APIMS-REC-TM-11 Mock Drill Report Updated
APIMS-REC-TM-11 Mock Drill Report Updated
APIMS-REC-TM-11 Mock Drill Report Updated
: APIMS-REC-TM-06
On-Site Emergency: Mock Drill
Rev. No. & Dt.: 01 / 05.01.19
Report and Evaluation
Page 1 of 4
1. Date: ________________.
2. Location: __________________________________
_________________________________________________________________________.
Details of key personnel who were involved in the emergency response mock drill:
Events:
Sl.N
Events Time Observations
o.
A Communication
Mode of call:
1 Siren
4 Siren sounded:
Page 1 of 4
Doc. No.: APIMS-REC-TM-06
On-Site Emergency: Mock Drill
Rev. No. & Dt.: 01 / 05.01.19
Report and Evaluation
Page 2 of 4
b) Other staff:
2 Arrival of Ambulance:
C Action by Staff
1 Proper approach:
E Assembly Point
Page 2 of 4
Doc. No.: APIMS-REC-TM-06
On-Site Emergency: Mock Drill
Rev. No. & Dt.: 01 / 05.01.19
Report and Evaluation
Page 3 of 4
Drivers
Total:-
F Medical
1 Ambulance Report:
2 Other Action:
3 Victim condition:
G Use of PPEs
2 Fire Suit:
3 Safety Kit:
4 Other tools:
H Transport
1 Call time:
2 Help extended:
J Other Observations
1 Speed of work:
2 Confidence in work:
Page 3 of 4
Doc. No.: APIMS-REC-TM-06
On-Site Emergency: Mock Drill
Rev. No. & Dt.: 01 / 05.01.19
Report and Evaluation
Page 4 of 4
3 Knowledge of area:
4 Panic situation:
Page 4 of 4