3.3.1 In-Kingdom Construction Strategy

Download as pdf or txt
Download as pdf or txt
You are on page 1of 106

1.

Permanent Resources in Saudi Arabia


Saudi Tumpane Workforces

Personnel Nationality
Position Text Employee Name Date of Joining
No Descritpion
10785 PUMP OPERATOR RAZIYUDDIN JALILUDDIN SIDDIQUE Indian 3/1/1990
AHMED MAHRAN HUSSEIN
10791 CAMP BOSS Egyptian 9/7/1989
MOHAMED
10806 MECHANIC BAPPU RAJ CHINDA PATEL Indian 9/24/1987
10814 DRIVER BASANTRAO CHINDA PATIL Indian 5/7/1988
MOHAMED NASER MOHAMED
10820 SITE SUPERVISOR Egyptian 11/2/2010
AHMED
10834 FOREMAN SAEED AHMED ABDUL AZIZ Pakistani 5/29/1991
HEAVY/MEDIUM VEHICLE
10841 GHULAM HABIB TALEH ZAR Pakistani 11/5/1991
DRIVER
10851 OFFICE HELPER MULFAT ALI CHAN MIAN Bangladeshi 10/21/1991
10863 MASON SHEIKH ROZ HASSAN Indian 5/2/1992
MOHAMMED ANWAR MOHAMMAD
10864 DRIVER Pakistani 7/5/1992
ABDULLAH
10865 FOREMAN SAYAD MOHAMMAD NOOR HAYAT Pakistani 6/5/1992
10868 ELECTRICIAN SHAMIM AHEMAD Indian 6/8/1992
10875 OPERATOR EXCAVATOR MOHD NASIR KALU MIAH Bangladeshi 7/4/1992
10883 CARPENTER CHHONGBA SHERAP Nepalese 2/9/1992
10889 PUMP OPERATOR MUNIR HUSSAIN FARID GHULAM Pakistani 3/29/1992
10904 SITE SUPERVISOR ABU TAHER SIDDIQUE Bangladeshi 5/1/1993
10909 PLUMBER JAMAL ABDUS SOBHAN Bangladeshi 11/1/1993
10925 DRIVER JAMIL AHMED MUSTAFA GHULAM Pakistani 1/1/1994
10944 FOREMAN DELOWAR AHMED TAJUL AHMED Bangladeshi 12/27/1994
GOLAM SAMDANI MUNSHI
10948 DRIVER Bangladeshi 12/27/1994
MAJIBUR RAHMAN
HEAVY/MEDIUM VEHICLE ADEL ABDEL RAHMAN ALI
10949 Egyptian 9/21/1994
DRIVER MOHAMED
MOHAMMED HOSSAIN ABUS
10957 MASON Bangladeshi 12/27/1995
SUBAN
10963 OPERATOR WHEEL LOADER BORHAN UDDIN FIROZ AHMED Bangladeshi 8/17/1996
10969 OPERATOR WHEEL LOADER YOUSUF SAYEDUL HOQUE Bangladeshi 10/7/1996
10974 DRIVER RABIUL ALAM ABDUL KHALEQUE Bangladeshi 10/23/1996
HIRON MIAH MOHAMMED ZOHAR
10975 PLUMBER Bangladeshi 10/23/1996
ALI
10976 DRIVER BILLAL HOSSAIN ABDUL ALI Bangladeshi 10/23/1996
MOHAMMED MILON ABDUS
10982 DRIVER Bangladeshi 7/28/1997
SOBHAN
10984 OPERATOR WHEEL LOADER ALAMGIR HOSSAIN HASMAT ALI Bangladeshi 8/23/1997
MOHAMMOD SUHEL MOHAMMOD
10986 OPERATOR WHEEL LOADER Bangladeshi 8/23/1997
ABRA MIAH
10991 DRIVER HAKIM ABDUL MANAN Bangladeshi 8/13/1997
10998 PLUMBER NAYEEM AKHATAR Indian 9/20/1997
10999 FOREMAN MARTIN ALUMPARAMPIL ANTONY Indian 9/20/1997
11004 LABOUR SANU MIAH DANU MIAH Bangladeshi 10/4/1997
11011 MECHANIC KHORSHID ABDUL KHAIR Bangladeshi 10/6/1997
11017 ELECTRICIAN VINOD VARGHESE Indian 10/17/1997
11022 MECHANIC SHAIK WAHEED BASHA Indian 11/5/1997
11023 WELDER MUSTAQ AHMAD Indian 11/17/1997
RAFIQUL ISLAM MOZAMMEL
11024 MECHANIC Bangladeshi 11/26/1997
HOQUE
KAZAL MIAH MOHAMMED
11030 OFFICE HELPER Bangladeshi 11/10/1997
SIDDIQUE MIAH
11032 PAINTER JASHIM UDDIN ABDUL MANNAN Bangladeshi 12/17/1997
11035 DRIVER SHERE ALI KHAN Indian 1/6/1998
11040 LABOUR SHEKH ISRAR AHMAD Indian 1/1/1998
THARWAT EL DESSOUKI AHMED
11041 CIVIL SITE ENGINEER Egyptian 1/3/1998
ZALAMA
11046 DRIVER RAZEEK ASAN SAIBO Sri Lankan 6/1/1998
11048 OPERATOR EXCAVATOR KAJAL MIAH FELAL UDDIN Bangladeshi 6/1/1998
HEAVY/MEDIUM VEHICLE
11050 JAMAL UDDIN SUKUR MIAH Bangladeshi 6/1/1998
DRIVER
KAMAL HOSSAIN MOHAMMED
11054 LABOUR Bangladeshi 6/21/1998
HANIFA
11055 LABOUR QORESH ALI ABDUR RAHMAN Bangladeshi 6/1/1998
11063 OPERATOR WHEEL LOADER ABDUL QUDDUS DUDU MIAH Bangladeshi 6/1/1998
11064 OFFICE HELPER IMRAN KHORSHED ALAM Bangladeshi 6/1/1998
HEAVY/MEDIUM VEHICLE
11065 LITON ABDUL MAJID Bangladeshi 6/1/1998
DRIVER
11067 DRIVER OBID CHENU MIAH Bangladeshi 6/1/1998
11068 LABOUR MONIR HOSSAIN ABDUL HOSSAIN Bangladeshi 6/1/1998
11071 EQUIPMENT OPERATOR ATABUR ALI DIL MOHAMMED Bangladeshi 6/1/1998
11074 SECURITY GUARD NOWAB ULLAH ALI AHMED Bangladeshi 6/5/1998
11075 PUMP OPERATOR HARUNUR RASHID AMBAR ALI Bangladeshi 6/18/1998
11079 PUMP OPERATOR SADIQE IMAM HABIBUR RAHMAN Bangladeshi 8/5/1998
11080 MECHANIC MOHAMMED RIPON ABDUR RAHIM Bangladeshi 8/5/1998
MOHAMMAD KAZAL MIAH
11084 MECHANIC Bangladeshi 8/5/1998
MOHAMMAD OSMAN MIAH
BELAYET HOSSAIN ABDUL
11087 DRIVER Bangladeshi 9/2/1998
KUDDUS
11101 LABOUR NAZIM UDDIN SHAHAAJ UDDIN Bangladeshi 10/22/1998
11102 PUMP OPERATOR NABAB ALI RUSTAM ALI Bangladeshi 10/22/1998
11105 PUMP OPERATOR YOUNUS MIAH ABDUL SOBAHAN Bangladeshi 10/26/1998
MOHAMMAD RUHUL AMIN
11108 LABOUR Bangladeshi 10/26/1998
MOHAMMED DHANU BEPA
11110 PUMP OPERATOR BAHADUR CHAMAR Nepalese 11/11/1998
11118 LABOUR NAGENRA MANDAL DHANUK Nepalese 11/18/1998
11119 MECHANIC KHEM BAHADUR THAPA Nepalese 11/18/1998
11126 LABOUR ABDUL RAHMAN ROSHAN ALI Bangladeshi 11/18/1998
11127 PIPE FITTER ALI AHAMMED SIDDIQUR RAHMAN Bangladeshi 11/18/1998
11128 LABOUR MOHAMMED ARIF ABDUL ROB Bangladeshi 11/18/1998
11130 FOREMAN ATIQUR RAHMAN ABDUL HASHEM Bangladeshi 11/18/1998
11135 LABOUR SALAUDDIN HUMAYUN KHALID Bangladeshi 12/14/1998
11136 DRIVER MOKLIS ALI REZAN Bangladeshi 12/14/1998
HEAVY/MEDIUM VEHICLE
11138 AL AMIN ALA UDDIN MIAH Bangladeshi 12/14/1998
DRIVER
HEAVY/MEDIUM VEHICLE
11141 JAMAL HOSSAIN ABDUL RAZZAK Bangladeshi 12/29/1998
DRIVER
11142 DRIVER RANJU MIAH ABDUL HASHEM Bangladeshi 12/28/1998
11145 PLUMBER JASHIM UDDIN ABDUL KHALEQUE Bangladeshi 12/14/1998
MOSLEM UDDIN MUNSH MOTAHAR
11147 LABOUR Bangladeshi 12/14/1998
ALI
11159 ACCOUNTANT MOHAMMAD ABU RAYYAN Jordanian 7/4/1999
11163 EQUIPMENT OPERATOR HARUN RASHID AZIM UDDIN Bangladeshi 8/12/1999
11165 OPERATOR EXCAVATOR ANIS MIAH SAMAD MIAH Bangladeshi 8/12/1999
MOHE UDDIN MOLLAH SONAJ
11166 SURVEYING OFFICER Bangladeshi 8/12/1999
UDDIN MOLLAH
MOHAMMED LEHAS UDDIN ABDUS
11167 OPERATOR EXCAVATOR Bangladeshi 12/8/1999
SHUKUR
AHMED MOHAMMAD MOHAMMAD
11172 PROJECT MANAGER Egyptian 9/10/1999
AHMED EI KORDAY
11175 SECURITY GUARD ABDUL KADER ABUL HASHEM Bangladeshi 8/3/1999
11178 DRIVER HABIBUR RAHMAN AZIZUL HOQUE Bangladeshi 9/26/1999
11180 DRIVER SHAFIQUL ISLAM SHAMSUDDIN Bangladeshi 9/26/1999
11202 DRIVER YOUSSOUF MOUSSA KOREI Chadian 9/1/2001
MAGDI ABDELHALIM NOGOD
11205 PROJECT MANAGER Sudanese 11/3/2001
ABDALLA
11215 MECHANIC KABIR HOSSAIN LAL MIAH Bangladeshi 9/9/2002
11216 DRIVER HRIDOY AHMED ABDUL KHALEQUE Bangladeshi 6/23/2002
11219 LABOUR NAZRUL ISLAM YOUSUF ALI Bangladeshi 11/11/2001
11221 DRIVER SHEREEF OMMER RAVUTHER Indian 9/15/2002
11223 LABOUR MUHAMMAD AKRAM NOOR AHMED Pakistani 9/24/2002
11225 FOREMAN RAFAQAT ALI NIAMAT ALI Pakistani 9/26/2002
11228 FOREMAN RANA MUHAMMAD SAHFIQUE Pakistani 9/25/2002
11229 LABOUR SIYA SHARAN PANDIT KUMAR Nepalese 8/22/2002
11232 LABOUR PRAMOD KUMAR SAH Nepalese 8/20/2002
11239 HELPER MECHANIC RAM CHHABILA RAUT Nepalese 8/20/2002
11241 LABOUR RAM ADHIN PASMAN Nepalese 8/20/2002
11243 DRIVER PRAMOD PASMAN Nepalese 8/20/2002
11245 ELECTRICIAN ZIAUDDIN FIROJ MIAH Bangladeshi 9/9/2002
11249 PIPE FITTER ALAMGIR SIRAJ UDDIN Bangladeshi 9/2/2002
11250 OPERATOR WHEEL LOADER RASHDUL ALFAZ UDDIN Bangladeshi 9/2/2002
RAFIQUL ISLAM MOHAMMED PHUL
11256 PUMP OPERATOR Bangladeshi 9/19/2002
MIAH
11259 OPERATOR EXCAVATOR NURUL UL ALAM MOZIBUL HOQUE Bangladeshi 11/6/2002
SREEJITH EDATHADAN
11260 WORKSHOP ENGINEER Indian 11/7/2002
PURUSHOTHAMAN
MOHAMMED SHAHALAM KALIM
11274 DRIVER Bangladeshi 9/23/2002
UDDIN
11276 PUMP OPERATOR MONIR HOSSAIN TAMIJ UDDIN Bangladeshi 1/5/2003
11278 LABOUR KAMAL HOSSAIN ABDUS SOBAN Bangladeshi 9/22/2002
11288 LABOUR JAKIR HOSSAIN SEKANDAR ALI Bangladeshi 6/3/2002
11293 STEEL FIXER SHER AFGAN KHAN Indian 9/20/2002
ABDELNABI MOHD ABBAS
11298 PIPE FITTER Egyptian 5/22/2003
MOHAMMED
MOHAMMAD AMER MAHMOUD
11299 SITE SUPERVISOR Egyptian 5/22/2003
RASLAN
11301 PROJECT DIRECTOR ASHRAF SAYED ALI USMAN Egyptian 5/21/2003
11305 ELECTRICIAN MOHAMMED MOFIJ ABDUR ROB Bangladeshi 7/2/2003
11306 MASON ABUL ZOHAR ALI Bangladeshi 2/7/2003
11307 LABOUR HOSSAIN MIAH DUDH MIAH Bangladeshi 7/2/2003
WAREHOUSE & DISTRIBUTION
11310 GOLJAR HOSSAIN KORBAN ALI Bangladeshi 3/20/2003
OFFICER
DULAL HOSSAIN MHAMMED
11312 LABOUR Bangladeshi 7/2/2003
DUDHU
11314 MASON SALEH MOHAMED SAYED SALEH Egyptian 4/18/2003
11315 SURVEYING OFFICER DALOWAR ABDUL MANNAN Bangladeshi 11/20/2002
11316 WELDER KOHINOUR ISLAM ABDUL MONNAF Bangladeshi 1/4/2003
11320 LABOUR EMAMUL HAQUE ALTAF ALI Bangladeshi 9/20/2003
11331 ELECTRICIAN ISMAIL HOSSAIN ABUL KASHEM Bangladeshi 4/21/2003
11332 CARPENTER AURANG ZEB BAZ NOOR Pakistani 7/23/2003
11333 PLUMBER YOUSUF ALI ABDUL MUNAF Bangladeshi 3/6/2003
11339 DRIVER MOHAMMAD FIYYAZ KAFAIT ALI Pakistani 9/11/2003
11340 EQUIPMENT OPERATOR FAZLE AZIM ABDUL KARIM Pakistani 9/11/2003
11341 OPERATOR WHEEL LOADER NASEER AHMED NAZIR AHMED Pakistani 9/11/2003
11344 EQUIPMENT OPERATOR SIRAJUL ISLAM ANSAR ALI Bangladeshi 1/25/2004
11347 LABOUR FARID MONDAL OSMAN MONDAL Bangladeshi 4/20/2003
11348 DRIVER ZAREEN KHAN LALA KHAN Pakistani 1/22/2004
HEAVY/MEDIUM VEHICLE
11349 ALI ERSHAD ROBBAN MIAN Bangladeshi 12/28/2003
DRIVER
GHULAM HOSSEIN MUHAMMAD
11350 MECHANIC Pakistani 1/22/2004
ABDULLAH
11360 LABOUR JITU PASMAN Nepalese 9/4/2002
HEAVY/MEDIUM VEHICLE
11366 JEWEL JAJU MIAN Bangladeshi 4/15/2004
DRIVER
11367 ELECTRICIAN MOHSIN MIAH SHAMSUL HOQUE Bangladeshi 4/15/2004
11368 WELDER ENAMUL HOQUE MANTAJ MIAH Bangladeshi 4/15/2004
11376 MASON OPINDRA RAY AMATYA Nepalese 4/27/2004
MOTALIF MIAH ABDUL MUNNAF
11384 LABOUR Bangladeshi 11/1/2004
MIAH
11389 MASON SURENDRA SINGH Indian 12/1/2004
11390 MASON MOHAMMED AARIF DAIYA Indian 12/1/2004
11399 MASON SALIM SEIKH Indian 12/30/2004
11400 DRIVER SALIM KHAN GAGAN KHAN Bangladeshi 4/10/2005
ABDEL SALAM ABDEL KADER
11401 CHEMIST Egyptian 3/31/2005
MOHAMMAD EID AL
11406 PUMP OPERATOR SURESH RAMAKRISHNAN Indian 2/27/2005
11419 MASON ABDUL QUAIUM SHAHAB UDDIN Bangladeshi 4/1/2005
11430 LABOUR SHUZAN ZAHUR UDDIN Bangladeshi 12/7/2005
11432 LABOUR MANIK MIAH FORZAT ALI Bangladeshi 12/7/2005
MOHAMMED KASHEM ABDUR
11434 LABOUR Bangladeshi 12/7/2005
RASHID
11436 LABOUR RAZZAP ALI HOSSAIN ALI Bangladeshi 7/12/2005
11440 DRIVER TUSHAR KHAN KASHEM KHAN Bangladeshi 12/7/2005
11441 LABOUR FAZLUL HAQUE ABDUL HASEN Bangladeshi 12/7/2005
11442 LABOUR UZZOL SIRAJ UDDIN Bangladeshi 12/7/2005
11444 LABOUR DIL MOHAMMED SARFAT ALI Bangladeshi 1/2/2006
11445 LABOUR REON SHAMSUL HAQUE Bangladeshi 1/2/2006
11446 MASON RASEL MIAH ABDUL HAMID Bangladeshi 1/2/2006
11450 OFFICE HELPER SOHAG MIAH ABDUL MANNAN Bangladeshi 1/18/2006
11489 LABOUR KALAM ABDUS SOBAHAN Bangladeshi 2/1/2006
11491 LABOUR LITON ABDUL HELIM Bangladeshi 2/1/2006
11492 EQUIPMENT OPERATOR MOBAROK MIAS UDDIN Bangladeshi 2/1/2006
11493 EQUIPMENT OPERATOR BAKUL ABDUL MANNAN Bangladeshi 2/1/2006
11495 WAREHOUSE OFFICER FAHIMUDDIN MOHAMMED Indian 2/2/2006
11504 DRIVER WAHID NURUL ISLAM Bangladeshi 5/16/2006
11513 DRIVER MOHAMMED MILLAT YOUNUS MIAH Bangladeshi 9/1/2006
AHMED MOHAMED ABDEL AZIM
11515 ACCOUNTANT Egyptian 9/6/2006
KERSHA
MOHAMMAD ASLAM MUHAMMAH
11516 ESTIMATION MANAGER Pakistani 10/10/2006
HASSAN
11521 DRIVER SHAH PALI KHAN RAWOOF ABDUL Pakistani 11/2/2006
11534 LABOUR SHOUKAT ALI ALI SHER Pakistani 12/28/2006
MUHAMMAD SALIM MUHAMMAD
11538 PLUMBER Pakistani 12/28/2006
GULZAR
11539 LABOUR MEHDI HAMIDI HUSSAIN Pakistani 12/28/2006
11578 DRAFTSMEN MOHAMMAD NOORUDDIN Indian 2/4/2007
11581 MECHANIC MOHAMMAD SHARIQ Indian 2/2/2007
MUHAMMAD ARIF KHAN
11583 DRIVER Pakistani 1/28/2007
MUHAMMAD
11587 DRIVER AMEER ZAIB MISKEEN ZADA Pakistani 7/2/2007
NAZIR AHMED SARDAR
11590 DRIVER Pakistani 1/28/2007
MUHAMMAD
11591 DRIVER BACHA ZADA MOHAMMAD YOUSUF Pakistani 1/28/2007
11593 OPERATOR WHEEL LOADER VINAY KUMAR PANDEY Indian 1/28/2007
11608 MECHANIC MOHAMMAD SAMIM SHEIKH Indian 2/9/2007
11609 MANAGER TREASURY AHMED HAMED RABIE HASSAN Egyptian 2/11/2007
11612 OPERATOR WHEEL LOADER GULZAR ALI RAWIL KHAN Pakistani 2/4/2007
11615 DRIVER NAJEEB VAZHAKKOLA Indian 2/12/2007
SYED IBRAHIM SYED HAMEED
11621 STEEL FIXER Pakistani 2/9/2007
ULLAH
11636 PLUMBER SHAMBHU SINGH Indian 2/19/2007
ZAHID UL HAQ MUHAMMAD
11642 LABOUR Pakistani 2/12/2007
RAZEEQ
MUHAMMAD NAZIR MUHAMMAD
11643 LABOUR Pakistani 2/12/2007
ILYAS
MD MOTALAB HUSSIN SATTAR
11651 DRIVER Bangladeshi 3/5/2007
MIAH
11652 QUALITY CONTROL ENGINEER NESTOR PAGOBO CALUZA Filipino 3/5/2007
11654 OPERATOR WHEEL LOADER AFSAR KHAN MISKEN KHAN Pakistani 2/21/2007
11660 DRIVER SHAHID NAWAZ SHER NAWAZ Pakistani 2/26/2007
11661 LABOUR BAKHSHAD WALI KHAN Pakistani 2/26/2007
11665 CARPENTER MOHAMMED ISMAL FARID GHULAM Pakistani 2/20/2007
11667 OPERATOR EXCAVATOR SAIDUR RAHMAN ABUL KALAM Bangladeshi 12/5/2006
11668 OPERATOR EXCAVATOR NAZRUL ISLAM MOHAMMAD ISMAIL Bangladeshi 3/17/2007
11669 EQUIPMENT OPERATOR NASIR ABDUL BASHAR Bangladeshi 3/17/2007
11670 WELDER MOHAMMED ALI SONALI MIAN Bangladeshi 3/17/2007
