Shuttring, Deshuttering, Steel Fixing, P.C.C and R.C.C Work Jsa

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

Jubliant Infrastructure Limited-Bharuch

Annexure-6
JOB SAFETY ANALYSIS

JSA NO. Department / Routine/ Non


Job Title: New/ Revised
Activity/ No… Routine

Reference work
Permit no:
JOB SAFETY Supervisor:
Prepared By:
ANALYSIS

Plant Location: Unit-1


Department: Project
Reviewed By:
Niacinamide

Job Description: R.C.C, P.C.C, shuttering, de-shuttering and steel fixing


work Approved By:

SEQUENCE OF TASK POTENIAL HAZARDS PREVENTIVE MEASURES

 Mobilization of  Unskilled workers,  Site safety induction should be provided to all new
Manpower  Unauthorized entry employees.
 Deploy experienced trained skilled worker for specific jobs.
 Job specific training should be given
 TBT to be taken on daily basis prior to start the job
Mandatory
 PPE’s should be provided viz. safety helmet, safety shoes,
reflective jacket etc.
 Safety Awareness/motivational programs shall be conducted
to workmen for more awareness on safety.
 Medical fitness is must for all workers.
 Gate pass compliance (As per JIL HR Dept) shall be complied.
 Storage of shuttering  Slip, trip & fall  All shuttering material should be stored properly with
material hazards may arise due sufficient stacking height.
to improper  Properly secure or tie store shuttering material
housekeeping at  Shuttering yard areas to be demarcated and barricaded.
shuttering material
storage area
 Manual handling of  Sharp edge or  Use mandatory PPEs safety shoes, helmet, gloves & goggles
shuttering material protruding nails etc.
 Lifting of excess  Bend / remove unwanted protruding nails. Use proper tool
weight to remove embedded nails, nails to be collected in proper
 Material falling on box, maintain good housekeeping.
feet.  Supervisor shall be ensure that no workman will lift more
 Slippery surface & than 20 kg for manually handling loads more than 20kg,
tripping hazard. deploy a team of required manpower.

Page 1 of 5
Format No.: EHS-006/F06-00 Effective Date:
Jubliant Infrastructure Limited-Bharuch

Annexure-6
JOB SAFETY ANALYSIS

 Wrong posture.  Provide shoulder pad for material shifting.


 Ensure obstruction free accesses to work place.
 Ensure proper packing is provided below the stacked
material
 PPEs safety shoes with steel toe shall be provided.
 Shuttering material stack height to be limited to 1.2 mtr.
 Shuttering frame  Inadequate designed,  Skilled carpenter & fitter to be deployed for shuttering work.
making/formwork fabricated, and  Continue supervision to be provided.
supported form work.  Ensure proper tying or fixing of shuttering.
 Cut hazard  Support formwork or shuttering secured with both ends.
 Dust  The vertical supports shall be adequately braced or
 Trapping and pinching otherwise secured in position.
 Inadequate tying of  Avoid excessive stacking on shuttering material.
frames.  Provide the rubber / PVC insulated sleeve for the hammer.
 Rusted or spoiled nuts  After assembling the basic unit, adjustment screw shall be
and bolts. set to their approximate final adjustment.
 Protruding nails.  The centring frames shall be tied together with sufficient
 Uneven ground. braces to make rigid and solid.
 Do not used rusted or spoiled threaded nuts & bolts.
 Use of adequate PPE's are provided, proper communication
amongst crew.
 Ply wood cutting for  Wrong operation of  Ensure only valid & inspected ply cutter machine should be
shuttering work ply cutter machine. used by competent person.
 Dust  Inspect work locations and ensure closure of observations.
 Flying of small  Inspect hand tools before use, use right tool for right job.
particles.  Use of dust mask/Nose mask.
 Electrical shock  All electrical connection given through ELCB (capacity 30
 Defective hand tools mA).
 Flying Nail leading to  Electrical connection shall be taken only through authorized
bodily injury electrician.
 Ensure joint free cable is used for the electrical connection
and protection
 Maintain good housekeeping in the area.
 Deploy trained persons, use of adequate PPE's.
 Access way should be free from obstacles.
 Electric supply cable should be having industrial/waterproof
pin top.
 Tool box talk conducted by concerned engineer or
supervisor before start of work.
 Work permit should be taken before start the work,
 Only skilled person are allowed to execute ply wood cutting
work.
 Use of safety glasses, Hand gloves, Appropriate PPES, restrict
unauthorized person at workplace.

Page 2 of 5
Format No.: EHS-006/F06-00 Effective Date:
Jubliant Infrastructure Limited-Bharuch

Annexure-6
JOB SAFETY ANALYSIS

 De-shuttering work  Failure of scaffolding.  Ensure continuous supervision during deshuttering work.
 Fall of shuttering  Proper inspection of scaffolding by certified inspector,
material required strengthening, supporting before start of work.
 Contact with bare  Barricade the deshuttering area.
nails,  Only authorized persons are allowed.
 Access block,  Do not keep loose material on working platform
 Improper material  Follow proper sequence while shuttering / deshuttering
storage work.
 Use of steel toe safety shoes.
 Conduct tool box talk before starting the work.
 Ensure access way should be free from obstruction.
 After Deshuttering, all nails must be removed from shutter
material or sharp point of nails must be bend or sheared off.
 Properly stack de-shuttering material.
 Provide safe & unobstructed access way.

