ADD Z15015 ALL
10500
@ MAX 1200, LAP 900
BOTH ENDS
PURLINS GUTTER
Z220X2 SPACED LYSAGHT 2C15015
@ 600 OC
C1 C1 C1
14.1

10mm SAG ROD

Z15015 LAP 900

8800

DRAW SINGLE LINE

I S S U E S

14.2
C1 C1 C1

No. Date Description Chk'd By


AREA 14 ROOF PURLIN PLAN R E V I S I O N
1 Scale 1 : 75 PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 ROOF PURLIN PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


AREA 14 PURLIN SECTION SCHEDULE
PM CR/RB LG 03/26/2024
0.5 0 0.5 1 1.5 2 2.5 NAME WEIGHT MATERIAL
SECTION JOB NO. DRAWING NO. SCALE
(kg/m)
SCALE m PSBR01 1:50
1: 50 Z220X2 Z 220x75x2x2 6.3 S355 ST100_FRA29
SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:58:58 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C

10500

C1 C1 C1
14.1

225
450
225
450

8800

C1 C1 C1

14.2 I S S U E S

AREA 14 RC COLUMN PLAN No. Date Description Chk'd By


1 Scale 1 : 75 R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 RC COLUMN PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 05/17/2024
0.8 0 0.8 1.5 2.3 3 3.8 AREA 14 CONCRETE COLUMN SCHEDULE
JOB NO. DRAWING NO. SCALE
SCALE m NAME SECTION PSBR01 1:75
1: 75 C1 450X450
ST100_COL15
SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:58:59 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C

10500

SC1 SC1 SC1


14.1

225

225

225
225 225

8800

I S S U E S
SC1 SC1 SC1

225

225

225
14.2
225 225

AREA 14 STEEL COLUMN PLAN No. Date Description Chk'd By


1 Scale 1 : 75 R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 STEEL COLUMN PLAN

CREATE ANCHOR BOLT LAYOUT PLAN& AREA 14 STEEL COLUMN SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE

0.8

SCALE
1: 75
0 0.8 1.5 2.3 3 3.8

m
CONNECTION DETAIL NAME

SC1
SECTION
HA 300x300x10x16
WEIGHT
(kg/m)
96.6
MATERIAL

S355
PM

JOB NO.
PSBR01
SHEET SIZE
CR/RB

DRAWING NO.
ST100_COL16
LG 05/17/2024

SCALE
1:75

REV. NO.
DATE PRINTED 15/05/2024 11:59:03 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES
14.1 14.2 14.C 14.B 14.A
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
8800 NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
+6.100 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
g1.14 TOP OF SLAB PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
10500 DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
+6.100 SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
g1.14 TOP OF SLAB 4550 5950
1100

1100
SC1 SC1 SB1 SB1 SC1
+5.000 SC1 +5.000 SC1
SB1
g1.14 TOP OF BEAM g1.14 TOP OF BEAM
6100

6100
5000

5000
C1 C1 C1
C1 C1

500mm THK. EQUIPMENT PAD (TYP.)


500mm THK. EQUIPMENT PAD (TYP.)
+0.200 +0.200
+0.000 +0.000
+0.000 +0.000
400 1100 150

400 1100 150


g1.14 +0.000 g1.14 +0.000
-0.150 -0.150
1650

1650
1500

1500
g1.14 -0.150 g1.14 -0.150

-1.650 F1 FTB1 F1 -1.650 F1 FTB1 F1 FTB1 F1


g1.14 -1.650 g1.14 -1.650
F1 F1
LEAN CONCRETE (TYP.) 400 400 LEAN CONCRETE (TYP.)
-1650 -1650

AREA 14 FRAMING ELEVATION @ GRID 14.A AREA 14 FRAMING ELEVATION @ GRID 14.1
1 Scale 1 : 75 2 Scale 1 : 75

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :
14.2 14.1
8800 PURE SALMON LAND-BASED
ATLANTIC SALMON FARM
14.A 14.B 14.C

