(CKM) Garis Panduan Mekanikal (Standard Specs CW & SP JKR)
(CKM) Garis Panduan Mekanikal (Standard Specs CW & SP JKR)
(CKM) Garis Panduan Mekanikal (Standard Specs CW & SP JKR)
KERAJAAN MALAYSIA
JABATAN KERJA RAYA
PENGARAH KANAN
CAWANGAN KEJURUTERAAN MEKANIKAL
IBU PEJABAT JKR MALAYSIA
MEKANIKAL ARAS 24 - 28, MENARA KERJA RAYA
JALAN SULTAN SALAHUDDIN
50480 KUALA LUMPUR.
2017
This page is intentionally left blank
TABLE OF CONTENTS
Page No.
SECTION 1 - TECHNICAL SPECIFICATION ............................................................ 1
i
1.2.5.2 Vertical Position ................................................................................. 21
1.2.6 VENTILATING PIPE .......................................................................... 22
1.2.7 ANTI-SYPHONAGE .......................................................................... 22
1.2.8 TRAPS .............................................................................................. 23
1.2.9 FLOOR TRAPS ................................................................................. 23
1.2.10 TESTING TEES................................................................................. 23
1.2.11 GREASE INTERCEPTORS/WASTE DRAIN TRAP (WHERE
SPECIFIED) ...................................................................................... 23
1.2.12 REDUCING FITTING ........................................................................ 23
1.2.13 CLEANING EYES AND INSPECTION OPENING ............................. 23
1.2.14 TEMPORARY CLOSING OF PIPEWORKS (INGRESS OF
CONTAMINANTS)............................................................................. 23
1.2.15 INSPECTION CHAMBER .................................................................. 24
1.2.16 UNDERGROUND/BURIED PIPE (FOR SANITARY) ........................ 24
1.2.16.1 Excavation and Trenching for Piping ................................................. 24
1.2.16.2 Trench Excavation ............................................................................. 24
1.2.16.3 Depth of Trench’s Cover.................................................................... 24
1.2.16.4 Protection of Existing Utilities ............................................................ 24
1.2.16.5 Backfilling of Trenches ...................................................................... 25
ii
SECTION 3 - SPECIFICATION FOR COMPREHENSIVE SERVICE AND
MAINTENANCE FOR INTERNAL COLD WATER AND SANITARY PLUMBING
SYSTEMS ................................................................................................................ 30
REFERENCES ......................................................................................................... 34
APPENDIX ............................................................................................................... 39
LIST OF TABLES
LIST OF FIGURES
iii
This page is intentionally left blank
NOMENCLATURE
ABS Acrylonitrile-Butadiene-Styrene
AS Australian Standard
AWWA American Water Works Association
BS British Standard
CPC Certificate of Practical Completion
CMGD Certificate of Making Good Defect
DLP Defect Liability Period
FRP Fibre Reinforced Plastic
G.I. Galvanized Iron
HDPE High-Density Polyethylene
IP Ingress Protection
MS Malaysian Standards
OMM Operation and Maintenance Manual
PB Polybutylene
PE Polyethylene
PE-X Cross-linked Polyethylene
PP Polypropylene
PP-R Polypropylene Random Copolymer
PRV Pressure Reducing Valve
PVC Polyvinyl Chloride
RPM Revolution Per Minute
S.O. Superintending Official
SPAN Suruhanjaya Perkhidmatan Air Negara
SS Stainless Steel
UPVC Unplasticized Polyvinyl Chloride
WC Water Closet
iv
This page is intentionally left blank
iv
SECTION 1:
TECHNICAL SPECIFICATION
This page is intentionally left blank
Cawangan Kejuruteraan Mekanikal – Revision 1/2017
The work to be performed under this contract shall comprise, but not limited to
the supply, delivery, installation, testing, adjusting, balancing, commissioning and
maintenance of the following principal services and the associated works and
items:
i) Internal Piping system complete with all bends, tees, sockets, valves,
plugs, reducers, brackets, supports and other necessary accessories
to complete the installation.
The Contractor shall prepare and submit working drawings to the Superintending
Officer (S.O.) for approval within thirty (30) days from the date of acceptance of
tender. In preparing these working drawings, the Contractor shall coordinate with
the building layout and constructional details of the architectural, structural and
electrical drawings.
The drawing shall be fully dimensioned and show all the precise locations,
arrangement and loading of the equipment. The drawings shall also indicate
location and details of all foundation, supports, chases, core holes, opening in
partition wall, floors and roof and any other information required for works or
services to be provided by others.
The contractor shall submit method statement (upon S.O. request), samples of
materials or execute samples of workmanship (mock-up) for S.O. approval, and
for further samples as required until the samples submitted or executed are, in
accordance with this specification.
After connection work is done, the Contractor shall ensure that all system to be
operational as required.
The Contractor shall service and maintain the above-mentioned cold water and
sanitary plumbing system during Defect Liability Period (DLP) from the date of
Certificate of Practical Completion (CPC) in good operating condition until
Certificate of Making Good Defect (CMGD).
The Contractor shall submit the as-built drawing, Operation and Maintenance
Manual (OMM) complete with Schedule of Maintenance before handing over
subject to S.O. approval.
Exclusion:
The boundary of scope of work between mechanical works and civil works can
be referred from Figure 1 to Figure 4 in the Appendix.
1.1.1 GENERAL
All water supply plumbing and installation shall be executed in accordance with
the latest edition of the following:
1.1.2.1 General
Pipework for water supply plumbing shall be to the dimensions shown in the
drawings or as specified hereinafter and shall be complete with all bends, tees,
sockets, plugs, reducers, brackets, supports and other accessories to complete
the installation.
1.1.2.2 Standards
All pipes, fittings and equipment used for water supply plumbing and installation
shall be of the type and make approved by SPAN and as mentioned in the
drawings.
The standards stated in this specification shall comply with their latest edition
issued or relevant standards approved by SPAN.