11680 LABOUR MOHAMMED MUSHTAQ Pakistani 3/4/2007
11681 MASON MOHAMMED JAMIL SHER MOHD Pakistani 3/4/2007
11682 LABOUR ABUL HOSSAIN MONTAZ MIAH Bangladeshi 3/29/2007
11683 EQUIPMENT OPERATOR RAFIQ NAYEB ALI Bangladeshi 3/29/2007
11684 LABOUR ALAMGIR HOSSAIN WASAK MIAH Bangladeshi 3/29/2007
11694 OPERATOR EXCAVATOR JAHANGIR HAZRAT KHAN Bangladeshi 12/5/2006
11695 WELDER SHAHIDUD ABDUL SAMAD Bangladeshi 4/26/2007
11697 DRIVER JASIM MUNSUR RAHAMAN Bangladeshi 4/26/2007
11700 DRIVER MD ZOBAYAR MD MIAN UDDIN Bangladeshi 4/26/2007
SAYED MOHAMED GOMAA
11704 PLUMBER Egyptian 4/30/2007
MOHAMED
ABDUL HAMED ABDUL HAMMED
11726 PROJECT MANAGER Egyptian 8/13/2007
SHOALA
11738 DRIVER KAMLESH THAKUR Nepalese 7/10/2007
11740 LABOUR BINOD SADA Nepalese 7/10/2007
11744 LABOUR RABINDRA MANDAL Nepalese 7/26/2007
USAMA ABDULBAQI MOHAMMED
11754 SURVEYING SUPERVISOR Egyptian 7/30/2007
MATAR
11758 DRIVER QAMAR IQBAL KHAN TAHIR KHAN Pakistani 8/4/2007
11793 MECHANIC NABEEL AHMED Indian 9/23/2007
11794 WELDER AHMED SOLAH ALI Indian 9/24/2007
11795 WAREHOUSE OFFICER MUHAMMAD MAROOF KHAN Indian 9/23/2007
11802 MASON KEDAR NATH YADAV Nepalese 10/1/2007
11809 MASON SHANKAR LAL Indian 10/6/2007
11810 PLUMBER TANVEER KHAN Indian 10/6/2007
11811 LABOUR DINESHAWAR PARASHAD Indian 10/7/2007
WAREHOUSE & DISTRIBUTION
11821 HAMAD AHMED SATTI MANOFALI Sudanese 10/16/2007
OFFICER
MEHMOOD MAHER ABDELMORDY
11828 ACCOUNTANT Egyptian 10/21/2007
ABDELATY
11829 FOREMAN SAYED FATHI HUSSAIN MAHMOOD Egyptian 10/31/2007
11831 MASON MUHAMMAD HANEEF Indian 11/3/2007
11856 WELDER PARMOD KUMAR SINGH Indian 11/6/2007
GOVERNMENT RELATIONS ABDULAZIZ AHMED JASIM EL
11864 Saudi Arabian 11/20/2007
EXPEDITOR ENEGY
11870 MASON CHHOTEY LAL Indian 11/24/2007
11880 LABOUR SEROZ ALAM Indian 11/24/2007
ABDUS SALAM BASHIR AL HAJ
11897 CAMP BOSS Syrian 3/13/2004
HUSSAIN
11898 FINANCE MANAGER BADER ASAD MOHAMMAD ABASS Jordanian 5/1/2001
12207 SITE SUPERVISOR MOHD SAMER AL AWANI Syrian 12/4/2007
12225 MECHANIC MOHAMMAD HAMID Indian 12/25/2007
12266 LABOUR RAJAN DAMI Nepalese 1/22/2008
12306 LABOUR SANTOSH KUMAR Indian 9/23/2007
12350 FOREMAN NASSAR MOHAMED AL ABAD SAAD Egyptian 2/23/2008
12354 MASON KARIMULLAH ANSARI Indian 2/13/2008
12363 PLUMBER NAVEED AHMED ABDUL AZIZ Pakistani 3/29/2008
12377 LABOUR MAKI AHMED Indian 3/10/2008
12399 CARPENTER GURPREET SINGH Indian 4/28/2008
12410 MECHANIC MUHAMMAD ASHRAF JAVED SHAH Pakistani 4/15/2008
12424 HELPER MECHANIC MARLON BLANCO OANDASAN Filipino 6/2/2008
12439 WELDER YADAV RAJIV KUMAR Indian 5/31/2008
12485 ACCOUNTANT BENJAMIN JR MENDOZA PAGCO Filipino 7/12/2008
12507 STEEL FIXER KALAMUDDIN KYAMUDDIN Indian 6/13/2008
12508 STEEL FIXER YADAVA SURESH Indian 6/12/2008
RAHMAT MOHAMMAD ISRISH
12513 LABOUR Indian 6/27/2008
NADAF
12521 OPERATOR EXCAVATOR MOHAMMED IRFAN Indian 7/26/2008
12538 WELDER IVAN BATIQUIN JEMINO Filipino 7/12/2008
IFTIKHAR KHAN ABBASI
12552 DRIVER Pakistani 7/14/2008
MUHAMMAD FIAZ KHAN
12557 LABOUR AKHTAR KHAN RAHMAT Indian 7/22/2008
12566 SURVEYING OFFICER JAIME CABLAO SAMIA Filipino 8/28/2008
12587 LEGAL ADVISOR MOHD RAEID AL JABBAN Syrian 3/16/2008
YASSER AHMAD MOHAMMAD
12625 SITE SUPERVISOR Egyptian 9/17/2007
KALIFA
WASAM KHALED MAHMOUD
12709 ACCOUNTANT Jordanian 2/2/2008
SANJAGIEH
KHALED MOHAMED ABDE MOHSEN
12721 QUANTITY SURVEYOR Egyptian 5/17/2008
MOHAMED
12912 EQUIPMENT OPERATOR ABBAS NASARUDDIN ALI Indian 4/25/2009
12925 MASON NASARUDDIN ISMAIL ANSARI Indian 5/17/2009
12928 MASON AWADH MUNILAL MAHATO Indian 5/4/2009
12931 DRIVER RAJESH KUMAR SAHU Indian 5/4/2009
12932 DRIVER DHIRAJ SINGH AJIT SINGH Indian 5/7/2009
12938 LABOUR ZULFEKAR RAHAT ALI Indian 5/17/2009
12939 EQUIPMENT OPERATOR RIYASAT PHAJIL ANSARI Indian 5/17/2009
12940 MASON VIDYA NAND BIN Indian 5/17/2009
12977 LABOUR MUKH LAL RAM Indian 7/2/2009
13008 WELDER SARBUDEEN UMAR UMAR Indian 7/12/2009
13019 DRIVER RAKESH KUMAR SINGH Indian 7/30/2009
13036 LABOUR HASSAN ALI SHAH DRASH GUL Pakistani 8/8/2009
13048 PLUMBER MUSHARAF SHAHWALLAS KHAN Pakistani 8/8/2009
13072 OPERATOR WHEEL LOADER SANJAY KUMAR RAJ KUMAR Indian 7/11/2009
13079 DRIVER RAMJAN RASID ALI Indian 7/15/2009
13112 LABOUR MOHAMMED ALI MOHARRAM Indian 7/22/2009
13113 HELPER MECHANIC SURESH JEYABALAN JEYABALAN Indian 7/26/2009
13131 HELPER MECHANIC MOHAMMAD ISLAM KHAN Indian 8/19/2009
13132 DRIVER SHAHZAD KHAN PASHAM GUL Pakistani 8/19/2009
MUHAMMAD BABU HUSSAIN
13158 WELDER Pakistani 9/6/2009
MUHAMMAD SHARIF
MUHAMMAD WASIM KHAN FAIZ
13159 OPERATOR EXCAVATOR Pakistani 9/6/2009
ALAM
RASHEED AHMAD KHAN
13166 LABOUR Pakistani 9/6/2009
MUHAMMAD AKRAM
FAHEEM AKHTAR MUHAMMAD
13172 EQUIPMENT OPERATOR Pakistani 9/6/2009
RAFIQ
13178 OPERATOR TRUCK CRANE ABDUL MALIK NORAB GUL Pakistani 9/9/2009
13186 LABOUR MUSHTAQ AHMED FAZAL HUSSAIN Pakistani 9/16/2009
13189 ELECTRICIAN SHAHID RASHID ABDUL RASHID Pakistani 9/16/2009
MUHAMMAD RAMZAN ZULFIQAR
13190 OPERATOR EXCAVATOR Pakistani 9/16/2009
ALI
13192 MASON SHARAFAT ALI MUHAMMAD DIN Pakistani 9/16/2009
MUHAMMAD SOHAIL MUHAMMAD
13194 PLUMBER Pakistani 9/16/2009
JAMIL
13203 PIPE FITTER RAM UDGAR YADAV Nepalese 9/30/2009
13211 PUMP OPERATOR MOHAMMAD ALAM KITAB UDDIN Indian 10/5/2009
13213 LABOUR DAUD SALAMA ANSARI Nepalese 10/8/2009
13234 HEAVY EQUIPMENT OPERATOR SRIBHAGWAN MUNNI PRASAD Indian 10/15/2009
13250 MASON RAGHUBAR MUNDRIKA RAM Indian 11/1/2009
IBRAHIM HAFNI IBRAHIM HAFNI
13374 BUYER Egyptian 12/6/2009
DAUD
13491 LABOUR LAL CHAND JAGAT RAM Indian 3/21/2010
JAYARAMAN SAMBANDAM
13493 LABOUR Indian 3/21/2010
SAMBANDAM
MOHAN SUNDARRAJAN
13494 LABOUR Indian 3/21/2010
SUNDARRAJAN
13502 LABOUR BHAJAN LAL SARWAN KUMAR Indian 3/14/2010
13517 OPERATOR TRUCK CRANE SHAHZAD ABDUL RAZZAQ Pakistani 3/16/2010
13527 LABOUR HAQ NAWAZ RAB NAWAZ Pakistani 3/16/2010
13544 PUMP OPERATOR TARIQ FEROZE ALLAH RAKHA Pakistani 3/27/2010
13550 OPERATOR TRUCK CRANE MOHAMMAD AMIN YASIN MIYAN Indian 3/20/2010
13552 LABOUR NASARULLAH NAIMUL ANSARI Indian 3/20/2010
13580 LABOUR KALIM AHMAD ULLAH Indian 4/1/2010
13581 DRIVER TARIQ MUHAMMAD JUMA GUL Pakistani 3/16/2010
13584 LABOUR ANIL KUMAR CHHEDI PRASAD Indian 4/1/2010
13585 OFFICE HELPER KHALIL MIAH ABDUL MATIN Indian 4/1/2010
13587 MASON AWADH BIHARI CHHANGUR Indian 4/1/2010
13647 DRIVER DILAWAR KHAN SAMAND KHAN Pakistani 4/24/2010
MUHAMMAD IMRAN HASHIM ALI
13649 DRIVER Pakistani 4/24/2010
KHAN
13650 DRIVER BAKHT MARIN KHAN SHER ALI Pakistani 4/24/2010
13653 DRIVER MUHAMMAD SADIQ GHUFRAN Pakistani 4/24/2010
13658 OPERATOR EXCAVATOR IMRAN ULLAH MUHAMMAD SALAH Pakistani 4/24/2010
13660 DRIVER AMIN SHAH AKBAR SHAH Pakistani 4/24/2010
13669 DRIVER HAMID ALI SAFDAR ALI Pakistani 4/22/2010
13670 OPERATOR WHEEL LOADER SHARAB DIN PIR GUL Pakistani 4/22/2010
13671 DRIVER IMRAN HUSSAIN EJAZ HUSSAIN Pakistani 4/24/2010
13675 DRIVER NOOR WALI ROBIYA KHEL Pakistani 4/22/2010
13681 LABOUR RAMGUN DAS TATMA PRABODH Nepalese 4/2/2010
BIRENDRA MAHARA CHANDRA
13685 PLUMBER Nepalese 4/2/2010
CHAMAR
13689 LABOUR BALBODH MANDAL GITA DEVI Nepalese 4/2/2010
13695 OPERATOR WHEEL LOADER SANTOKH SINGH GANDHU RAM Indian 4/4/2010
13698 LABOUR SURYANATH BINDHYACHAL Indian 4/4/2010
MURUGANANDAM GOVINDARAJ
13702 LABOUR Indian 4/1/2010
GOVINDARAJ
13711 LABOUR DINESH DAS BANODIYA SUSILA Nepalese 4/2/2010
BISHNUHARI SAPKOTA ISHWORI
13721 LABOUR Nepalese 4/2/2010
SAPKOTA
13722 LABOUR RAM NANDAN THAKUR SAGAM Nepalese 4/2/2010
13726 LABOUR RAM PRASAD YADAV JAGESHWAR Nepalese 4/2/2010
13758 OPERATOR EXCAVATOR SURAJ KUMAR JOGINDER PAL Indian 5/27/2010
13759 OPERATOR WHEEL LOADER RAJESH KUMAR OM PARKASH Indian 5/28/2010
MOHAMMAD IMRAN KHURSHEED
13762 OPERATOR TRENCHER Indian 5/28/2010
AHMED
ABHIMANYU RAMANAND MAHATO
13763 WELDER Indian 6/4/2010
KUMAR
13765 MECHANIC SALAUDDIN AFATOON Indian 6/4/2010
13768 MECHANIC BALINDRA BALKHILA YADAV Indian 6/4/2010
13769 STEEL FIXER HRI CHARAN RAM Indian 6/4/2010
13771 CARPENTER GAUTAM VIDYA RAM Indian 6/4/2010
13772 CARPENTER MANOJ YADAV KUMAR Indian 6/4/2010
TANVEER HUSSAIN JAN AFSAR
13775 SECRETARY Pakistani 6/5/2010
KHAN
13777 LABOUR HARI KUMAR SHRESTHA MAN Nepalese 6/6/2010
13795 LABOUR DILIP NIRANJAN TALUKDAR Indian 5/14/2010
HEAVY/MEDIUM VEHICLE
13797 ALAM MOHAMMAD IDREES Indian 5/14/2010
DRIVER
13798 LABOUR FAYEJ ALI SEIKH Indian 5/14/2010
HEAVY/MEDIUM VEHICLE
13803 JAVED IQBAL AZHAR IQBAL Pakistani 5/8/2010
DRIVER
MUTHURAMAR
13804 LABOUR CHINNAMUTHUSAMY Indian 5/13/2010
CHINNAMUTHUS
13808 PIPE FITTER DILIP MAHARA SONAMA MOCHI Nepalese 5/16/2010
13810 LABOUR ARUN SADA SAMUNDRA DEVI Nepalese 5/16/2010
13815 STEEL FIXER SUBBIRAMANIAN IRULAN Indian 5/13/2010
13819 STEEL FIXER KALAIARASAN KRISHNAN Indian 5/13/2010
13821 STEEL FIXER SHANMUGAM SUBRAMANIAN Indian 5/13/2010
THANKAPPAN OOTTUPARA
13826 DRIVER Indian 5/15/2010
CHANDRAN
13827 DRIVER HARIKUMAR RAGHAVAN PILLAI Indian 5/15/2010
MUHAMMAD INTAZAR GHULAM
13832 DRIVER Pakistani 5/8/2010
RASOOL
MUHAMMAD ARSHAD RAZIQ
13833 DRIVER Pakistani 5/8/2010
MUHAMMAD
GHAZANFAR ALI MOHAMMAD
13856 OPERATOR WHEEL LOADER Indian 6/7/2010
ZAFAR
13868 DRIVER LAKHWINDER JARNAIL SINGH Indian 6/14/2010
13869 OPERATOR EXCAVATOR ABDUL SLAM MIR HASAN ANSARI Indian 6/14/2010
13870 OPERATOR WHEEL LOADER CHANDRAKET SINGH KUMAR Indian 6/14/2010
13871 PLUMBER MANOJ SINGH KUMAR Indian 6/14/2010
13874 EQUIPMENT OPERATOR JITENDRA HARENDRA KUMAR Indian 6/18/2010
MUHAMMAD AMRAIZ MUHAMMAD
13878 OPERATOR TRUCK CRANE Pakistani 6/8/2010
DURAIZ
13896 PLUMBER MAKBUL KABARI MUSAHAR KABARI Nepalese 4/29/2010
13914 LABOUR AKBAR ALI KHAN Indian 6/9/2010
CHANDAN KUMAR SHANKAR
13918 WELDER Indian 6/9/2010
PRASHAD
13920 MASON RUSTAM ALABAND KHAN Indian 6/9/2010
13930 LABOUR RAJAMANICKAM ALAGAR ALAGAR Indian 6/10/2010
MANGALASAMY RAJENDRAN
13931 ELECTRICIAN Indian 6/10/2010
RAJENDRAN
MOHAMMAD MOSEEM MUMTAZ
13959 LABOUR Indian 4/4/2010
AHMAD
13982 MECHANIC TAJ MAHMAD WAKIL MIA Indian 7/22/2010
13986 CARPENTER BIRU DAHARI PRASAD Indian 7/22/2010
14000 MECHANIC SHAH MUNNA BIRENDRA Indian 6/18/2010
OMPRAKASH BAIJNATH
14003 LABOUR Indian 6/18/2010
CHAUDHARY
MOHAMMAD GEYASUDDIN
14008 MECHANIC Indian 6/18/2010
ZAHIRUDDIN
MOHAMMAD IZRAIL SAYEED
14022 PLUMBER Indian 6/23/2010
ANSARI
14026 HEAVY EQUIPMENT OPERATOR MOHAMMED KAMAL HUSSAIN Indian 7/3/2010
14061 DATA ADMINISTRATOR ZUBAIR ALI SYED Indian 10/1/2010
14069 SECURITY GUARD MUNNA NANDJI MANJHI Indian 7/31/2010
14070 LABOUR NANDJEE RAM SINGH Indian 7/31/2010
14071 HELPER MECHANIC IMTEYAJ ALEE AKHTAR SHAH Indian 7/31/2010
14076 CARPENTER VIRENDRA BABUNAND KHARWAR Indian 7/31/2010
14080 MASON RAJESH PRASAD KHARWAR Indian 8/2/2010
MOHAMED ABDELA AL SHEBL ALY
14084 SURVEYING SUPERVISOR Egyptian 7/26/2010
EL SAADANY
MOHAMED YASSER ABDELLATIF
14085 SURVEYING OFFICER Egyptian 7/26/2010
EL MAHDY
RAED ABDEL HAMEED BADWI
14091 ACCOUNTANT Jordanian 11/15/2009
AMRO
14092 OPERATOR EXCAVATOR RAJAN THAMARAI SELVAN Indian 7/17/2010
14093 OPERATOR WHEEL LOADER YOGENDRA YADAV RAM AVADH Indian 8/19/2010
MAHMOUD ALI AHMED ALI
14102 SURVEYING SUPERVISOR Egyptian 10/16/2010
ELASHKAR
14106 OPERATOR TRENCHER FELIX LIGAYA PELLAZAR Filipino 10/8/2010
14236 STEEL FIXER BABAR ALI Pakistani 1/18/2009
14237 LABOUR AJAY KUMAR RAM Indian 9/25/2008
HANI DEEB ABEDALAH
14252 SITE SUPERVISOR Jordanian 8/18/2008
ALQATROUS
14263 FOREMAN AWAD FAHD ATYA EDRIS Egyptian 11/27/2010
GOVERNMENT RELATIONS
14266 BADAR SALEHAL WAHABIAL HARBI Saudi Arabian 7/2/2005
EXPEDITOR
14274 DRIVER ANSAR MEHMOOD FAZAL HUSSAIN Pakistani 1/29/2009
GOVERNMENT RELATIONS
14276 RUMEH ALI HAMED AL RUMEH Saudi Arabian 3/1/2004
EXPEDITOR
ZAKI ALDEEN ABKER ADAM
14755 MECHANIC Sudanese 7/2/2005
KHATER ADAM KHAT
14757 DRIVER HERMINIGILDO ROSARIO REYES Filipino 5/9/2010
MOHAMED MEKHIMAR AHMED
14758 SITE SUPERVISOR Egyptian 1/12/2009
ELWAN
ALAA HEMDAN ABDALLA
14759 SITE SUPERVISOR Egyptian 3/26/2011
ABDALAAL
MASEOUD ABDELHALIM SHAFIK
14760 SITE SUPERVISOR Egyptian 3/26/2011
SADEK
MOHAMED ABDULJAWAD
15060 SITE SUPERVISOR Egyptian 2/13/2011
MOHAMMED
HEAVY/MEDIUM VEHICLE ABDULJABBAR BHATI GHULAM
15062 Pakistani 10/23/2003
DRIVER MUHAMMAD
15079 LABOUR BRAJESH SURESH YADAV Indian 4/10/2011
15085 DRIVER SUCHA JAVAL SINGH Indian 4/10/2011
15089 LABOUR MUBARAK ALI MOHAMMAD Indian 4/21/2011
MUHAMMAD KHAN NAZIR UR
15103 DRIVER Pakistani 4/22/2011
REHMAN
15106 DRIVER ZARSHAID KHAN BADAM KHAN Pakistani 4/22/2011
AKHTAR NAWAZ SHER NAWAZ
15107 DRIVER Pakistani 4/22/2011
KHAN
15108 DRIVER FAHIM KHAN SIRAJ MUHAMMAD Pakistani 4/22/2011
MUHAMMAD ZAMIN KHAN
15109 DRIVER Pakistani 4/22/2011
MUHAMMAD USAMAN
15113 DRIVER UMAR ZEB SARWAR KHAN Pakistani 4/24/2011
15132 SECURITY GUARD AROCKIASAMY LOORDUSAMY Indian 4/27/2011
15214 SECURITY SUPERVISOR IBRAHIM EIYADA AL OTAIBI Saudi Arabian 12/24/2008
15238 MECHANIC TAHIR AROUR FAROUK Syrian 2/5/2008
