WALL REINFORCING AT WALL REINFORCING AT

TYPICAL DUCTILE MOMENT FRAME BEAM DETAIL TYPICAL FRAMING PLAN OF CORNER INTERSECTION
TWO WAY SLAB ADDITIONAL Ø10 @ 400 O.C. 400
CHB WALL
CHB WALL

C COLUMN C COLUMN C COLUMN

LC L1 L2

400
0.75 LC OR 0.25 L1 0.25 L1 OR 0.25 L2 0.25 L2 OR 0.25 L1 0.25 L2 2 - Ø 16 EXTRA VERT. BARS ADDITIONAL Ø10
(GREATER GOVERNS) 0.25 L1 OR 0.75 LC (GREATER GOVERNS) 2 - Ø 16 EXTRA VERT. BARS @ 400 O.C.
(GREATER GOVERNS) CHB VERT. REINF. (SEE
CHB VERT. REINF. (SEE SCHED. OF REINF.)
1.3 Ld 1.3 Ld SCHED. OF REINF.)
CHB HOR. REINF. (SEE
CHB HOR. REINF. (SEE SCHED. OF REINF.)

40mm OVER (TYP.)


EQ. EQ. TOP BARS EQ. EQ. SCHED. OF REINF.)
AT SUPPORT

STRIP
TOP BARS AT

COL

L/4
CANTILEVER'S TOP BARS TOP BARS CONTINUOUS TOP BARS
DISCONTINUOUS AT SUPPORT AT MIDSPAN WEB BARS AT MIDSPAN
END

LONG CLEAR SPAN "L"

MIDDLE
STRIP
L/2
WALL REINFORCING AT END BLOCK WALL REINFORCING AT R.C. COLUMN/WALL

STRIP
COL

L/4
CHB WALL ELASTIC SEALANT

COVER
(TYP.)
40mm
2d EQ. EQ. 2d 2d EQ. EQ. POLYURETHANE BACKING
BOTTOM BARS NO SPLICE SPLICE ZONE BOTTOM BARS

CHB "t"
CHB WALL
AT MIDSPAN SHALL BE FOR BOTTOM AT MIDSPAN
ALLOWED 2d BARS

BOTTOM BARS 0.165 L1 BOTTOM BARS


FROM THE
0.165 L2
TWO WAY SLAB
FACE OF THE
AT CANTILEVER'S AT SUPPORT SUPPORT
DISCONTINUOUS 0.22 L1 0.22 L2 1 - Ø 16 MM
END CHB HOR. REINF. (SEE
50mm MAX. 50mm MAX.
SHOWING TOP BAR REINFORCEMENT SCHED. OF REINF). RC COLUMN OR
CHB VERT. REINF. SEE
SCHED. OF REINF.
AT SUPPORT AT SUPPORT WALL
CHB HOR. REINF. SEE
SCHED. OF REINF.
SHORT CLEAR SPAN "S" 1 - Ø 16 EXTRA
HOOP REINFORCEMENT HOOP REINFORCEMENT HOOP REINFORCEMENT VERT. REINF.
SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE
* WHICHEVER IS LARGER GOVERN. COL MIDDLE COL
STRIP STRIP STRIP WALL BASE REINFORCING AT FLOOR W/ 400
S S S
CONTINUOUS END CONTINUOUS END DISCONTINUOUS END 4 2 4 DEPRESSION
FREE END

CHB WALL
WALL BASE REINFORCING AT FLAT FLOOR

STRIP
LONG CLEAR SPAN "L"
COL

L/4
CHB VERT. REINF. (SEE
SCHED. OF REINF.)
CHB WALL

MIDDLE
STRIP
CHB VERT. REINF. DOWELS CHB VERT. REINF. (SEE

L/2
TYPICAL SEISMIC RESISTANT COLUMN DETAIL KEY COLUMN ELEVATION SECTION (TO MATCH VERT. REINF.) SCHED. OF REINF.)

400
STRIP
COL

L/4
CHB VERT. REINF. DOWELS
(TO MATCH VERT. REINF.)

400
SUSPENDED SLAB

SLAB
DEP.
JOINT HOOPS MUST BE SPACED AT "2Sh" FOR THE DEPTH OF THE
SHALLOWEST BEAM WHEN BEAMS W/ WIDTH > 3/4 TIMES THE WIDTH
OF THE COLUMN FRAME INTO THE FOUR SIDES OF A COLUMN. TWO WAY SLAB SUSPENDED SLAB
CONF. REINF.