Acrylonitrile PN 12 to MS 1419: Part 1: 2007 MS 1419: Part 1: 2007 MS 1419: Part 2: 2007 - Fitting
Butadiene MS 1419: Part 3: 2007 - Solvent cement.
Styrene (ABS) All ABS pipes, fittings and solvent cement shall be supplied by the
same manufacturers.
Polybutylene PN 15 at 20°C (equivalent to 15 bar MS ISO 15876 or AS/NZS 2642 Moulded integrally dezincified brass with BSP threads of BS EN
(PB) derated working pressure at 30°C) 12420:2014 or BS EN 12165:2016.
Nickel and Chromium plated to BS 1224 service condition NO. 2.
Polypropylene PN 14 at 70°C MS 2286 or BS EN ISO 15874 Moulded integrally dezincified brass with BSP threads of BS EN
random co- 12420:2014 or BS EN 12165:2016.
polymer (PP-R) Nickel and Chromium plated to BS 1224 service condition NO. 2.
Stainless Steel BS EN 10312: MS 1841: 2010, BS EN 10312 Stainless steel compression fittings to BS 4368 or SAS 322: 2003
(SS) <Ø 12mm → Series 1 ASTM A312/A312M or Ø ½’’ – Ø 2’’ → (Schedule 40S) Threaded & screw fittings
>Ø 12mm → Series 1 or Series 2 JIS G 3448 according to ISO 4144:2003
or Ø 2½’’ – Ø 8’’ → (Schedule 10S) Butt weld fittings according to
ASTM A312/A312M:
ASTM A 403 / A 403M
Ø ½’’ – Ø 2’’ → Schedule 40S
(Threaded)
Ø 2½’’ – Ø 8’’ → Schedule 10S
(Welded)
Copper Tubing Type K BS EN 1057 Brazing according to BS EN 1254: Part 1 or
BS 2871 Compression joint according to BS EN 1254: Part 2 or
Accelerated ‘push fit’ according to BS EN 1254: Part 2
Crosslinked PN 12 at 70°C MS 1736: Part 2 MS 1736: Part 3 - Fitting
Polyethylene Moulded integrally dezincified brass with BSP threads of BS EN
(PE-X) 12420:2014 or BS EN 12165:2016.
Nickel and Chromium plated to BS 1224 service condition NO. 2.
Pipes and fittings shall be cleaned and free from manufacturing burrs and site
debris.
The pipes shall be adequately protected against damage during transit. Each
delivery of pipes shall be accompanied by the manufacturer’s testing certificate.
All installation shall be done according to the approved drawings and pipe
manufacturer’s recommendation. Plumber shall be competent in various types of
installation. Special care shall be taken in the arrangement of piping to ensure a
neat finishing and alignment.
Services pipes and distribution pipes except those buried under ground level
shall be concealed in wall, ceilings, boxed up or laid within the common trench,
services shaft, etc provided where possible. All work shall be executed in such a
manner to avoid cutting into finished work in walls, aprons, beam, etc. where
practicable as the work proceeds. Pipe work to be buried or concealed shall not
be covered or plastered before they are examined, tested and approved by the
S.O.
Installation of valves and fittings shall be grouped where this will not affect their
operation, to reduce the number of joints to a minimum.
All necessary isolating valves, check valves and other fittings as required are as
shown in the approved drawings. Every section of major branch supply piping
shall be installed a gate valve at the point of connection to the supply.
Minimum diameter for internal cold water plumbing system shall be 20mm (3/4”)
except for flush valve system where minimum diameter shall be 25mm (1”). Final
branches to fittings shall be 20mm diameters and the sizes of feeders from which
these branches are taken shall be as follows:-
1 20mm
2 20mm
3, 4 25mm
5, 6 ,7 32mm
8, 9, 10, 11, 12 40mm
13, 14, 15, 16, 17, 18 50mm
Threaded end connections for plastic (ABS/PE/PB) pipes shall have tapered
thread forms complying with AS ISO 7.1-2008 and AS ISO 7.2-2008 or
equivalent approved standard in accordance with manufacturer’s instruction.
All screwed joints shall be made by using Teflon tape or approved jointing
compound.
Flanged joints or other suitable methods can be used for pipe more than 50mm
and working pressure more than 10 bar (PN10).
1.1.3.4 Bends
Bends of all piping shall have a radius of not less than 5 times the diameter and
shall be of standard type.
Pipe supports, hangers, anchors, guides etc. shall be supplied and installed for
proper support.
Vertical riser shall be supported at each floor with galvanized iron (G.I) riser
clamps or other material subject to S.O. approval.
Horizontal pipe runs shall be supported on hangers of split ring adjustable type
or clevis type. Where pipelines run along walls, columns or ceilings, brackets or
clamps may be used.
Where pipe lines run in a common group, they shall be supported from a
common hanger bar as indicated in the approved drawings.
Pipe supports and hangers shall be spaced at intervals not exceeding the
following:
Recommended Maximum
Pipe Size Spacing of Support (m)
(mm)
Non-metal Metal
20 0.8 1.5
25 0.85 1.8
32 1.0 2.4
40 1.1 2.4
50 1.25 2.4
80 1.65 3.0
100 1.9 3.0
Recommended Maximum
Pipe Size Spacing of Support (m)
(mm)
Non-metal Metal
20 1.0 2.4
25 1.1 2.4
32 1.3 3.0
40 1.3 3.0
50 1.6 3.6
80 2.1 3.6
100 2.5 3.6
Vertical pipes shall be supported at least at the top and bottom of each riser, at
each floor level, and at each isolating valve. In addition, a further support shall be
provided between floor levels for pipes smaller than 32mm.
Where pipes are required to be laid through structural beams or slabs, G.I/ uPVC
pipe sleeves shall be provided. All pipes shall be properly secured in place with
brackets.
