Renewable Energy Modelling
###
Costs
Fixed costs local currency 25,000,000
Variable costs (excl fuel) as % of revenu% variable elec. rev. 7.5%
Start of Operations
Start phase 1 year 1.0
Start phase 2 year 2.0
Phase 1 - days of operation per year af days 365.0
Phase 2 - days of operation per year af days 365.0
Percentage ramp-up in 1st year of opera% 62.5%
Plant Capacity
Phase 1 MW 167.0
Phase 2 MW 167.0
End
Operations
Assumptions
Start phase 1 year 1
Phase 1 operating flag
Start phase 2 year 2
Phase 2 operating flag
Phase 1 - days of operation days 365.0
Phase 2 - days of operation days 365.0
Percentage ramp-up in 1st year of operations 62.5%
Plant Capacity
Installed capacity:
Total Phase 1 167.0
Total Phase 2 167.0
Total project 334.0
Total hours in 1 year Hours 8,760.0
Electricity sales
Offtaker 1 Phase 1
Offtaker 1 Phase 2
Industry Phase 1
Industry Phase 2
Tariff Structure
Total Electricity tariff - peak hours local currency / kWh 0.05
Total Electricity tariff - peak hours local currency / kWh
Total Electricity tariff - non peak hours % peak tariff 70.0%
Total Electricity tariff - non peak hours local currency / kWh
% peak hours % total 55.0%
Page 5
Operations
Revenues
Capacity Charge
Debt Service to be done later
Fixed costs to be done later
Fixed return required to be done later
Industry Phase 1
Industry Phase 2
TOTAL REVENUE
Working capital: receivables 30.0
Accounts Receivable
EXPENSES:
Fixed costs local currency 25,000,000.0
Fixed costs per year
Variable costs as % of revenues % revenue 7.5%
Variable costs per year
EBITDA
End
Page 6
Operations
1 2 3
1 1 1
0 1 1
228.1 365.0 365.0
0.0 228.1 365.0
Page 7
Operations
days
local currency '000s 4,597.1 5,377.2 5,669.7
27,965.8 32,711.2 34,490.7
Page 8
Operations
4 5 6 7
1 1 1 1
1 1 1 1
365.0 365.0 365.0 365.0
365.0 365.0 365.0 365.0
Page 9
Operations
Page 10
Operations
8 9 10 11
1 1 1 1
1 1 1 1
365.0 365.0 365.0 365.0
365.0 365.0 365.0 365.0
Page 11
Operations
Page 12
Operations
12 13 14 15 16
1 1 1 1 1
1 1 1 1 1
365.0 365.0 365.0 365.0 365.0
365.0 365.0 365.0 365.0 365.0
Page 13
Operations
Page 14
Operations
17 18 19 20
1 1 1 1
1 1 1 1
365.0 365.0 365.0 365.0
365.0 365.0 365.0 365.0
Page 15
Operations
Page 16