15250 OFFICE HELPER MOORTHI CHINNATHAMBI Indian 5/28/2011
15252 DRIVER RAJAN ARUMUGAM Indian 5/28/2011
15254 LABOUR GULAB ABDUL KHALIQUE KHAN Indian 5/30/2011
15256 PLUMBER REYAZ AHMED JAHANGIR ANSARI Indian 5/30/2011
15265 DRAFTSMEN DANISH KAMAL KHAN Indian 5/6/2011
15266 DRAFTSMEN MOHAMMAD ARIF SIDDIQUE Indian 5/6/2011
15272 DRIVER MOHAMMAD AZAM DILAWAR KHAN Indian 5/14/2011
15274 OFFICE HELPER ANISH SATTAR ANSARI Indian 5/14/2011
15277 EQUIPMENT OPERATOR NAGINA PRASAD SRIPAT Indian 5/17/2011
15282 EQUIPMENT OPERATOR UPENDAR PITAMBAR SAH Indian 5/23/2011
15287 DRIVER SOHRAB ALAM SHAUKAT ALI Indian 6/11/2011
15288 MECHANIC MOHAMED RABIE HAMED SAYED Egyptian 6/8/2011
HAMADA MOHAMED MOHAMED ALI
15289 MECHANIC Egyptian 6/7/2011
ELFEKI
15296 EQUIPMENT OPERATOR NOORULLAH JAN AHMAD JAN Pakistani 6/10/2011
ANWAR RAHMAN MUHAMMAD
15307 LABOUR Pakistani 6/10/2011
SARDAR
15309 EQUIPMENT OPERATOR RAHMAT ALI HADI KHAN Pakistani 6/10/2011
HEAVY/MEDIUM VEHICLE
15320 GHULAM HAIDER BASHIR AHMAD Pakistani 6/19/2011
DRIVER
15323 LABOUR SUBRAMANI ARUMUGAM Indian 6/25/2011
15324 DRIVER POOVEN KARUPPIAH Indian 6/22/2011
15328 LABOUR BOOMI KUMAR CHINNA THAMBI Indian 6/22/2011
15329 WAREHOUSE OFFICER SYED ABDUL KHALIL MOBIN Indian 6/25/2011
15345 LABOUR ENAYAT ULLAH REHMAT KHAN Pakistani 6/30/2011
MUHAMMAD RAFIQ MUHAMMAD
15349 LABOUR Pakistani 6/30/2011
RAMZAN
AZMAT NAWAZ RAJA SARFRAZ
15357 OPERATOR EXCAVATOR Pakistani 6/30/2011
KHAN RAJA
15373 CARPENTER SHAH PASAND ABDUL NABI Pakistani 6/30/2011
MUHAMMAD SHOAIB ABDUL
15378 MASON Pakistani 6/30/2011
MAJEED
15389 PLUMBER AAMIR AMEEN SULTAN AFSAR Pakistani 6/30/2011
SHAKEEL AHMED MUHAMMAD
15391 LABOUR Pakistani 6/30/2011
SALEEM
RAZZIQ ULLAH MUHAMMAD
15414 DRIVER Pakistani 7/9/2011
SARDAR
15426 FOREMAN KHIZAR HAYAT GUL HAYAT Pakistani 7/6/2011
MUHAMMAD AMJAD MUHAMMAD
15429 PLUMBER Pakistani 7/6/2011
AFZAL
15432 LABOUR NADIR KHAN MUHAMMAD ROSHAN Pakistani 7/6/2011
HEAVY/MEDIUM VEHICLE
15599 AMIR KHAN AMIR NOSHAD Pakistani 1/5/2003
DRIVER
15625 PROJECT MANAGER REFAT MOUSA ISMAIL AMRU Jordanian 9/1/2007
MOHAMED GAMAL MOHAMED
15628 CIVIL SITE ENGINEER Egyptian 8/21/2011
BADR
15636 PLUMBER PARVEJ ALAM ABDUL AZAD Indian 8/10/2011
15640 OPERATOR WHEEL LOADER MD ARIF KHAN RABIULLAH Indian 8/13/2011
15652 DRIVER BALAJI SELLAKANNU Indian 8/8/2011
15653 LABOUR SAJEED GUL GHULAM SARWAR Pakistani 8/10/2011
MAHENDRA BHUSAL BHAGAWATI
15654 LABOUR Nepalese 8/25/2011
BHUSAL
15663 DRIVER RAJESH KUMAR JOGINDER SINGH Indian 8/23/2011
15675 EQUIPMENT OPERATOR MOHAMMAD SHAHID KHAN Indian 8/16/2011
15677 OPERATOR EXCAVATOR MADHO KUMAR SINGH Indian 8/18/2011
15678 OPERATOR EXCAVATOR SHASHI BHUSHAN PRASAD Indian 8/18/2011
15681 LABOUR HASNAIN ALI ALIRAJ Indian 8/18/2011
15685 EQUIPMENT OPERATOR RAJESH SHREE KANT Indian 8/23/2011
15693 MASON HYDAR KHAN MIRZA WALI KHAN Pakistani 8/27/2011
15713 COMMERCIAL ENGINEER SAMEH ABDO AHMED OMAR Egyptian 7/7/2010
SALEEM KHAN MUHAMMAD
15715 DRIVER Pakistani 1/5/2003
YOUNAS
15768 OPERATOR EXCAVATOR RAJ KUMAR BANARAS SAH Indian 9/7/2011
MANZOOR IQBAL ESSA
15770 DRIVER Pakistani 9/17/2011
MUHAMMAD KHAN
15774 DRIVER CHANAKA GEETH JAYAWARDENA Sri Lankan 9/29/2011
15778 OFFICE HELPER PURNA BAHADUR SUNAR LAL Nepalese 9/28/2011
15782 LABOUR ASHIM KUMAR BISWAS Indian 10/1/2011
15783 CARPENTER BISWAJIT HARIDAS BISWAS Indian 10/1/2011
15786 LABOUR ASHOK KUMAR Indian 10/1/2011
MOHAMED MOHAMED IBRAHIM
15818 SITE SUPERVISOR Egyptian 7/31/2008
HAMAD
15820 SITE SUPERVISOR MOHMOUD ABBAS AL WASEEF Egyptian 6/30/2010
15822 CIVIL SITE ENGINEER IBRAHIM MOHAMED ALI OWN Egyptian 7/10/2010
15887 SITE SUPERVISOR IBRAHIM SAYED SAYED TONY Egyptian 11/13/2011
SURESH KANDAKUTTI
15893 LABOUR Sri Lankan 10/15/2011
NAWARATHNAM
15897 PIPE FITTER RAJ KISHOR SINGH Indian 10/14/2011
AMIRTHAM MANIVANNAN
15898 CARPENTER Indian 10/14/2011
AMIRTHAM
GURUSAMY MUTHUKRISHNAN
15902 OPERATOR EXCAVATOR Indian 10/14/2011
GURUSAMY
HEAVY/MEDIUM VEHICLE
15904 SANTHANAM DITTO SANTHANAM Indian 10/14/2011
DRIVER
15910 LABOUR BALAMUNYAN PERIYAKARUPPAN Indian 10/19/2011
15911 DRIVER SHAHUL HAMEED SAMSUDEEN Indian 10/19/2011
15914 STEEL FIXER POOVALINGAM RAMASAMY Indian 10/19/2011
RAJENDRAN SURESHKUMAR
15918 LABOUR Indian 10/19/2011
RAJENDRAN
15921 LABOUR WAZIR ANSARI MUSLIM ANSARI Indian 10/6/2011
15922 OPERATOR WHEEL LOADER ARIF RAHISUDDIN RAHISUDDIN Indian 10/6/2011
MOHAMMAD SHAMSHAD
15923 OPERATOR EXCAVATOR Indian 10/6/2011
MOHAMMAD RAISH
15924 LABOUR NOOR MOHAMMAD ABDUL MONIB Indian 10/6/2011
SHAMSHER SAH MOHAMMAD
15927 PIPE FITTER Indian 10/6/2011
QAYAMUDDIN SAH
GOVERNMENT RELATIONS
15943 HAMAD MASAD JARALLAH AL GAZI Saudi Arabian 3/20/2007
EXPEDITOR
CHHOTELAL BHARTI YOGENDRA
15990 LABOUR Indian 12/13/2011
BHARTI
16000 LABOUR RAJARAJAN SETHU RAMAN Indian 11/22/2011
16005 STEEL FIXER ULAGANATHAN VELUTHEVAR Indian 11/22/2011
16008 OPERATOR WHEEL LOADER BHOLA KUMAR YADAV Indian 11/27/2011
16009 CARPENTER SANTOSH KUMAR BALAKRISHNA Indian 11/27/2011
16010 CARPENTER MAHENDRA GUPTA RAJA GUPTA Indian 11/27/2011
16011 CARPENTER VIJAY KUMAR GAURI Indian 11/27/2011
16012 EQUIPMENT OPERATOR RAKESH KUMAR HARI RAM GUPTA Indian 11/27/2011
16013 OPERATOR WHEEL LOADER MUNNA KUMAR YADAV Indian 11/21/2011
16014 OPERATOR EXCAVATOR SANJEEV KUMAR MOTILAL SAH Indian 11/21/2011
16030 PIPE FITTER AMAJAD SHAH MASJID SHAH Indian 12/5/2011
16045 LABOUR ASHARFI NISHAD FEKU Indian 12/7/2011
16054 LABOUR SWAPAN GOLAK BISWAS Indian 10/24/2011
RAJAN BISHWOKARMA DIL
16055 LABOUR Nepalese 10/26/2011
BAHADUR
16056 LABOUR PREM BAHADUR GURUNG GIRI Nepalese 10/26/2011
16060 LABOUR ASHOK KUMAR SARDAR HANU Nepalese 10/26/2011
16062 HELPER MECHANIC PERIYASAMY MUNIYASAMY Indian 11/1/2011
16063 PIPE FITTER GOVINDARAJAN PONNUCHAMY Indian 11/1/2011
IRFAN ANSARI SALAHUDDIN
16068 PIPE FITTER Indian 11/4/2011
ANSARI
16069 OPERATOR WHEEL LOADER UMA SHANKAR BHAGAT Indian 11/4/2011
16070 OPERATOR WHEEL LOADER RAM KUMAR SINGH Indian 11/21/2011
16071 LABOUR ABUL HASAN MOHAMMAD SAID Indian 11/4/2011
16072 LABOUR SARFUDIN MIYAN KASIM MIYAN Indian 11/21/2011
16074 OPERATOR TRUCK CRANE NITESH KUMAR SINGH Indian 11/21/2011
16075 OPERATOR WHEEL LOADER NAGENDRA KUMAR SINGH Indian 11/21/2011
DHARMENDRA SINGH ASHOK
16076 MASON Indian 11/4/2011
SINGH
SUNIL SHARMA RAM AYODHEYA
16079 PIPE FITTER Indian 11/12/2011
SHARMA
16089 OPERATOR EXCAVATOR CHANDRIKA PRASAD Indian 10/18/2003
16106 DRIVER AMIR KHAN GHULAM MUSTAFA Pakistani 7/28/2008
16154 SURVEYING OFFICER MOHAMED FAWZY ALI EL DEWER Egyptian 12/25/2011
MOHAMED AHMED AHMED
16155 SURVEYING OFFICER Egyptian 12/25/2011
HASSAN EID
16164 LABOUR ANUP PRASAD HIRALAL PRASAD Indian 1/14/2012
16165 OPERATOR WHEEL LOADER SUNIL RAM BALKHILA RAM Indian 1/14/2012
16170 OFFICE HELPER MOHAMMED RAFEEQ CHHOUHAN Indian 1/4/2012
16181 LABOUR JAFEER AHAMED LEBBE SAMOON Sri Lankan 1/1/2012
16192 LABOUR KAMALESH JITENDAR YADAV Indian 1/25/2012
16194 LABOUR LINGAM VARDA RAJAIAH Indian 1/26/2012
16195 LABOUR BANGI EMAJYA BHUKYA Indian 1/26/2012
16197 LABOUR MANJUR DARSI Indian 1/26/2012
16201 HELPER MECHANIC ODAIAH KANUKUTLA MALLAIAH Indian 1/26/2012
16209 CARPENTER MANOJ SAH SURENDRA SAH Indian 1/26/2012
HEAVY/MEDIUM VEHICLE RAMAVTAR BAIRWA MOOL CHAND
16213 Indian 1/26/2012
DRIVER BAIRWA
16219 LABOUR UMASHANKAR JOKHAN Indian 2/1/2012
16224 LABOUR RADHE SHYAM RAJ KUMAR Indian 2/8/2012
16342 LABOUR ANJAIAH NARSALAH MAMIDI Indian 3/1/2012
16349 MASON BINDU KUMAR MANDAL Indian 2/28/2012
16352 LABOUR RAJESHAM RAJAM BATHULA Indian 3/1/2012
16354 LABOUR RAJU YELLA REDDY GUDA Indian 3/1/2012
16358 LABOUR MANOJ KUMAR SHARMA Indian 3/15/2012
MOHAMED ABDELLATIF MOHAMED
16379 MECHANIC Egyptian 6/18/2008
ISMAIL
HEAVY/MEDIUM VEHICLE
16380 MOHAMMAD KHALID SHERDDIN Indian 2/26/2003
DRIVER
AHMED MOHAMED AHMED
16381 WORKSHOP OFFICER Egyptian 7/13/2011
ELGAMIL
AHMED MOHAMED MOHAMED
16384 QUANTITY SURVEYOR Egyptian 8/28/2011
ELSHAHAT
16387 DRIVER SAEED UR REHMAN Pakistani 12/20/2001
16390 WORKSHOP SUPERVISOR SHWAKI ALSHAKER MOHAMAD Syrian 3/23/2010
16446 LABOUR SADEQUL ISLAM BUDHU MONDAL Bangladeshi 9/11/2003
16451 STEEL FIXER NAFEES AHMED Indian 10/22/2008
16525 LABOUR RAMEES MOHAMED MEIYADEEN Sri Lankan 4/24/2012
KUMMARI CHINNA BALRAJ
16528 LABOUR Indian 4/23/2012
YADUNORI
MOHAMED IBRAHIM SAYAD
16536 SITE SUPERVISOR Egyptian 11/29/2011
HUSSEIN
HEAVY/MEDIUM VEHICLE
16862 ABDUL ALIM BADIUZZAMAN Bangladeshi 7/1/1998
DRIVER
GAMAL MOHAMMED MOHAMMED
16863 SITE SUPERVISOR Egyptian 5/9/2007
ABU KAHILA
WAREHOUSE & DISTRIBUTION
16864 SYED NAVED AHMAD Indian 12/24/2007
OFFICER
FOUAD AHMED AL SAAWOOD AL
16866 CIVIL SITE ENGINEER Syrian 2/4/2008
AWAD
16869 LABOUR DARWAISH KHAN SAID GHAFOOR Pakistani 7/5/2008
16871 BUYER KHIZAR HAMMED AL NAJDI Iraqi 6/30/2008
MAGZOUB AL AMIN EL FADIL EL
16874 PURCHASER PROJECT Sudanese 8/28/2012
SHEIKH
16878 SECURITY GUARD NASER DABSANNASERAL HARITHY Saudi Arabian 11/25/2008
16879 DRIVER MOHAMMAD IMRAN ASRAF ANSARI Indian 4/18/2009
HAZRA HUSSAIN KARAMAT
16880 OPERATOR EXCAVATOR Indian 4/18/2009
HUSSAIN
GOVERNMENT RELATIONS
16882 ASAD TARMUJAISHAL ENEGY Saudi Arabian 7/22/2009
EXPEDITOR
16884 LABOUR MUHAMMAD IQBAL ALLAH WASAYA Pakistani 9/6/2009
WAREHOUSE & DISTRIBUTION KHALED EL AMIN EL FADEL EL
16886 Sudanese 12/19/2009
OFFICER SHEIKH
SYED SHIRAZ AHMED SYED
16891 ACCOUNTANT Pakistani 2/21/2010
SALEEM AHMED
WAREHOUSE & DISTRIBUTION TABREZ SHAMSHULABIDDIN
16892 Indian 2/25/2010
OFFICER GOLAM MOHAMMAD
MOHAMED ABDELLATIF
16895 SURVEYING OFFICER Egyptian 4/6/2010
ABOELHAMAD AHMED
16896 QUANTITY SURVEYOR JAYSON ADOVISO AZOGUE Filipino 4/17/2010
MUHAMMAD NASIR MUHAMMAD
16897 WAREHOUSE OFFICER Pakistani 4/17/2010
ASLAM
16899 OFFICE HELPER IMRAN ABDULLAH ALLAHEM Saudi Arabian 6/1/2010
16901 OFFICE HELPER NAWAFMOHAMMEDAL GHAMDI Saudi Arabian 6/1/2010
16902 RECEPTIONIST BADERNASSERAL SHAMRI Saudi Arabian 6/1/2010
MOHAMED SAID MOHAMED
16905 SURVEYING OFFICER Egyptian 6/7/2010
MASOUD HEMIDA
MOHAMMED RATHIKHALEEFAL
16909 RECEPTIONIST Saudi Arabian 7/1/2010
MOTAIRY
GOVERNMENT RELATIONS
16912 ABDUL WAHABBARAAKAL AWAD Saudi Arabian 7/24/2010
EXPEDITOR
WAREHOUSE & DISTRIBUTION
16914 AHMED MOHAMMED OMAR Sudanese 7/21/2010
OFFICER
16917 PROCUREMENT ENGINEER SYED AMBIAH NAGOOR MEERAN Indian 8/29/2010
MAHMOUD SALEM MOHAMED
16918 SURVEYING OFFICER Egyptian 9/1/2010
MOHAMED
BELAL MAHMOUD MOHAMMAD
16921 PROCUREMENT ENGINEER Jordanian 9/18/2010
ELEIWI
WAREHOUSE & DISTRIBUTION
16923 TAREQ ALAMIN AL FADAL SHEIKH Sudanese 10/4/2010
OFFICER
16927 MECHANIC MOHAMED NAGI AHMED IBRAHIM Egyptian 11/27/2010
16929 OPERATOR WHEEL LOADER IRSHAD SHAMEER Pakistani 12/2/2010
MOHAMED HUSSEIN SAADAWY
16930 SITE SUPERVISOR Egyptian 12/26/2010
MOHAMED
MOHAMMED TARIQ GULAM
16933 MECHANIC Pakistani 12/1/2010
RASSOL
MAHAR NAGY HAMMADKHALILAL
16935 SECURITY GUARD Saudi Arabian 1/1/2011
SHAMMARY
16936 SECURITY GUARD AYED KHALAFAL ENIJI Saudi Arabian 10/1/2010
SAEED HUSAINMOHAMMADAL
16937 SECRETARY Saudi Arabian 1/1/2011
QAHTANI
16943 SECRETARY HAMMADNAGIHAMMAD ALSHAMRI Saudi Arabian 2/1/2011
MUHAMMAD ATIF MUHAMMAD
16946 DRAFTSMEN Pakistani 2/22/2011
NASIR
16949 PUMP OPERATOR Mufadi Abdullah Mohammed Al Anazi Saudi Arabian 3/1/2011
FAYEZ HUSSEIN SAADAWY
16950 SITE SUPERVISOR Egyptian 4/9/2011
MOHAMED
OMAR ABDEL BAKI MOHAMMED
16951 SURVEYING OFFICER Egyptian 4/20/2011
MATAR
16957 DRIVER SYED HABIBULLAH HUSSAIN Indian 6/7/2011
16962 WELDER RAM BIR RAM DHANI Indian 7/11/2011
NIAMAT ULLAH KHAN SHAH DARAZ
16973 LABOUR Pakistani 7/24/2011
KHAN
16974 DRIVER IFTIKHAR ALI QADAR KHAN Pakistani 7/24/2011
MOHAMMAD KHALIQ ALI
16976 DRIVER Pakistani 7/24/2011
MOHAMMAD
16986 LABOUR ABDUR RAZIQ NAIMAT KHAN Pakistani 8/7/2011
HABIB MOHAMED IBRAHIM
16988 SURVEYING SUPERVISOR Egyptian 8/9/2011
ELNEMR
ASHHAD GAMAL ELSAYED
16989 SURVEYING OFFICER Egyptian 8/9/2011
ABDRABOU YOUSEF
16990 PIPE FITTER AKBAR ALI ANSARI Indian 8/9/2011
16991 LABOUR MOHAMMAD RAFIQ ANSARI Indian 8/9/2011
16994 OPERATOR EXCAVATOR VIJAY KUMAR GURDIAL SINGH Indian 8/9/2011
16999 PIPE FITTER AZAD KUMAR RAM Indian 8/9/2011
17001 WELDER ZAVED AKHTAR MUSTUFA ANSARI Indian 8/9/2011
17003 OPERATOR EXCAVATOR KAMAL HUSSAIN EKBAL ANSARI Indian 8/9/2011
17005 WELDER GANESH SHARMA RAM PRAKASH Indian 8/9/2011
17006 TRAFFIC OFFICER ADEL SALEM ZEILI Saudi Arabian 8/13/2011
17007 ACCOUNTANT WADDAH SHABAN MOUSA SHABAN Jordanian 8/16/2011
17008 SITE SUPERVISOR AMMAR ADEL THEEB AL QATROUS Jordanian 8/17/2011
HAMADA MAHMOUD KAMEL
17011 QUANTITY SURVEYOR Egyptian 8/28/2011
ELSAYED HAWAS
17016 LABOUR MAHENDRA KHUDABUD Indian 9/10/2011
17021 MASON RAJESH LAL BAHADUR MAHTO Indian 9/21/2011
17023 OPERATOR WHEEL LOADER OKESH KUMAR RAMDAS PRASAD Indian 9/21/2011
17024 LABOUR VIVEK KUMAR YADAV Indian 9/21/2011