 Work inside the  Injury to person inside  Ensure that work permit procedures are followed.
confined space the confined space  Ensure that in & out record in confined space entry should be
 Oxygen mentioned.
deficiency/hazardous  Gas testing shall be carried out to ensure toxic gases.
gases  Ensure the confined space check list then start the work.
 Property damage  Competence, training, supervision and suitability.
 Personnel/equipment  Proper ventilation either through natural or fan.
fall in confined space
 Wear appropriate PPE
 Awkward Access/
 Confined space attendant still attend outside of confined space
Egress
until person working inside the confined space.
 Personnel /equipment
fall in, collapse of  Ensure proper good condition of ladder.
excavated adjacent  Ensure proper entrance & exit of confined area
 Keep access always clear from obstructions.
 Ensure the excavated area hard barricaded
 Remove all of loose items from excavated adjacent to avoid falling
 Ensure proper shoring or maintain slope to avoid collapse of
excavated area.
 R.C.C and P.C.C work  Dermatitis disease  TBT conducted before starting the work.
 Personal injury  Ensure work under supervision.
 Body or eye injury  Ensure all equipment in good condition and inspected by competent
 Loss of eye person.
 Slip/Trip hazard  Wear mandatory PEEs like rubber gloves, gum boot, safety goggles,
 Sprain and strain on body goggles etc.
parts.  Wash the effected body parts with water immediately after concrete
 Noise burn.
 Trapping of legs inside  Engage only trained worker for concreting work.
reinforcement mats.  Use hearing protection when noise level exceeds more than 85db.
 Concrete burn

Page 3 of 5
Format No.: EHS-006/F06-00 Effective Date:
Jubliant Infrastructure Limited-Bharuch

Annexure-6
JOB SAFETY ANALYSIS
 Rebar installation/steel  Hand injury  Conduct tool box talk before start the work.
fixing work  Cut/puncture/hand  Make sure all protruded nail remove before wooden material lying at
injury the ground.
 Slip/Trip/Fall  Cover re-bar to avoid tripping where access is necessary. Wire mesh
 Property damage will be installed on top of rebar mats to minimize slip, trip and fall
 Pinch point hazards.
 Heat  Remove all unwanted material and secure properly to keep access and
egress free from obstruction.
Stress/Exhaustion  Wear appropriate PPEs before starting the work.
 Back injury  Tool must be inspected before used.
 Competent person must be deploy
 Ensure area are clear and materials properly stack within the
working area.
 All rebar’s that is protruding must be capped and kept
secured
 Workers will be oriented about the proper posture and
positioning during the execution of the job.

 Mobilization and  Driver unaware about  Vehicle fitness certificate to be checked.


demobilization of T.M site conditions may  Vehicle internal inspection is conducted.
cause of incident lead to  Accessories required with the vehicle should be checked (ex.
property damage or Wheel stoppers).
injury  Access is free from obstruction.
 Unfit Vehicle comes on  Signal man is in continuous contact with the TM driver.
site may leads to  Mandatory PPE's is provided (Safety shoes, helmet, goggle and
property damage & jacket etc.)
bodily injury  Ensure that 10 feet clearance around TM.
 Access blocked due to
TM may leads to
problem in case
emergency situation
 Movement of miller
struck with person.

 Concrete compaction  Fall/slip/trip  Pre start work tool box talk discuss and understand the hazard on the
using vibrator machine  Eye injury area.
 Property damage  Ensure all workers train and competent to perform task.
 Wear mandatory PPEs like hand gloves, goggles, gum boot, helmet etc.
 Vibrating tool causing  Ensure cable should be proper routed at working area and free from
finger/hand injury joint.
 Electric shock  User take regular breaks from the activity alternate the task between
 Excessive noise different people.
 Provide ELCB in distribution board.

 Work during night  Poor Illumination  Night work permit to be taken from concern engg.and safety
shift  fall of person dept.
 fall of machinery  Ensure proper illumination during dark hours. (50 lux on
access & 110 lux on work location)
 Electrical cable should lead min 2 m height. No exposed

Page 4 of 5
Format No.: EHS-006/F06-00 Effective Date:
Jubliant Infrastructure Limited-Bharuch

Annexure-6
JOB SAFETY ANALYSIS

electrical wire.Earthing.
 Route shall be illuminated.
 Ensure continues supervision provided at work place. Avoid
extra hours working.
 Housekeeping  Slip, trip hazards  Ensure entire area shall be cleaned after job is completed.
Remove unwanted material from site after close the job.
 Erection material should be proper stacking.
 In Case of Emergency  Confusion  Emergency assembly point, emergency access should be
defined & always free from any obstructions.
 Emergency contact details to be displayed at prominent
locations of site.
 Emergency vehicle must be available at work locations
during all working hours.
 All workers shall aware / trained about site emergency
procedure.

Day-1 Day-2 Day-3 Day-4 Day-5 Day-6

Permit issuer

Permit acceptor

Prepared by- Permit Issuer and Permit Acceptor Reviewed by-Plant Manager/ Safety
officer

Approved By HOD

Page 5 of 5
Format No.: EHS-006/F06-00 Effective Date: