Standard Bidding Document Furniture
Standard Bidding Document Furniture
Standard Bidding Document Furniture
[ZIMBABWE COUNCIL
FOR HIGHER
EDUCATION]
STANDARD
BIDDING
DOCUMENT
for the
Procurement of Goods
April 2020
Standard Bidding Document for
the Procurement of: Office
Furniture
Procurement Reference
No:ZIMCHE/FURNCAP2020
Procuring Entity:ZIMCHE
Date of Issue:
2
BIDDING DOCUMENT FOR THE PROCUREMENT OF [OFFICE FURNITURE]
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
Table of Contents
Part 3: Contract
SHORT TENDERING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO:
5
Prices must be quoted as specified in the Price Schedule included in Part 2 Statement of Requirements. In
quoting prices, the Bidder is free to use transportation through carriers registered in any eligible country and
similarly may obtain insurance services from any eligible country. Prices quoted must include the following
costs and components:
(a) For Goods
(i) the price of the Goods and the cost of delivery to the final destination, including the relevant
INCOTERM, as stated in the Delivery Schedule;
(ii) the custom duties to be paid on the Goods on entry in Zimbabwe, if not already included;
(iii) Any other applicable import taxes;
(iv) any sales and other taxes due within Zimbabwe which will be payable on the Goods, if not
already included;
(v) any rebate or mark-up of the local agent or representative.
(b) for Related Services, (other than inland transportation and other services required to convey the
Goods to their final destination), whenever such Related Services are specified in the Schedule of
Requirements:
the price of each item comprising the Related Services (inclusive of any applicable taxes).
Bid Security (Please ignore this requirement because of the Covid lockdown)
The Bidder must include either:
A bid security that will be the required to be paid 2.5% of the total amount of the goods.
1. Certified bank cheque in the name of ZIMCHE
2. Bank guarantee
3. Cash deposit to the authority (PRAZ)
If option 3 is chosen, bidders must pay 2.5% for the bid security directly to PRAZ
A “Bid-Securing Declaration” using the form included in Part 2. Any bid not accompanied by a Bid Security
or Bid Securing Declaration, where this is a requirement of bidding, will be rejected by the Procuring Entity
as non-responsive.
The Bid Security or Bid- Securing Declaration of a Joint Venture (JV) must be in the name of the JV that
submits the Bid. If the JV has not been legally constituted at the time of bidding, the Bid Security or Bid-
Securing Declaration must be in the names of all intended partners.
Evaluation of Bids
Bids will be evaluated using the following methodology:
1. Preliminary examination to confirm that all documents required have been provided, to confirm the
eligibility of Bidders in terms of section 28 (1) of the Regulations and to confirm that the Bid is
administratively compliant in terms of section 28 (2) of the Regulations.
2. Technical evaluation to determine substantial responsiveness to the specifications in the Statement of
Requirements;
3. Financial evaluation and comparison to determine the evaluated price of bids and to determine the lowest
evaluated bid.
Bids failing any stage will be eliminated and not considered in subsequent stages.
Evaluation criteria
6
BIDDING DOCUMENT FOR THE PROCUREMENT OF [OFFICE FURNITURE]
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
The Procuring Entity’s evaluation of a Bid will take into account, in addition to the Bid Price, the
specifications by end user and life span.
(a) Delivery schedule: The specified Goods are required to be delivered by the date indicated in the
Delivery Schedule in Part 2. Bids offering delivery after the date shall be treated as non-responsive.
(b) Deviation in payment schedule: The payment schedule is stated in the Special Conditions of Contract
(SCC) in Part 3. A Bidder may propose a deviation from the schedule and if the deviation is considered
acceptable to the Procuring Entity, the Bid will be evaluated by calculating interest earned for any
earlier payments involved in the terms outlined in the Bid as compared with those stipulated in the SCC,
at the rate of interest indicated by the Reserve Bank of Zimbabwe on the closing date for submission of
bids.