+6.100
g1.14 TOP OF SLAB 10500
1100

5950 4550
SC1
+5.000 SC1 +6.100
g1.14 TOP OF BEAM g1.14 TOP OF SLAB
1100

+5.000 SC1 SC1 SC1


SB1 SB1 CONSULTANT :
g1.14 TOP OF BEAM
6100

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
5000

SINGAPORE 068809
C1 C1
6100

5000

500mm THK. EQUIPMENT PAD (TYP.) SCHEMATIC DESIGN PHASE


C1 C1 C1 BUILDING G1
+0.200
+0.000 STRUCTURAL DRAWINGS
+0.000
400 1100 150

g1.14 +0.000
-0.150
1650

PLOT NO. LOCATION


1500

g1.14 -0.150
+0.000 Kg Sabun, Mukim Serasa,
400 1100 150

Daerah Brunei - Muara,


F1 F1 g1.14 +0.000 Negara Brunei Darussalam
-1.650 FTB1
g1.14 -1.650 -0.150
1650
1500

DRAWING TITLE :
F1 g1.14 -0.150
LEAN CONCRETE (TYP.) 400
-1650 -1.650 F1 FTB1 F1 FTB1 F1 AREA 14 FRAMING ELEVATION
g1.14 -1.650
F1
400 LEAN CONCRETE (TYP.)
AREA 14 FRAMING ELEVATION @ GRID 14.C -1650
3 Scale 1 : 75
DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 11:50
: 75
1: 100 ST200_FRA014
SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:59:07 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

14.A 14.B 14.C


14.1 14.2

8800
10500
10500

+6.100 +6.100
g1.14 TOP OF SLAB g1.14 TOP OF SLAB
1100

1100
SB1 SB1
SC1 SB1 SC1 SC1
+5.000 SC1 +5.000 SC1
g1.14 TOP OF BEAM g1.14 TOP OF BEAM

I S S U E S
6100

6100
5000

5000
C1 C1 C1 C1 C1

+0.200 +0.200
+0.000 +0.000
+0.000 +0.000 No. Date Description Chk'd By
400 1100 150

400 1100 150


g1.14 +0.000 g1.14 +0.000 R E V I S I O N
-0.150 -0.150 PROJECT :
1650

1650
1500

1500
g1.14 -0.150 g1.14 -0.150

-1.650 F1 FTB1 F1 -1.650 F1 FTB1 F1 FTB1 F1 PURE SALMON LAND-BASED


g1.14 -1.650 g1.14 -1.650 ATLANTIC SALMON FARM
F1 F1
LEAN CONCRETE (TYP.) 400 400 LEAN CONCRETE (TYP.)
-1650 -1650

AREA 14 FRAMING SECTION 1 AREA 14 FRAMING SECTION 2


1 Scale 1 : 75 2 Scale 1 : 75
CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 FRAME SECTION

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 11:50
: 75
1: 100 ST300_FRA32
SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:59:08 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

CONCRETE COLUMN

STEEL POST
(REFER TO
ARCHITECTURAL)
CONCRETE
SLAB
0.000
±0.000

50
2000
-0.050
50 800 50
CONCRETE
PEDESTAL
50

COLUMN TIES.

800
COLUMN
REINF.

1000
2000
ADJUST TEXT LENGTH
T12-2 CREATE TOP BARS
800

50 STARTER BARS T12-250

200
1.050
I S S U E S

50
50
ST100_FRA01

LEAN CONCRETE
1

T12-25
0
50 800 50
2000

FOUNDATION PLAN F1 SECTION F1 DETAIL


1 Scale 1:15 2 Scale 1:15 No. Date Description Chk'd By
R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 FOUNDATION DETAILS

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024
150 0 150 300 450 600 750
JOB NO. DRAWING NO. SCALE
SCALE mm Notes: PSBR01 1:15
1: 15 1. ALL FOOTINGS SHALL BE COATED WITH BITUMINOUS MATERIAL.
ST500_FOU14
SHEET SIZE REV. NO.
DATE PRINTED 15/05/2024 11:59:08 am
A1 00
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

