What Is BIM Coordination

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

Ignacy Lozinski

BIM
Coordination
What is it actually?

Spoiler Alert: It is NOT just Clash Detection


Ignacy Lozinski

Many AEC professionals associate BIM


Coordination with detecting clashes
between models.

Clash Detection

However, it is only a
part of the whole
process.
Ignacy Lozinski

When implementing BIM into a project


it’s vital to initially define the goals that
our client or company aims to achieve.

Define the goals Create a plan to


that our client implement BIM
wants to achieve to achieve these
using BIM goals

When we have these goals, we create a


plan for how various BIM uses will be
implemented.

Such a plan is usually called the BIM


execution plan.
Ignacy Lozinski

BIM Coordination
is a process of coordinating tasks related to
the proper implementation of the BIM
execution plan in a project
Ignacy Lozinski

It can be divided into 3 parts

Model Data
Coordination Coordination

Process
Coordination
Ignacy Lozinski

Model
Coordination

The coordination of 3D
models is the most obvious
part of BIM Coordination

Here we use coordination software to


combine different trade models created
for the project into a federated model.

Trade models Federated model


Ignacy Lozinski

Model We perform
Coordination automated 3D model
check between trades
to identify potential
coordination issues

Then we create reports and send them


to everyone involved in the process

It also involves managing issues, either


through BCF file format or issue servers.

Issue
Model Check Issue Reports
Management

BCF
Ignacy Lozinski

Data
Coordination

There are different sets of information


requirements for each phase of the
project.

We perform a model information


integrity review for verifying that
models include the correct data for
downstream use
Ignacy Lozinski

Data
Coordination

Such data coordination can be


performed in tools like Solibri Office.

Track and coordinate data requirements


specified in contract documents

We can check if models contain the


right information for each delivery.
Ignacy Lozinski

Process
Coordination

because without good processes


your work will be difficult to
manage

This group includes tasks related to


process management and planning
activities of the previous two
coordinations: model and data.
Ignacy Lozinski

Process
Coordination

Such process planning is often carried


out with the assistance of project
managers

We ensure that coordination meets


project milestones and deliverables
Did you learn something new today?

Reshare it.

For more valuable daily insights about


BIM and construction technology.
Follow me on LinkedIn

You might also like