(c) Cost of major replacement components, mandatory spare parts, and service: [State any high-usage
and high-value items of components and spare parts, along with estimated quantities of usage in the
initial period of operation.] Bidders must state the unit prices for these items. The total cost of these
items and quantities will be added to the Bid price, for evaluation purposes only.
(d) Life Cycle Costs: [Life cycle costing should be used when the costs of operation and/or maintenance
over the specified life of the goods are estimated to be considerable in comparison with the initial cost
and may vary among different Bids. Life cycle costs will be evaluated on a net present value basis. If
life cycle costs apply, then specify the factors required to determine them for evaluatio
[Either amend the following text as required, or delete it if life cycle cost is not applicable]
(i) number of years for life cycle cost determination is [insert the number of years];
(ii) the discount rate to be applied to determine the net present value of future operation and
maintenance costs (recurrent costs) is [insert the discount rate];
(iii) the annual operating and maintenance costs (recurrent costs) will be determined on the basis of the
following methodology: [insert methodology];
(iv) the following information is required from bidders [insert any information required from bidders,
Domestic Preference
A margin of preference, in accordance with the procedures outlined in section 8 of the Regulations, will apply.
(a) The percentage of preference to be given to domestic providers is [15% fifteen percent].
(b) Any additional preference to be given to women-owned businesses [ must not exceed fifteen per cent
(15%)].
(c) Eligibility for the margin of preference will be based on the following factors [state eligibility criteria
in terms of ownership, location of bidder or production facilities, origin of labour, raw material or
components, extent of proposed sub-contracting or association with local partners and any other
relevant factors].
(d) Documentation required from the Bidder as evidence of eligibility for the margin of preference is/are:
Eligibility and Qualification Criteria
Bidders are required to meet the criteria in section 28 of the Act to be eligible to participate in public
procurement and to be qualified for the proposed contract. They must therefore provide any available
documentation and certify their eligibility in the Bid Submission Sheet. To be eligible, Bidders must [specify
the documentation that is required to demonstrate the criteria listed below]:
1. have the legal capacity to enter into a contract;
7
2. not be insolvent, in receivership, bankrupt or being wound up, not have had business activities suspended
and not be the subject of legal proceedings for any of these circumstances;
3. have fulfilled their obligations to pay taxes and social security contributions in Zimbabwe;
4. not have a conflict of interest in relation to this procurement requirement;
5. not be debarred from participation in public procurement under section 72 (6) of the Act and section 74(1)
(c), (d) or (e) of the Regulations or declared ineligible under section 99 of the Act;
6. have the nationality of an eligible country as specified in the Special Conditions of Contract; and
7. have been registered with the Authority as a Supplier and have paid the applicable Supplier Registration
Fee set out in Part III of the Fifth Schedule to the Regulations.
Participation in this bidding procedure is open to [both Zimbabwean and foreign bidders]. [Where the
procurement is below the threshold in section 10(3) of the Regulations and bids are being invited from
Zimbabwean suppliers only, edit to state that “Participation in this bidding procedure is restricted to
Zimbabwean bidders” and state any documentation required as evidence of the nationality of the bidder.]
Origin of Goods
All goods and related services must have as their country of origin an eligible country, as specified in the
Special Conditions of Contract.
Technical Criteria
The Technical Specifications Sheet details the minimum specification of the goods required. The goods
offered must meet this specification, but no credit will be given for exceeding the specification.
DESCRIPTION QUANTITY
1 Executive L/shaped desk (made of hardwood teak 1
with a natural finish and leather touch up at the front
and top)
2 Semi –executive L/shaped desk (made of hardwood 8
teak with a natural finish and leather touch up on the
top)
3 Standard desk (made of hardwood teak with a 7
natural finish )
4 Six drawer desk 3
5 Executive Leather padded swivel chair 19
6 Leather Padded visitors chair 2
8
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
PART 1 BIDDING PROCEDURES
Currency
Bids should be priced in RTGS .. The currency of evaluation will be RTGS. Bids in other currencies
will be converted to this currency for evaluation purposes only, using the exchange rates published by
the Reserve Bank of Zimbabwe on the date of the submission deadline, see http://www.rbz.co.zw/.