RAMY KHALEDNOURELDEN
17050 BANK MESSENGER Egyptian 10/5/2011
GHONIM
BAHAA ATYA ABDELMAWGOUD EL
17051 SITE SUPERVISOR Egyptian 10/5/2011
ASHKAR
MOUSTAFA ABDELAATY MAHMOUD
17053 SURVEYING OFFICER Egyptian 10/10/2011
ABOUELATTA
ADEL MOSTAFA ABDELAZZIZ
17061 SURVEYING OFFICER Egyptian 12/1/2011
MOSTAFA
AHMED MOHAMED ABDEL AZEEM
17062 SURVEYING OFFICER Egyptian 12/15/2011
EL REFAEY
MOHAMED ABDELRAHMAN
17063 DATA ADMINISTRATOR Egyptian 12/31/2011
MOHAMED ELSAYED
17066 FOREMAN MOSTAFA SAMIR SAAD MOHAMED Egyptian 1/1/2012
17068 SECURITY GUARD HAMEED ABDULLAH AL ENEGY Saudi Arabian 1/31/2012
17082 LABOUR RIYAJ NASIR AHMAD ALI Indian 2/20/2012
17083 DRIVER AKHILESH KUMAR PANDEY Indian 2/20/2012
ABDULLAH AHMED JASIM AL
17087 CAMP BOSS Saudi Arabian 2/26/2012
ENEGY
17111 DATA ADMINISTRATOR MUDDASSAR REHMAN Pakistani 4/23/2012
ALI NOURELDIN ABDEL GHAFFAR
17115 SITE SUPERVISOR Egyptian 5/2/2012
MOHAMED
AHMED MOHAMED AL ARBI ABDUL
17131 SITE SUPERVISOR Egyptian 5/20/2012
SABUR
MAHMOUD YOUSUF MOHAMED
17134 SURVEYING OFFICER Egyptian 8/11/2012
MAHMOUD
17142 PROJECT MANAGER MOHAMMED YOSEF MOHAMMED Sudanese 9/29/2012
ABDULMUJAHED KHAN
17143 DRAFTSMEN Indian 9/25/2012
MOHAMMED
17156 SECURITY GUARD BASSAM SALEM AL ATAWI Saudi Arabian 10/23/2012
17179 LABOUR MOHANLAL PUN MAGAR Nepalese 11/29/2012
17190 LABOUR BUDHE JHAKRI Nepalese 11/29/2012
17197 LABOUR KRISHNA BAHADUR Nepalese 12/21/2012
17198 LABOUR DAMMAR GHARTIMAGAR Nepalese 12/21/2012
17204 LABOUR TULBIR SUNAR Nepalese 12/21/2012
17205 MASON TEJNARAYAN MAHARA CHAMAR Nepalese 12/21/2012
17206 LABOUR UDABIR DAMAI Nepalese 11/29/2012
17207 LABOUR RIM BAHADUR B K Nepalese 11/29/2012
17209 LABOUR BHUSHAN YADAV Nepalese 11/29/2012
17212 LABOUR RUME DAMAI Nepalese 12/9/2012
17217 LABOUR SURESH DHIMAL Nepalese 12/9/2012
17218 LABOUR MUKTA DAMAI Nepalese 12/9/2012
RADI MOHAMMAD ATEIEH
17231 QUANTITY SURVEYOR Jordanian 11/24/2012
KHASHRAM
17232 OPERATOR TRENCHER LLONEL DACER Filipino 11/29/2012
17233 OPERATOR TRENCHER GAYLORD CASTIL Filipino 11/29/2012
17243 LABOUR YOGINDRA BAHADUR SARKI Nepalese 12/30/2012
17246 LABOUR NIR KUMAR ACHARYA Nepalese 12/30/2012
17249 LABOUR TAKMAN MAHARA KSHETRI Nepalese 12/30/2012
17251 LABOUR BHARE BOHORA Nepalese 12/30/2012
17252 LABOUR RAM DAYAL MOCHI Nepalese 12/30/2012
17253 LABOUR BILEKSHAN MOCHI Nepalese 12/30/2012
ABDULMALEQUE MOKBUL
17256 LABOUR Bangladeshi 12/7/2005
HOSSAIN
17261 HEAVY EQUIPMENT OPERATOR MOHAMMAD SHARIK Indian 11/24/2007
17283 LABOUR SURYA BAHADUR BUDHA MAGAR Nepalese 1/5/2013
MUKTA BAHADUR GHARTI
17286 LABOUR Nepalese 1/6/2013
KSHETRI
17287 LABOUR SUK BAHADUR GURUNG Nepalese 1/5/2013
17319 DRIVER NASSER ALQAHTANI Saudi Arabian 1/7/2013
17346 LABOUR GHANA SHYAM BISHWAKARMA Nepalese 1/23/2013
17348 LABOUR DHAN BAHADUR PUN Nepalese 1/23/2013
17349 SITE SUPERVISOR AHMED ALOOBI Egyptian 2/2/2013
17360 LABOUR RANJIT KUMAR SADAY Nepalese 2/1/2013
17447 OFFICE HELPER MOEEN UDDIN KURIKAL Indian 3/26/2002
17450 SECRETARY ABDUL QADER NOOR UDDIN Sudanese 9/16/2000
17452 WELDER AFSAR ALI SHAH Pakistani 4/15/2000
17454 LABOUR ABDUL QUDDUS ABDUR RASHID Bangladeshi 12/22/2001
JAMSHED BHUIYAN MANKUL
17455 LABOUR Bangladeshi 12/22/2001
BHUNIYA
17456 WELDER ABDUR ROB MUSTAFA MIAH Bangladeshi 12/22/2001
17457 WELDER SAYED AHMED ABDUS SATTAR Bangladeshi 12/22/2001
HEAVY/MEDIUM VEHICLE
17458 ROBIUL AWAL ABDUS SATTAR Bangladeshi 12/22/2001
DRIVER
17459 LABOUR ALMAS ALI YASIN ALI Bangladeshi 12/22/2001
17464 LABOUR BISHWANATH MAHARA CHAMAR Nepalese 1/25/2002
17465 LABOUR VIJAY KUMAR YADAV Nepalese 12/28/2001
17467 EQUIPMENT OPERATOR RAM UDGIAR RAUTAMAT Nepalese 12/28/2001
17468 LABOUR SYED SARDAR ALI SHAH Pakistani 12/20/2001
17470 SITE SUPERVISOR MOHAMMAD MUFEED SHER Pakistani 12/25/2001
HEAVY/MEDIUM VEHICLE
17472 TARIQ MEHMOOD KHAN Pakistani 12/25/2001
DRIVER
HEAVY/MEDIUM VEHICLE
17473 TAHIR MAHMOOD GHULAM SURUR Pakistani 12/25/2001
DRIVER
17475 CARPENTER AZIZ ULLAH BAKU Pakistani 1/24/2002
17480 OPERATOR TRUCK CRANE SHIYAM RAM SHAH Nepalese 8/21/2002
17484 LABOUR RAM ADGAR Nepalese 8/21/2002
17488 EQUIPMENT OPERATOR DEV SUNAR YADAV Nepalese 12/17/2002
17490 LABOUR NIAZ BAHADAR SHER BHADAR Pakistani 1/6/2003
17494 FOREMAN SHAFIKUL ISLAM LAL MIAH Bangladeshi 1/6/2003
17496 MASON ANWAR HUSSAIN ANU MIAH Bangladeshi 1/6/2003
17497 LABOUR SOHAG MOHAMMED ABU KALAM Bangladeshi 1/6/2003
17498 LABOUR RAFIQUL ISLAM FAZAR ALI Bangladeshi 1/6/2003
MOHAMMED SALA UDDIN
17499 LABOUR Bangladeshi 1/6/2003
MOHAMMED
17502 LABOUR KHAZA AHMED ASLAM HAJI Bangladeshi 1/6/2003
17503 OFFICE HELPER SAIFUL ISLAM ABDUR RAHIM Bangladeshi 1/6/2003
17505 OFFICE HELPER KADER NURUL ISLAM Bangladeshi 1/6/2003
17506 LABOUR SAFI ALAM MOBARAK ALI Bangladeshi 1/6/2003
17507 SECURITY GUARD SHAHA JAN CHOWDHURY MIAH Bangladeshi 1/6/2003
17509 LABOUR ABDUL AZIZ MOHAMMAD DAROG Bangladeshi 1/7/2003
17510 LABOUR AYNAL HAQUE IMAN MONDAL Bangladeshi 1/7/2003
17511 LABOUR SHAFI UDDIN USMAN ALI Bangladeshi 1/7/2003
17513 LABOUR SOLAYMAN HOSSAIN SAHEB ALI Bangladeshi 1/7/2003
17514 EQUIPMENT OPERATOR RAKIB BACHHU MIAH Bangladeshi 1/7/2003
17515 RECEPTIONIST MAZAM ALI SAKIM UDDIN Bangladeshi 1/7/2003
17516 LABOUR JAMAN ALI HABEJ Bangladeshi 1/7/2003
17517 LABOUR MEHDI HASSAN AZIM UDDIN Bangladeshi 1/7/2003
17519 WELDER ZAKIR REAZ UDDIN Bangladeshi 1/7/2003
17521 EQUIPMENT OPERATOR HURMUZ ALI JAMSHER ALI Bangladeshi 1/7/2003
17522 STEEL FIXER ALTAF MAHMOOD ALLAHDAD Pakistani 1/5/2003
17523 DRIVER RAGA ALTAF HUSSAIN MUHAMMAD Pakistani 1/5/2003
17525 LABOUR DULAL HUSSAIN BANI SHEIKH Bangladeshi 1/13/2003
HEAVY/MEDIUM VEHICLE MOHAMMED SHAHAJALAL OLI
17529 Bangladeshi 1/18/2003
DRIVER ULLAH
17531 EQUIPMENT OPERATOR CHALITAR YADAV SAGUNI Nepalese 1/29/2003
17532 HEAVY EQUIPMENT OPERATOR MOHAMMAD MOMATAJ MIYA Nepalese 1/29/2003
17540 LABOUR RAJ KUMAR MAR BASTA Nepalese 1/29/2003
17543 DRAFTSMEN DAVESSY RAJU KALATHIL Indian 1/29/2003
17544 QUANTITY SURVEYOR MOHAMMAD ALI AKHTAR ANSARI Indian 1/29/2003
17545 ELECTRICIAN BABU ALI ABDUL HAMID Indian 1/29/2003
17548 DRIVER TALIBHASAN MUSTAFA Indian 2/15/2003
17549 HELPER MECHANIC AAS MOHAMMAD SHEIKH Indian 2/26/2003
17551 OPERATOR EXCAVATOR FAIZ HAYAT MUHAMMAD ASHRAF Pakistani 3/13/2003
17552 HEAVY EQUIPMENT OPERATOR MUHAMMAD ALTAF FAZAL ELLAHI Pakistani 3/24/2003
17555 WELDER MOHAMMAD MONIR RUHUL AMIN Bangladeshi 9/11/2003
17556 WELDER MONIRUL HOQUE MOHASIN MOLLA Bangladeshi 9/11/2003
AZAHARUL ISLAM TAFFAZAL
17558 OFFICE HELPER Bangladeshi 9/11/2003
HOSSAIN
17561 DRAFTSMEN LUTFAR RAHMAN TAYEJ UDDIN Bangladeshi 9/11/2003
17564 LABOUR BISHESHWAR YADAV JAGU YADAV Nepalese 9/14/2003
17565 EQUIPMENT OPERATOR KISHORI SAH TELI JAMUNI Nepalese 9/14/2003
17566 LABOUR DIPE CHOWDHURY DAKANI DEVI Nepalese 9/13/2003
17567 OPERATOR TRUCK CRANE RAJENDRA SAH RAM Nepalese 9/13/2003
HEAVY/MEDIUM VEHICLE NABAL KISHOR YADAV
17570 Nepalese 9/13/2003
DRIVER KAMESHWAR
17571 LABOUR PRADIP YADAV RAJO DEVI Nepalese 9/13/2003
17583 OPERATOR WHEEL LOADER TABIBAR RAHMAN ABDUL AZIZ Bangladeshi 9/17/2003
17585 LABOUR MOYEN UDDIN ALEF UDDIN Bangladeshi 9/17/2003
17586 EQUIPMENT OPERATOR JONGSER ALI BASER ALI Bangladeshi 9/18/2003
17588 LABOUR JAMAL SHEIKH ABDUL MONDAL Bangladeshi 9/18/2003
17589 LABOUR ASAD MOHAMMAD ALI Bangladeshi 9/18/2003
17590 LABOUR YOUSUF ALI NURU MIAH Bangladeshi 9/18/2003
17592 CARPENTER UMER YAQUB MOHAMMAD Indian 9/28/2003
17595 STEEL FIXER SOKAT SULTAN KHAN Indian 9/28/2003
HEAVY/MEDIUM VEHICLE
17596 LUKMAN BAHNOWAR KHAN Indian 9/28/2003
DRIVER
17597 HELPER MECHANIC RIYASAT ALI RAHMAT ALI Pakistani 10/4/2003
17601 LABOUR SHAHIDUL ISLAM ABDUR RAHIM Bangladeshi 10/11/2003
17603 EQUIPMENT OPERATOR MAHENDRA SAHU FUL KUMARI Nepalese 10/18/2003
17604 MASON PREM KUMAR SAH TELI Nepalese 10/18/2003
17606 DRIVER SAGHIR AHMED SHARIF AHMED Indian 11/3/2003
17607 DRIVER ABID HUSSAIN NAWAB KHAN Pakistani 11/3/2003
17608 DRIVER IJAZ AHMED MUHAMMAD HUSSAIN Pakistani 11/3/2003
17610 DRIVER ZAFAR KHAN SIDHU ZAKAULLAH Pakistani 12/3/2003
MUHAMMAS SHAHBAZ MUHAMMAD
17611 SECURITY GUARD Pakistani 12/27/2003
RIAZ
MUHAMMAD AZAM MUHAMMAD
17612 DRIVER Pakistani 12/27/2003
ANWAR
HEAVY/MEDIUM VEHICLE
17613 MUHAMMAD RIAZ BARKAT ALI Pakistani 2/14/2004
DRIVER
17617 SITE SUPERVISOR AYMAN ALI EL BAKRI YAHIA Egyptian 5/10/2008
17622 LABOUR MANDAL KHATWE Nepalese 6/7/2008
17627 LABOUR LAKSHMI KAPAR Nepalese 6/10/2008
17629 LABOUR HARIDEV YADAV Nepalese 6/10/2008
17638 EQUIPMENT OPERATOR BIRENDRA KUMAR YADAV Nepalese 8/6/2008
17640 HEAVY EQUIPMENT OPERATOR SAFI MOHAMMAD Indian 8/12/2008
17642 HELPER MECHANIC MOHAMMED AHMED ALI Indian 8/17/2008
17647 MECHANIC ALAM HAROON Indian 8/24/2008
17648 LABOUR SANKAR SINGH Indian 8/24/2008
17649 WELDER YADAV PRABHU Indian 8/24/2008
17652 STEEL FIXER MONAJ KUMAR KUSHWAHA Indian 8/26/2008
17653 LABOUR RAJ KUMAR KHATWE Nepalese 8/28/2008
17654 LABOUR NABALKISHOR YADAV Nepalese 8/28/2008
17655 LABOUR NAFIS AHMAD Indian 8/28/2008
MAZHAR IQBAL MUHAMMAD
17656 LABOUR Pakistani 9/1/2008
ZAMAN
LIAQAT ALI KHAN RAJA ZULFIQAR
17657 OPERATOR TRUCK CRANE Pakistani 9/1/2008
KHAN RAJA
MUHAMMAD AZEEM AKRAM
17659 OPERATOR EXCAVATOR Pakistani 9/1/2008
MUHAMMAD AKRAM
17661 SECURITY GUARD LOKNATH KUSHWAHA Indian 9/3/2008
17663 LABOUR SATHEESH KUMAR MANOHARAN Indian 9/14/2008
MAHMOOD AHMAD MUHAMMAD
17664 DRAFTSMEN Pakistani 9/22/2008
YOUNAS
17666 MASON SHAH NAWAZ Indian 9/22/2008
17667 WELDER MOHAMMAD NAUSHAD Indian 9/22/2008
17669 CARPENTER MOHAMMAD SERFARAJ Indian 9/25/2008
17673 STEEL FIXER KARIM ULLAH SAMAH ULLAH Indian 9/27/2008
17678 CARPENTER CHAUDHARY SANTOSH Indian 10/7/2008
17680 LABOUR CHAUDHARY MUNNA Indian 10/9/2008
17682 DRIVER MUHAMMAD ILLYAS DITTA Pakistani 9/22/2008
17684 FOREMAN NAEEM AHMED SHAMIM AHMED Indian 10/15/2008
17686 LABOUR CHAUDHARI SANJAY KUMAR Indian 10/16/2008
17687 LABOUR MIAH KUDDUCH Indian 10/16/2008
17688 STEEL FIXER TUN TUN SHAH Indian 10/16/2008
17689 LABOUR RAKESH SRIVASTAV Indian 10/21/2008
17690 STEEL FIXER YADAV KALINDRA KUMAR Indian 10/21/2008
17693 STEEL FIXER OPENDRA PRASAD Indian 10/28/2008
17695 CARPENTER MANGI SREE RAM KUMAR Indian 11/1/2008
MUHAMMAD SAFDAR MANZOOR
17696 LABOUR Pakistani 11/1/2008
HUSSAIN
17698 STEEL FIXER AFTAB KHAN Indian 11/3/2008
ASHIQHUSSAIN AKHBAR HUSSAIN
17699 HEAVY EQUIPMENT OPERATOR Pakistani 11/5/2008
KHAN
17701 LABOUR ABDUL ARIF Indian 12/1/2008
17702 WELDER MOHAN MISHRA Indian 11/20/2008
17703 ELECTRICIAN SHEKH GUDDU Indian 11/22/2008
17704 WORKSHOP SUPERVISOR IMAD SALEH ALHAMADI Syrian 11/27/2008
17705 LABOUR RAM EKBAL Indian 11/29/2008
17706 LABOUR VIJAY YADAV Indian 11/29/2008
17708 STEEL FIXER MOHAMMAD SHAHJAHAN Indian 12/1/2008
17709 LABOUR FOUL MOHAMED Indian 12/6/2008
MUHAMMAD IMRAN MUHAMMAD
17712 CARPENTER Pakistani 12/18/2008
ISMAIL
MOHANNAD MOHAMMED SHABAN
17713 QUANTITY SURVEYOR Syrian 12/23/2008
AL MADALLAH
MOHAMMAD SOULIMAN AMEER
17715 CARPENTER Pakistani 1/13/2009
ABDULLAH
17717 STEEL FIXER MUHAMMAD IKHLAQ NAZIR AHMED Pakistani 1/13/2009
MOHAMMAD RAFEEQ MOHAMMAD
17718 OPERATOR EXCAVATOR Pakistani 1/18/2009
ALI KAN
17719 LABOUR MUHAMMAD ASIF BARKAT ALI Pakistani 1/18/2009
TALAAT ELSHAHAT ELSAYED
17729 SURVEYING ENGINEER Egyptian 3/17/2009
SOLIMAN
17732 OPERATOR EXCAVATOR RAM KUMAR RAJ KUMAR Indian 7/2/2009
HARPAL SINGH GURBAKHSH
17733 MECHANIC Indian 7/2/2009
SINGH
MAHMOUD MOSTAFA ALY
17734 SURVEYING SUPERVISOR Egyptian 8/9/2009
ELNAGAR
17735 DRIVER MATEE ULLAH RIZWAN ULLAH Pakistani 9/6/2009
17738 ESTIMATION ENGINEER AMR AHMAD AYED ISHTAYA Jordanian 11/21/2009
AHMAD ALAABED MAHMOUD
17741 ELECTRICIAN Syrian 2/23/2010
NASRA
17743 MECHANIC ABDULSATAR NABHAN MOHAMED Syrian 3/1/2010
17768 PUMP OPERATOR FAHED SAED AL OTAIBI Saudi Arabian 1/1/2012
MAKSOOD THACHAN KANDY
17780 PUMP OPERATOR Indian 1/16/1986
PALIKANDY
17899 SITE SUPERVISOR AHMAD MEJOUL SAEID Syrian 11/20/2012
17904 ASST. MANAGER- TREASURY ABEER MATHIL ALHARBI Saudi Arabian 3/10/2013
18017 SITE SUPERVISOR ABDELHAMID MOHAMED SAYED Egyptian 3/23/2013
GOVERNMENT RELATIONS
18101 FALAH MHAREB ALSHAMMARI Saudi Arabian 4/10/2013
EXPEDITOR
PERSONNEL & PAYROLL
18123 HADEEL SALEH ALHARBI Saudi Arabian 4/20/2013
OFFICER
18152 SECRETARY SYED SHUJA ULLAH HUSSAINI Pakistani 3/28/2013
18162 DRIVER THIRUPPATHI PALANISAMY Indian 4/9/2013
AHMED HAMDY ABDELMOAMEN
18229 CIVIL SITE ENGINEER Egyptian 5/1/2013
MOHAMMED
18256 SECURITY GUARD SALIM AIYED SALIM Saudi Arabian 4/21/2013
18296 LAB TECHNICIAN MOHAMMED ABDOU HILAL Syrian 5/1/2013
18303 OPERATOR EXCAVATOR RAMESHHWAR SINGH Indian 6/14/2013
18310 DRIVER JINSMON CHAMAKALAYIL THOMAS Indian 5/13/2013
18324 DRIVER RAJESH PUTHIYA VEEDU Indian 5/13/2013
18336 FLEET CONTROLLER MOHAMMED HASSAN ALSAYED Egyptian 6/2/2013
