Bago River Bridge Construction Project (Group 4)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

Group 4

Name Role No:

Pa-4

Pa-10

Pa-11

Pa-16
Planning for the construction of a new project


Different Stages of Planning in Bridge Construction


Bago river Bridge Construction
Project(Thanlyin bridge 3)


• General Min Aung Hlaing, the Chairman of the State Administration Council, installed a gold nut connecting
the structures of Bago River Bridge (Thanlyin Bridge-3) in Yangon Region on 2013 December 17.
• Chief Engineer of Bago River Crossing Bridge project – U Tun Lin
• The Department of Bridges under the Ministry of Construction is taking
responsibilities for implementation of the bridge project.
• Bago river bridge is Japan-Myanmar Cooperation project.
Project Outline

Category :B
Reason of Categorization

.The project is not considered to be a large-scale road project.

.It does not located in a sensitive area.

.It does not have the sensitive characteristics under the JICA guidelines. for
environmental and social considerations(April 2010).

. it is not likely to have a significant adverse impact on the environment.


Services
. Feasibility Study, Detailed Design, Tender Assistance,
Construction Supervision

Sector
.Transportation / Urban and Regional Development

Project Location and Timeline


.Yangon and Thanlyin Area/ The bridge was build in
Client 2019(present).

. Japan International Cooperation Agency (JICA),


Ministry of Construction

• The bridge project is being implemented with Yen 31


billion of ODA loan with soft interest rate from Japan
International Cooperation Agency-JICA. The loan
period was set for 40 years including 10 years
suspended period.
Finance
.Japanese ODA Loan

Cost
.The estimated budget is around
US$289 million.

Project Cost estimated


Materials

Equipment
• Most of the construction equipment and machineries for bridge erection
shall be procured from other countries

• General construction machineries (e.g., bulldozer and backhoe) and barge


mounted crane can be procured in Myanmar

Labor
• Main contractor shall be international construction company.

• Special skilled labour for bridge works shall be procured from other ASEAN countries for the
conditions of the cost estimation.
.The Construction of Bago River-crossing Thanlyin Bridge , Thanlyin and Thilawa Special
Economic Zone is now 97% complete and is expected to finish in 2024 May.


Benefits


Type of Bago river bridge (Thanlyin)
.Truss type


our