Award of Contract
The lowest evaluated bid, after application of any additional evaluation criteria, including any margin
of preference, which is substantially responsive to the requirements of this bidding document will be
recommended for award of contract. In the case where there are Lots 1 to 4 and the bidder wins all
four Lots then, there can only be awarded two and then the other two Lots can be awarded to the next
cheaper one. The proposed award of contract will be by issue of a Notification of Contract Award in
terms of section 55 of the Act which will be effective until signature of the contract documents in
accordance with Part 3: Contract. Unsuccessful Bidders will receive the Notification of Contract
Award and, if they consider they have suffered prejudice from the process, they may within 14 days
of receiving this Notification, submit to the Procuring Entity a Challenge in terms of section 73 of the
Act, subject to payment of the applicable fee set out in section 44 of and the Third Schedule to the
Regulations.
Right to Reject
The Procuring Entity reserves the right to accept or reject any Bids or to cancel the procurement
process and reject all Bids at any time prior to contract award.
Corrupt Practices
The Government of Zimbabwe requires that Procuring Entities, as well as Bidders and Contractors,
observe the highest standard of ethics during the procurement and execution of contracts. In pursuit
of this policy:
1. the Procuring Entity will reject a recommendation for award if it determines that the Bidder
recommended for award has, directly or through an agent, engaged in corrupt, fraudulent,
collusive or coercive practices in competing for the Contract or been declared ineligible to be
awarded a procurement contract under section 99 of the Act;
2. the Authority may under section 72 (6) of the Act impose the sanctions under section 74 (1) of the
Regulations; and
3. any conflict of interest on the part of the Bidder must be declared.
9
Bid Submission Sheet
{Note to Bidders: Complete this form with all the requested details and submit it as the first page of
your Bid. Attach the completed Statement of Requirements and any other documents requested in
Part 1. Ensure that your Bid is authorised in the signature block below. A signature and
authorisation on this form will confirm that the terms and conditions of this Bid prevail over any
attachments. If your Bid is not authorised, it may be rejected. If the Bidder is a Joint Venture (JV),
the Bid must be signed by an authorized representative of the JV on behalf of the JV, and so as to be
legally binding on all the members as evidenced by a power of attorney signed by their legally
authorized representatives.
Bidders must mark as “CONFIDENTIAL” information in their Bids which is confidential to their
business. This may include proprietary information, trade secrets or commercial or financially
sensitive information}.
Procurement Reference
Number:ZIMCHE/FURNCAP2020
Subject of Procurement:
Office Furniture
Name of Bidder:
Date of Bid:
We offer to supply the items listed in the attached Statement of Requirements, at the prices indicated
on the attached Price Schedule and in accordance with the terms and conditions stated in your Bidding
Document referenced above.
We confirm that we meet the eligibility criteria specified in Part 1: Procedures of Bidding.
We declare that we are not debarred from bidding and that the documents we submit are true and
correct.
The validity period of our bid is: …60..days from the date of submission.
We confirm that the prices quoted in the attached Price Schedule are fixed and firm for the duration of
the validity period and will not be subject to revision, variation or adjustment.
Company ……………………………………………………………………………………
Address: ……………………………………………………………………………………
10
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
PART 1 BIDDING PROCEDURES
…………………………………………………………………………………….
11
PART 2: STATEMENT OF REQUIREMENTS
Name of Bidder:
Item
No¹
Description of Goods Quantity² Unit Price3 Total Price4
Note 2: The description or quantity must indicate the unit of measure where relevant.
Note 3: Unit and total prices must be for delivery through to the final destination stated in Part 1.
Note 4: Include any additional costs, such as installation or commissioning.
The price to be quoted in the Price Schedule must be the total price of the bid, excluding any discounts offered.
12
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO:ZIMCHE/FURNCAP2020
PART 2 STATEMENT OF REQUIREMENTS
Delivery Schedule
Name of Bidder:
{Note to Bidders: If the delivery period offered, or any other details, differ from the requirements below, this
should be stated in your tender}.
