5.

02- F01 HAZARD IDENTIFICATION & RISK ASSESSMENT

PRE- START CHECKLIST

Date: 12-05-2023
Project Name: Sea World Abu Dhabi
Time: 09:00 AM
Description of Task / Activity: SWAD _ Inverters Installation
Risk Assessment No: Rev No.

001 Emp No. Name


Risk Assessor: Karim MAhmoud
Construction Manager: Ibrahim Adel
PORJECT MANGER: Hossam Hamouda
Safety Department:
Engineer: Himanshu Karayat
SUBJECT MATTER EXPERT: Joseph Xavier
1 Manpower Required for Task:
SWAD _ Inverters Installation
2 Work Notification Status:
3 Estimated / Planned Start Date: 09-05-2023
4 Duration of Activity: 30days
5 Night work and Equipment: N/A
6 Equipment and Materials: As per MOS
7 Overhead Services / Underground: N/A
Sequence of Works Activity:
8 Subcontractors to be Used: Non
9 Interface with Public: N/A
10 Adjacent Activities & Interface with YES
other Sub Contractors:
11 Logistics, Loading, Delivery: N/A
12 Specific PPE Required: As per MOS
13 Environmental: N/A
14 Elevated Positions: N/A

15 Confined Space Entry: N/A


16 Hoarding / Fencing / Barricading/ N/A
Demarcation:
17 Access / Egress: YES
18 Security Requirements: As per project main contractor requirements
19 Traffic: As per project main contractor requirements
20 Permit to Work Required Details: Mechanical Works PTW
21 Work Near Water: N/A
22 Hazardous Substances: N/A
23 Excavations: N/A
24 Lifting Equipment / Machinery: N/A
25 Special Emergency Arrangements: NA

5.02- F01 HAZARD IDENTIFICATION & RISK ASSESSMENT


Page 1 of 8 Rev. 4 [18-Apr-2019] CRM Controlled Document

Description of Task / Activity: SWAD _ Inverters Installation


Risk Assessment No: Rev No.
26 Additional Comments: MSRA to be communicated with all the involved persons by supervision Staff
and MS & RA should be revised if work method, materials/equipment’s are
changed.

Page 2 of 8 Rev. 4 [18-Apr-2019] CRM Controlled Document


Project Name: Sea World Abu Dhabi Project Code:
Description of Task / Activity: SWAD _ Inverters Installation
Risk Assessment No. 002 RA Rev No.
Task Site Location: Yas Island, Abu Dhabi, UAE

RISK/LOSS POTENTIAL ASSESSMENT MATRIX


PROBABILITY of recurrence?
SEVERITY of occurrence Severity Almost Certain Very Likely Likely Unlikely Very Unlikely
Rating 1 or more times a Once every 10 Once in a lifetime/ 100
Once per month Once per year
week years years
Catastrophic
Multiple Fatalities / Low
5 High 25 High 20 High 15 Med 10
Environmental release with detrimental effects requiring external emergency services/ 5
>10m AED
Major
Med Low
Single Fatality/Multiple LTI’s/ Major Illness or Injury, disability/ 4 High 20 High 16 High 12
Environmental release with minimal off site impact/ 1-10m AED
8 4
Moderate
Single LTI/ Serious but non-permanent injury or ill health Med Med Low
3 High 15 High 12
Work days lost/ Restricted Workday 9 6 3
On site release requiring environmental emergency plan to be activated/ 100k-1m AED
Minor
Corrective Medical Treatment. Med Med Med Low Low
2
No work restrictions/ 10 8 6 4 2
Local on-site environmental release treated locally/ 10-100k AED
Negligible
First Aid Case/ Minor cuts & bruises or sickness/Preventive OR Diagnostic Medical Low Low Low Low Low
1
Treatment. 5 4 3 2 1
Nuisance release with no adverse impact/ 1-10k AED
Probability Rating 5 4 3 2 1