All exposed piping within occupied rooms shall be boxed up to S.O. approval.
Where pipe past through fire break walls or other partitions, clearance between
pipes and sleeves shall be tightly pegged with suitable fire rated material to form
a sound and fire barrier.
All valves and fittings necessary for the correct control, operation and
maintenance of all services shall be provided and installed to the satisfaction of
the S.O. Samples shall be submitted for S.O. approval before installation. Valves
shall be installed where they are easily accessible for maintenance and
operating purposes.
Each valve shall be of the same nominal size as the pipeline in which it is
installed, except for control, pressure reducing and similar valves which shall be
correctly sized as per specific duty and functionality. Connection between each
valve and adjacent piping or equipment shall be made either flange or threaded
joints may be applicable.
Before installation, every valve shall be blown out with air to remove any foreign
matter lodged in the valve.
Full bore copper alloy screw-down stop valves / gate valves of the same
diameter as the pipe shall be provided and fixed for control in the following
positions:
Stop valve of 50mm and below shall be complied with MS 1022 and stop valve of
50mm and above shall be complied with BS EN 1213.
Gate valve of various sizes shall be complied with BS EN 12288 (copper alloy
valves) and BS EN 1171 (cast iron valves) (PN12 above).
Gate valve sized from 65mm to 100mm shall be either screwed or flanged end
complied with above mentioned standards.
Valves with reduced flow areas shall not be used for water closet flush valves
and flushing cistern.
All valves shall have hand-wheel with externally screwed bronze or stainless
steel spindle.
Dial type with 3-way gauge cock shall be supplied and installed where indicated
in the approved drawings.
A pressure gauge shall be installed at every suction pipe, every delivery pipe and
at the common header pipe.
Pressure gauges shall be minimum 100 mm diameter dial face type and having
ranges suitable for the service pressure encountered. The measuring range of
the gauge should be 125% of the maximum pressure.
The gauges shall be industrial type shock proof, liquid filled, stainless steel
casing and IP 65 Ingress Protection Rating.
Air vent and pressure reducing valve shall be installed at 30 meter intervals
along downpipes to restrict the pressure sustained by the fittings to prevent
water hammer and other effect.
Where shown in the drawings, non-slam-type check valves shall be supplied and
fitted.
Valves shall be selected in relation to the velocity of the water in the pipe. In all
cases, the valve is required to operate silently on reversal of water flow and if
necessary, valves of the double or articulated clack type or the spring assisted
type shall be fitted.
All water tanks for water supply shall be of the type and capacity shown or stated
in the drawings. The water tanks shall be watertight and properly supported.
General
The tanks shall be scribbled down and flushed out with clean water and sterilized
with chemical containing chlorine before being put into use.
Materials for the construction of panels shall conform to MS 1241. The surface of
FRP panels shall be manufactured with built-in stabilizer against embrittlement
due to ultra-violet radiation.
The panel shall be of hot press moulded and fabricated from fiberglass
reinforced plastic (FRP) of dimension 1meter x 1meter square with maximum
tolerance of 1.5mm. Each FRP panel will be manufactured with flanges at a right
angle of 90° to all sides of each panel. The thickness of the flange for the side
wall and base plates will not be less than 10mm and the landed width of each
flange will not be less than 70mm for base and side panels.
Water storage tank of 10,000 litres or more shall have internal compartments to
facilitate maintenance of the water tank. Alternatively, multiple tank may be
employed. An equalizing pipe shall be provided between each compartment or
between each separate storage tank supplying water to the same distribution
pipe.
Physical Properties
Parameter Results
Tensile strength >70 MN/m
Bending strength >100 MN/m
Elastic modulus in bend >6,000 MN/m
30 % or 90 % of the resin
Hardness manufacturer specification
which ever is higher
Glass content >25%
Water absorption 1.0%
Source: Malaysian Standard. (2010). MS 1390: Glass-Fibre Reinforced Polyester Panels and
Panel Water Tanks – Specification (First Revision)
Jointing Material
The jointing material shall be synthetic rubber as sealant with stainless steel
washer, nuts and bolts.
The holes for the bolts will be 12mm + 1.5 to 2.0mm in diameter, suitable for
M12 bolts and nuts.
Connections
All holes and pipe connection made in wall, top and bottom of tanks shall be
factory fabricated before delivery of tank to site. The positions and type pipe
connections shall be carried out strictly in accordance with the manufacturer’s
recommendations.
Painting
The internal face of the water tank shall be given two coats of non-toxic, non-
corrosive paint and external one coat primer and two coats of non-corrosive paint
to S.O. approval.
The tanks and all piping connections shall be installed strictly in accordance to
manufacturer’s instructions and specification and the installation shall be
supervised and verified by the manufacturer.
The tanks shall come with a minimum 10 years warranty against defect in
materials, manufacture and workmanship by the tank manufacturer. The
warranty certificate shall be submitted to S.O. before handing over.
Stainless steel tank design shall comply with the following standards:
Material used in the fabrication of this tank shall be of Grade 304 stainless steel
ASTM Designation: A240/A240M-94a or equivalent standards and supported by
the respective mill certificates.
The finished surface of the materials used shall be of bright annealed (BA) and/or
non-shining (2B) finished.
a) Top cap
b) Top cover
c) Tank body
d) Bottom cover
e) Stand (for round bottom & spherical types only)
The stands (except for flat bottom type), fittings and accessories such as internal
and external ladder, tank cover, screw nut, etc. of the tank shall be made of
similar stainless steel materials of the above grade.
Each tank shall be marked / labeled on the external upper part of the tank body
according to the following information:
Material for the pressed steel sectional water tank shall be manufactured from
0.8mm thickness Grade 304 stainless steel plate inner surface composite with
minimum of 5mm external surface of mild steel plate.
The reinforcement for pressed steel sectional water tank shall be reinforced
using suitable support. Detail calculation for internal / external reinforcement
design shall be submitted to S.O. for record.
