L1885AAA

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

8/1/24, 5:03 PM Insurer's Report

No. Klaim: Tanggal: 01/08/2024


Bengkel: HONDA SURABAYA CENTER (ISTANA MOBIL SURABAYA INDAH)
REFERENSI
Tertanggung: PURNO WIDODO No. Polis: 20022223001489
Tanggal Kejadian: 14/07/2024 Jenis Klaim OD
Sum Insured: Rp 200,250,000
DESCRIPTION & IDENTIFICATION OF VEHICLE
Nomor Polisi: L1885AAA Tipe: HATCHBACK - 5 DR
Make & Model: HONDA JAZZ, 1.5 S GK58 (A) [2014] Reg. Date:
No. Mesin: L15Z51232766 No. Rangka: MHRGK5860HJ801661

Surveyed By: BAKTIAR ARIS WICAKSONO Ditangani Oleh: CHANDIKA ARIESTIANTO


Surveyed On: 16/07/2024 Report On: 16/07/2024
Report completed Report completed on
BAKTIAR ARIS WICAKSONO 17/07/2024
by: :

TOTAL OFFER
Offer Initiated By: BAKTIAR ARIS WICAKSONO on 17 Jul 2024 08:35
Rep. Gross Total: Rp23,055,540 [Diff: Rp835,750, 3.62%]
Approved Gross Total: Rp22,219,790
+ VAT (PPN) (11.00%): Rp2,444,177
Jumlah Bruto Disetujui: Rp24,663,967
- Deductible: Rp300,000
Approved Gross Offer: Rp24,363,967
- WHT (PPH) (2.00%): Rp25,362
Jumlah Bersih (after WHT): Rp24,338,605
(Tidak Betterment/Depreciation)

COST OF CLAIMS Repairer's Our Offer Difference Diff %


Parts 16,715,000 15,879,250 835,750 5.00
Item Lain-lain 0 0 0
Bahan Pengecatan 80.00/80.00% 5,072,432 5,072,432 0 0.00
Labour 1,268,108 1,268,108 0 0.00
Derek 0 0 0
Total Bruto (Rp) 23,055,540 22,219,790 835,750 3.62
+ VAT (PPN) Lengkap (kecuali Lain-lain) 11.00/11.00% (Rp) 2,536,109 2,444,177 91,932 3.62
Gross Amount (Rp) 25,591,649 24,663,967 927,682 3.62

https://indonesia.merimen.com/claims/index.cfm?fusebox=MTRinsurer&fuseaction=gen_printrpt&caseid=6351546&tpins=0&CFID=82195202&CF… 1/3
8/1/24, 5:03 PM Insurer's Report

REPAIR DETAILS
Referensi
Part Source: MRM-ID Version: 2.8 (Last Synchronised: 30 Jul 2024)
Parts: 144 HONDA JAZZ 1.5 S GK58 (A) [2014] (Katalog:Merimen Indonesia HONDA 2.8 [02/04/2024])
Jasa: Repairer's (Price-denominated Standard List)
Print Code: (Unsubmitted, no print-code for L1885AAA)
Validity: These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with
the END OF ESTIMATES marker on the last estimate page
Further Info: Items/values not in reference catalogue are prefixed with an asterisk *.

Recommended Parts
No. Qty Part No. Particulars Condition Svg Repairer's Harga Jumlah

1 1 68100T5SZ20ZZ *TAIL GATE COMP - 4,815,000 F - 4,815,000 FP


BACKDOOR
2 1 73127TY0000 *RUBEER_WSHLD DAM - 115,000 F - 115,000 FP
3 1 73226SZW000 *DAM_STD 5X5 S - 65,000 F - 65,000 FP
4 1 73214T5A013 *RUBEER WSHLD DAM - 550,000 F - *550,000 FP
5 1 SKF255U *SIKAFLEX 255 ULTRA BLACK CTR 310 - 360,000 F - *360,000 FP
6 1 71501T5LT80ZZ *FACE_RR BUMPER IDE - 2,455,000 F - 2,455,000 FP
7 1 33550T5AJ02 *LIGHT ASSY L TAIGT - 1,865,000 F - 1,865,000 FP
STOPLAMP LH
8 1 71515T5LT80 *DIFFUSER_RR BUMPER - 210,000 F - 210,000 FP
9 1 SKFAUTO *SIKAFLEX AUTO WHITE 300 ML - 180,000 F - *180,000 FP
10 1 84640T5A003ZA *LNG ASSY RR PANEL - 1,005,000 F - 1,005,000 FP
11 1 74800T5SK61 *LOCK ASSY T/GATE - 1,070,000 F - 1,070,000 FP
12 1 74440T5A003 *WTHSTRIP TAIL GATE - 235,000 F - 235,000 FP
13 1 74820T5SK21 *OPEN STAY ASSY R - 385,000 F - 385,000 FP
HIDROLIK BACKDOOR
14 1 74870T5SK21 *OPEN STAY ASSY L - 385,000 F - 385,000 FP
HIDROLIK BACKDOOR
15 1 66100T5ST10ZZ *BACKPANEL - 3,020,000 F - 3,020,000 FP
TIDAK DAPAT DIREPAIR KARENA RUSAK/MELENGKUNG
PARAH
F=Franchise part. P=PartDisc.
Sub Total (Rp) 16,715,000 16,715,000
- Part Discount on P Items 0.00/5.00% (Rp) 0 835,750

Total Parts (Rp) 16,715,000 15,879,250

Report was unsubmitted during this print-out.

https://indonesia.merimen.com/claims/index.cfm?fusebox=MTRinsurer&fuseaction=gen_printrpt&caseid=6351546&tpins=0&CFID=82195202&CF… 2/3
8/1/24, 5:03 PM Insurer's Report

Recommended Item Lain-lain


There are no new miscellaneous items selected.

Recommended Jasa
Tipe
No Particulars Repairer's Jumlah
Jasa

Item Jasa
1 G/C BACKDOOR Ganti 1,423,423 1,423,423
2 B/P KACA BACKDOOR Ganti 1,261,261 1,261,261
3 G/C BUMPER RR Ganti 1,009,010 1,009,010
4 G/C BACKPANEL Ganti 1,261,261 1,261,261
5 LANTAI BAGASI Ganti 872,072 872,072
6 BUFFLE STOPLAMP / DUDUKAN Ganti 513,513 513,513
Material:80%, Jasa:20%, Withholding Tax (PPH):2.00%

Labour Cost (inclusive of taxes) (Rp) 6,340,540 6,340,540

Report was unsubmitted during this print-out.

< END OF REPORT >

https://indonesia.merimen.com/claims/index.cfm?fusebox=MTRinsurer&fuseaction=gen_printrpt&caseid=6351546&tpins=0&CFID=82195202&CF… 3/3

You might also like