Ldt TOP LEVEL


16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

LEVEL + 4.000M

LINK SPACING (S1)

S1
E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

lcr
ADD 1 BAR EACH SIDE REINF. (REFER SCHEDULE)
O

400

STOREY HEIGHT
NOTES

LINK SPACING (S)

SPACING
? 12T25 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL

500

LINK
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,

S
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
SPACING OF LINKS AT LAP NOT DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE

50
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
GREATER THAN:

Iₒ
BEFORE PROCEEDING THE WORK.
FOUDATION ∅ OF LONGITUDINAL BAR
- 12∅


- 0.6 x LESSER DIM OF COLUMN/WALL

Lt
- 100

50
LINK SPACING (S1)
LINKS (S) T10-200

MAX(lcr;Lt)
T10-200 T10-200

Lt

S1
KICKER 100
LEVEL LEVEL (X+1)
C1

50
COLUMN

S1
LINK SPACING (S1)
REINF. (REFER SCHEDULE)

lcr
STOREY HEIGHT

SPACING

LINK
S
LINK SPACING (S)
SPACING OF LINKS AT LAP

Iₒ
NOT GREATER THAN:

50
∅ OF LONGITUDINAL BAR
- 12∅


- 0.6 x LESSER DIM OF COLUMN/WALL

Lt
- 100

50
A-A

LINK SPACING (S1)


MAX(lcr;Lt)

Lt

S1
KICKER 100
LEVEL X

50
S1
45 Ø
I S S U E S

100MAX
S1
TYPICAL COLUMN/ WALL DETAIL
No. Date Description Chk'd By
R E V I S I O N
PROJECT :

CRANKED UPPER COLUMN/WALL BARS PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
LOWER COLUMN/WALL BARS

A-A

NOTES:
1. S: REFERS TO LINK SPACING IN COLUMN/WALL CONSULTANT :
SCHEDULE
2. S1 = MIN(bo/2; 100; 8dbL) ARTELIA Singapore Pte. Ltd.
bo: MINIMUM DIMENSION OF THE CONCRETE 6 Shenton Way – 39-02 OUE Downtown 1
CORE (THE CENTERLINE OF THE HOOPS) SINGAPORE 068809
dbL: MINIMUM DIAMETER OF THE LONGITUDINAL
BARS (mm)
3. lcr = MAX(hc; lo/6; 450)
hc: THE LARGEST CROSS-SECTIONAL DIMENSION SCHEMATIC DESIGN PHASE
OF THE COLUMN/WALL (mm).
4. THE TIE C IN THE WEB (FOR RC WALL ONLY)
BUILDING G1
SHALL BE ALTERNATED ALONG WALL HEIGHT STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 COLUMN SCHEDULE


REINFORCEMENT

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST500_COL14 NTS

SHEET SIZE REV. NO.


DATE PRINTED 15/05/2024 11:59:09 am
A1 00
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN
15 22
20 21
17

19

16 18
K10
K9 L2 K12

B2 CD2
G2
K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

REINFORCEMENT BEAM SCHEDULE


BEAM SIZE SINGLE SPAN END SPAN INTERIOR SPAN CANTILEVER LINKS
BEAM
BEAM SIZE (BxH) TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. LINK TYPE SIDE BARS REMARK
MARK B (mm) H (mm) S1 S2 S3
T11 T12 T13 B11 B12 B13 T21 T22 T23 B21 B22 B23 T31 T32 T33 B31 B32 B33 T41 T42 B41
FTB1 FTB1 300x400 300 400

G1 G1 300X500 300 500 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16

G2 G2 300X500 300 500 3T25 3T25 3T25 3T25


3T25 3T25
+3T25 +3T25 +3T25 +3T25 +3T25 +3T25

W W
0.25L1 0.25L1 0.5L1 Max(L1 & 0.25L2)
(Min. Lt)
S1 S2
(Min. Lt)
S3 S2
(Min. Lt)
S1
(Min. Lt)
Max(0.5L1 & 0.25L2)
NORMAL LINK
e.g. 2R8-100/200
TORSION LINK
e.g. 2R8-100/200
NOTES:
2
(Min. Lt) 1. * U.N.O. LAPPINGS ARE INDICATE ONLY. NO LAPPING IF THE