18341 OPERATOR WHEEL LOADER RAJESH TAMILAGHAN Indian 4/27/2013
18347 LABOUR NINDER SINGH Indian 6/15/2013
18348 LABOUR NIRMAL SINGH SEKHON Indian 6/14/2013
18369 WORKSHOP OFFICER MAGDY MOHAMED ELSAYED Egyptian 5/29/2010
18395 OPERATOR EXCAVATOR VANEEM AHAMAD Indian 5/29/2013
18399 DRIVER KANHAIYA YADAV Indian 5/29/2013
HEAVY/MEDIUM VEHICLE
18403 SANOJ PASWAN Indian 5/29/2013
DRIVER
18457 DRAFTSMEN MOHAMEMMD SULIMAN SHAIK Indian 5/8/2013
18484 WORKSHOP ENGINEER MOHAMMED AHMAD ISSA FITAYAN Jordanian 7/7/2013
MOHAMMED KAMAL ALDAIN
18496 LABOUR Bangladeshi 6/30/2013
AHMED
18500 OPERATOR WHEEL LOADER GULAM ARSHAD ARSHAD Indian 7/9/2013
18509 LABOUR MOHAMEED ABDULMAJEED Indian 5/30/2013
18512 LABOUR PRABU SEKAR Indian 8/9/2013
18517 LABOUR SHERDIN SAIMUNDIN Indian 6/27/2013
18520 LABOUR SARFADDIN ALI YASIN Indian 7/8/2013
HEAVY/MEDIUM VEHICLE
18524 RAJESH BHASKARAN GOVINDAN Indian 7/13/2013
DRIVER
UNNIKRISHANAN SAAIDHARAN
18525 DRIVER Indian 7/13/2013
PILLAL
MOHAMED MOUSTAFA MOHAMED
18542 MECHANIC Egyptian 7/30/2013
MOUSTAFA
18544 CIVIL SITE ENGINEER MUHANNAD GHAZI NASSAR Jordanian 7/29/2013
AHMED IBRAHIM ABDELMOHSEN
18557 SURVEYING SUPERVISOR Egyptian 10/10/2009
IBRAHIM
18568 OPERATOR WHEEL LOADER PRAMANAND SINGH Indian 7/8/2013
18593 SECRETARY AFDHAL NADEEM Pakistani 5/1/2013
18594 FOREMAN MOHAMEED RASHAAD MOBARK Egyptian 7/4/2013
18597 SURVEYING SUPERVISOR MOHAMEED ZAKARIA ALI AHMAD Egyptian 7/14/2013
HEAVY/MEDIUM VEHICLE
18606 AMARJIT SINGH Indian 7/20/2013
DRIVER
HEAVY/MEDIUM VEHICLE
18610 YUSUF SABER Indian 7/21/2013
DRIVER
HEAVY/MEDIUM VEHICLE
18611 SHAILESH MAHATO Indian 7/29/2013
DRIVER
18615 OPERATOR EXCAVATOR PRABHU RAM Indian 7/21/2013
18628 DRAFTSMEN MOHAMEED YAHYA MOHAMMED Pakistani 6/17/2013
18639 LABOUR BALMURUGAN GUNASEKARAN Indian 6/20/2013
18642 SAFETY OFFICER ISMAIL KHAN Indian 6/23/2013
18646 LABOUR MUTHUSAMY KALIYAPERUMAL Indian 6/21/2013
18648 ELECTRICIAN RAKESH PRASAD Indian 7/8/2013
18650 LABOUR MAHBUB AHMAD Indian 6/23/2013
18683 DIRECTOR-OPERATIONS MOHAMMED SAAD ABUNAYYAN Saudi Arabian 9/17/2013
18694 SECRETARY OMAR IBRAHIM ALAWADH Saudi Arabian 9/11/2013
18705 FOREMAN MAHMOUD MOHAMMED ALSAYED Egyptian 9/1/2013
18709 LABOUR MOHAMMED GIASUDDIN ABDUL Bangladeshi 9/11/2013
18710 DRIVER SHAKEEL KHAN JALIL KHAN Pakistani 9/11/2013
18711 WELDER ANSARI KHUSBUDDIN Indian 9/29/2008
18717 PUMP OPERATOR SALEH NASIR ALDKHEEL Saudi Arabian 9/11/2013
18719 PUMP OPERATOR ABDULLAH FAHAD ALQABBAA Saudi Arabian 9/11/2013
18723 PUMP OPERATOR ALI SALEH ALOLIQI Saudi Arabian 9/11/2013
18725 PUMP OPERATOR SAMI ABDULLAH ALHASAN Saudi Arabian 9/11/2013
ABDULAZIZ ABDULRAHMAN
18727 PUMP OPERATOR Saudi Arabian 9/11/2013
ALHAMID
FAHAD ABDULRAHMAN
18733 PUMP OPERATOR Saudi Arabian 9/11/2013
ALMARSHOD
18735 PUMP OPERATOR ABDULLAH SALEH ALSWAYED Saudi Arabian 9/11/2013
18736 PUMP OPERATOR MOHAMMED IBRAHIM ALDLEFEA Saudi Arabian 9/11/2013
SHAKEL KHAN MOHAMMED
18742 MECHANIC Pakistani 9/26/2013
SHAREF
18743 PUMP OPERATOR ABDULLAH SALEH ALLAFI Saudi Arabian 9/11/2013
18745 PUMP OPERATOR ALI NASIR ALMLEMEDH Saudi Arabian 9/11/2013
18747 PUMP OPERATOR NAIF ABDULAZIZ ALBETI Saudi Arabian 9/11/2013
18750 FOREMAN ALAA MOHAMMED ALMGHAZY Egyptian 9/1/2013
ABDULLAH ABDULRHMAN SULIMAN
18758 SECRETARY Saudi Arabian 9/11/2013
ALQNAIAAN
18766 SITE SUPERVISOR YOUSSEF FATHI MAHMOUD Egyptian 9/29/2013
18783 LABOUR MOHAMMAD SALMAN Indian 9/11/2013
18784 MASON MOHAMMAD RAFIK Indian 9/11/2013
18786 LABOUR SELVARASU KANNAN Indian 9/15/2013
18787 LABOUR NEBULAL SAH Indian 9/11/2013
18788 LABOUR SUKHMANDER SINGH SIDHU Indian 9/11/2013
18789 LABOUR RAMALINGAM THILLAIVANAM Indian 9/15/2013
18790 LABOUR SASIKUMAR SUBRAMANIAN Indian 9/15/2013
18791 LABOUR MUKHATYAR ISHFAQUE Indian 9/11/2013
18801 OPERATOR WHEEL LOADER RAJA HUSSAIN ANSARI Indian 9/11/2013
18802 DRIVER PIR MAHAMAD BHOLA MIYA Indian 9/11/2013
18803 LABOUR MANZOOR ALAM MANSOORI Indian 9/11/2013
HASSAN HASSAB MOHAMMED
18897 MECHANIC Egyptian 12/11/2011
AWAD AWADEN
18936 CIVIL SITE ENGINEER MOHAMMED NIDAL HAMDAN Jordanian 11/1/2013
AHMED ABDULRAHMAN
18948 SECRETARY Saudi Arabian 9/11/2013
ALHUSSAIN
WAEL ALSAID MOHAMMED
18951 FOREMAN Egyptian 9/1/2013
ALMURSE
18952 PUMP OPERATOR AHMAD MOHAMMED ALKHADERI Saudi Arabian 10/1/2013
18957 FOREMAN SAID SHABAN ALSAID AHMAD Egyptian 9/1/2013
MOHAMMAD ABDULRAHMAN
18958 PUMP OPERATOR Saudi Arabian 9/11/2013
ELIEICH
18959 FOREMAN KHALED NAZIH HASAN HAMAD Egyptian 9/1/2013
MOHAMMED ABDULLAH SAID
18962 FOREMAN Egyptian 9/1/2013
ABDULHALIM
18965 LABOUR MOHAMMED KAJEH ABDOU Egyptian 10/30/2013
18966 LABOUR MOHAMMED TAWFIQ AHMAD Egyptian 10/30/2013
18970 PLUMBER ABDULJALIL ABDULRAB SERDAR Bangladeshi 10/1/2013
18971 SITE SUPERVISOR ISLAM IBRAHIM FAHMI Egyptian 11/28/2013
18973 DRIVER SETHI KUMAR VENUGOPAL Indian 9/11/2013
18975 FOREMAN ABDULNASER IBRAHIM OMAR Syrian 10/1/2013
MAJDE FARAJ MOHAMMED
18977 PLUMBER Egyptian 10/1/2013
ALTWAR
18980 PUMP OPERATOR ABDULAZIZ MOHAMMED ALASTA Saudi Arabian 10/1/2013
18981 O & M ENGINEER ADEL ANWER Egyptian 10/1/2013
18990 LABOUR SHIVALAL BHANTO GANGNY Indian 6/30/2013
WAREHOUSE & DISTRIBUTION
18996 MIRZA VASEEM AHMED Indian 10/1/2013
OFFICER
18999 SECRETARY TAMER ABDULLAH ABOUHEGAZE Egyptian 10/1/2013
19002 PLUMBER MOHAMMAD MAHDI GELFAF MAHDI Egyptian 10/1/2013
19004 FOREMAN HASSAN MOHAMMED HELMI FAID Egyptian 10/1/2013
19005 FOREMAN ELTAIEB MAHSOUB SALIM HEFNY Egyptian 10/1/2013
19006 FOREMAN VICTOR LAURIANO Filipino 9/1/2013
19009 OPERATOR EXCAVATOR BALAMURUGAN SUBBURATHINAM Indian 10/12/2013
19012 DRIVER ABDULRAOUF MOHAMMED RAFIQ Pakistani 9/30/2013
19013 FOREMAN KHALID ALI MOHAMMED HASSAN Egyptian 10/1/2013
19014 ELECTRICIAN ABDULIRASHEED SHAFI Pakistani 9/17/2013
19015 FOREMAN SAUD HADI ALHARBI Saudi Arabian 12/1/2013
OMANAKOTAN MADABTAN
19023 FOREMAN Indian 9/1/2013
THANAKBAN
19024 FOREMAN MOHAMMED ABDULSATAR ALAAM Egyptian 10/1/2013
19026 DRIVER ZULFAQAR ALI RASOOL Pakistani 10/1/2013
19027 DRIVER ALI RADHA MOHAMMED RIYADH Pakistani 10/1/2013
19029 PLUMBER HASSAN DILSHAD Indian 10/1/2013
19047 SITE SUPERVISOR TLAL NWRY ALNAYF Syrian 12/7/2013
RAJA KHALID MAHMOOUD R
19060 SURVEYING OFFICER Pakistani 10/29/2013
MUHAMMAD KHAN
MAHRAN AHMAD MOHAMMAD
19061 CIVIL SITE ENGINEER Egyptian 11/14/2013
AHMAD
19063 DRIVER JAHANGIR ALAM MOTIUR Bangladeshi 10/1/2013
NADY MAHMOUD MABROUK
19064 FOREMAN Egyptian 10/1/2013
FARAG
19070 LABOUR NOOR MOHAMED SAMEEN Sri Lankan 12/2/2013
HEAVY/MEDIUM VEHICLE
19078 SADDAM HUSSAIN HUSSAIN Indian 9/7/2011
DRIVER
19080 WELDER SANTOSH GUPTA Indian 8/29/2008
AIMAN ALSAID ABDULAZIZ
19090 FOREMAN Egyptian 10/1/2013
MOHAMMED
19091 FOREMAN RABIEE RASHAD ROBI SHABAN Egyptian 10/1/2013
WAREHOUSE & DISTRIBUTION
19093 DHARMENDAR KEWAT KEWAT Indian 10/1/2013
OFFICER
19094 FOREMAN AMER MADAH AMER Egyptian 10/1/2013
19095 PROJECT MANAGER WALID ALI MOHAMMED ALSHAAL Egyptian 10/1/2013
MOHAMMED OMRAN ALSAID
19096 SITE SUPERVISOR Egyptian 10/1/2013
OMRAN
MUHAMMAD WASEEM KHAN
19102 SITE SUPERVISOR Pakistani 2/7/2011
MUHAMMAD RAFIQUE
19104 FOREMAN HAITHAM ABDULFAZIL RABIA Egyptian 10/1/2013
19105 ELECTRICAL ENGINEER AIMAN JAFAR Egyptian 10/1/2013
19110 FOREMAN AHMAD MUSTAFA Egyptian 10/1/2013
19114 LABOUR MOHAMMED YUNAS AZIZ Bangladeshi 10/1/2013
19115 LABOUR NAZROOL ABDULKHALIQ Bangladeshi 10/1/2013
19116 LABOUR NARINA SAMI MONIAN Indian 10/1/2013
19118 PUMP OPERATOR SAMI SAUD NASER ALHARBI Saudi Arabian 10/1/2013
19120 FOREMAN SADIQ ALI MOHAMMED JAMEEL Pakistani 10/1/2013
19122 WAREHOUSE OFFICER MIRZA FAIZAN BEG Indian 2/2/2014
19126 FOREMAN KHAIRY MOHAMED NAGUIB Egyptian 9/10/2013
AHMED NASSER DAKEEL
19128 PUMP OPERATOR Saudi Arabian 12/8/2013
ALDAKEEL
RAMACHANDRAN WEERAIYA
19142 LABOUR Sri Lankan 12/29/2013
CNRUPIAH
19149 SAFETY OFFICER SALEH ALI ALRASHEED Saudi Arabian 1/5/2014
19151 SITE SUPERVISOR KHALED ALI ABDUELSALAM Egyptian 11/28/2013
19154 DRAFTSMEN SUDHEEV KRISHNAN Indian 1/1/2014
19155 WAREHOUSE OFFICER MOHAMED ABUBACKER SYED Indian 12/8/2013
MUTLAQ RASHEED KHASHEM
19157 SECURITY GUARD Saudi Arabian 1/12/2014
OUDAH
HEAVY/MEDIUM VEHICLE
19168 MAMDOUH ABDULMOWLA EWEIS Egyptian 12/16/2013
DRIVER
19170 WELDER SINGH SANTOSH KUMAR Indian 12/23/2013
19172 PUMP OPERATOR RAYAN ABDULLAH ALRKBI Saudi Arabian 12/28/2013
19179 WORKSHOP ENGINEER ALAA MAMDOUH MOHAMED KOTB Egyptian 1/14/2014
19192 FOREMAN OMER BIN ALI NAHDI Indian 10/29/2013
SHAABAN SAMIR ABDELFATTAH
19195 PLUMBER Egyptian 1/12/2014
MOHAMED
SAQIB RAFIQUE MUHAMMAD
19197 OPERATOR EXCAVATOR Pakistani 4/24/2010
RAFIQUE
MAHMOUD ELBADRY ELSAYED
19207 PLUMBER Egyptian 1/21/2014
MARZOUK
19234 PLUMBER MOSTAFA ABDELAZIZ MEKHIMAR Egyptian 2/4/2014
19266 ELECTRICIAN KHALED SALEH SULIMAN ALBATI Saudi Arabian 2/9/2014
19298 PROJECT MANAGER AHMED MOHAMMED IDRAIS ZAKI Egyptian 2/26/2014
THAMER ABDUALLAH SULIMAN
19325 FOREMAN Saudi Arabian 2/18/2014
ALDAKHAIL
GOVERNMENT RELATIONS ABDULAZIZ MOHAMMED HAMAD
19347 Saudi Arabian 3/1/2014
EXPEDITOR ALDELAIFEA
19350 SURVEYING OFFICER SULEIMAN ATIEH ALKOUZ Jordanian 2/25/2014
19353 PUMP OPERATOR WALID AMER MOHAMED GENIDY Egyptian 3/5/2014
19364 LABOUR NASEEB NAWAB SHAH ASGHAR Pakistani 6/30/2011
19375 DRAFTSMEN AHTSHAM JAHEER AALAM Indian 3/12/2014
19377 FOREMAN DAKHIL SULIMAN ALDAKHIL Saudi Arabian 2/16/2014
19381 LABOUR AMRENDRA KUMAR BISHWANATH Indian 1/14/2014
RAMADAN RABI ABDELMONEM
19409 LABOUR Egyptian 4/3/2014
ABDELHAMID
19439 ELECTRICIAN SAKHAOUT ABUL HASHEM Bangladeshi 1/9/2014
19441 LABOUR ZAHID ALI ZARIN KHAN Pakistani 6/30/2011
19448 MECHANIC RAUL GULFO VICIO Filipino 3/24/2014
WAREHOUSE & DISTRIBUTION
19509 ABBAS GUFTAR MUHAMMAD Pakistani 4/9/2014
OFFICER
19532 EQUIPMENT OPERATOR MOHAMMAD PERVEZ MOHAMMAD Pakistani 7/6/2011
HATEM MOHAMED NAGUIB
19538 QUANTITY SURVEYOR Sudanese 6/3/2014
MUSTAFA
HAMIDI ABDULLAH AYYASH AL
19544 SECURITY GUARD Saudi Arabian 5/27/2014
ENEZI
MOHAMMED BASHEER
19546 CIVIL SITE ENGINEER Jordanian 6/1/2014
MOHAMMED SAYED
AHMAD SULIMAN IBRAHEEM
19686 FOREMAN Egyptian 6/1/2014
MAHMOUD
19701 LABOUR PITAMPAR BADTIYA RAGHUNATH Indian 8/11/2014
PERIYASAMY VEENGYAN
19702 LABOUR Indian 8/11/2014
VEENGYAN
19705 LABOUR SELVARAJ RAMASAMY RAMASAMY Indian 8/11/2014
19706 LABOUR CHINNA DURAI KARUPPALAH Indian 8/11/2014
SILAMBARASAN RAJENDRAN
19708 LABOUR Indian 8/11/2014
RAJENDRAN
BALAMURUGAN MURUGESAN
19709 LABOUR Indian 8/11/2014
MURUGESAN BALAMUR
SARATHKUMAR SADAIYAN
19710 LABOUR Indian 8/11/2014
SADAIYAN
MUTHAIYAN THANGARASU
19715 LABOUR Indian 8/12/2014
THANGARASU
19716 LABOUR VADIVEL THILLAIVANAM Indian 8/12/2014
19728 PUMP OPERATOR ABDULLAH YAHYA ALI AL AMID Saudi Arabian 8/17/2014
19749 PUMP OPERATOR MOATH SALEH ABDULLAH AL ASTA Saudi Arabian 8/1/2014
ABDULRHMAN RASOOL
19778 WAREHOUSE OFFICER Indian 8/28/2014
MOHAMMED
19798 DRIVER MAHENDIRAN JAWAHER JAWAHER Indian 9/15/2014
19800 LABOUR JEGANATHAN KALIYA MOOPPER Indian 9/15/2014
19803 OPERATOR EXCAVATOR BALISTAR PRASAD YADAV Indian 9/18/2014
ARUMUGAM KATHANMUPPAR
19804 MECHANIC Indian 9/16/2014
KATHANMUPPAR
HARIPUTHIRAN PARAMASIVAM
19806 DRIVER Indian 9/16/2014
PARAMASIVAM
MANIKANDAN VENKATACHALAM
19810 DRIVER Indian 9/15/2014
VENKATACHALAM
VELMURUGAN KALYANA
19811 DRIVER Indian 9/16/2014
SUNDARAM
VIJAY RUKMANKATHAN
19812 HELPER MECHANIC Indian 9/16/2014
RUKMANKATHAN
NARAYANAN DEVANASAMY
19814 DRIVER Indian 9/17/2014
DEVANASAMY
19815 DRIVER RAJIV KUMAR SINGH Indian 9/15/2014
19817 SECURITY GUARD RAM SHARIKH PHOOL CHAND Indian 9/27/2014
SURESH MURUGASAN
19821 DRIVER Indian 9/17/2014
MURUGASAN
19823 DRIVER KUMAR KASINATHAN KASINATHAN Indian 9/17/2014
19824 DRIVER NEMA KATHAT SAYAR Indian 9/10/2014
ANTHONIRAJ kulandaisamy
19825 DRIVER Indian 9/17/2014
kulandaisamy
19827 DRIVER BAKKYARAJ PANNEER SELVAM Indian 9/16/2014
Sanath Kumar Dharmasooriya
19832 DRIVER Sri Lankan 9/11/2014
Waduge
ABDUL WAHAB ATHAMBAWA
19833 DRIVER Sri Lankan 9/12/2014
MUHAMMED MUSTHAF
19834 DRIVER SAMSUDEEN ATHAMBAWA ISMAIL Sri Lankan 9/12/2014
VARISH HUSAIN NIJAMUDDIN
19836 EQUIPMENT OPERATOR Indian 9/15/2014
MIYAN
RAMKUMAR THAMOTHARAM
19838 DRIVER Sri Lankan 9/10/2014
SELLAN
19839 DRIVER SARATH ARUNA KANKANAMALAGE Sri Lankan 9/10/2014
19840 LABOUR VIKASH YADAVSHANKAR YADAV Indian 9/15/2014
19844 OPERATOR EXCAVATOR NITESH KUMAR YADAV Indian 9/15/2014
19847 PLUMBER IMRAN HUSSAIN ZAHOOR AHMED Pakistani 9/22/2014
19848 DRIVER NOMAN KHAN ISLAM GUL Pakistani 9/22/2014
SHEHZAD AKHTER MUHAMMAD
19850 SECURITY GUARD Pakistani 9/22/2014
AKRAM
SURESH SUBRAMANIYAN
19851 HELPER MECHANIC Indian 9/16/2014
SUBRAMANIYAN
19853 LABOUR MALAIYAN PAVADAI PAVADAI Indian 9/16/2014
VENKATATACHALAM THANGARAS
19854 MASON Indian 9/16/2014
THANGARAS
AMANPREET SINGH HARMEET
19857 LABOUR Indian 9/17/2014
SINGH
