1 PRELIMINARIES
General
A These Preliminaries shall be priced in full with amounts against the individual items or parts of ite
required. Items or parts of items against which no price is entered shall be deemed to be covere
elsewhere by the Contractor.
The Bid is to be inclusive of all Preliminaries for all the Works whether measured in full or covere
Sums.
Name of Parties
B The term "Employer" shall mean Nkhotakota District Council, P.O. Box 48, Malawi
The term "Project Manager" shall mean Directorate of Public Works, P.O. Box 48, Nkhotakota, M
C be represented by: The Director of Public Works.
.
D The Architect and Quantity Surveyor shall be represented by: Project Quantity Surveyor (Team l
Description of Works
The works comprise the Construction of 4No School Blocks, 1No Semi detached house, 2No Si
E associated External Works at Nkhota Kota LEA
Bills of Quantities
Measurement of Building Works in Malawi, Metric Edition, and dated January 1982. Any diverge
F Standard Method of Measurement will generally be in order to provide further more detailed infor
These Bills of Quantities must not be used for the purpose of ordering materials and no liability w
the Employer for any loss or expense incurred in this respect.
CARRIED TO COLLECTION
1.1
ITEM PRELIMINARIES
Plant
A Provide for all plant necessary for the proper execution of the Works comprising:-
Provide for complying with all safety, health and welfare regulations pertaining to all work- people
contractors) employed on the site and for duly observing in full the requirements of the Factories
sites. Such facilities as the Contractor is required to provide to conform with the foregoing shall b
areas made good upon completion of the Works.
Provide for HIV Awareness for work people and the surrounding
D Provide all necessary measures for the safety of the public for the duration of the Contract.
Insurances
E Provide for insurance as outlined in Clause 13 of Conditions of Contract and Contract Data
Advance Guarantee/Bond
F Provide for Advance Guarantee Bond as outlined in Clause 50.1 of the Conditions of Contract
Performance Guarantee/Bond
CARRIED TO COLLECTION
1.2
ITEM PRELIMINARIES
Programme of Operations
A As outlined in clause 27.3 of General Conditions of Contract
B Protect all trees, shrubs, etc designated for protection by the Architect/Supervising Officer or his
shall be liable for a payment of liquidated damages of K200.00 for any tree and K20.00 for any s
execution of the Works, sustains harmful damage or is removed without the prior consent of the
Notice Board
The Contractor shall provide, erect, paint, letter as required and maintain, in a position approved
C Officer, a notice board, size 2.75 x 5.80 metres overall. The wording permitted on the notice boar
specifically authorized by the Architect/Supervising Officer. No other boards or signs, other than
allowed on or adjacent to the site unless authorized by the Architect/Supervising Officer. All sign
removed and disturbed areas made good upon completion of the works.
Temporary Buildings
Provide, erect and maintain the following buildings in positions approved by the Architect/Superv
D rates and other charges in connection therewith.
Suitable office accommodation for site agent, foreman and other supervisory staff
CARRIED TO COLLECTION
1.3
ITEM PRELIMINARIES
A All necessary mess room and living accommodation sufficient for all workpeople employed on th
Separate fly-proof latrine accommodation including washing facilities for all workpeople employe
maintained in a sanitary condition whilst in use. After removal, the ground shall be disinfected an
All workshops necessary for the preparation of joinery, servicing of plant, vehicle and equipment
B work carried on therein is directly related to the execution of the Works.
All covered and open yards for the preparation and storage of reinforcing steel and for pre-castin
components and the like to be used upon the Works.
The Contractor shall make his own arrangements for any temporary living accommodation requir
C abide by all national and local regulations in connection therewith.
D The following shall be provided by the Contractor as soon as possible after possession of the site
drawing racks and benches, pin boards and other like facilities which may be required. This offic
E order for the duration of the Contract.
Laws of Malawi
F The contractor and his employees shall be subject to all laws of Malawi including taxation set in t
Value
The Added Tax
contractor shall provide Tax Payer Identification Number in the summary showing that paym
G Revenue Authority. Contractors without TPIN shall include Value Added Tax in their rates.
Supervision
CARRIED TO COLLECTION
1.4
ITEM PRELIMINARIES
Clause 34 Materials, Goods and workmanship to conform to description, testing and inspection
pay all costs in connection with any necessary testing thereof except testing charges only of suc
A against the provisional sum included hereunder
B Allow a Provisional sum of MK 1000,000 in respect of testing of materials (for successful tests on
C Daywork Prices allowable in accordance with Clause 52 of the General Conditions of Contract sh
cover foreman’s supervision, overheads and profits. The net amount of wages shall mean the re
prescribed under the Regulations of Minimum Wages and Conditions of the Contract.
workmen engaged in that particular trade. Non productive time shall be chargeable net but only i
Architect/ Supervising Officer. Traveling expenses and Subsistence allowances paid to workmen
(2) Materials – materials used in carrying out dayworks shall be charged at invoice cost less all tr
profit and handling.
(3) Plant - Plant hire charges shall be at rates agreed with the Architect/Supervising Officer.
CARRIED TO COLLECTION
1.5
ITEM PRELIMINARIES
Any arithmetical error by the Tenderer in extending the bills of Quantities or in the additions or ca
A summaries or form of tender or any palpable pricing error by the tenderer shall be corrected duri
B price (such as misplacement of the decimal point) in that case the total amount as quoted shall p
corrected.
b) In cases where there is a discrepancy between the amounts in figures and words, the amou
c) In such cases the priced bills shall be amended to correct such errors and the corrected tota
adjusted with the agreement of the bidder.
The tender amount stated on the tender form shall be adjusted in accordance with the above pro
upon the tender. If the bidder rejects the corrected sum, then the tender shall be rejected.
Where any items remain unpriced, the work covered by those items will be deemed to be include
CARRIED TO COLLECTION
1.6
ITEM PRELIMINARIES
Temporary screens
D Provide, erect and maintain such temporary screens and the like as may be necessary.
CARRIED TO COLLECTION
1.7
ITEM PRELIMINARIES
General Scaffolding
A
Provide and erect all scaffolding including all stages, trestles, planks, guard rails, barrow runs an
execution of the Works and maintain, alter and adapt as necessary and remove when no longer
All scaffolding shall be in accordance with the provisions of the Factories Act and current Buildin
Regulations
CARRIED TO COLLECTION
1.8
ITEM PRELIMINARIES
WORKS BY NOMINATED SUB-CONTRACTORS
General
Works which are required to be carried out by nominated sub-contractors are dealt with elsewhe
A
sums included accordingly.
"Attendance", which will be treated as a lump sum and not subject to adjustment save for substa
the works, is given as an item in each case and shall be deemed to include for providing the follo
sub-contractor to carry out his work:
(i) Use of mess rooms, sanitary accommodation and welfare facilities.
(x) Obtaining full particulars in respect of making the position of holes, mortises, chases and th
CARRIED TO COLLECTION
1.9
ITEM PRELIMINARIES
(i) Obtaining full particulars of any special conditions imposed by any Sub-contractors Trade A
such conditions when not opposed to this contract and when reasonably practical
Builders work in connection with works carried out by nominated sub-contractors is dealt with els
General
Goods and materials which are required to be obtained from nominated suppliers are dealt with e
Provisional Sums included accordingly.
Fixing only goods and materials is dealt with elsewhere and shall be deemed to include the follow
(i) Checking the quantity, quality and condition of all items before taking delivery. Any goods
found to be missing or damaged shall be replaced at the Contractor's own expense.
(ii) Taking delivery, loading and transporting around and adjacent to the site.
(iii) Unloading, unpacking, storing, returning pickings, handling, assembling (whether or not sp
lowering and fitting and fixing in position
(iv) Making and following up any claims upon the transporters, insurers and the like in the even
CARRIED TO COLLECTION
1.10
ITEM PRELIMINARIES
ITEM PRELIMINARIES
B
The Contractor shall be responsible for the adequate drying out of the Works and for maintaining
and humidity until handed over.
C
Remove all rubbish and debris from the site both as it accumulates from time to time and upon c
shall not bury or otherwise conceal the same upon the site.
Clean the Works internally and externally upon completion to the satisfaction of the Architect/ Su
glazing and sanitary fittings
CARRIED TO COLLECTION
1.11
ITEM PRELIMINARIES
COLLECTION
CARRIED TO COLLECTION
1.12
MINARIES
K t
x 48, Malawi
P.O. Box 48, Nkhotakota, Malawi. The District Council shall
RIES
K t
comprising:-
9,000,000.00
3,000,000.00
e Conditions of Contract
K 12,000,000.00
RIES
K t
t/Supervising Officer or his representative. The Contractor
y tree and K20.00 for any shrub, which, as a result of the
out the prior consent of the Architect/Supervising Officer.
2,000,000.00
ervisory staff -
K 2,600,000.00
RIES
K t
K -
RIES
K t
ct/Supervising Officer.
K 1,000,000.00
RIES
K t
RIES
K t
fficer
as may be required to enable the Architect/Supervising
orks as and when he may wish to do so.
rvising Officer of items of equipment required for the
w:
may be necessary.
RIES
K t
guard rails, barrow runs and the like required for the
3,000,000.00
nd remove when no longer required.
ries Act and current Building (Safety, Health and Welfare)
K 3,000,000.00
ARIES K t
tors are dealt with elsewhere and provisional or prime cost
ies.
ation
ARIES K t
o the site.
embling (whether or not specifically described), hoisting,
K -
ARIES K t
ARIES K t
ARIES K t
Page No.
1.1
1.2 12,000,000.00
1.3 2,600,000.00
1.4 -
1.5 1,000,000.00
1.6
1.7 -
1.8 3,000,000.00
1.9
1.10
1.11 600,000.00
K 19,200,000.00
BILL NO.2 CLASSROOM BLOCK
SUBSTRUCTURE (PROVISIONAL)
Description Quantity Unit Rate K t
EXCAVATION -
-
Excavating -
-
Trenches; to receive foundations; starting -
from reduced level -
-
A not exceeding 1.50m deep 70 m3 3,000.00 210,000.00
Ditto; attached piers -
Extra over all kinds of excavations -
irrespective of depth for -
-
B excavating in rock 8 m3 10,000.00 80,000.00
-
Surface treatment -
-
Surfaces of earth subgrade -
-
C Compacting to 93% MOD AASHO 168 m2 3,000.00 504,000.00
-
Disposal -
-
Imported Gravel Type 1 material -
-
backfilling; depositing and compacting -
D to 93% MOD AASHO in 150mm layers 41 m3 9,500.00 389,500.00
-
Surplus excavated material -
-
E removing from site 37 m3 1,500.00 55,500.00
-
DISPOSAL OF WATER -
-
Keeping excavations free from -
-
F general water 1 item -
-
PLANKING AND STRUTTING -
-
Sides of all kinds of excavations -
irrespective of depth -
-
G generally 1 item -
-
HARDCORE-GRAVEL TYPE 1 MATERIAL -
-
H 200mm thick compacted to 95% MOD -
AASHO well compacted and rolled 168 m2 2,800.00 470,400.00
To Collection 1,709,400.00
2.1
