Presentationbycivil1to6 161214130857

Download as pdf or txt
Download as pdf or txt
You are on page 1of 44

1

RUBNAWAZ
2015-UET-CCET-CIVIL-02
3rd SEMESTER
CIVIL ENGINEERING DEPARTMENT
GOVERNMENT OF THE PUNJAB

Construction of Flyover on G.T Road


at Aziz Cross Gujranwala

February 2012
COMMUNICATION & WORKS DEPARTMENT
GOVERNMENT OF THE PUNJAB

Construction of Flyover on G.T Road


at Aziz Cross Gujranwala

February 2012
CONSTRUCTION OF FLYOVER ON
G.T ROAD AT AZIZ CROSS GUJRANWALA
SALIENT FEATURE

 ADP (2016-17) Gr. Sr. No. 2775


 Approved Cost Rs. 6672 Million
 Construction Cost Rs. 3435 M
 Land Acquisition (80 Kanal) Rs. 2920 M
 Miscellaneous Rs. 317 M
 Consultant M/s NESPAK
 Contract M/s NLC
 Client C & W Dept
 Agreement Amount Rs.3115 M (9.35% below Est.cost)
 Date of Commencement 30.01.2016
 Date of Completion 29.11.2016
INTRODUCTION

 Aziz Cross project is a signal free interchange with partial clover


leaf system and two additional directional ramps.

Clover leaf interchange Partial Clover leaf


interchange with two
directional ramps instead
of loops
INTRODUCTION

 There are normally 32 conflicts at any interchange which are


completely resolved at Aziz Cross.

Traffic Count 2014


32 No. Traffic Conflicts
NEW TRAFFIC DIRECTIONS & VOLUMES (ADT 2014)

RAWALPINDI SIALKOT
36,543 13,000

31,775

17,541
GUJRANWALA
LAHORE
BASIC COMPONENTS OF FLYOVER

Bridge cross-section can be divided

Structure
Super
into two portions.

Web

Web
1. Super Structure
This portion receives the live load

Canopy
Pier
directly. For example, Box Girder

2. Sub Structure

Structure
Sub
This Portion supports the entire

Shaft
Pier
structure and live loads.
 Piles
Pile Cap
 Pile cap
Pile

Pile

Pile
 Piers
 Abutments
CONCRETE PILES

A pile is a vertical structural element of a deep foundation which


transfers super structure loads to the earth farther down from the
surface to a subsurface layer.
PILE CAP

PILE CAP
Pile cap is a thick
reinforced concrete mat that
rests on concrete piles that
have been casted into ground. Pier
concrete pile cap distributes the
load of the superstructure (from
piers and abutments into the
Pile Cap
piles.

Piles
PILE CAP AND PIER

PIER
A pier is a reinforced, Box Girder

raised structure in form of


pillars typically supported by
well-spaced pile caps. It
transfers the loads from deck to
Pier Canopy
pile caps.
For this project, special shape
Pier Shaft
of pier is adopted. It as two
components
1. Pier Shaft as column
2. Pier Canopy as transom
ABUTMENTS
Abutment refers to the substructure at the ends of a bridge span. It
supports;
 Super Structure load
 Live Load
 Lateral Earth Pressure

Abutment

Pile Cap

Piles
REINFORCED EARTH WORK
 Reinforced earth wall is earth retaining structure and provided at
approaches (from road level to bridge level).
 The key components of a Reinforced Earth wall are geo-strips,
granular backfill and precast concrete facing panels.
 The frictional bond between the backfill supports the lateral earth
pressure and stresses induced due to traffic load.
ABUTMENT 01 ABUTMENT 06

LOOP 2 ABUTMENT 07
REINFORCED EARTH WORK
PRE-STRESSED BOX GIRDERS
 An optimal and most efficient design of beam is box girder. A box girder
consists of enclosed tube with multiple walls.
 The advantage of a box girder is that it better resists torsion. Having
multiple vertical webs, it can also carry more load than an I-shape girder
of equal height.

Bottom View of Box Girder

Piers
Pre-stressing Mechanism
SCOPE OF WORK
Flyover 1
Length 301.5
RWP Piles 80
SKT
P. Cap 15
Piers 15
Abt. 2
Flyover 5
Flyover 2 Spans 10
Length 80.05
Length 301.5 Piles 38
Piles 66 P. Cap 4
P. Cap 11 Piers 6
Piers 12 Abt. 2
Abt. 2 Flyover 4 Flyover 3 Spans 3
Spans 10 Length 564.41 Length 417.3
Piles 84 Piles 64
P. Cap 20 P. Cap 15
Piers 18 Piers 13
Abt. 2 Abt. 2 GRW
LHR Spans 18 Spans 14

Pile= 332 Ramp 3 (L=361.14m) Ramp 6(L=369.39 m) Bridge approaches (841m)


Pile caps=65 Ramp 3A(L=573.11m) Ramp 7(L=369.39 m)
Abutment= 10 Ramp 4( L=379.35m) Loop 1(270.18m) Bridge Lengths(1664m)
12/14/2016 Ramp 5 (L=846.94m)
Piers=60 Loop 2(L=195.23) Road Length (4660m)
PHYSICAL PROGRESS
FLYOVER S– 1, 2, 3 & 4
 Piles 100 % Completed (294 out of 294)
 Pile Caps 100 % Completed (62 out of 62)
 Piers 100 % Completed (62 out of 62)
 Abutment 100 % Completed (8 out of 8)
 Box Girders 20% in progress (4 out of 17)
 Reinforce Earth Wall 50 % Completed (0.6 km out of 1.12 km)
 At Grade Roads 60% up to WBM (3 Km out of 5 Km)
RAILWAY BRIDGE
 Piles 100% Completed (38 out of 38)
 Pile Caps 100% Completed (4 out of 4)
 Piers 100% Completed (2 out of 2)
 Transoms 50% Completed (1 out of 2)
 Abutments 50% Completed (1 out of 2)
 Pre-cast Girders 100% Completed (21 out of 21)
FINANCIAL PROGRESS

Year Release Expr. %age Remarks

Payment made for land


2014-15 2500 2500 100%
acquisition.

Rs. 400 M land acquisition.


Rs. 215 M shifting of
2015-16 1555 1555 100%
services.
Rs. 940 M paid to NLC.

2016-17 1000 510 51% Rs. 510 M paid to NLC.