Schedule of Beam: Foundation Plan Second Floor Framing Plan Roof Framing Plan
Schedule of Beam: Foundation Plan Second Floor Framing Plan Roof Framing Plan
Schedule of Beam: Foundation Plan Second Floor Framing Plan Roof Framing Plan
SCHEDULE OF BEAM)
10mm Ø BAR STIRRUPS (SEE
10mm Ø HORIZONTAL AND
SIZES (mm) REINFORCEMENT BARS BAR ARRANGEMENT
SCHEDULE OF BEAM) VERTICAL BAR SPACED @
FLOOR STIRRUPS SIZE 0.60M BOTHWAYS
LEVEL MARK BREADTH DEPTH SUPPORT MIDSPAN
SUPPORT MIDSPAN SUPPORT AND SPACING L/3 L/3 L/3
B D TOP BOTTOM TOP BOTTOM
D
10mmØ, 3@50, 10@100,
B-1 200 350 5-16mmØ 2-16mmØ 2-16mmØ 5-16mmØ
REST @200mm O.C. 2-12mm Ø
SECOND FLOOR LONGITUDINAL
LB 150 250 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ
10mmØ, 3@50, 10@100, BAR SPACED
REST @200mm O.C. @ 0.25m O.C.
COLUMN COLUMN
10mmØ, 3@50, 10@100, L/4 L/2 L/4
RB-1 200 300 5-16mmØ 2-16mmØ 2-16mmØ 5-16mmØ
REST @200mm O.C. 10mm Ø 10mmØ TRANSVERSE BAR
ROOF LEVEL TRANSVERSE SPACED @ 0.15m O.C.
RB-2 200 300 3-16mmØ 2-16mmØ 2-16mmØ 3-16mmØ
10mmØ, 3@50, 10@100, L BAR SPACED 10mm THICK CHB WALL
REST @200mm O.C. @ 0.30m O.C.
NATURAL GROUND LINE
10mmØ TEMPERATURE
BAR SPACED @ 0.20m. O.C.
0.44
5 TYPICAL SECTION OF BEAM
S-01 SCALE: 1:25m
0.2
0.1
DIMENSION (mm)
FOOTING DEPTH OF FOOTING REINFORCEMENT REBAR BAR SPACING ALONG SHORT DIRECTION (mm) BAR SPACING ALONG LONG DIRECTION 10mmØ LONGITUDINAL SECTION
MARK LENGTH WIDTH THICKNESS FOOTING LENGTH WIDTH FLOOR MARK DIAMETER BAR SPACED @ 0.15m
L W (mm) (m) L W
LEVEL (mm) LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT O.C.
F1 1500 1500 250 1.25 7-16mmØ 7-16mmØ TOP BOT. TOP BOT. TOP BOT. TOP BOT. TOP BOT. TOP BOT.
10mmØ TRANSVERSE BAR
SPACED @ 0.15m O.C. 10mmØ EXTRA BAR
SPACED @ 0.30m O.C.
6 WF DETAIL ROOF BEAM
0.6
F2 1500 1000 250 1.25 5-16mmØ 5-16mmØ
SECOND
FLOOR
S1 10 200 200 400 200 200 200 200 200 400 200 200 200 10mmØ TEMPERATURE BAR
SPACED @ 0.20m. O.C.
S-01 SCALE: 1:40m
0.03
10mmØ @
WF 400 200 0.60 2-12mmØ
0.20m C/C
0.35
L/4 L/2 L/4
7 CANOPY 02 DETAIL
0.2 L 0.2
S-01 SCALE: 1:30m
A B C A B C A B C
7.4 7.4 8.1
0.7 0.7 2" X 3" X 1.5mm C-PURLINS
2.85 4.55 2.85 4.55 3.7 3.7 0.7
7 7 7 7 7 7
B-1 B-1
RAFTER-2
B-1 B-1
2.3
2.3
2.3
LB B-1 LB
RAFTER-2
F2-C1
6 6 6 B-1 6 6 6
F1-C1
5.4
5.4
5.4
B-1
RAFTER-2
3.06
3.06
3.06
REMOVE AND REPLACE (SEE B-1 B-1 LB
CONCRETE FLOOR DETAIL)
B-1
RAFTER-2
B-1 B-1
5 F1-C1 5 5 5 5 5
F1-C1
B-2
2.48
2.48
2.48
REMOVE AND REPLACE (SEE B-1 STAIR B-1
2.86
2.86
2.86
G
B-2 S-1 B-1
IN
G
12
CONCRETE FLOOR DETAIL)
AC
CIN
mm
RAFTER-1
RAFTER-1
BR
RAFTER-1
RAFTER-1
RAFTER-1
RA
Ø
S
RO
B
B-1
OS
S
UN
4 4 4 4 4 4
OS
F1-C1
CR
D
CR
R
BA
BA
R
17.41
17.41
17.41
17.41
17.41
17.41
R
B-1
BA
D
CR
F1-C1
UN
D
OS
UN
RO
S
RO
3.31
3.31
3.31
BR
Ø
B-1 S-1 B-1
mm
Ø
B-1
AC
2.9
2.9
2.9
0.20M ABOVE FINISHED S-1
mm
12
IN
12
G
FLOOR LINE
LB
RETAINED B-1 B-1
3 F1-C1 EXISTING
F1-C1
3 3 3 3 12
m
3
MARBLE 12
NG
m
Ø NG
m
m I CI
FLOOR Ø AC RO A
LB RO BR UN BR
UN SS D
BA SS
O O
B-1 B-1
D
BA CR R CR
3.25
3.25
3.25
RAFTER-3
RAFTER-3
S-1
3.24
3.24
3.24
RAFTER-3
RAFTER-3
RAFTER-3
S-1 RR RCR
BA CR BA O
SS
B-1 UN
D O
SS U ND BR
RO BR RO AC
Ø A Ø ING
m CI m
m NG m
12 12
F1-C1 B-1 B-1 F1-C1
F1-C1
2 F1-C1 2 2 2 2 2
F1-C1
RAFTER-4
RAFTER-4
RAFTER-4
0.10M DROP FROM
3.01
3.01
3.01
3.01
3.01
3.01
FINISHED FLOOR LINE
1 1 1
PRCN: PROJECT TITLE: APPROVED BY: DRAWN BY: SHEET CONTENT: SHEET NO:
PTRN: CHECKED BY: FOUNDATION PLAN CANOPY 02 DETAIL
RENOVATION OF BUNGALOW HOUSE INTO 2-STOREY
ARIEL F. EPALAN DATE: RESIDENCE DATED:
SECOND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
WF DETAIL
SCHEDULE OF FOOTING
4
REG. CIVIL ENGINEER PLACE: OWNER
TYPICAL SECTION OF BEAM SCHEDULE OF BEAM S-01
LOCATION: BRGY. STA. CRUZ DUMALAG, CAPIZ REVISION: TYPICAL SECTION OF SLAB SCHEDULE OF SLAB