LINE OF DEPRESSED SLAB @


FOR ALL OTHER CONDITIONS, USE HOOPS SPACED AT "Sh" O.C.
SHOWING BOTTOM BAR REINFORCEMENT
Lo

OTHER SIDE WHEN REQUIRED


50mm

TYP. STIFFENER COLUMN DET. ON CHB


JOINT REINF.

ROOF BEAM LEVEL 10 mmØ BAR CHAIR TYP.CHB STIFFENER BEAM DETAILS
TEMP. REINF.
AS REQUIRED WALLS
Sh 50mm

t
CONF. REINF.

LAP SPLICE ONLY W/IN CENTER HALF OF CLEAR


(Z1)

S/4 S/2 S/4


H/4

Lo

COLUMN HEIGHT. (SEE TABLE OF MIN. LAP LAP SPLICE LENGTH AT ANY
2Ø12 VERT. BAR
VERIFY

SPLICE LENGTH OF COLUMN REINFORCEMENT) LEVEL NO MORE THAN 50% COLUMN STRIP MIDDLE STRIP COLUMN STRIP
FOR COL. BAR SPLICES SEE TABLE OF MIN. OF VERT. BARS SHOULD BE Ø10 TIES SPACED@
S 2Ø12 VERT. BAR
LAP SPLICE LENGTH OF COL. SPLICED. 150 O.C TO C.L (TYP.)
MIN. DISTANCE BET. TWO CLEAR SPAN-SHORT CHB. VERT. REINF. (SEE ALTERNATELY PLACED
COLUMN TIES AS

REINFORCEMENT
PER SCHEDULE

SCHED. OF REINF.) (FOR 4M CMU WALL HEIGHT)


Slap

ADJACENT INTERVAL BARS


SPLICES SHALL BE NO LESS
THAN 800 MM.
(Z2)
H

Ø10 SPACED
2ND FLOOR BEAM LEVEL SECTION @150 O.C (TYP.)
ALTERNATELY PLACED
(TWO-WAY SLAB)
Sy

(FOR 3M CMU WALL HEIGHT)


4Ø12 VERT. BARS W/1Ø10
Sh = HOOPS & CROSSTIE SPACING NOT TIES; SPACED@150
TO C.L (TYPICAL)
CONF. REINF.

TO EXCEED Bs/4. 6Db VERTICAL OR Sc


H/4

(FOR 4M CMU WALL HEIGHT)


(Z1)

Lo

(350 - hx)
Sh

Sc = 100 +
50mm

3 LOC. OF GROUND BEAM


VERIFY

100MM THK SLAB ON GRADE


Sy = TIE SPACING NOT TO EXCEED
6Db of VERTICAL or 150mm COMPACTED
w/ 10MMØ BAR @400MM
O.C.B.W. w/ 75 MM THK WALL SUPPORT AT BOTTOM OF WALL SUPPORT AT BOTTOM EDGE OF WALL TOP SUPPORT IN AREAS W/
SUITABLE BACKFILL
Slap = TIES SPACING, NOT TO EXCEED
THE SMALLER OF Bs/4 OR 100MM
ATLEAST 95%
GRAVEL BED.
SLAB/BEAM BEAM DROPPED CEILINGS
MAXIMUM DRY
50mm

Bs = SMALLER DIMENSION OF COLUMN CROSS DENSITY(ASTM D-1557) 6MM THK. PL ANCHORED TO CONCRETE
SECTION GROUND FLOOR LEVEL/
SLAB W/ 2-Ø10 POWDERED ACTUATED
TOP OF TIE BEAM STUD OR WELDED TO BOT. OF STL. TRUSSES
Lo = LARGEST COLUMN DIMENSION, BUT NOT LESS 2-Ø10 POWDER ACTUATED
THAN 1/6 CLEAR HEIGHT, OR 450MM STUD ANCHOR (OR EQUAL)
BOTTOM OF CONCRETE
25 COMPRESSIBLE FILLER L 64 x 64 x 6MM
SLAB/BEAM 200 X 300 X 6 PL. SUPPORT
min. MATERIAL BRACE @ 1200 O.C.
2.00M(min.)

NAT. GROUND LEVEL @ 1200 O.C.