H
* LAP * LAP * LAP 1 REINFORCEMENT ARE OF SAME SIZE AND LENGTH OF REINFORCEMENT NOT
T11 T12 T13 T41 T42 EXCEEDING 11.7M. REFER TO GENERAL NOTES FOR LOCATION AND LAP LENGTH.
DETAIL OF LINKS
TYPE 1 TYPE 2 2. ORIENTATION OF REBARS IN BEAMS (FROM LEFT TO RIGHT, BOTTOM TO TOP)
W SHALL SAME THAT OF BEAM MARKS.
W W
PROVIDE 1T10 @800 (MAX) 3. REFER TO GENERAL NOTES AND STANDARD DRAWINGS
WHEN 600 < D1 < 1000 FOR OTHER DETAILING REQUIREMENTS.
0.08L1 * LAP B12 SB * LAP 0.08L1 * LAP I S S U E S

H > 700
B11 B13 B41 SB 2 1 2 SB SB 4. Lt: TENSION LAP LENGTH.
1 PROVIDE 2T10 @800 (MAX)

H
3 3 4

D1
SPAN L1 SPAN L1 SPAN L2 SB SB WHEN 1000 < D1 < 2000

2/3H
SB SB
SINGLE SPAN CANTILEVER TYPE 3 TYPE 4

TYPES OF SHEAR LINKS TYPICAL BEAM SECTION WITH SIDE BARS

No. Date Description Chk'd By


0.25L1 Max(0.25L1 & 0.25L2) Max(0.25L1 & 0.25L2) Max(0.25L2 & 0.25L3) Max(0.25L1 & 0.25L2) 0.25L2 R E V I S I O N
(Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt)
S1 S2 S3 S1 S2 S3 S1 S2 S3 U.N.O SIDE BARS(SB) FOR BEAM DEPTH (H) > 700 PROJECT :

* LAP * LAP * LAP * LAP * LAP * LAP PURE SALMON LAND-BASED


BEAM DEPTH (H) NO. OF "SB" "SB" SIZE &
T21 T22 T23 T31 T32 T33 T21 T22 T23 EACH FACE SPACING ATLANTIC SALMON FARM

700 < H ≤ 900 2 WHERE W < 400


900 < H ≤ 1200 3 PROVIDE T12-200
SIDE BARS
1200 < H ≤ 1500 4
0.08L1 * LAP B22 SB * LAP 0.15L1 0.15L2 * LAP B32 SB * LAP 0.15L2 0.15L2 * LAP B22 SB * LAP 0.08L2 WHERE W ≥ 400
B21 B23 B31 B33 B21 B23 1500 < H ≤ 1800 5 PROVIDE T16-200
1800 < H ≤ 2000 6 SIDE BARS
SPAN L1 SPAN L2 SPAN L1 SPAN L2 SPAN L3 SPAN L1 SPAN L2
CONSULTANT :
END SPAN - LEFT INTERIOR SPAN END SPAN - RIGHT
ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 BEAM SCHEDULE


REINFORCEMENT

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST500_BEA14 NTS

SHEET SIZE REV. NO.


DATE PRINTED 15/05/2024 11:59:10 am
A1 00
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

23
11 12 & 13

KEY PLAN

UPDATED DRAWING 15

16
17

18
19
20 21 22

K9

B2 CD2
K10
L2

G2
K12

K11
P
K5 K6
RV

E F
A B1 C1 D1
K4

J M
K2 K3 U

K8 N K1
L1 G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 14 3D MODEL

DRAWN BY CHECKED BY APPROVED BY DATE

AREA 14 3D MODEL PM CR/RB LG 03/26/2024


1 Scale JOB NO. DRAWING NO. SCALE
PSBR01 ST900_GE0014 NTS

SHEET SIZE REV. NO.


DATE PRINTED 15/05/2024 11:59:16 am