Delivery Date
Required by
Item Physical Procuring Bidder’s offered
No
Description of Goods Quantity
Unit Entity and Delivery period
applicable
INCOTERM
[Completed by {to be provided
Procuring Entity] by the Bidder}
Executive L/shaped desk (made
of hardwood teak with a natural
1 1
finish and leather touch up at
the front and top)
Semi – executive L/shaped desk
(made of hardwood teak with a
2 8
natural finish and leather touch
up on the top)
Standard desk (made of
3 hardwood teak with a natural 7
finish)
4 Six drawer desk 3
Executive Leather padded
5 19
swivel chair
6 Leather padded visitors chair 2
The delivery period required is measured from the date of the signing of the Contract between the
Procuring Entity and the Bidder.
The Project Site for delivery of the goods is [insert full physical address of the final destination]
the final destination:
13
14
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO:ZIMCHE/FURNCAP2020
PART 2 STATEMENT OF REQUIREMENTS
The detailed technical evaluation will examine the technical specification of the items offered in
column c and determine whether this meets the minimum specification in column b. Bidders must
complete column c or their tender will be rejected. Bidders are required to include technical
literature to positively support the details provided in column c.
15
Declaration by the Accounting Officer
I declare that the procurement is based on neutral and fair technical requirements and bidder
qualifications.
[To be signed by the Accounting Officer of the Procuring Entity, together with his/her name and
designation.]
16
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO:ZIMCHE/FURNCAP2020
PART 2 STATEMENT OF REQUIREMENTS
Bid-Securing Declaration
{The Bidder must fill in this Form in accordance with the instructions indicated, where it has
been stated in the Bidding Procedures that a Bid-Securing Declaration is a requirement of
bidding}.
We understand that, according to the terms and conditions of your bidding documents, bids must be
supported by a Bid-Securing Declaration.
We accept that we may be debarred from bidding for any contract with a Procuring Entity in
Zimbabwe for a period of time to be determined by the Authority, if we are in breach of our
obligation(s) under the bidding conditions, because:
(a) we have withdrawn our Bid during the period of Bid validity;
(b) having been notified of the acceptance of our Bid by the Procuring Entity during the period of
bid validity, we fail or refuse to execute the Contract.
We understand this Bid Securing Declaration will expire if we are not the successful Bidder, either
when we receive your notification to us of the name of the successful Bidder, or twenty-eight days
after the expiration of our Bid, whichever is the earlier.
Company ……………………………………………………………………………………
Address: ……………………………………………………………………………………
…………………………………………………………………………………….
{Note: In case of a Joint Venture, the Bid Securing Declaration must be in the name of all the
partners to the Joint Venture that submits the Bid.}
17
PART 3 CONTRACT
18
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
PART 3 CONTRACT
Contract Agreement
Procurement Reference:…….
THIS CONTRACT AGREEMENT is made the [insert: date] day of [insert: month],
[insert: year].
BETWEEN
(1) [insert complete name of Procuring Entity], a [ insert description of type of legal
entity, for example, an agency of the Ministry of .... of the Government of
Zimbabwe, or corporation incorporated under the laws of Zimbabwe] and having
its principal place of business at [insert full postal address of Procuring Entity]
(hereinafter called “the Procuring Entity”), and
(2) [insert name of Contractor], a corporation incorporated under the laws of [insert:
country of Contractor] and having its principal place of business at [insert full
postal address of Contractor] (hereinafter called “the Contractor”).
WHEREAS the Procuring Entity invited Bids for certain Goods and ancillary services, viz.,
[insert brief description of Goods and Services] and has accepted a Bid by the Contractor for
the supply of those Goods and Services in the sum of [insert Contract Price in words and
figures, expressed in the Contract currency] (hereinafter called “the Contract Price”).
1. In this Agreement words and expressions shall have the same meanings as are assigned
to them in the General and Special Conditions of Contract referred to below.