All bolts, nuts and washers in contact with water shall be of stainless steel Grade
304. All external bolts, nuts and washers in contact with water shall be of hot
dipped galvanized mild steel.
The cover for pressed steel sectional water tank shall be constructed 1.2m x
1.2m / 1m x 1m from 1.2mm thickness Grade 316 stainless steel plate.
The installation of storage / domestic tanks shall include but not limited to the
following accessories and fitting to the tanks:
a) Overflow / warning pipe, outlet tapping and scour pipes shall discharge
outside the building or to a point shown or stated in the approved drawing.
b) Access manholes with cover, the number, locations and details of which shall
be approved by S.O.
c) Mosquito-proof air vents to the tank cover at the positions and as per details
approved by S.O.
d) Water tanks of two (2) metres depth or more shall be provided with internal
and external ladders. The internal ladder and external ladder shall be made of
stainless steel grade 304 unless otherwise specified. The ladder width shall
not be less than 300 mm and the length shall be suitable for the tank
specified. The maximum height from floor finish level to the first ladder step
shall be 300 mm.
e) Water level indicators and scales graduated in meters to suit the depth of the
tank as shown in the approved drawings.
Float operated valve shall comply with BS 1212. The combination of body
pattern, seat number and size of float to suit the required pressure zone shall
be as per standard.
All ball valves shall be supplied and fitted complete with back nuts, ball float,
arm, etc. Ball floats may be of soldered copper or brass or alternatively
polyethylene and PVC.
h) Drain Cocks
If concrete slab is used, dwarf walls or steel beams shall be placed between the
tank and the base level to allow a minimum clearance of 500 mm to enable ease
of tank installation and subsequent bolts tighten and adjustments after
installation.
Whenever recommended by the tank manufacturer, the steel skid base shall be
designed and constructed in accordance with manufacturer’s instructions, and
details. In such cases, the continuous support can be spaced at greater than
1000 mm nominal centers as recommended by the manufacturer.
The concrete plinth shall have minimum of 100 mm height complete with 5 mm
mild steel base plate as per tank size.
Flange joint used for the inlet, outlet and scour of storage tanks shall be made of
stainless steel grade 304 externally and internally. Joint gaskets shall be of 5 mm
thick, medium rubber reinforced with two-ply flexible fabric and complying with
BS 6956, or approved silica sealant used in the FRP tanks. All bolts, nuts and
washer used for flange nozzles shall be made of stainless steel grade 304.
All pipes, fittings, etc., shall be kept closed against moisture and foreign matters
when stored on site.
All pipes, fittings, valves and accessories shall be thoroughly cleaned internally
and externally before their installation and again where necessary before closing
up.
After installation and before putting into service, all pipework including fittings,
valves shall be thoroughly cleaned internally.
All thermoplastic pipes, fittings, valves, etc., exposed directly to sunlight shall be
painted with water based exterior-grade latex paint.
All surfaces to be painted shall be first thoroughly cleaned to remove dirt, scales,
grease spots etc. Surface shall be completely dry before painting.
All surfaces shall have minimum one coat primer and two coats finish subject to
S.O. approval.
All pipes installed shall be identified in accordance with their relevant standards.
Directional arrows shall be painted on the pipework in the plant rooms, tank room
and vertical risers. Lettering and the direction of flow must be indicated by
painting a black / white arrow on to the pipelines at appropriate intervals. These
arrows shall be 3" long on pipes up to 50 mm (2") diameter, 150 mm (6") long for
pipes over 50 mm (2") diameter.
All the workmanship and material for the supply, installation, testing, adjusting,
balancing & commissioning of all system and accessories shall comply with the
following rules and regulation requirements:
All pipes, fittings and equipment used for sanitary plumbing and installation shall
be of the type and make approved by SPAN and as mentioned in the drawings.
The standards stated in this specification shall comply with their latest edition
issued or relevant standards approved by SIRIM.
Item Standard
MS 1063, BS EN 1329-1, BS 4514,
Unplasticized polyvynil chloride (uPVC) MS 628,
BS EN ISO 1452-2:2009
MS 979: Part 1 (100mm & 155mm)
Unplasticized polyvynil chloride
MS 979: Part 2 (200mm and above) or
(uPVC) (Underground)
BS EN 1401-1, MS 1085
a) Dirty water from baths, basins, wash troughs, ablution, floor trap and other
waste containing a small proportion of soap and /or dirt; and
b) Greasy water from kitchen sinks and equipment where grease traps or
interceptors are required.
All main stacks shall be minimum 100mm diameter or subject to S.O. approval.
In this system, all appliances discharge separately into a single discharge stack.
All traps are unventilated and those on pipes 50mm and below must have 75mm
water seals (trap). The stack is directly connected to the manhole.
All appliances are directly discharged to a common stack and essential features
of this system are the provision of 75mm deep seal traps on baths, basins and
sinks as well as the provision of a ventilating pipe to which every appliance
connected.
The modified single stack system basically similar to the single stack system,
with the exception that the W.C.’s only are ventilated direct to the main
ventilating pipe.
The depth of the water seal to all appliances, except W.C.’s shall 75 mm.
The depth of the water seal to W.C.’s shall be 50 mm to the main discharge
stack.
The discharge from W.C.’s, urinal and other soil appliances are conveyed via a
main discharge soil (soil pipe) and finally to the sewer line.
A separate waste pipe conveys the discharge from waste basins, baths, sinks to
the waste water drain through a trapped gully.
All pipes shall run in accordance with layout sizes shown in the approved
drawings. The pipes shall be provided, fixed and connected to fittings and
sanitary installation complete with all necessary bends, tees, sockets, branches,
offsets, inspection pieces, etc. Pipes shall be joined with approved solvent in
accordance with the manufacturer’s instructions.