19861 ELECTRICIAN MASUM ALI RABDDIN MIYAN Indian 9/15/2014
19862 OFFICE HELPER SHAHID JAMAL MUMTAZ AHMAD Indian 9/15/2014
19863 CARPENTER MANIKANDAN VARDAN VARDAN Indian 9/17/2014
VENKATESAN CHINNAKANNU
19864 LABOUR Indian 9/17/2014
CHINNAKANNU
19865 WELDER JEGANDAN COVINDAN COVINDAN Indian 9/17/2014
19867 PLUMBER SUBHAN AHMAD MUSLIM KHAN Indian 9/15/2014
19868 CARPENTER MOHAMMAD ARIF ROJAN ALI Indian 9/15/2014
19870 MASON SHIV CHAND JHILLU Indian 9/18/2014
VELMANI MURUGESAN
19872 LABOUR Indian 9/17/2014
VETHACHALAM
RAMPRAVESH CHAUDHARI RAM
19874 LABOUR Indian 9/17/2014
SUBHAG
19880 LABOUR NAGENDRA SINGH TRIVENI Indian 9/17/2014
19882 HELPER MECHANIC SADDAM HUSAIN SUDDAN Indian 9/18/2014
19883 LABOUR IRSHAD AHMAD MUSTAK ALI Indian 9/17/2014
19885 EQUIPMENT OPERATOR SHIV KUMAR GOND Indian 9/17/2014
19886 ELECTRICIAN AINUL HAQUE ABDUL HAQUE Indian 9/15/2014
19887 ELECTRICIAN AZAD ALI ABAS ALI Indian 9/15/2014
19889 LABOUR KANTA RAO BETALA Indian 9/17/2014
SATHESH CHINNASAMY
19890 WELDER Indian 9/17/2014
CHINNASAMY
SAPPANIMUTHU RAMASAMY
19891 LABOUR Indian 9/16/2014
RAMASAMY
SANKAR VELAYUTHAM
19892 LABOUR Indian 9/16/2014
VELAYUTHAM
CHANDRAIAH BURRANENI
19893 LABOUR Indian 9/16/2014
BURRANENI
19894 PIPE FITTER SOHRAB ALAM SAHEB HUSSAIN Indian 9/15/2014
19895 LABOUR SANKAR GOPAL GOPAL Indian 9/17/2014
19896 DRIVER SYED ABBAS ISRAR Pakistani 9/22/2014
SADAYAN AYYAKKANNU
19898 PLUMBER Indian 9/16/2014
AYYAKKANNU
CHINNADURAI PERIYASAMY
19900 LABOUR Indian 9/16/2014
PERIYASAMY
19901 MASON MURUGAN VENU VENU Indian 9/15/2014
19903 DRIVER MANOJ KUMAR PERUMAL Indian 9/17/2014
SHAHID ARBAB MUHAMMAD
19904 SURVEYING OFFICER Pakistani 12/2/2014
ARBAB KHAN
SIVAKUMAR SIVALINGAM
19913 LABOUR Indian 9/15/2014
SIVALINGAM
19914 PLUMBER MOHAMMAD RAYIS HADIS MIYAN Indian 9/16/2014
19928 OPERATOR WHEEL LOADER Jagdish Kumar Hari Ram Indian 8/9/2011
19941 LABOUR MARGHUB AHMAD IMAMUDDIN Indian 9/17/2014
MUHAMMAD ABU BAKAR
19943 DRIVER Pakistani 10/4/2014
MUHAMMAD RAZZAQ
19944 CARPENTER ABDUL RAZZAQ ABDUL HAMEED Pakistani 11/3/2014
19962 PUMP OPERATOR FISAL ALI MOHAMMED AL SAUDI Saudi Arabian 9/1/2014
19971 OPERATOR EXCAVATOR NASER MEHMOOD JAVED IQBAL Pakistani 7/6/2011
MUHAMMAD MISBAH UL MALIK
19972 OPERATOR EXCAVATOR Pakistani 9/26/2014
MUHAMMAD YAQOO
WAQAS AHMED MUHAMMAD AZAD
19982 CARPENTER Pakistani 11/3/2014
KHAN
NAGY REFAAT HASSAN
19987 SAFETY OFFICER Egyptian 4/4/2012
ELSHABRAWY
19989 LABOUR IMRAN MUHAMMAD FAZAL KHAN Pakistani 10/4/2014
HOSSAM NAGY EL HOSSINY
19991 SURVEYING SUPERVISOR Egyptian 10/25/2009
IBRAHIM
AMJAD ALI KHAN SHAH ZAMIN
19992 LABOUR Pakistani 10/5/2014
SHAH
19993 LABOUR SHER NAWAZ KHAN DAWA KHAN Pakistani 10/5/2014
ABDUL MANAN KHAN ABDUL
19994 LABOUR Pakistani 10/5/2014
HAMEED KHAN
ATIF FAHEEM MUHAMMAD AYUB
19995 LABOUR Pakistani 10/5/2014
ARSHAD
19996 LABOUR IMDAD ULLAH IHSAN ULLAH Pakistani 10/5/2014
20010 PLUMBER GANTHI GOVINDA MOOPER Indian 10/26/2014
20012 MASON THANGAVEL SADAYAN SADAYAN Indian 10/26/2014
20015 OPERATOR EXCAVATOR SAMBATH APPAL CHETTYAR Indian 10/26/2014
20016 OPERATOR EXCAVATOR CHANDU KUMAR SINGH Indian 9/15/2014
HEAVY/MEDIUM VEHICLE GUNASEKAR DURAISANY
20019 Indian 10/26/2014
DRIVER DURAISANY
PROJECT PLANNING & ESLAM FAROUK ABDELBAR
20024 Egyptian 11/24/2014
CONTROL ENGINEER GOMAA
RAJENDIRAN VARADHARAJAN
20025 LABOUR Indian 10/26/2014
VARADHARAJAN
20031 SITE SUPERVISOR THAMER MONIF GLAWAY KHALIF Saudi Arabian 10/30/2014
20032 RECEPTIONIST ISMAIL NEDA MUTLAQ KHALEF Saudi Arabian 11/2/2014
20045 DRIVER ABDUL QADIR ABDUL MUNAF Indian 11/29/2014
20046 LABOUR LATHEEF PASHA SHAIK Indian 10/30/2014
MUHAMMAD BASEER ANWAR
20047 ELECTRICIAN Pakistani 11/16/2014
KHAN
MUHAMMAD SAGHIR MAKHAN
20048 LABOUR Pakistani 11/16/2014
KHAN
MUHAMMAD IMRAN SANOBER
20053 PLUMBER Pakistani 11/16/2014
KHAN
SASHASALAM DHARMALINGAM
20054 PIPE FITTER Indian 10/26/2014
DHARMALING
20057 WELDER ELUMALAI VAIYAPURI VAIYAPURI Indian 10/26/2014
CHOKKALINGAM SUNDARAM
20060 LABOUR Indian 10/26/2014
SUNDARAM
AYYAPPAN MAHALINGAM
20061 LABOUR Indian 10/26/2014
MAHALINGAM
OHMRAJA SAKKARAPANI
20062 WELDER Indian 10/26/2014
SAKKARAPANI
KEERTHI UPUL D B
20063 LABOUR Sri Lankan 10/3/2014
GAMLADDALAGE
20065 LABOUR LALCHAND HARIKRISHAN KUMHAR Indian 11/26/2014
20066 LABOUR SAIF ULLAH ZAHEER ULLAH Pakistani 10/5/2014
SENEVIRATHNA MANATHUNGA
20076 LABOUR Sri Lankan 10/19/2014
MUDIYANSELAGE
20078 WAREHOUSE OFFICER ISMAIL KHAN ABDULKAREEM KHAN Indian 10/26/2014
MANIVANNAN PONNIAH
20079 LABOUR Sri Lankan 11/23/2014
MALLIGANANTHA PAAMAK
RAVICHANTHIRAN KANAPATHIRAN
20080 LABOUR Sri Lankan 11/23/2014
THEIVENTHIR
20083 SECURITY GUARD AHMED HAMMAD ALSHAMMARI Saudi Arabian 12/7/2014
MUHAMMAD NIAZ AMIR ULLAH
20084 STEEL FIXER Pakistani 12/5/2014
KHAN
MUHAMMAD HAMMAD
20085 SECURITY GUARD Saudi Arabian 12/7/2014
ALSHAMMARI
MUHAMMAD MEHBOOB
20087 DRIVER Pakistani 12/5/2014
MUHAMMAD BOOTA
SYED HIMAYAT SHAH NISAR
20089 LABOUR Pakistani 12/5/2014
HUSSAIN
20090 CARPENTER FAYAZ HUSSAIN AMIRULLAH KHAN Pakistani 12/5/2014
MUHAMMAD ISMAIL MUHAMMAD
20091 SECURITY GUARD Pakistani 12/5/2014
RAFIQ
DHRUV SINGH RAJNARAYAN
20092 OPERATOR EXCAVATOR Indian 11/29/2014
SINGH
20094 LABOUR AMIN GUL MUNJRA GUL Pakistani 11/15/2014
JAHANGIR KHAN AMIR KHAN
20095 OPERATOR TRUCK CRANE Pakistani 12/5/2014
QALARUDDIN
VELMURUGAN AYYASAMY
20096 LABOUR Indian 12/4/2014
AYYASAMY
20098 LABOUR SEKAR MUTHAL CHETTIAR Indian 12/4/2014
BOOMINATHAN PONNUSAMY
20099 LABOUR Indian 12/5/2014
PONNUSAMY
GOVERNMENT RELATIONS
20101 ABDULRHMAN KHALED ALNAEM Saudi Arabian 8/14/2014
EXPEDITOR
20103 PUMP OPERATOR SAMI SALEH ALFARAJ Saudi Arabian 9/30/2014
SAMEER MOHAMMED JABER
20105 SITE SUPERVISOR Egyptian 11/24/2014
ABDULRAHMAN
20120 WELDER PARMATMA YADAV Indian 9/10/2008
SAMAN PRIYANTHA WYSOORIYA
20134 DRIVER Sri Lankan 12/9/2014
MUDIYANSELAGE
PRASAD USHANTHA LGALA
20147 LABOUR Sri Lankan 12/10/2014
WITHANAGE
ELFADIL ALI ELFADIL E MOHAMED
20150 WAREHOUSE OFFICER Sudanese 12/16/2014
ELHAG
KAZIM HUSSAIN MULLAZIM
20151 DRIVER Pakistani 10/5/2014
HUSSAIN
MUHAMMAD SALEH FAWZAN AL
20154 PUMP OPERATOR Saudi Arabian 11/9/2014
FAWZAN
AHMED GAMAL ABBAS
20166 CIVIL SITE ENGINEER Egyptian 1/6/2015
ELMETWALLY
20168 LABOUR BAKHTYAR HUSSAIN ISMAIL Pakistani 12/25/2014
20169 ELECTRICIAN IMTIAZ KHAN GHUFRAN Pakistani 12/25/2014
GOVERNMENT RELATIONS
20171 BASIL SIAR ALSHAMMARI Saudi Arabian 1/1/2015
EXPEDITOR
20172 LABOUR MASTAN KATHAT NATHU KATHAT Indian 1/8/2015
JAYAKANTHAN THAMBIPILLAI
20173 OPERATOR EXCAVATOR Sri Lankan 1/12/2015
PONNAMPALAM
DEVARAJAN AYYASAMY
20174 LABOUR Indian 12/30/2014
AYYASAMY
20175 DRIVER KUMAR DURAIRAJ DURAIRAJ Indian 12/30/2014
20177 MECHANIC ANNAMALAI RASU RASU Indian 12/30/2014
MOHAMED NAGY ELHOSSINY
20188 SURVEYING SUPERVISOR Egyptian 6/26/2010
IBRAHIM
HUSSAM ABDULNABI SALEM
20201 LAB TECHNICIAN Egyptian 12/8/2014
MUTAWALLI
20203 LABOUR FIAZ AHMAD MUHAMMAD HANIF Pakistani 12/5/2014
WAREHOUSE & DISTRIBUTION
20244 NISAR AHMED KHAN Indian 2/11/2015
OFFICER
MOHAMED MEERA HUSSAIN
20245 WAREHOUSE OFFICER Indian 1/24/2015
MOHAMED NAINAR
20246 STEEL FIXER VIPIN SAH JAVAHAR SAH Indian 2/10/2015
20249 LABOUR IMRAN NAZAR NAZAR HUSSAIN Pakistani 1/28/2015
RUSTAM ALI KHAN GHULAM
20250 LABOUR Pakistani 1/28/2015
MURTAZA
TAHIR MEHMOOD MUHAMMAD
20252 LABOUR Pakistani 1/28/2015
SHABBIR
MOHAMED GOUDA GOUDA ALAA
20256 SENIOR ENGINEER Egyptian 2/15/2010
EL DIN
20261 CIVIL SITE ENGINEER AHMED GABER MOHAMED GABER Egyptian 2/15/2015
AMJAD NAGUIB ABDELTAWWAB
20263 FOREMAN Egyptian 2/18/2015
ABDALLA
20266 MALE NURSE MOUSA ABDULLAH ALBASHIR Sudanese 2/5/2015
20282 DESIGN ENGINEER IBRAHIM FATHI IBRAHIM ABOSERIA Egyptian 2/25/2015
RABIE ABDELSAMIE MOHAMED
20287 MECHANIC Egyptian 3/11/2015
SOLIMAN
AHMED MOHAMED ALI
20299 SURVEYING SUPERVISOR Egyptian 3/22/2015
ABOUELENIN ELWAKIL
20325 CIVIL SITE ENGINEER AHMED FAIEZ HUSSEIN SAADAWY Egyptian 3/25/2015
20334 DRAFTSMEN ASIM AFSAR AFSAR ALI Pakistani 4/5/2015
MOHAMMAD JUNAID SIDDIQUI
20336 QUALITY CONTROL ENGINEER Pakistani 2/1/2015
BADERULISLAM
20354 SECRETARY ZAMEER BASHA MUKHTAR AHMED Indian 4/11/2015
MOHAMMAD ARID RIAZ
20355 DRIVER Pakistani 3/16/2010
MOHAMMAD SADIQ
20360 PUMP OPERATOR FAHAD ABDULLA ARESNI Saudi Arabian 2/19/2015
20361 FOREMAN ALI IBRAHIM ALI ALSWEED Saudi Arabian 1/18/2015
20362 DATA ENTRY YUSUF ABDULLAH SALEH AMER Saudi Arabian 3/23/2015
20372 CONSTRUCTION MANAGER ALI MOHAMED MOHAMED SALEH Egyptian 3/30/2015
20387 ELECTRICAL ENGINEER KAMEL MOHAMED ABDELFATTAH Egyptian 5/9/2015
MUHAMMED ASHRAF MANSOR
20390 SITE SUPERVISOR Pakistani 4/8/2015
HUSSAIN
MAHMOUD KARAM GHAEM
20391 MECHANIC Egyptian 5/2/2015
MAHMOUD
20393 FOREMAN KHAMIS HELAL ALHARASH Syrian 5/18/2015
MOHAMED ABDELSALAM
20395 PURCHASER PROJECT Egyptian 5/13/2015
MOHAMED ELHENDAWI
20397 CIVIL SITE ENGINEER JODAH ALSAIED MOHAMMED Egyptian 5/11/2015
GOUTAM BYAPARI ADYASHWAR
20398 LABOUR Indian 12/7/2011
BEPARI
20403 OPERATOR EXCAVATOR SIYARAM MAHARA Nepalese 8/7/2007
SUDARSHAN HEMNARAYAN
20405 EQUIPMENT OPERATOR Indian 8/11/2009
CHOUDHARY
20406 OPERATOR EXCAVATOR SHEO KUMAR MAHTO Indian 8/11/2009
20422 LABOUR WASEEM AKHTAR NAZIR HUSSAIN Pakistani 12/18/2008
20423 CARPENTER SAHID MIYA MUSLIM MIYA Indian 7/20/2008
20426 CARPENTER ABDUL HAFIZ ABDUL RAHMAN Indian 3/26/2012
GHULAM MUHAMMAD MUHAMMAD
20427 STEEL FIXER Pakistani 12/28/2006
HUSSAIN
RIAZ UDDIN SIKDER SAMAD
20430 STEEL FIXER Bangladeshi 9/11/2003
SIKDER
20431 CARPENTER ABDUR RASHID NURUL ISLAM Bangladeshi 9/11/2003
20432 STEEL FIXER PUNDEO SAH Indian 2/13/2008
MURUGANANTHAM KRISHNA
20435 LABOUR Indian 7/4/2009
MOORTHY
20437 LABOUR RAJ KUMAR RAY RANJITA Nepalese 4/2/2010
20438 WELDER JAGDEV MANDAL PARBATI DEVI Nepalese 4/2/2010
GUL ZAMEER KHAN ZOOR
20440 LABOUR Pakistani 7/16/2009
MUHAMMAD KHAN
20444 PIPE FITTER SADI AHMAD BASHIR AHMAD Pakistani 3/16/2010
20446 CARPENTER MOHAMMAD MUMTAZ SHAH Pakistani 12/7/2011
20447 MASON RATAN AYUB ALI Bangladeshi 1/25/2004
20452 EQUIPMENT OPERATOR RAJNANDAN DAS TATMA RAJ Nepalese 4/2/2010
20454 WELDER ASI GOPAL Indian 9/22/2008
20457 PIPE FITTER UPENDRA SINGH KUSHWAAHA Indian 8/25/2009
20463 CARPENTER MOHAMMAD JAFAR QURESHI Indian 6/16/2010
MIAN MUHAMMAD MUMTAZ
20468 LABOUR Pakistani 7/16/2009
MUHAMMAD SALEEM
20469 STEEL FIXER RUPINDER SINGH DARSHAN SINGH Indian 8/4/2009
20474 LABOUR SAMIULLAH FAQIRULLAH Pakistani 7/19/2009
20475 PIPE FITTER MUHAMMAD RAUF QASIM ALI Pakistani 7/16/2009
20477 LABOUR ABDUL JAMIL WAHAB Indian 10/3/2009
20479 CARPENTER MOHAMMAD KALIM Indian 3/19/2009
ELSAYED MOHD FARAGE
20486 STEEL FIXER Egyptian 4/1/2007
ABDELLATIF
20501 OPERATOR EXCAVATOR MOHAMMAD SUHAIL KHAN Indian 6/26/2010
MOHAMMAD SHOAIB KHOKHAR
20503 SAFETY OFFICER Pakistani 1/29/2009
MOHAMMAD KHAN K
MUHAMMAD SOHAIL AKRAM
20508 LABOUR Pakistani 3/16/2010
MUHAMMAD
SALAHUDDIN FAKHARUDDIN
20514 OPERATOR WHEEL LOADER Indian 10/6/2011
FAKHARUDDIN
20517 OPERATOR WHEEL LOADER VINOD KUMAR YADAV Indian 10/13/2011
MUHAMMAD FAROOQ ZAR
20522 PAINTER Pakistani 7/16/2009
MUHAMMAD
20532 FOREMAN AHMAD NOMAN AL AHMAD Syrian 5/24/2015
HAMDY MOHAMED ATTA
20535 ELECTRICIAN Egyptian 12/7/2014
ELGAZZAR
ABDULLAH MAHMOUD ZAHER GAD
20553 ACCOUNTANT Egyptian 6/19/2015
ALHAQ
20554 SITE SUPERVISOR MAHMOUD SAAD ABO ELELA Egyptian 6/17/2015
20557 PLUMBER AMR RAGAB MOHAMED ISMAIEL Egyptian 5/18/2015
TAREQ ABDALLA MOHAMED
20558 FOREMAN Egyptian 6/16/2015
ABOUHEGAZY
MOHAMED MOUSTAFA HASSAN
20561 FOREMAN Egyptian 6/5/2015
ALY
YASSEIN ABDELHAFEIZ YASSEIN
20562 ELECTRICAL ENGINEER Egyptian 6/12/2015
MAHFOUZ
20585 FOREMAN MOHAMED KHAIRI ALI YOUSSEF Egyptian 7/5/2015
MAHMOUD MOHAMED ABDLLAH
20587 FOREMAN Egyptian 6/30/2015
HAMMAM
ALI MOHAMMED MOHAMMED
20589 SURVEYING OFFICER Yemeni 6/28/2015
ALAMDI
IFTKHAR ALAM MOHAMMAD
20590 OPERATOR WHEEL LOADER Indian 9/24/2011
IBRAHIM
MUHAMMAD ASAD SOHIB
20654 DRIVER Pakistani 8/1/2015
MUHAMMAD AMIN KHAN
ELHUSSEINY RAMADAN AZAB
20658 FOREMAN Egyptian 7/20/2015
IBRAHIM
20669 CARPENTER GURUSAMY MUTHU CHELVAM Indian 5/13/2015
ABDULLAH MOHAMMAD ABDUAZIZ
20722 CIVIL SITE ENGINEER Jordanian 9/29/2013
AL MEAANY
HASSAN MOHAMMED HASSAN
20727 ESTIMATION MANAGER Egyptian 6/24/2008
HALLOWS
MOHAMMED IBRAHIM AMIN SAYED
20728 SURVEYING OFFICER Egyptian 3/11/2012
AHMED
20731 OPERATOR WHEEL LOADER JATINDRA SAROOP SINGH Indian 10/12/2011
MOHAMMAD IQBAL NAYEF
20732 CONSTRUCTION MANAGER Jordanian 10/13/2015
HAMMAD ALSARAIREH
WAREHOUSE & DISTRIBUTION ALHASSAN MOHAMED AHMED
20734 Egyptian 9/24/2015
OFFICER MOHAMED
20740 HEAVY EQUIPMENT OPERATOR MICHAEL JUGAL ACEDERA Filipino 10/15/2015
20742 HEAVY EQUIPMENT OPERATOR YVES TYRONE ALBOR CADIO Filipino 10/15/2015
20745 ELECTRICIAN MARCIAL MERCADO CORTEZ Filipino 10/15/2015
20746 HEAVY EQUIPMENT OPERATOR JONATHAN RICARDO AWATIN Filipino 10/15/2015
