Building Technology II Sequence of Building Construction Work 1. Surveying & Layout. 2. Site Clearance. 3. Demarcation of Site. 4. Positioning of Central Coordinate, i.e. (0,0,0) as per grid plan. 5. Excavation, Building Technology II Sequence of Building Construction Work 6, Laying of Plain Cement Concrete. 7. Bar Binding and Placement of Foundation Steel. 8. Shuttering and Scaffolding. 9. Concreting. 10. Electrical and Plumbing. Building Technology II Sequence of Building Construction Work 11. De-Shuttering. 12. Brickwork / Concrete Hollow Blocks. 13. Doors and Windows frames along lintels. 14. Wiring of Electrical Purposes. 15. Plastering. Building Technology II Sequence of Building Construction Work 16. Flooring and Tiling Work. 17. Painting. 18. Final Completion and Handing over the Project. Building Technology II Sequence of Building Construction Work 16. Flooring and Tiling Work. 17. Painting. 18. Final Completion and Handing over the Project. Building Technology II Construction Process & Materials Used. 1. Surveying and Layout. Major duties of land surveyors’ include Land measurements, establishing boundaries, topographic surveys, legal documentation and documentation research, boundary dispute resolution, etc. Building Technology II Construction Process & Materials Used. 1. Surveying and Layout. Building Technology II Construction Process & Materials Used. 2. Site Clearance. The very first step is site clearance which involves removal of grass and vegetation along with any other objections which might be there in the site location. Building Technology II Construction Process & Materials Used. 2. Site Clearance. Clearing and Grubbing The lot which shall be utilized by the project shall be cleared from logs, stumps, bushes, rubbish and other objectionable matters. Building Technology II Construction Process & Materials Used. 2. Site Clearance. Building Technology II Construction Process & Materials Used. 3. Demarcation of Site. Ø The whole area on which construction is to be done is marked so as to identify the construction zone. Ø Example: A project, a plot (lot Area) of 15 x 50 meters. Building Technology II Construction Process & Materials Used. 3. Demarcation of Site. Building Technology II Construction Process & Materials Used. 4. Positioning of Central coordinate and layout. Ø The center point is to be marked with the help of a thread and plumb bob as per the grid drawing. Ø With respect to this center point, all the other points of columns are to be decided so that its exact position is set. Building Technology II Construction Process & Materials Used. 4. Positioning of Central coordinate and layout. Building Technology II Construction Process & Materials Used. 5. Excavation. Ø Excavation can be carried out both manually as well as mechanically. Adequate precautions are taken to see that the excavation operations do not damage the adjoining structures. Building Technology II Construction Process & Materials Used. 5. Excavation. Building Technology II Construction Process & Materials Used. 6. Plain Cement Concrete. (PCC). Ø After the process of excavation, laying of plain cement concrete that is PCC is done. Ø A layer of 4 inches is to be made in such a manner that it will not be mixed with the soil. Building Technology II Construction Process & Materials Used. 6. Plain Cement Concrete. (PCC). Ø It provides a solid base for the raft foundation and a mix of 1:5:10 that is, 1 part of cement to 5 parts of fine aggregates and 10 parts of coarse aggregates by volume are to be use. Building Technology II Construction Process & Materials Used. 6. Plain Cement Concrete. (PCC). Building Technology II Construction Process & Materials Used. 7. Bar Binding & Placement of Foundation Steel. Ø Steel reinforcements are to be use, generally, in the form of bars of circular cross section in concrete structure. Building Technology II Construction Process & Materials Used. 7. Bar Binding & Placement of Foundation Steel. Ø They are like a skeleton in human body. Plain concrete without steel or any other reinforcement is strong in compression but weak in tension. Building Technology II Construction Process & Materials Used. 7. Bar Binding & Placement of Foundation Steel. Building Technology II Construction Process & Materials Used. 7. Bar Binding & Placement of Foundation Steel. Building Technology II Construction Process & Materials Used. 8. Shuttering and Scaffolding Ø The term ‘SHUTTERING’ or ‘FORMWORK’ includes all forms, moulds, sheeting, shuttering planks, walrus, poles, posts, standards, V-Heads, struts, and