Pipes, fittings and the system of unplasticised polyvinyl chloride (uPVC) in the
field of soil, ventilation and waste discharge (low and high temperature) inside
buildings, for soil and waste discharge systems buried in ground within the
building structure and for soil, ventilation and waste discharge for both inside
buildings and buried in building structure shall complied to MS 1063 or BS EN
1329 Part 1 or BS 4514 (size 82 mm only).
Pipes, fittings and the system of unplasticized polyvinyl chloride (uPVC) piping
systems shall comply to MS 1063; or BS EN 1329: Part 1; or BS 4514 (size
82mm only)
• For soil, ventilation and waste discharge (low and high temperature)
inside buildings (marked with “B”).
• For soil and waste discharge systems buried in ground within the
building structure (marked with “D”).
• For soil, ventilation and waste discharge for both inside buildings and
buried in building structure (marked with “BD”).
The pipes and the fittings shall be coloured through the wall. The colour of pipes
and fittings shall be as follows:
Main soil, waste and vent pipes shall be carried up to the roof level and
protected by vent cowl and weather apron as per approved drawing.
All pipes shall be fixed in straight runs and all horizontal runs shall be laid to
gradients in accordance with BS EN 12056 Part 2 and in any event not less than
18 mm/m unless otherwise instructed.
1.2.4.1.1 UPVC Waste, Vent and Soil System (Inside building, buried in building structure
and buried in ground within building structure)
The uPVC pipes, fittings and system shall comply in all respects with the
requirements of MS 1063 or other relevant standard certified by SIRIM / SPAN.
Pipes shall be supplied in plain-ended lengths and the minimum acceptable with
thickness of pipe and fittings as below:
* For soil and waste discharge systems buried in ground within the building
structure and for soil, ventilation and waste discharge for both inside buildings
and buried in building structure.
The method of jointing to be employed shall be that solvent welding using the
manufacturer’s approved cement. Seal ring fittings shall be used where
necessary to accommodate thermal movement or the sockets of standard fittings
shall be converted to seal ring adaptor.
The underground uPVC sewerage pipes and fittings shall comply in all respects
with the requirement of MS 979: Part 1 (100mm and 155mm) and MS 979:
Part 2 (200mm and above) or other relevant standard certified by SIRIM /
SPAN.
The minimum acceptable wall thickness of pipes and fittings shall be as below:-
Where pipework is constructed using solvent welded joints, expansion joints for
uPVC pipes shall be carried out in accordance with the manufacturer’s
recommendations.
Where shown or stated in the drawing, 100mm diameter cast iron soil and vent
pipes internally coated with anti-corrosive bituminous coating shall be provided,
fixed and connected to the fittings and sanitary system.
All main and branch soil pipe and fittings shall be cast iron to BS 416 Heavy
grade coated with an approved tar-based composition.
Main and branch vent pipe and fittings shall be cast iron to BS 416 Heavy grade
factory coated with an approved certificate tar-based composition.
Branch vent pipe of 2” (50 mm) diameter and below shall be galvanized to BS
10255: Heavy grade.
Cast iron pipes shall be jointed with an approved certificate resin with molten
lead and well-sealed. All necessary bends, tees, sockets, branches, offsets,
inspection pieces, shall be provided where necessary.
All material not specifically mentioned above shall conform to the latest edition of
their respective British Standard and/or Malaysian Standard or equivalent
specification and shall be to the approval of SIRIM / SPAN.
The installation, method of jointing and fixing shall comply in all respects to the
manufacturer’s recommendation and comply with latest relevant standards.
All soil, waste and vent pipes, pipe hooks clamps and clips shall be placed tight
up against the head or underside of the collar. Extension clips shall be used
where it is necessary to run the pipe clear of the wall.
Use only fixings that are compatible with the materials and system of pipework.
Do not exceed the maximum spacing between fixings for sanitary pipes given
below.
Recommended Maximum
Pipe Size Spacing of Support (m)
(mm)
Non-metal Metal
32 0.5 2.1
40 0.5 2.4
50 0.6 2.7
80 1.0 3.0
100 1.0 3.0
150 1.2 NA
Recommended Maximum
Pipe Size Spacing of Support (m)
(mm)
Non-metal Metal
32 1.2 3.7
40 1.2 3.7
50 1.2 4.6
80 2.0 4.6
100 2.0 5.5
150 2.0 NA
The work shall be inspected and tested during installation at agreed stages
subject to S.O. approval.
All work, which will be concealed, shall be tested before it is finally enclosed.
A final test shall be made upon completion for soundness and performance in
accordance with BS EN 12056-2: Gravity Drainage Systems Inside Buildings:
Sanitary Pipework, Layout and Calculation or MS 1402 – Code of Practice for
Sanitary System in Buildings.
Main ventilating stack pipe shall be discharge to the open air or connected to the
discharge stack above the spillover level of the highest appliance on the stack.
(Soil pipe or single stack system shall in all cases be vented by upward
extension of the soil or combined pipe).
The upward vent pipe shall be straight and free from any bends or angles
except where unavoidable. It shall be extended through the roof to the required
height with the open end protected by means of copper wire globe or approved
cowl. The distance of outlet is not less than 900 mm above the head of any
window or other opening into a building and within a horizontal distance of 3 m.
All vent and branch vent pipes shall be graded 18 mm/m (minimum 1o) to drip
back to the soil or waste pipe by gravity. A branch vent must rise vertically or at
an angle of not more than 45˚ from the vertical to a point 150 mm above the
fixture it is venting before running horizontally.
Main ventilating pipe shall not be less than 50 mm dia. or 2/3 of the diameter of
the main soil/waste pipe whichever the larger diameter is.
1.2.7 ANTI-SYPHONAGE
No fixture shall be connected to the soil, waste or combined pipe at any point
between the trap and the anti-syphonage pipe, which it serves.
Before connecting to the main vent pipe all anti-syphonage pipework shall rise
above the floor level of the sanitary appliances.
