Commissioning Report Exhaust Air Unit
Commissioning Report Exhaust Air Unit
Commissioning Report Exhaust Air Unit
Contents
1.0 Document Revision History....................................................................................................................3
2.0 Objective.................................................................................................................................................3
3.0 Scope......................................................................................................................................................3
4.0 System Discription..................................................................................................................................3
5.0 Physical Verification................................................................................................................................4
6.0 Physical Verification................................................................................................................................5
7.0 Component Verification..........................................................................................................................6
8.0 Operation Verification............................................................................................................................9
PLANT: BAXTER AHMEDABAD 1 DEPARTMENT: ENGINEERING SERVICES
2.0 Objective.
To provide the documentary evidence that the HVAC system Exhaust Air Unit - (C-Box Area) having
Equipment ID: EQP/ENG/611 is installed as per specification.
3.0 Scope.
This Commissioning qualification protocol is applicable to the HVAC system Exhaust Air Unit (Ventilation
Unit)- having equipment EQP/ENG/611 installed at C Box Area at Baxter Ahmedabad -1 plant.
The system is having Double Skin Floor Mounted Air Handling Unit. The EAU is having inner skin is 0.6 mm
pre-coated G.I. and outer skin is 0.6 mm Pre-Painted G.I. and insulated with Poly Urethane Foam. The EAU is
a constant air volume, recirculating type system comprising a main air handling unit. The EAU Collect Return
air from its location and filter through EU- 4 filter. Exhaust Air is taken through damper & that passes through
EU-4 Pre-Filter and release it into environment. The air passed through fan section. The return air taken back
from area through return air diffuser in EAU system. For more details regarding System description, refer air
flow diagram & EAU GA Drawing with Technical specification
43 mm thick
Aluminium
Sections with C
EAU Panel
2. PUF insulation D P
Thickness
between M
external and
internal skin
C
EAU Exhaust
3. 2500 CFM D P
Air
M
C
EAU Static 100 MM of
4. D P
Pressure WC
M
C
Floor Mounted
5. Type D P
(Horizontal)
M
Easy filter
C
Filter mounting for
6. D P
Mounting quick filter
M
cleaning.
Filter access
doors are to be
provided with
C
hinges and
7. Access Doors D P
locking through
M
handle by
rotating at 90
deg.
PLANT: BAXTER AHMEDABAD 1 DEPARTMENT: ENGINEERING SERVICES
C : Certificate
D : Document
P : Physical
M : Measurement
Performed Checked
Sr. Method of
Item Description Specification Observation by (Sign & by (Sign
No Observation
Date) & Date)
Exhaust Air Fan
Performed Checked
Sr. Method of
Item Description Specification Observation by (Sign & by (Sign
No Observation
Date) & Date)
j. Make AAF C D
P M
k. Location Before Fan C D
P M
l. Filter Size/Qty 610mm x 610mm C D
x 50mm – 02 Nos. P M
m. Filtration EU-4 (90 %) /10 C D
Efficiency micron P M
n. IPD 50±10% Pa C D
P M
o. Type Box Type C D
P M
DUCTING INSTALLATION, INSULATION SPECIFICATION AND GRILL CHECK
p. Make Jindal C D
P M
q. Duct size - Should be as C D
Exhaust duct and Ducting Layout P M
Return duct
r. MOC 120 GSM C D
Galvanized Iron P M
s. Make Supreme C D
P M
t. Thickness for 25 mm thick C D
Exhaust / Exhaust class ‘O’ Plain P M
duct Nitrile Rubber
u. No. of Return Grill 04 No. C D
350 x 700 mm P M
PLANT: BAXTER AHMEDABAD 1 DEPARTMENT: ENGINEERING SERVICES
Remarks:
Conclusion:
OPERATIONAL VERIFICATION
1. Ensure Manually ON the
that main main power MCB.
power
MCB is
ON.
2. Release Control Power
the resume on BLDC
Emergenc Controller and
y Push Ventilation motor
Button started and gain
speed as per Set
Frequency.
Remarks:
PLANT: BAXTER AHMEDABAD 1 DEPARTMENT: ENGINEERING SERVICES
Conclusion:
PLANT: BAXTER AHMEDABAD 1 DEPARTMENT: ENGINEERING SERVICES