1 3 3

Page 3 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
Description of Task / Activity: SWAD _ Inverters Installation
Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
General Measures
• Ensure all drivers have valid driving license and fit body
condition.
• Provide information on defensively driving
• Prohibit overloading and unsecured materials
• All vehicles to be checked and be roadworthy before
entering
• Driver to take regular breaks to prevent fatigue and use
journey planning
Inverters
• Monitor vehicles and driving and take disciplinary action as
Shifting required
Site / Work Hazard:
• Poorly secured loads Additional Measures
Preparatory
Works • Load restriction devices in • Separate the work and unloading area from pedestrians and
poorly maintained vehicles other workers by placing barriers and warning signs , and
01 3 3 9 setting a safe distance of 3 meters between the vehicle and y 1 3 3
(Material
offloading , Consequence: people
Transportation to • Can cause injury Fatality or • Definition a safe passage for pedestrians and workers and
site location) Property damage placing traffic signs along the process of transferring materials
to the warehouse of others, and if this is not so, they are fully
(Use of Forklifts ) aware of the existing risks
• Determine the maximum speed and the commitment of the
fork truck driver to it, and let it be ( 8 MPH).
• Developing a traffic management plan for the process of
unloading and transporting materials to the warehouse or
lifting area
• Banksman ensuring that loads are restrained on the forklift
platform while being transported and adjusting the forks of the
forklift if it was moved
(Method Statements) Ref..
• Contractor must be onboard with
project WW requirements.
Page 4 of 8 Rev. •4 [18-Apr-2019]
Operatives must complete project HSE +WW inductions.
CRM Controlled Document • All should have their medical insurance cards & Emirates
ID with them.
• All should enter to the site with the Mandatory & Job
specific PPEs. Refer their Mandatory PPE & Job specific
Description of Task / Activity: SWAD _ Inverters Installation
Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
Electrical shock, electrocution, • No tampering or unauthorized modifications on electrical
burns, fire hazards personal tools and systems — repairs will be done by competent
injuries electricians only
• Hazards to be communicated to the workforce through
DSTI and acknowledged by the workforce
• All the power tools Operatives to be trained by
manufacturer
• Daily inspection by the operators
• Send the defective power tools to quarantine zone
immediately, defective tools are not allowed to be keep at
site.
• 110 V power tools to be preferred at site using by step
down transformers, in case 220+ V power tools are chosen
30 mA RCD to be fitted on DB. Special dispensation for HV
from Main Contractor must be obtained.
• Use industrial sockets and standard cables to tap the
power
• Site DB’s to be inspected by electrician weekly and record
to be kept on DB
• All the rotating parts to be guarded Grinding /Cutting
Machine: (if required)
• Hot work permits are required for cutting and grinding
activities.
Page 5 of 8 Rev. 4 [18-Apr-2019]
CRM Controlled Document
• Work area to be barricaded while the work is in progress
• Fire prevention & protection to be provided
• Fire extinguishers readily available in work locations
• Competent Fire Watch available during the activity and 30
min on completion of the activity
• All combustible material must be removed or in case
immovable, covered with fire blanket.
• All task related PPE shall be worn by operatives

Description of Task / Activity:


Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
• Daily DSTI briefing must be conducted to the workforce
prior to start work.
Use of Hand tools • Ensure competent workforce is assigned for the task.
for fixing • Job specific training should be conducted to the
05 inverters, Hazard workforce regarding safe usage of Hand tools. CES & GFTS
isolators Substandard tools, Purpose 3 3 9 y 1 3 3
• All the tools must be tethered on rigid place while
made tools working on the roof.
• Use right tools for the right job.
• Inspect all hand tools are safe for use prior to start work.

Description of Task / Activity: SWAD _ Inverters Installation


Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
• Concerned work in charge should inspect all tools prior to
start the work.
Consequences:
Serious injury to personnel Cuts, • Tools should be used for its proposed purpose only
bruises • Ensure appropriate PPE’s are provided (Goggles, Hand
Page 6 of 8 Rev. 4 [18-Apr-2019]
CRM Controlled Document
Gloves, Ear Plugs) etc.
• Ensure protruded sharp edges are secured properly to
avoid injury
• Do not use homemade tools
• All the hand tools should be maintained in way that neat
and clean always.
• Homemade alterations or modifications of tools are not
permitted.
• Work should be performed in presence of concerned
work in charge.
• Close supervision at all times.
• Maintain proper cable management on workplace.
• Maintain proper storage for all power operated
equipment’s.
• Only authorized personnel allowed in the work area
Hazard • Signage to identify and demarcate the work area must be
Adjacent work in Unauthorized personnel in area display
CES & GFTS /
06 other project 3 2 6 • Coordinate activities with adjacent work teams to prevent Y 1 2 2
ALEC
areas Consequences • Clashes in the work place
Personal injuries • Highlight adjacent teams and hazards to the work team
during DSTI
07 Environment Hazard 2 3 6 General Measures y 1 3 3
condition • Height Heat • Stop working in bad weather conditions
• Rainy • Provide care facilities (drinking water and rest areas)
(Weather/climate) • Windy during high temperatures
• Foggy Measures above the line
• Dust Storme • Before the work carried out weather monitoring should
Consequences be carried out.
• (people& property) • Set the maximum safe wind speed for operation
• Serious injury to personnel • Stop the work if the wind speed is above 9.8m/s .If any
Cuts, bruises other risk is identified during lifting operation work should
• Heat stress and stork, be stopped even under lesser wind speed.
dizziness, Serious injuries • Stopping work during the high temperature and
obligatory during the summer at noon (UAE OSHAD)

Page 7 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
• Lone working strictly prohibited at site.
• Arrange for rest area that is significantly cooler
(Ventilated) than the work area
• Restricted working hours in accordance with ministry of
labor requirements.
• All work is to be suspended during sandstorm or where
visibility is <5m during heavy downpour and/or strong wind
condition.

Description of Task / Activity: SWAD _ Inverters Installation


Risk Assessment No: 004 RA Rev No.

Legal Additional control


SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person

Page 8 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
• Restricted working hours in accordance with ministry of
labor requirements.
• All work is to be suspended during sandstorm or where
visibility is <5m during heavy downpour and/or strong wind
condition.
• The lifting activities to be suspended when the wind speed
is over 38km/h
• Cold drinking water to all.
• All the operatives must hold personal water bottle (project
approved) at work areas.
• Enough number of coveralls to periodically wash and use
• Cover body as much as possible from UV rays, dust etc.
• Lone working strictly prohibited at site.

Page 9 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document