20749 DRAFTSMEN RENATO BASAYON PONGASE Filipino 10/15/2015
MOHAMMED AHMED MOHAMMED
20750 CIVIL SITE ENGINEER Egyptian 10/24/2015
ISMAIEL ELMAAML
YASER MUHAMMED SALEH AL
20786 PUMP OPERATOR Saudi Arabian 10/1/2015
ZAMAM
FAHED ABDULAZIZ FAHED
20787 PUMP OPERATOR Saudi Arabian 8/30/2015
ALRESINI
20790 MECHANIC JOEMAR CORTEZ ARCEDAS Filipino 10/21/2015
20791 PUMP OPERATOR ROGRLIO JR BANGIBAN ROMERO Filipino 10/21/2015
20792 STEEL FIXER PETER HONRADO MARTINEZ Filipino 10/21/2015
20793 ELECTRICIAN RENANTE CASSION CABAN Filipino 10/21/2015
20797 DRAFTSMEN DENNIS UY BALIJON Filipino 10/31/2015
MANIKANDAN BALASUBRAMANIAN
20809 MECHANIC Indian 10/28/2015
BALASUBRAMAN
MOHAMED AHMAD MUSTAFA
20819 FOREMAN Egyptian 12/2/2006
MATAWLI
MOHAMMED AHMED OTHMAN
20820 FOREMAN Egyptian 12/2/2006
HUSSEIN
MOHAMED ELSAYED ELSAYED
20821 FOREMAN Egyptian 12/2/2006
MOHAMED
GOVERNMENT RELATIONS QUSAY ABDULLAH AHMED AL
20836 Saudi Arabian 11/22/2015
EXPEDITOR SHAMMARI
20896 Project Manager Tareq Ben Ziad El-Ghul Jordanian 9/1/2012
20981 LABOUR Mohammad Goodu Ali Indian 2/27/2013
21018 PLUMBER Ayyaz Ali Muhammad Ashraf Pakistani 3/10/2013
21019 WORKSHOP OFFICER Ramadan Mohamed Abdul Ellah Egyptian 3/14/2013
21075 SURVEYING SUPERVISOR Ahmed Kotb Egyptian 5/17/2013
21077 MASON Muhammad Waheed Chaudhry Pakistani 5/21/2013
21082 CONSTRUCTION MANAGER Wissam Ghanem Lebanese 5/21/2013
21173 QUANTITY SURVEYOR Fayyaz Wazir Muhammad Wazir Khan Pakistani 10/30/2013
21193 LAND SURVEYOR Reda Abd El Aleem Mohammad Egyptian 1/12/2014
21195 SURVEYING OFFICER Mohammad Mabrook Mohammad Egyptian 1/12/2014
21198 SURVEYING OFFICER Abd El Hady Abd El Khaleq Egyptian 1/12/2014
21247 DRAFTSMAN Awais Hameed Abdul Hameed Pakistani 11/5/2014
21252 Project Manager Khalid Al Dosari Saudi Arabian 10/25/2014
21270 ELECTRICAL ENGINEER Mohamed Mohamed Elziny Egyptian 12/16/2014
21273 MECHANICAL ENGINEER Ahmad Anis Shaaban Lebanese 12/26/2014
21300 WORKSHOP OFFICER Kareem Magdy Ahmed El Bestawy Egyptian 2/11/2015
21374 HR ASSISTANT Manager Ahmed Mohamed Mahmoud Awad Egyptian 6/4/2015
21383 SURVEYING OFFICER Masood Zaheer Muhammad Zaheer Pakistani 7/4/2015
Hafiz Muhammad Sadam Abdul
21402 CARPENTER Pakistani 8/10/2015
Rasheed
21407 MECHANIC Ihab Yassine Younes Lebanese 7/22/2015
21422 SR. ELECTRICAL ENGINEER Mohammed Yahya Mustafa Al Ngozi Lebanese 8/8/2015
21423 LAND SURVEYOR Omar Essam Omar Fadlyi Egyptian 8/15/2015
21456 LABOUR Khaled Mohamed Abdellah Mohamed Egyptian 9/19/2015
21510 LABOUR Bakhtiar Gun Ziarat Gul Pakistani 10/29/2015
21520 LABOUR Muhammad Farman Ali Liaqat Ali Pakistani 10/29/2015
21536 LABOUR Muhammad Munir Abdul Wahid Pakistani 11/7/2015
21591 SAFETY STAFF Mohammed Abdul Azeem Indian 5/19/2013
21615 Jonathan Abellanosa Filipino 4/27/2015
21692 PUMP OPERATOR ABDULLAH NASSER ALOUDH Saudi Arabian 2/1/2016
21708 DRIVER ELBEN DRAGON DAGAPIOSO Filipino 2/5/2016
21777 LABOUR Muhammad Mohsin Pakistani 2/25/2016
PROJECT PLANNING &
21801 HAVIER S DAWAMI Filipino 4/3/2016
CONTROL ENGINEER
MOHAMED ABDULWAHAB IBRAHIM
21809 CONSTRUCTION MANAGER Egyptian 3/27/2016
SHERBI
21835 COMMERCIAL DIRECTOR AHMAD RADI AHMAD HAWARY Jordanian 4/1/2016
DESIGN & ENGINEERING
21855 ASHRAF GOMAH M ELSHAMANDY Egyptian 4/10/2016
MANAGER
21936 SECURITY GUARD SALEH HUSSEIN ABAAR SAYAH Saudi Arabian 6/1/2016
21943 SECURITY GUARD AHMED MAHIDI SHAHIR MKAMI Saudi Arabian 7/14/2016
21998 DRAFTSMEN MUHAMMAD AKHTAR WARIS ALI Pakistani 9/22/2008
22037 INSURANCE SUPERVISOR HAFIZ FADHEL ALOYUTI Jordanian 10/17/2016
DESIGN & ENGINEERING
22038 WAHEED KHALIL HIJAZI Lebanese 10/17/2016
MANAGER
22039 TECHNICAL DIRECTOR MAZEN ELDALI BALTA Lebanese 10/17/2016
22061 ESTIMATION MANAGER SAYED ISHTIYAQ ALAM Pakistani 10/20/2016
22097 Service Manager LABIB NORUDIN AL HARIRE Lebanese 10/20/2016
22102 QUANTITY SURVEYOR MOHAMMED AZIZ KHAN Indian 11/1/2016
22132 SURVEYING OFFICER Hossam Abdel Maksoud El kewaiey Egyptian 11/19/2016
Mohamed Mostafa Abdel Aziz
22133 SAFETY OFFICER Egyptian 11/19/2016
Nawwara
22134 DESIGN ENGINEER Lutfi Mahmoud ALYamani Lebanese 11/16/2016
22135 TECHNICAL ENGINEER Jamil Mohamed Tabakh Syrian 11/20/2016
22136 DRAFTSMEN John Taay Tapao Filipino 11/20/2016
Mohamed Ahmed Hassan Hassan
22145 SURVEYING OFFICER Egyptian 9/24/2016
Selim
22211 ADMINISTRATION OFFICER Turki Mohamed Abdullah Al Quraini Saudi Arabian 12/8/2016
22212 FOREMAN Jaouad Khayi Moroccan 12/19/2016
22214 DRAFTSMEN Gulam Nabil Ansari Indian 12/6/2016
22215 ELECTRICAL ENGINEER Abdul wadud Muhyialdeen Alsakafi Lebanese 12/1/2016
22216 ENGINEER - MECHANICAL Mohamed Hassan Al Kema Egyptian 11/27/2016
22220 PROCUREMENT MANAGER Adnan Danab Lebanese 12/4/2016
22222 SECRETARY Abdullah Mubarak Abdullah Al Ahmari Saudi Arabian 12/17/2016
22225 SECRETARY Mohamed Hesham Mohamed Tafesh Jordanian 11/23/2016
22228 O & M ENGINEER Amir Nawab muhib Ullah Khan Pakistani 8/1/2016
22234 LAND SURVEYOR Khaled Ali Soliman Al Atoy Saudi Arabian 1/1/2017
22236 SECRETARY Ahmed Sami Bakor Syrian 11/27/2016
GOVERNMENT RELATIONS
22255 Ali Hussain shay Shaflut Al Qahtani Saudi Arabian 1/1/2017
EXPEDITOR
GOVERNMENT RELATIONS Mohammed Awoda Ayad Almousi Al
22256 Saudi Arabian 1/12/2017
EXPEDITOR HOYETI
22257 FOREMAN Shahid Muhammad Muhammed Pakistani 1/23/2017
22259 QUANTITY SURVEYOR Shah Aminullah Bangladeshi 1/7/2017
22270 DESIGN ENGINEER Claro Dano Filipino 1/8/2017
22271 PROCUREMENT ENGINEER Ahmad Saleh Abdel Razak Bashori Syrian 12/25/2016
22272 PROCUREMENT ENGINEER Ayman Abdul rahim Al Batran Jordanian 1/1/2017
Jamal Majed Abdul Rahman Abu
22273 DESIGN ENGINEER Jordanian 12/18/2016
Nafisa
22278 ENGINEER - PMO Hussain Jaber Iasloum Saudi Arabian 1/29/2017
22279 COLLECTION OFFICER Muhammad Rashid Sattar Pakistani 1/18/2017
22281 QUANTITY SURVEYOR Rodulfo Grino Jr Filipino 1/24/2017
22282 MATERIALS PLANNER Gilbert Janoba Manere Filipino 1/24/2017
STRATEGY & PLANNING
22283 Alexander Celles Filipino 1/18/2017
MANAGER
PROJECT PLANNING &
22284 Fernando Catolos Filipino 1/18/2017
CONTROL ENGINEER
STRATEGY & PLANNING
22285 John Paul Aromin Filipino 1/24/2017
MANAGER
22286 PROJECT MANAGER Khaled Hussien Nawaf Al zinati Jordanian 2/1/2017
GOVERNMENT RELATIONS
22297 Ahmed Fahd Abdel Aziz Al Reseeny Saudi Arabian 1/1/2017
EXPEDITOR
22299 QUANTITY SURVEYOR Ibrahim Macabuat Filipino 2/7/2017
22309 QUANTITY SURVEYOR Moustafa Sabry Abdel Sadek El Gaziry Egyptian 5/12/2010
22334 CHIEF ACCOUNTANT Zahran Mamdouh Zahran Egyptian 3/1/2006
22335 SURVEYING OFFICER Fahim Iqbal Zafar Iqbal Pakistani 12/1/2009
22336 PROJECT DIRECTOR Abdelal khalil Abueljedyan Palestine 2/11/2016
22337 VALUE ENGINEER Abad Hussain Khan Indian 3/13/2017
22339 FOREMAN Ali Hamdy Mohamed Ghoweinam Egyptian 8/19/2008
22340 FABRICATOR Ibrahim Anwar Ullah Bangladeshi 1/7/2003
22341 MASON Saki Chandra Kumar Indian 9/25/2008
22342 CARPENTER Mohamed Anwar Maamoun mohamed Egyptian 11/19/2008
22343 MECHANIC Arya Chandra Pal Indian 9/29/2008
22344 OPERATOR TRUCK CRANE Mian Muhammad Din Pakistani 3/13/2003
22351 STORE KEEPER-G8 Ahmed Gamaleldin Youssef Mohamed Egyptian 2/16/2010
Mohammed Abd Elmawl Mustafa
22352 STORE SUPERVISOR Egyptian 1/11/2010
Nawar
22353 OFFICER -SERVICES Ahid Tukku Mia Indian 6/13/2009
HEAVY/MEDIUM VEHICLE
22356 Nasir Alam Hasmatullah Bangladeshi 12/14/1998
DRIVER
HEAVY/MEDIUM VEHICLE
22358 Abaid Ullah Riasat Ali Pakistani 9/16/2009
DRIVER
22361 FORKLIFT OPERATOR Baljeet Mandal Rajendra Mandal Nepalese 4/2/2010
22367 OPERATOR TRUCK CRANE Mohamed Aman Allah Pakistani 7/19/2009
Mohammad Shaidullah
22368 DRIVER Bangladeshi 8/5/1998
M.Mojibulhaque
22369 OPERATOR EXCAVATOR Hashim Khan Khan Baig Pakistani 7/6/2011
HEAVY/MEDIUM VEHICLE
22370 Mohammed Hasrat Khan Indian 2/17/2007
DRIVER
22371 QUANTITY SURVEYOR Mahmoud Elsayed Mahrous Saleh Egyptian 5/19/2010
22373 PLUMBER Subas Yadav Sudama Yadav Indian 12/7/2011
Muhammad Saleem Muhammad
22374 FOREMAN Pakistani 2/4/2007
Ismail
22376 WELDER Rafaqat Ali Nazakat Ali Pakistani 9/16/2009
22377 MASON Achche Lal Indian 3/28/2008
22378 PIPE FITTER Jitendra Rajdav Indian 8/25/2009
22379 LABOUR Om Prakash Rajbhar Indian 4/4/2010
22380 QUALITY CONTROL MANAGER Feroz Khan Indian 9/23/2009
22381 SR. ENGINEER ELECTRICAL Ahmed Ibrahim Abdel Aziz Egyptian 1/17/2010
Faheem Afroze Mohammed Afroze
22383 CONSTRUCTION MANAGER Pakistani 3/29/2008
Khan
22384 MECHANICAL SUPERVISOR Atif Imran Mohammed Pakistani 7/29/2008
22385 PLUMBER Mohammed Iftkhar Pakistani 9/16/2009
NETWORK & COMMUNICATION
22387 Mohamed Abdel Kareem Egyptian 3/13/2012
ENGINEER
22388 SR. ENGINEER ELECTRICAL Mohamed Abdel Aleem Egyptian 3/11/2012
22450 HUMAN RESOURCES OFFICER Gulam Mohamed Bozlu Bangladeshi 3/18/2017
22454 SITE SUPERVISOR Saad Sihmi Saud Al Subaie Saudi Arabian 4/1/2017
22524 LABOUR Mohamed Ehsan Indian 4/1/2017
22525 LABOUR Mohamed Rasheed Indian 4/1/2017
Irfan Pasha Mohammed Gulam
22532 DRAFTSMEN Indian 5/14/2017
Rasool
22552 HUMAN RESOURCES OFFICER Salah Mahdy Saud Al Yami Saudi Arabian 6/1/2017
22576 SUPPORT SERVICES OFFICER Yousef Hamdan Alenzi Saudi Arabian 7/1/2017
22585 LAB TECHNICIAN Ahmed Eid Albalwi Saudi Arabian 6/1/2017
22589 SURVEYING OFFICER Chaudry Ziaullaah Naz Pakistani 2/26/2017
22605 LABOUR Tanveer Umer Din Pakistani 7/17/2017
22629 CIVIL SITE ENGINEER Khaled Abdel Aziz Al Husaini Saudi Arabian 9/25/2017
22630 CONSTRUCTION MANAGER Amer Abed El Karim Bakri Lebanese 9/17/2017
22645 SENIOR ENGINEER RIYADH ABDULAZIZ ALSUDAIS Saudi Arabian 10/1/2017
22657 FOREMAN AbdulHakh Yahaiya Indian 9/21/2017
22669 TECHNICAL ENGINEER Mohamed Samir Aly Al Serougy Egyptian 11/1/2017
CUSTOMER SERVICES
22677 Wassam El Hajj Chehade Lebanese 11/16/2017
ENGINEER
22700 SURVEYING SUPERVISOR Ahmed Abdallah Mohamed El Rashidy Egyptian 11/29/2017
22704 SECRETARY Sara Munahi Naif Al Otaibi Saudi Arabian 12/1/2017
22705 SECRETARY Sultana Munahi Naif Al Otaibi Saudi Arabian 12/1/2017
22708 SECURITY GUARD Hussien Jubran Al Qahtani Saudi Arabian 12/4/2017
22713 Sultan Salem Basyba Saudi Arabian 12/10/2017
22714 CIVIL SITE ENGINEER Ahmed Osama Sami Qasim Saudi Arabian 12/3/2017
GOVERNMENT RELATIONS
22719 Rashed Mohamed Al muhedy Saudi Arabian 12/1/2017
EXPEDITOR
22721 MANAGER-SAFETY Kamal Mahmoud Khoder Lebanese 12/18/2017
22722 SECRETARY Majed Ahmed Al zahrani Saudi Arabian 12/17/2017
22740 ESTIMATION MANAGER Amr Hassan Abd El Malk Ragab Egyptian 1/7/2018
22745 RECEPTIONIST Faisal Faihan Nassr Min Saqyan Saudi Arabian 1/14/2018
22782 SECURITY GUARD Naja Abdelrahman Shabab Al mutari Saudi Arabian 1/28/2018
Faisal Mohammed Hamoud Al
22783 SECURITY GUARD Saudi Arabian 2/17/2018
Shrayhe
22784 SECURITY GUARD Toala Obaid Toala Alshammari Saudi Arabian 2/17/2018
22786 FOREMAN Mohamed Eissa Ibrahim Issa Sudanese 12/18/2017
22787 CONSTRUCTION MANAGER Ayman Sabbah Ktob Salah Egyptian 1/30/2018
GOVERNMENT RELATIONS
22803 Saad Mohammed Al Hewitty Saudi Arabian 2/14/2018
EXPEDITOR
22807 ADMINISTRATION OFFICER Sarah Thwaini Suliman Al Thwaini Saudi Arabian 3/12/2018
22808 SECRETARY Faisal Mohammed Al Kabaa Saudi Arabian 3/1/2018
22809 PROJECTS COORDINATOR Abdel Aziz Ahmed Al Ayyar Saudi Arabian 3/1/2018
22810 ADMINISTRATION OFFICER Abdel Aziz Bander Al Salboud Saudi Arabian 3/1/2018
Sayed Ahmed Abdel Rasoul Saleh
22815 SITE SUPERVISOR Egyptian 3/1/2018
Ahmed
TECHNICAL SERVICES
22816 Abd Rabou El shbrawy Mohamed Egyptian 3/6/2018
MANAGER
22820 SECRETARY Bdoor Saleh Khalaf Al Harbi Saudi Arabian 3/19/2018
22825 FINANCIAL CONTROLLER Fidal Sami Hasan Abu Alya Jordanian 3/20/2018
MOHAMMAD ABDULLAH
22836 DIRECTOR-OPERATIONS Saudi Arabian 4/2/2018
MOHAMMAD AL SUDAIS
22858 FOREMAN ZIAD ABDULAZIZ AL SALMAN Saudi Arabian 4/1/2018
22859 FOREMAN OMAR HAZZA AL HARBI Saudi Arabian 4/1/2018
22862 FOREMAN HANI AHMED IBRAHIM IBRAHIM Egyptian 4/1/2018
WALID ALI FARAHAT IBRAHIM
22863 CARPENTER Egyptian 4/1/2018
EISSA
22874 HR Business Partner NAIF BIN MUTAIB BARAK AL OTAIBI Saudi Arabian 5/2/2018
22890 Planning Engineer FARZAUDI ASGALI MUSTAFA Filipino 5/14/2018
22897 SAFETY OFFICER Syed kashif Hussain Shah Pakistani 5/23/2018
22898 SAFETY ENGINEER Islam Mohamed Aselah Egyptian 6/2/2018
Abdul Majed Mohammed Awadah Al
22899 SECURITY GUARD Saudi Arabian 5/20/2018
Hoawaty
22900 SECURITY GUARD Ibrahim Ahmed Al Howaity Saudi Arabian 5/24/2018
22901 SECURITY GUARD Awad Ibrahim Awad Al Hewati Saudi Arabian 5/24/2018
22914 PROJECT MANAGER IYAD MAHMOUD ALSHAWAREB Jordanian 5/1/2018
22922 CONSTRUCTION MANAGER Nafith Ata Abd Saleh Jordanian 6/24/2018
22923 SECURITY GUARD Saeed Baraka Saeed Al Shurahy Saudi Arabian 7/3/2018
22924 SECURITY GUARD Abdulasalam Mordy Al Shammary Saudi Arabian 7/3/2018
22926 SENIOR ACCOUNTANT Mustafa Magdy Mohamed Said Egyptian 7/8/2018