1.2.8 TRAPS
Each sanitary appliance shall be fitted with a trap either as an integral part of the
appliance or attached to and immediately beneath its outlet. All traps shall be
accessible and provided with adequate facility for cleaning. The internal surface
of the trap shall be smooth throughout. Generally, the trap shall be of the same
material as the soil/waste pipe.
Floor trap in all areas, unless otherwise specified, shall be 100 mm diameter
similar materials to the pipe traps complete with grating and self-tapping screw.
Testing tees shall be located on the vertical stacks between floors to enable
each floor to be tested independently as specified hereafter. Upon completion of
testing, the tees shall be sealed up with lead joint or solvent joint where uPVC
pipe is specified.
The body of the interceptor and baffles shall be made of Stainless Steel Grade
316. The baffles shall be of removable type.
Wherever reduction in pipe sizes takes place, reducing fitting shall be used.
To provide access for the proper inspection, cleaning and testing of the entire
length of pipe, inspection openings and cleaning eyes shall be provided on all
soil, waste and combined pipes at:
As soon as pipes have been installed, all openings shall be capped or plugged
to prevent the entrance of materials that would obstruct or choke the pipes. It is
the responsibility of the Contractor to ensure that caps and plugs are left in place
until removal is necessary for completion of installation.
The works shall include the construction of all inspection chambers / gully trap
generally as shown in the civil/tender/working drawings and specification.
Inspection chamber and gully trap shall not be located in clinical areas, clean
areas or any other areas that will affect the cleanliness, functionality and
operability of the spaces.
All underground/buried pipes shall be carefully laid on beddings free from rocks,
stones and other broken materials. Unless otherwise stated, all direct buried
pipework shall be installed in open trench.
The Contractor shall perform all excavation to the depths indicated in the
drawings or as specified in conformance with local authority requirements.
All excess excavation materials shall be removed from the site. The contractor
shall prevent surface water from flowing into trenches or the excavations by
using sheeting and shoring method thus ensuring the safety of personnel. Any
water accumulating therein shall be removed.
Trenches shall be of necessary width for the proper laying of the pipe, and the
banks shall be as nearly vertical as practicable. The bottoms of the trenches
shall be accurately graded to provide uniform bearing and supports for each
section of the pipe on undisturbed soil at every point along its entire length, or
may be over excavated 100 mm below depth indicated and filled with well
tamped salt free coarse sand or other approved materials. Layers or brick,
concrete base and angle blocks shall be used support for the laying of piping.
The minimum depth of trenches covered with concrete slab shall be 450 mm
from top of pipe to finished ground level and trenches without concrete slab shall
be 750 mm.
Existing utility lines or other completed utility lines if damaged by the Contractor
shall be repaired at his own expense.
When connecting to existing utility lines, no section of the existing piping shall be
abandoned unless it is specifically indicated on the drawings.
Trenches shall not be backfilled until all required pressure and other tests have
been performed. Backfill and compaction shall comply to Civil & Structural
Engineer’s requirements.
2.0 GENERAL
All work to be performed shall be in accordance with this specification and the
commercial practice.
The Contractor shall allow for the cost of all tests to the plumbing system to the
satisfaction of the S.O. The completed plumbing system shall be tested for
hydraulic performance.
The cost for providing all testing, adjusting, balancing and commissioning as well
as calibrated measuring equipment, all materials and consumables such as fuel,
electricity, water etc. shall be borne by the Contractor.
The Contractor shall give the S.O. a minimum of full seven (7) days notice of his
readiness to carry out acceptance tests, completed testing sheet and schedule
for S.O. approval.
No acceptance test shall be carried out except in the presence of the S.O., the
State Water Authority’s representative (if required) and the Contractor or their
respective representative appointed for the purpose.
Internal reticulation and main distribution pipes shall be slowly and carefully
charged with water in order that all air is expelled from the system. The system
shall be allowed to stand full for 24 hours. An air relief valve should be provided
at the highest point in the system to bleed off any air that is present.
A test pressure of 1.5 times the maximum working pressure shall be applied for
24 hours.
The completed system shall be inspected for leaks during the test. Should any
signs of leakage occur in the tanks or pipework, their positions shall be marked
and the Contractor shall carry out remedial measures. The pressure tests
procedure shall be repeated until the whole water system passes. The pipe
installation is considered to have passed the pressure test if no visible leak and
no drop in the pressure reading are observed during the test.
The permanently installed pumps shall not be used for pressure testing of the
water system.
During the flow test, all pumps shall be run with all valves fully open and the
following data shall be recorded:-
After completion of the pressure tests to the satisfaction of the S.O., the whole
piping and water storage system shall be thoroughly flushed with potable water
before they are put into use.
The Contractor shall ensure the system is fit for purpose and the water in the
pipeline is safe for consumption after flushing.
The Contractor, at his own expense, shall use water supply for cleaning and
flushing out of all the plumbing system that he had installed as per Contract.
Control valves and all equipment liable to damage, shall be disconnected before
cleaning out. All strainers shall be thoroughly cleaned out during and at the
completion of the clean out operation.
2.1.1.4 Balancing
2.1.1.5 Records
All pressure, flow and balancing tests shall be recorded by Contractor and
certified by S.O. or S.O.’s representatives.
The S.O. reserves the rights to order a re-test if the Contractor fail to produce
authentic test record.
After flushing, the tank shall be filled with water to maximum operating capacity
level and the level of water surface shall be carefully recorded. The tank shall be
accepted as satisfactory if after a period of 48 hours there is:
If the test results do not satisfy the above conditions of test, the Contractor shall
locate and rectify all defects and leakages and the test shall be repeated. The
Contractor shall bear all costs and expenses for all tests and remedial works.
All pumps and motors shall be checked for flow rates, pressures and RPM. The
input signal device sensors and controllers shall be checked to ensure the
pumps cut-in and cut-out at predetermined water levels.