2. The following documents shall constitute the Contract between the Procuring Entity and
the Contractor, and each shall be read and construed as an integral part of the Contract:
19
the Goods and Services and to remedy any defects in them in conformity with the
Contract.
5. The Procuring Entity hereby agrees to pay the Contractor in consideration of the
provision of the Goods and Services and the remedying of any defects in them, the
Contract Price or such other sum as may become payable under the Contract at the
times and in the manner prescribed by the Contract.
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in
accordance with the laws of Zimbabwe on the day, month and year indicated above.
Signed: ………………………………………..
Name:
Signed: ………………………………………..
Name:
20
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
PART 3 CONTRACT
GCC 8.1 Notices: Any notice shall be sent to the following addresses:
For the Procuring Entity, the address shall be as given in the Contract document and
the contact shall be [state name of contact and the location where he/she can be
found].
For the Contractor, the address shall be as given in the Bid and the contact shall be
GCC 19.1 Liquidated Damages: Liquidated Damages in terms of section 88 of the Act
shall/shall not [delete as appropriate] apply. [Where applicable, state the
percentage of the delivered price of the delayed Goods or unperformed Services for
each week or part thereof of delay until actual delivery or performance, up to a
maximum deduction after which the Contract may be terminated. State the terms of
liquidated damages by specifying the details as required in section 88 of the Act.]
21
GCC Special Conditions
reference
GCC 21.2 Packing, Marking and Documentation: The goods shall meet the following special
packing requirements in addition to the general requirements stated in GCC clause
21.1 [State any special packing requirements]
Upon shipment, the Contractor shall notify the Procuring Entity and the insurance
company in writing of the full details of the shipment. In the event of Goods sent by
airfreight, the Contractor shall notify the Procuring Entity a minimum of forty-eight
(48) hours ahead of dispatch, the name of the carrier, the flight number, the expected
time of arrival, and the waybill number. The Contractor shall email and then send by
courier the following documents to the Procuring Entity, with a copy to the
insurance company:
(i) one original and two copies of the Contractor’s invoice, showing the
Procuring Entity as the consignee; the Contract number, Goods description,
quantity, unit price, and total amount. Invoices must be signed in original;
(ii) one original and two copies of the negotiable, clean, on-board through bill
of lading marked “freight prepaid” and showing Procuring Entity as the
consignee and Notify Party as stated in the Contract, with delivery through
to final destination as per the Schedule of Requirements and two copies of
non-negotiable bill of lading, road consignment note, truck or air waybill, or
multimodal transport document, marked “freight prepaid” and showing
delivery through to final destination as per the Schedule of Requirements;
(iii) two copies of the packing list identifying contents of each package;
(iv) copy of the Insurance Certificate, showing the Procuring Entity as the
beneficiary;
Upon or before delivery of the Goods, the Contractor shall notify the Procuring
Entity in writing and deliver the following documents to the Procuring Entity:
(i) one original and two copies of the Contractor’s invoice, showing the
Procuring Entity, the Contract number, Goods’ description, quantity, unit
22
price, and total amount. Invoices must be signed in original;
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
PART 3 CONTRACT
GCC 23.1 & Inspections and tests: the tests and/or inspections of the Goods and Related
23.2 Services that the Contractor is required to carry at its own expense are: [provide
details including the place where the tests will be carried out or delete].
GCC 24.1 Performance security: The Contractor shall provide a performance security of
[state a fixed amount or percentage, which shall be no more than ten (10) per cent]
of the Contract Price. The performance security shall be denominated in the currency
of the Contract and issued by a Bank located in Zimbabwe or a foreign Bank through
correspondence with a Bank located in Zimbabwe or from another financial
institution acceptable to the Procuring Entity. The format shall be based on the
template following the Special Conditions of Contract in this Part [Delete if
performance security is not required.]
GCC 24.4 Reduction of performance security [State whether the Performance Security will
be progressively reduced in line with the Contractor’s progress in delivering or
completing the procurement requirement to which the security relates]
GCC 25.1 Warranty: The period of the warranty shall be [state number of] months.