To Collection 11,774,400.00
2.2
To Collection 5,928,200.00
2.3
-
-
To Collection 924,400.00
2.4
2.1 1,709,400.00
2.2 11,774,400.00
2.3 5,928,200.00
2.4 924,400.00
-
D 50 X 75 mm Purlins 610 m 3,800.00 2,318,000.00
-
E 50 x 75 mm Strut 350 m 3,800.00 1,330,000.00
-
F 50 x 100mm Wall Plate 60 m 4,500.00 270,000.00
-
G 50 x 150mm Rafter 595 m 5,500.00 3,272,500.00
-
-
To Collection 15,869,000.00
2.6
To Collection 247,500.00
2.7
2.6 15,869,000.00
2.7 247,500.00
ROOF
TO SUMMARY 16,116,500.00
2.8
To Collection 4,943,200.00
2.9
COLLECTION Page
2.9 4,943,200.00
2.10 9,551,800.00
TO SUMMARY 14,495,000.00
2.10
To Collection 745,720.00
2.11
-
A 970 x 2400mm; type D1 4 No 279,360.00 1,117,440.00
-
-
Door frames; 1.2mm pressed steel; -
purpose made primed before delivery -
-
960 x 2400mm high overall for 200mm -
thick wall; pair 100mm steel butt -
B hinges; building in; D2 4 No 120,000.00 480,000.00
-
To Collection 1,597,440.00
2.12
-
-
To Collection 1,902,400.00
2.13
2.11 745,720.00
2.12 1,597,440.00
2.13 1,902,400.00
IRONMONGERY
TO SUMMARY BILL NO.2 236,000.00
2.15
To Collection 2,316,000.00
2.16
To Collection 932,000.00
2.17
To Collection 694,000.00
2.18
2.16 2,316,000.00
2.17 932,000.00
2.18 694,000.00
WALL FINISHES
TO SUMMARY 3,942,000.00
2.19
FLOOR FINISHES
TO SUMMARY 1,038,400.00
2.20
-
-
-
SHELVING
TO SUMMARY 202,905.72
2.21
To Collection 2,101,050.00
2.22
To Collection 2,510,950.00
2.23
2.22 2,101,050.00
2.23 2,510,950.00
SUMMARY Page
FOR
A D-IRON
Supply and install a D-iron Item 1 45,000.00 45,000.00
-
METER BOARD -
B Supply and install ameter board Item 1 55,000.00 55,000.00
-
SUPPLY CABLE -
C Supply and install 10mm sq 2 core amoured cable from the main Distribution board to 7,500.00 262,500.00
school block Sub distribution board M 35
-
DISTRIBUTION BOARD -
Supply and install double door 4Ways single phase Distribution board complete with the
-
following:
-
1 No. 63A RCB with 30mA sensitivity as Wintrip, Crabtree /Legrand or equally approved
-
by the supervising engineer.
Earthing shall be provided for the whole electrical installation where all metal frameworks
E shall also be bonded. Provide 2400mm earth electrode clamped to 4mm² green cable, 50,000.00 50,000.00
grounded in an earth pit of 300x300mm and concrete cover.
Item 1
-
LIGHTING CIRCUITS (ROOM 1) -
-
FITTINGS AND ACCESSORIES -
Supply and install 34w, 220VAC 1500mm T8 LED fittings complete with tubes as
L No 16 55,000.00 880,000.00
Glowlite/philips or equally approved by the supervising engineer (Internal lights)
Supply and install wall mounted weather proof round bulkhead fittings complete with 12w
M No 6 55,000.00 330,000.00
LED bulbs
-
-
-
-
-
A Supply and install 1gang 1way weatherproof flush mounted switch 6,500.00 13,000.00
No 2
-
B Suply and install 5A 1gang 2way flush mounted switch No 2 6,500.00 13,000.00
CONTRACT NO:
SUMMARY OF BILLS
No. DESCRIPTION
FUNDED BY GOVERNMENT
SSROOM BLOCK
NKHOTAKOTA LEA
Amount (MK)
6,998,900.00
65,224,765.72
2,162,500.00
AVINGS
74,386,165.72
NKHOTAKOTA DISTRICT COUNCIL
CONTRACT NO:
SUMMARY OF BILLS
TOTAL AMOUNT
No. DESCRIPTION UNIT COST NO (MK)