The S.O. reserves the right to request for water, air or smoke tests as well as for
hydraulic performance to be performed by the Contractor at his expense
including the furnishing of the necessary equipment. The testing procedure shall
be in accordance with MS 1402: Part 3.
There is no justification for a water flood test to be applied to the whole of the
plumbing system. The part of the system mainly at risk is that below the lowest
sanitary appliances and this may be tested by inserting a test plug in the lower
end of the pipe and filling the pipe with water up to the flood level of the lowest
sanitary appliances, provided that the static head does not exceed 6 m. This is a
visual inspection.
Air test may be performed by inserting expanding rubber testing plugs in the
lower and upper ends of the main soil pipe and main ventilating pipes and
sealing the plugs with water necessary. The water seals of all sanitary
appliances shall be fully charged.
The testing plug at the upper end of the ventilation pipe should be fitted with a
tee-piece with cock on each branch. A flexible tube manometer should be fixed
to one branch while air pressure is being introduced into the system through the
other branch until the desired pressure is indicated on the manometer scale.
The air test applied shall be 3.8 mbar (38 mm water gauge) in period not less
than 3 minutes without loss.
Smoke can be introduced into the system by a small machine under the source
pressure as for the air test. The whole system shall be filled with smoke before
the openings are sealed with plugs.
The pressure on the smoke shall be maintained for three (3) minutes after the
last opening has been sealed.
Smoke testing shall normally only be used instead of air test when an
undetectable leak in the system occurs.
Hydraulic performance discharge tests shall be made from all appliances singly
and correctively. Obstruction in any of the pipe lines shall be traced and the
whole system examined for proper hydraulic performance including the retention
of an adequate water seal in each trap.
3.0 GENERAL
All work to be performed shall be in accordance with this specification and the
commercial practice.
The work described in this specification shall be performed by skilful workmen in the
service, maintenance and repair of the internal cold water and sanitary plumbing
system and shall be executed in accordance with the good engineering practice.
All materials to be supplied in connection with work under this Specification shall be
new, unused, genuine, and shall generally be the best quality in manufacturing and
performance.
3.2 SUPERVISION
The Contractor shall have in his direct employ workmen who are skilled in the
service, maintenance and repair of internal cold water and sanitary plumbing
system.
The work covered under this Specification is to service and maintain all equipment
comprising the complete internal cold water and sanitary plumbing system strictly
accordance with the servicing and maintenance schedule as set out in Clause 3.5
below.
The Contractor shall rectify of any defects in any parts of the complete internal cold
water and sanitary plumbing system observed during routine inspection and service,
and shall repair such defects if required to do so by the S.O.
The Contractor shall also provide emergency repair service at any time if required to
do so by the S.O.
The Contractor shall include in his service and maintenance contract for the supply
of the following consumable materials as and when required.
a) All oils and greases required for the lubrication of motor bearing, packing, pivots
and other moving parts.
b) All cotton waste, soap detergent and other cleaning materials required for
cleaning purpose.
e) All electric contact points required to replace worn electric contact points in
switchgears, electric control gears and electric relays.
The cost of these consumable materials shall not be charged for separately, but
shall be included in the schedule quoted by the Contractor for the service and
maintenance of the complete internal cold water and sanitary plumbing system.
The Contractor shall inspect and service all equipment comprising the complete
internal cold water and sanitary plumbing system periodically as scheduled in the
approved check list except where otherwise directed by the S.O.
The Contractor shall report in writing to the S.O. any defect/s observed in any part or
parts of the complete internal cold water and sanitary plumbing system. The
technical report shall state the causes of the defects observed, and shall include the
estimate of repairs required for non-consumable material or any part or equipment
damaged by catastrophic event or vandalism.
c) Check and record motor running amperes, voltages and resistance of cable.
3.6.3 All Electrical Starters, Electrical Control Gears, and Ancillary Electrical
Apparatus (If Applicable)
a) Clean and adjust all bearings, pivots and other moving parts as necessary.
e) Check all water taps for leakages and replace rubber washer as necessary.
b) Check any water leakage at any part of jointing of internal sanitary pipe system.
ii) Any blockages shall be removed by using hand operated rods and capable
passing through the system without damaging the internal surfaces of pipes
and fittings.
a) Inspect and check all other equipment under this Contract, whether or not these
are specifically mentioned in the check list.
b) The Contractor is responsible for the operation of the plant and equipment on
correct methods of operating the plant and equipment and on the maintenance
points to be watched.
c) Report in writing to the S.O. any defects observed in any part or parts of the
complete internal cold water and sanitary plumbing system. The report shall state
the cause/s of the defect/s observed and shall include an estimate of the cost of
repairs required.
The Contractor shall have deemed to have included the sampling and testing of
water in storage tanks.
The Contractor shall be responsible for ensuring that water quality testing is
regularly done on the cold or domestic water supply network to monitor the water
quality provided to the end user against the most current revision of the State Water
Authority guidelines for domestic and drinking water.
a) Chemical Analysis
b) Bacteriological Analysis
In the event the cold or domestic water quality does not meet the most recent
revision of the State Water Authority guidelines for domestic and drinking water (the
most current revision at the time of sampling), the Contractor shall immediately
notify the S.O. and recommend appropriate action for approval.
The above mentioned tests shall be performed again until the approval of S.O. is
obtained.
3.9 REPAIRS
The Contractor shall repair any defects in the complete internal cold water and
sanitary plumbing system on the instruction of the S.O.
All repairs on the complete internal cold water and sanitary plumbing system shall
be guaranteed by the Contractor against defects in workmanship and materials for a
period of one year to take effect from date of completion of the repairs. During the
guarantee period, the Contractor shall rectify defects in repairs carried out by him
with no additional charge to the government.