NATURAL SOIL
25 COMPRESSIBLE FILLER MATERIAL
min.
D1

BOT. OF FOOTING
L 75 X 75 X 6 X 300 LG. CHB WALL LINTEL BLOCK W/ 2 - Ø 16
COLUMN LAP SPLICE AND EXT. GIRDER SUPPORT @ 1200 O.C. CONT. HOR. REINF. TOP OF CHB WALL
WT6X13x4"LG. W/
CHB. VERT. REINF. (SEE
TO COLUMN CONNECTION DETAIL L&B
75MM THK GRAVEL BED
TYPICAL TO ALL FOOTINGS
SCHED. OF REINF.) L75X75X6X300LG. CHB WALL 2-Ø10X150LG.
100LG. FOR 1-Ø16MM
BOLT.
SUPPORT @ 1200 O.C. ANCHOR BOLTS
2 - Ø 10 POWDER ACTUA- CHB. VERT. REINF. (SEE
TED STUD ANCHOR (OR SCHED. OF REINF.) CEILING LINE LINTEL BLOCK
EQUAL) 2 - Ø 10 POWDER
2 - Ø 16 CONT.
ACTUATED STUD ANCHOR
(OR EQUAL) HORIZONTAL BARS
LAP SPLICE LENGTH: CHB VERT. REINF.
1. AT ANY LEVEL NO MORE THAN (SEE SCHEDULE
ALTERNATE BARS SHOULD BE FOR REINF.)
H (CLEAR HEIGHT OF COL.)

SPLICED.
2. MIN. DISTANCE BETWEEN TWO
ADJACENT BAR SPLICES SHALL
BE 600mm.
L
CHB EXTENSION LINTEL BLOCK IF REQ'D. SECTION 3a
WITHIN CENTER

PIPE SLEEVE THRU WALL


HALF OF "H"

L/4 CHB "t" CHB "t"


8a
TOP BARS @ SUPPORT (CONT.) CHB "t" S-9
PIPE SLEEVE
CONC. EXTENSION REQUIRED
REQ'D. BOT. BARS @ SUPPORT
BARS ALONG L WHEN REQUIRED
W/ 1-Ø16 REINF.
L

CHB WALL CONCRETE FILLER


JT. REINF.
LAT. TIES

PIPE
BARS ALONG B

CHB. VERT. REINF. (SEE CONCRETE


SCHED. OF REINF.)
FILLER
CONF. REINF. TIES

EXTRA BOT. BARS


@ MIDSPAN
0.165L SPLICE CHB WALL
BOT. BARS B MASTIC SEALANT
@ MIDSPAN EACH SIDE
0.22L EXTRA TOP BARS LINTEL BEAM : 2 - Ø 10 PIPE SLEEVE PIPE SLEEVE
@ SUPPORT CHB. VERT. REINF. (SEE
CONT. HOR. REQUIRED
SCHED. OF REINF.) COMPRESSIBLE
REINFORCEMENTS W/
MATERIALS
10mmØ C-Type STIRRUPS
@ 200mmO.C. CHB WALL

THIS DRAWING AND OTHER PROJECT TITLE: DEVELOPER: SHEET CONTENT: REVISIONS: REVISED BY: DATE DRAWN BY: SIGN/DATE SHEET NO.:
DOCUMENTS ARE INTELLECTUAL
Jan 03, 2022 Mark fil M. Sadiwa
PROPERTY OF METROSTAR GENERAL CONSTRUCTION NOTES 1
TWO STOREY UNIT
REALTY AND DEVELOPMENT INC.
IT IS UNLAWFUL TO DUPLICATE OR
TO MAKE COPIES OF SAID
SINGLE ATTACHED 01 MODEL METROSTAR 2
3
CHECKED BY:
Engr. Jade Manabat
S-2
DOCUMENTS WITHOUT THE EMINENZA RESIDENCES IV REALTY & DEVELOPMENT INC. 4
WRITTEN CONSENT OF THEIR
ARCHITECT. ALL DRAWINGS AND PRC No.: PTR No.: (ALTA MERRA) 5 APPROVED BY: 2 5
DOCUMENTS ARE TO BE KEPT FOR ISSUED ON: ISSUED AT: BAYANI ROAD, BRGY. TUNGKONG MANGGA, ADDRESS: 839 EDSA SOUTH TRIANGLE, QUEZON CITY Ar. John Henson
REFERENCE. (R.A. 9266) TIN No.: LOCATION: PROJECT NO.: DATE: OCT. 5, 2022
CITY OF SAN JOSE DEL MONTE, BULACAN Mr. Eugene Eugenio