GCC 25.6 Failure to remedy a defect: The period allowed to the Contractor to remedy a
defect during the period of the Warranty shall be [state number of months or days].
GCC 29.1 Price adjustments: The following price adjustments are applicable [State any
arrangements for adjustment of the contract price.]
(i) On Delivery: Ninety (90) per cent of the Contract Price shall be paid within a
maximum of sixty (60) days of receipt of the Goods and upon submission of the
documents specified in GCC Clause 13.
On Acceptance: The remaining ten (10) per cent of the Contract Price shall be paid
to the Contractor within thirty (30) days after the date of the acceptance certificate
for the respective delivery issued by the Procuring Entity.
GCC 31.1 Contract Administration Fee: The Contract Administration Fee set out in Part V of
the Fifth Schedule of the Regulations is due upon the signing of the Contract and the
applicable Fee is $ [State applicable Fee or delete].
23
Bank Guarantee for Performance Security
[Delete page if no Performance Security is required in the SCC]
[This is the format for the Performance Security to be issued by a commercial bank in Zimbabwe in accordance
with GCC 18.1]
To:
We have been informed that [name of supplier] (hereinafter called “the Supplier”) has undertaken,
pursuant to Contract No [reference number of Contract] dated [date of Contract] (hereinafter called “the
Contract”) for the supply of [description of goods and related services] under the Contract.
At the request of the Supplier, we [name of bank] hereby irrevocably undertake to pay you, without cavil,
delay or argument, any sum or sums not exceeding in total an amount of [insert amount in figures and in words]
upon receipt by us of your first written demand accompanied by a written statement that the Supplier is in
breach of its obligation(s) under the Contract conditions, without you needing to prove or show grounds or
reasons for your demand of the sum specified therein.
This guarantee is valid until full recovery of the entire sum of money above stated, consequently, we must
receive at the above-mentioned office any demand for payment under this guarantee in case of default.
Signature Signature
24
BIDDING DOCUMENT FOR THE PROCUREMENT OF
PROCUREMENT REFERENCE NO: ZIMCHE/FURNCAP2020
PART 3 CONTRACT
We have been informed that ………. [name of the Contractor] (hereinafter called “the Contractor”)
has entered into Contract No……. [procurement reference number of the Contract], dated [insert day
and month], [insert year] with you, for the execution of …………………….. [name of contract and
brief description of Works] (hereinafter called “the Contract”).
Furthermore, we understand that, according to the Conditions of the Contract, an advance payment in
the sum …….. [name of the currency and amount in figures] 1 (…... [amount in words]) is to be made
against an advance payment guarantee.
At the request of the Contractor, we ……... [name of the Bank]. hereby irrevocably undertake to pay
you any sum or sums not exceeding in total an amount of ……... [name of the currency and amount
in figures]* (……. [amount in words]) upon receipt by us of your first demand in writing
accompanied by a written statement stating that the Contractor is in breach of its obligation under the
Contract because the Contractor used the advance payment for purposes other than the costs of
mobilization in respect of the Works.
It is a condition for any claim and payment under this guarantee to be made that the advance payment
referred to above must have been received by the Contractor on its account number
……….[Contractor’s account number]. at ……... [name and address of the Contractor’s Bank].
The maximum amount of this guarantee shall be progressively reduced by the amount of the advance
payment repaid by the Contractor as indicated in copies of interim statements or payment certificates
which shall be presented to us. This guarantee shall expire, at the latest, upon our receipt of a copy of
the interim payment certificate indicating that eighty (80) percent of the Contract Price has been
certified for payment, or on the …... day of ………….. 2, whichever is earlier. Consequently, any
demand for payment under this guarantee must be received by us at this office on or before that date.
The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed [six
months][one year], in response to the Procuring Entity’s written request for such extension, such
request to be presented to the Guarantor before the expiry of the guarantee.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No. 758.
…………………………………………………..
25
an extension of this guarantee from the Guarantor. Such request must be in writing and must be made prior to
the expiration date established in the guarantee.
26