The Contractor shall provide a service and maintenance record book for the
complete internal cold water and sanitary plumbing system being serviced and
maintained by the Contractor. This record book shall be kept in the plant or
maintenance room of internal cold water and sanitary plumbing system being
serviced and maintained, and brief details of all services, maintenance and repairs
carried out The address and telephone number of the Contractor's personnel and
person in charge shall also be recorded into this record book to facilitate emergency
service call.
The Contractor shall also keep an accurate detailed record in duplicate of all
service, maintenance and repair work carried out by him on the complete internal
cold water and sanitary plumbing system as well as ancillary equipment. This record
shall be in the form of a Maintenance/Repair Sheet, and shall be countersigned by
the S.O. each time the internal cold water and sanitary plumbing system as well as
ancillary equipment is attended to by the Contractor.
References
• Department of Standard Malaysia. (2009). MS ISO 15876: Plastics Piping Systems For
Hot And Cold Water Installations -- Polybutene (PB).
• Department of Standard Malaysia. (2010). MS 2286: Plastics Piping Systems For Hot
And Cold Water Installation - Polypropylene (PP).
• Department of Standard Malaysia. (2004). MS 1736: Plastics Piping Systems For Hot
And Cold Water Installations – Crosslinked Polyethylene (PE-X).
• Department of Standard Malaysia. (2010). MS 1063: Plastics Piping Systems For Soil
And Waste Discharge (Low And High Temperature) Within The Building Structure -
Unplasticized Poly(Vinyl Chloride)(PVC-U) - Specification For Pipes, Fittings And The
System.
• Department of Standard Malaysia. (2012). MS ISO 7671: Plastics piping systems for soil
and waste discharge (low and high temperature) inside buildings - Polypropylene (PP).
• British Standards Institude. (2011). BS EN 12201: Plastics piping systems for water
supply, and for drainage and sewerage under pressure. Polyethylene (PE).
• British Standards Institude. (2014). BS EN 12420: Copper and copper alloys. Forgings.
• British Standards Institude. (2007). BS ISO 1224: Rolling bearings. Instrument precision
bearings. Boundary dimensions, tolerances and characteristics of inch series bearings.
• British Standards Institude. (2002). BS EN 10312: Welded stainless steel tubes for the
conveyance of aqueous liquids inclu ding water for human consumption. Technical
delivery conditions.
• British Standards Institude. (2014). BS 4368: Metallic tube connectors for fluid power and
general use. Split collet compression fittings.
• British Standards Institude. (2010). BS EN 1057: Copper and copper alloys. Seamless,
round copper tubes for water and gas in sanitary and heating applications.
• British Standards Institude. (2010). BS EN ISO 2871: Surface active agents. Detergents.
Determination of cationic-active matter content.
• British Standards Institude. (1998). BS EN 1254: Copper and copper alloys. Plumbing
fittings.
• British Standards Institude. (2016). BS EN 12165: Copper and copper alloys. Wrought
and unwrought forging stock.
• British Standards Institude. (2010). BS EN 12288: Industrial valves. Copper alloy gate
valves.
• British Standards Institude. (2015). BS EN 1171: Industrial valves. Cast iron gate valves.
• British Standards Institude. (2004). BS 4213: Cisterns for domestic use. Cold water
storage and combined feed and expansion (thermoplastic) cisterns up to 500 l.
Specification.
• British Standards Institude. (2005). BS EN 1212: Chemicals used for treatment of water
intended for human consumption. Sodium polyphosphate.
• British Standards Institude. (2014). BS EN 1329: Plastics piping systems for soil and
waste discharge (low and high temperature) within the building structure. Unplasticized
poly(vinyl chloride) (PVC-U). Specifications for pipes, fittings and the system.
• British Standards Institude. (2001). BS 4514: Unplasticized PVC soil and ventilating
pipes of 82.4 mm minimum mean outside diameter, and fittings and accessories of 82.4
mm and of other sizes. Specification.
• British Standards Institude. (2009). BS EN ISO 1452-2: Plastics piping systems for water
supply and for buried and above-ground drainage and sewerage under pressure.
Unplasticized poly(vinyl chloride) (PVC U). Pipes.
• British Standards Institude. (2009). BS EN ISO 1401-1: Plastic piping systems for non-
pressure underground drainage and sewerage. Unplasticized poly(vinyl chloride) (PVC-
U). Specifications for pipes, fittings and the system.
• British Standards Institude. (1990). BS 416-1: Discharge and ventilating pipes and
fittings, sand-cast or spun in cast iron. Specification for spigot and socket systems.
• British Standards Institude. (2008). BS 437: Specification for cast iron drain pipes, fittings
and their joints for socketed and socketless systems.
• British Standards Institude. (2004). BS EN 10255: Non-alloy steel tubes suitable for
welding and threading. Technical delivery conditions.
• Australian / New Zealand Standard. (2008). AS/NZS 2642: Polybutylene (PB) plumbing
pipe systems.
• Australian / New Zealand Standard. (2008). AS ISO 7.1: Pipe threads where pressure-
tight joints are made on the threads. Part 1: Dimensions, tolerances and designation.
• Australian / New Zealand Standard. (2008). AS ISO 7.2: Pipe threads where pressure-
tight joints are made on the threads. Part 2: Verification by means of limit gauges.
• ASTM International. ASTM A312 / A312M: Standard Specification for Seamless and
Welded Austenitic Stainless Steel Pipes.
• ASTM International. ASTM A403 / A403M: Standard Specification for Wrought Austenitic
Stainless Steel Piping Fittings.
• ASTM International. ASTM A240 / A240M: Standard Specification for Chromium and
Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for
General Applications.
• Japanese Industrial Standard. (2012). JIS G 3448: Light Gauge Stainless Steel Tubes for
Ordinary Piping.
• Jabatan Kerja Raya. (2008). JKR 20200-0045-99: JKR Standard Specification for
Detachable Joints and Variable Adaptors for uPVC, Ductile Iron and AC Pipes.
• SAS 322: 2003: Pipe Coupling Performance Standards for Stainless Steel Pipes for