structure, ties, walling steel rods, bolts, wedges, and all other temporary supports to the concrete during the process of sheeting. Building Technology II Construction Process & Materials Used. 8. Shuttering and Scaffolding Building Technology II Construction Process & Materials Used. 8. Shuttering and Scaffolding Building Technology II Construction Process & Materials Used. 8. Shuttering and Scaffolding Building Technology II Construction Process & Materials Used. 8. Shuttering and Scaffolding Building Technology II Construction Process & Materials Used. 9. Concreting Ø Concrete is a mixture of cement, sand, stone aggregates and water. Ø A cage of steel rods used together with the concrete mix leads to the formation of Reinforced Cement Concrete popularly known as RCC. Building Technology II Construction Process & Materials Used. 9. Concreting Building Technology II Construction Process & Materials Used. 9. Concreting Building Technology II Construction Process & Materials Used. 9. Concreting Building Technology II Construction Process & Materials Used. 9. Concreting Building Technology II Construction Process & Materials Used. 9. Concreting Building Technology II Construction Process & Materials Used. 10.1. Electrical Ø All electrical works and installations shall comply with the latest provisions of the Philippine Electrical Code with the rules and regulations of the national and local authorities concerned in the enforcement of electrical laws and regulations. Building Technology II Construction Process & Materials Used. 10.1. Electrical Building Technology II Construction Process & Materials Used. 10.1. Electrical Building Technology II Construction Process & Materials Used. 10.1. Electrical Building Technology II Construction Process & Materials Used. 10.1. Electrical Building Technology II Construction Process & Materials Used. 10.2. Plumbing Ø All plumbing works and installations shall comply with the latest provisions of the Philippine Plumbing Code with the rules an regulations of the national and local authorities concerned in the enforcement of Plumbing laws and regulations. Building Technology II Construction Process & Materials Used. 10.2. Plumbing Building Technology II Construction Process & Materials Used. 10.2. Plumbing Building Technology II Construction Process & Materials Used. 10.2. Plumbing Building Technology II Construction Process & Materials Used. 11. De-Shuttering Building Technology II Construction Process & Materials Used. 11. De-Shuttering Building Technology II Construction Process & Materials Used. 11. De-Shuttering Building Technology II Construction Process & Materials Used. 12. Brickwork/Masonry/CHB Building Technology II Construction Process & Materials Used. 12. Brickwork/Masonry/CHB Building Technology II Construction Process & Materials Used. 12. Brickwork/Masonry/CHB Building Technology II Construction Process & Materials Used. 13. Door & Windows Frames along with lintel beams. Building Technology II Construction Process & Materials Used. 13. Door & Windows Frames along with lintel beams. Building Technology II Construction Process & Materials Used. 14. Wiring for Electrical Purposes. Building Technology II Construction Process & Materials Used. 15. Plastering Ø Plaster protects structure from temperature variations; external attacks of sulphates, chlorides, etc. Plaster also provides smooth & aesthetic surface on RCC & Brickwork surface. Building Technology II Construction Process & Materials Used. 15. Plastering Ø The proportion of mortar used at site for ceiling coat is 1:4 and wall coat is 1:3. A plaster of 10 mm is done at ceiling and a plaster of 12.5mm is done at wall. Building Technology II Construction Process & Materials Used. 15. Plastering Building Technology II Construction Process & Materials Used. 15. Plastering Building Technology II Construction Process & Materials Used. 15. Plastering Building Technology II Construction Process & Materials Used. 15. Plastering Building Technology II Construction Process & Materials Used. 15. Plastering Building Technology II Construction Process & Materials Used. 16. Flooring & Tiling Work Building Technology II Construction Process & Materials Used. 16. Flooring & Tiling Work Building Technology II Construction Process & Materials Used. 16. Flooring & Tiling Work Building Technology II Construction Process & Materials Used. 17. Painting. Building Technology II Construction Process & Materials Used. 17. Painting. Building Technology II Construction Process & Materials Used.