ATHAR MAHMOOD MUHAMMAD
22933 SURVERING OFFICER Pakistani 2/1/2018
RAFIQUE
22934 DRAFTSMEN AYHAM MAHMOUD ALNAEM Syrian 5/6/2018
22938 DRAFTSMEN Yakoub khusro Mohamed Pakistani 7/18/2018
22943 ELECTRICIAN Muhammad Umair Jabbar Pakistani 7/24/2018
22952 OFFICE HELPER Abdul Aziz Abdul Rahman Al Qaiani Saudi Arabian 6/17/2018
Fatma Abdel Rahman Abdallah Al
22964 SECRETARY Saudi Arabian 8/1/2018
Dahim
22965 SECRETARY Safia Salem Msad Al adinan Saudi Arabian 8/1/2018
22966 SECRETARY Noof Said Mohamed Zahdm Saudi Arabian 8/1/2018
22967 SECRETARY Lualua Khaled Ibrahim Zid Saudi Arabian 8/1/2018
22968 SECRETARY Mozna Saud Eiad Al Harby Saudi Arabian 8/1/2018
Noura Mogair Mahmas Al thaimy Al
22969 SECRETARY Saudi Arabian 8/1/2018
Otaiby
22970 SECRETARY Dalal Mnour Wasel Al Mitairy Saudi Arabian 8/1/2018
22971 SECRETARY Ashwak Saud Gazy El Salimy Al Harby Saudi Arabian 8/1/2018
22972 SECRETARY Al Anoud Mouad Ayid Al Mitairy Saudi Arabian 8/1/2018
Samia Mnaor Oshban Al Sbaiy
22973 SECRETARY Saudi Arabian 8/1/2018
Alenzay
22974 SECRETARY Eman Mohamed Salah Al Rasheed Saudi Arabian 8/1/2018
Nower Aada Moflah Al Lfayin Al
22975 SECRETARY Saudi Arabian 8/1/2018
Sabaiy
22976 SECRETARY Khaloud Zail Ali Al matrafy Saudi Arabian 8/1/2018
22977 SECRETARY Amal Ali Mohamed Al Shahwan Saudi Arabian 8/1/2018
Rehab Hassan Mousa Al Tofily Al
22978 SECRETARY Saudi Arabian 8/1/2018
Zahrany
22979 SECRETARY Hend Ali Abdallah Anak Saudi Arabian 8/1/2018
22980 SECRETARY Hanan Ali Mohamed Al Waday Saudi Arabian 8/1/2018
22981 SECRETARY Fadia Abdel Aziz Fahad Al Malham Saudi Arabian 8/1/2018
22983 SECRETARY Nagla Abdel Aziz Fahad Al Malham Saudi Arabian 8/1/2018
22984 SECRETARY Arway Said Mohamed Al Raiza Saudi Arabian 8/1/2018
22986 SECRETARY Bayan Moubark Hassan Al Hazb Saudi Arabian 8/1/2018
22987 SECRETARY Shouk Salah Maouda Al Qahtani Saudi Arabian 8/1/2018
22989 SECRETARY Amira Said Mohamed Al Raiza Saudi Arabian 8/1/2018
22990 SECRETARY Maha Abdel Aziz Fahad Al Malham Saudi Arabian 8/1/2018
22991 SECRETARY Amal Hussain Salem AL Adinan Saudi Arabian 8/1/2018
22992 ADMINISTRATION OFFICER Maram Ali Talah Al Shary Saudi Arabian 8/1/2018
22993 ADMINISTRATION OFFICER Iman Gharmallah Abdallah Al Amary Saudi Arabian 8/1/2018
22994 ADMINISTRATION OFFICER Maram Ali Mashny Al Zahrany Saudi Arabian 8/1/2018
Bashair Abdel Aziz Ibrahim Al
22995 ADMINISTRATION OFFICER Saudi Arabian 8/1/2018
Trayman
22996 ADMINISTRATION OFFICER Asmaa Ahmed Farag Al Khaldi Saudi Arabian 8/1/2018
22997 ADMINISTRATION OFFICER Hanan Yehya Said Al Zhrani Saudi Arabian 8/1/2018
22998 ADMINISTRATION OFFICER Amna Mohamed Fayez Bu Halika Saudi Arabian 8/1/2018
22999 ADMINISTRATION OFFICER Mooza Hamoud Swaid Al Khaldi Saudi Arabian 8/1/2018
23000 ADMINISTRATION OFFICER Aliaa Saleh Khalf Al Ghaithy Saudi Arabian 8/1/2018
23001 ADMINISTRATION OFFICER Yassmin Hamed Ahmed Al Issa Saudi Arabian 8/1/2018
23002 ADMINISTRATION OFFICER Samia Mohamed Amer Asiri Saudi Arabian 8/1/2018
23003 ADMINISTRATION OFFICER Reem Ali Tala Al Shahri Saudi Arabian 8/1/2018
23004 ADMINISTRATION OFFICER Arij Mohamed Qaty Al Aissa Saudi Arabian 8/1/2018
23005 ADMINISTRATION OFFICER Raghad Said Ahmed Asiry Saudi Arabian 8/1/2018
23007 ADMINISTRATION OFFICER Nada Ahmed Salah Aiashy Saudi Arabian 8/1/2018
23009 ADMINISTRATION OFFICER Rawabi Mohsen Saad Haza Saudi Arabian 8/1/2018
Maha Abdallah Abdel Mohsen Al
23010 ADMINISTRATION OFFICER Saudi Arabian 8/1/2018
Yakoubi
23011 ADMINISTRATION OFFICER Wagod Ghazi Khadr Al Khadr Saudi Arabian 8/1/2018
23012 ADMINISTRATION OFFICER Ahlam Ibrahim Salah Al Rir Saudi Arabian 8/1/2018
23013 ADMINISTRATION OFFICER Hakima Lahak Medala AL Mitairy Saudi Arabian 8/1/2018
23014 ADMINISTRATION OFFICER Reem Abdallah Fahd Al Khathran Saudi Arabian 8/1/2018
23015 ADMINISTRATION OFFICER Al Hanouf Zaid Munir Al Otaibi Saudi Arabian 8/1/2018
23017 ADMINISTRATION OFFICER Hend Hamd Mohamed Al Amary Saudi Arabian 8/1/2018
23018 ADMINISTRATION OFFICER Wagdan Fahd Awad Al Rehamy Saudi Arabian 8/1/2018
23019 ADMINISTRATION OFFICER Fatma Fahd Salah Al Salem Saudi Arabian 8/1/2018
23020 ADMINISTRATION OFFICER Shadya Bader Ali Al Harby Saudi Arabian 8/1/2018
23021 ADMINISTRATION OFFICER Athir Maflah Abdallah Al Harby Saudi Arabian 8/1/2018
23022 ADMINISTRATION OFFICER Louloua Abdallah Fahd Al Dabah Saudi Arabian 8/1/2018
23023 ADMINISTRATION OFFICER Al Hanouf Saad Thamer Al Azamy Saudi Arabian 8/1/2018
23024 ADMINISTRATION OFFICER Reem Fazaa Snitan Al Otaibi Saudi Arabian 8/1/2018
23036 ADMINISTRATION OFFICER Najood Abdallah Khalaf Al Harby Saudi Arabian 8/1/2018
23037 ADMINISTRATION OFFICER Lamia Abdallah Khalaf Al Harby Saudi Arabian 8/1/2018
23038 ADMINISTRATION OFFICER Moda Mesfer Mohamed Al Sebaay Saudi Arabian 8/1/2018
23039 ADMINISTRATION OFFICER Arij Ali Ahmed Al Barky Saudi Arabian 8/1/2018
23040 ADMINISTRATION OFFICER Fatma Ali Mohamed Hazazi Saudi Arabian 8/1/2018
23041 ADMINISTRATION OFFICER Safia Derham Salem Al Qahtany Saudi Arabian 8/1/2018
23042 ADMINISTRATION OFFICER Ibtisam Awad Mohamed Al Harby Saudi Arabian 8/1/2018
23043 ADMINISTRATION OFFICER Noura Mohamed Garah Al Shimary Saudi Arabian 8/1/2018
23044 ADMINISTRATION OFFICER Bashair said Mafouz Al Zahrany Saudi Arabian 8/1/2018
23045 ADMINISTRATION OFFICER Hanan Awaid Omair Al Harby Saudi Arabian 8/1/2018
Manahle Hamad Mohamed Al
23046 ADMINISTRATION OFFICER Saudi Arabian 8/1/2018
Khodairy
23047 ADMINISTRATION OFFICER Amany Khalf Mauouf Al Ainzy Saudi Arabian 8/1/2018
23048 ADMINISTRATION OFFICER Amal Fayyad Abdallah Al Amary Saudi Arabian 8/1/2018
23049 ADMINISTRATION OFFICER Badria Shafi Fahd Al Harby Saudi Arabian 8/1/2018
23050 ADMINISTRATION OFFICER Dalal Selim Nafa Al Harby Saudi Arabian 8/1/2018
23051 ADMINISTRATION OFFICER Tifla Ghazi Souilm Al Shimary Saudi Arabian 8/1/2018
23052 ADMINISTRATION OFFICER Fatma Abdallah Gaman Al Aissa Saudi Arabian 8/1/2018
23053 ADMINISTRATION OFFICER Al Anoud Hamed Gobran Al Khaldi Saudi Arabian 8/1/2018
23054 ADMINISTRATION OFFICER Nawader Fraig Soliman Al Harby Saudi Arabian 8/1/2018
23055 ADMINISTRATION OFFICER Zohra Zaid Munir Al Otaibi Saudi Arabian 8/1/2018
23056 ADMINISTRATION OFFICER Amal Abdallah Ibrahim Al Ghamdi Saudi Arabian 8/1/2018
23057 ADMINISTRATION OFFICER Noura Samah Sharkh Al Anzy Saudi Arabian 8/1/2018
23058 ADMINISTRATION OFFICER Bashair Ahmed Awaid Al Anzi Saudi Arabian 8/1/2018
23059 ADMINISTRATION OFFICER Aisha Hussain Ali Khabrani Saudi Arabian 8/1/2018
23060 ADMINISTRATION OFFICER Shimaa Farg Abdallah Al Dosary Saudi Arabian 8/1/2018
23061 ADMINISTRATION OFFICER Hanan Hussain Ali Khabrani Saudi Arabian 8/1/2018
23062 ADMINISTRATION OFFICER Hanan Abdallah Fahd Al Gomma Saudi Arabian 8/1/2018
23063 ADMINISTRATION OFFICER Gawaher Thawab Ali Al Mitairy Saudi Arabian 8/1/2018
23064 ADMINISTRATION OFFICER Nouf Hamdan Hussain Al Dokhy Saudi Arabian 8/1/2018
23065 ADMINISTRATION OFFICER Rawaby Mabrouk Ahmed Mashagy Saudi Arabian 8/1/2018
23066 ADMINISTRATION OFFICER Sara Mabrouk Ahmed Mashagy Saudi Arabian 8/1/2018
23067 ADMINISTRATION OFFICER Shahd Fahd AbdAziz Al Hazaa Saudi Arabian 8/1/2018
23068 ADMINISTRATION OFFICER Monira Fahd Ali Al Agamy Saudi Arabian 8/1/2018
23069 ADMINISTRATION OFFICER Amal Soliman Abdallah Al sahman Saudi Arabian 8/1/2018
23070 ADMINISTRATION OFFICER Alaa Said Hassan Al Shahry Saudi Arabian 8/1/2018
23071 ADMINISTRATION OFFICER Nouf Saad Nasser Al Dakhail Saudi Arabian 8/1/2018
23072 ADMINISTRATION OFFICER Al Hanouf Mosalh Aid Al Mitairy Saudi Arabian 8/1/2018
23073 ADMINISTRATION OFFICER Ahlam Hassan Said Al Ahmary Saudi Arabian 8/1/2018
Osama Mohamed Abdel wahab
23074 ELECTRICAL ENGINEER Egyptian 8/26/2018
Hussain
23075 SENIOR ENGINEER Mohammed Nabil Adwan Jordanian 8/26/2018
23083 HUMAN RESOURCES OFFICER Abeer Mohamed Abdel Aziz Al Nasser Saudi Arabian 9/10/2018
23084 PROCUREMENT ENGINEER Abdallah Abdel Aziz Abdallah Al Shiha Saudi Arabian 9/3/2018
23085 DRAFTSMAN Galal El Sawy Ahmed El Hamzawy Egyptian 9/9/2018
23111 QUANTITY SURVEYOR Eyad Adab Abdallah Syrian 9/24/2018
Mobilization Plan ( Sample)
COMPLET LIST OF YANBU EQUIPMENT
Current Current QUNY. OF
S.N Asset No. Asset Code Model Year Asset Categeory Model BRAND Status Plate No. Condition Action
Area Project LOWBED

1 40000399 BH-05 2003 BACKHOE LOADER 4X2 , 57 HP 424D CATERPILLAR BREAKDOWEN NIL YANBU AREA CO:0052 NEED PARTS FROM RIYADH RELEASE

2 40000777 DT-63 2009 DUMP TRUCK 16Mᶟ HD270 HYUNDAI ACTIVE 3803 ‫أ ط ى‬ YANBU AREA CO:0052 GOOD
3 40000681 DT-94 2012 DUMP TRUCK 16Mᶟ HD270 HYUNDAI ACTIVE 3564 ‫ا ك ى‬ YANBU AREA CO:0052 GOOD RELEASE
4 45000920 EG-22 2011 DIESEL GENERATOR 88 KW EY100P ENERGY ITALY BREAKDOWEN NIL YANBU AREA CO:0052 NEED ENGINE OVERHALL RELEASE
5 40000929 EG-32 2015 GENARATOR SET 165 KW 180REOZJG.CAN KOHLER ACTIVE NIL YANBU AREA CO:0052 GOOD
6 40000667 EX-71 2011 CHAIN EXCAVATOR 21 TON SH210LC-5 SUMITOMO ACTIVE NIL YANBU AREA CO:0052 GOOD
WAITING FOR PARTS FROM
7 40000718 EX-82 2011 CHAIN EXCAVATOR 21 TON SH210LC-5 SUMITOMO BREAKDOWEN NIL YANBU AREA CO:0052 RELEASE
JEDDAH AND RIYADH
8 40000805 EX-87 2012 CHAIN EXCAVATOR 21 TON CAT0320DTKGF09042 CATERPILLAR ACTIVE NIL YANBU AREA CO:0052 GOOD
11 LOWBED
9 40000622 ML-42 2010 SKID LOADER SMALL L160 NEWHOLLAND ACTIVE NIL YANBU AREA CO:0052 GOOD
WITHOUT JEEPS
10 40000628 ML-58 2011 SKID LOADER SMALL L160 NEW HOLLAND ACTIVE NIL YANBU AREA CO:0052 GOOD RELEASE CARS AND PICKUP
11 40000779 SB-07 2009 BIG BUS 55 SEAT BF106 DAEWOO ACTIVE 8306 ‫ا ع ص‬ YANBU AREA CO:0052 GOOD AND SEDAN CAR

12 40000709 TC-27 2012 TRUCK CARGO CRANE 8 TON , 6X4 HD260 HYUNDAI ACTIVE 3563 V K A YANBU AREA CO:0052 GOOD

13 40000840 WL-53 2012 WHEEL LOADER 2.3 mᶟ , 928H CATERPILLAR ACTIVE 7361 N J A YANBU AREA CO:0052 GOOD
14 40000875 WL-60 2012 WHEEL LOADER 2.3 mᶟ , 928H CATERPILLAR ACTIVE 6471 K J A YANBU AREA CO:0052 GOOD
15 40000024 WT-05 1990 WATER TANKER TRUCK16Mᶟ 2635 MERCEDES BENZ BREAKDOWEN 7538 ‫ا ب س‬ YANBU AREA CO:0052 DESPOSAL RELEASE
16 40000463 WT-31 2010 WATER TANKER TRUCK 16Mᶟ HD260 HYUNDAI ACTIVE 3141 ‫ا ط ى‬ YANBU AREA CO:0052 GOOD
17 40000507 WT-35 2010 WATER TANKER 16 mᶟ, 6X4 HD260 HYUNDAI ACTIVE 3768 D G A YANBU AREA CO:0052 GOOD

18 40000463 WT-43 2013 WATER TANKER TRUCK 16Mᶟ , 6X4 3340 MERCEDES BENZ ACTIVE 9097 ‫أ م و‬ YANBU AREA CO:0052 GOOD

19 30000218 JP-17 2007 JEEP 4X2 PAJERO MITSUBISHI ACTIVE 35 ‫ي ح ر‬ YANBU AREA CO:0052 GOOD
20 30000307 JP-30 2010 JEEP 4X2 TUCSON GL HYUNDAI ACTIVE 4419 ‫ب ب ع‬ YANBU AREA CO:0052 GOOD
21 30000304 JP-32 2010 JEEP 4X2 SANTA FE GLS , G250 HYUNDAI ACTIVE 4428 ‫ب ب ع‬ YANBU AREA CO:0052 GOOD
22 30000283 SC-16 2008 SEDAN PETROL ,4X2 ,M/T SONATA GL 2.4 HYUNDAI ACTIVE 2004 L S A YANBU AREA CO:0052 GOOD
23 30000296 PU-145 2010 Pick Up D/C DMAX ISUZU ACTIVE 7361 ‫ا ط و‬ YANBU AREA CO:0052 GOOD RELEASE
24 30000298 PU-146 2010 PICK-UP D/C - 4X2 , DIESEL DMAX ISUZU ACTIVE 7371 ‫ا ط و‬ YANBU AREA CO:0052 GOOD
27 30000462 PU-194 2012 Pick Up D/C D-MAX ISUZU ACTIVE 4768 YANBU AREA CO:0052 GOOD
28 30000492 PU-217 2013 PICK-UP D/C - 4X4 ,PETROL CDG D22 NISSAN ACTIVE 2601 ‫أ ن ع‬ YANBU AREA CO:0052 GOOD
29 30000493 PU-218 2013 PICK-UP D/C - 4X4 ,PETROL CDG D22 NISSAN ACTIVE 2605 ‫أ ن ع‬ YANBU AREA CO:0052 GOOD
30 CITISCAPE PU- CITISCAPE 2015 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 2243 ‫ب ا ك‬ YANBU AREA CO:0052 GOOD
7 Lowbed
31 CITISCAPE PU- CITISCAPE 2015 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 2256 ‫ب ا ك‬ YANBU AREA CO:0052 GOOD
32 CITISCAPE PU- CITISCAPE 2015 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 2264 ‫ب ا ك‬ YANBU AREA CO:0052 GOOD
33 CITISCAPE PU- CITISCAPE 2015 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 2274 ‫ب ا ك‬ YANBU AREA CO:0052 GOOD
34 CITISCAPE PU- CITISCAPE 2014 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 8959 ‫ا و ك‬ YANBU AREA CO:0052 GOOD
35 CITISCAPE PU- CITISCAPE 2014 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 8966 ‫ا و ك‬ YANBU AREA CO:0052 GOOD
36 CITISCAPE PU- CITISCAPE 2013 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 9428 ‫ا و ر‬ YANBU AREA CO:0052 GOOD
37 CITISCAPE PU- CITISCAPE 2014 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 9435 ‫ا و ر‬ YANBU AREA CO:0052 GOOD
38 CITISCAPE PU- CITISCAPE 2015 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 9442 ‫ا و ر‬ YANBU AREA CO:0052 GOOD
39 CITISCAPE PU- CITISCAPE 2014 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 9447 ‫أ و ر‬ YANBU AREA CO:0052 GOOD
40 CITISCAPE PU- CITISCAPE 2014 PICK-UP D/C - 4X2 , DIESEL D-MAX ISUZU ACTIVE 9448 ‫أ و ر‬ YANBU AREA CO:0052 GOOD
41 CITISCAPE BL-CITISCAPE 2015 TELESCOPIC HANDLER BOB CAT ACTIVE 1073 K D A YANBU AREA CO:0052 GOOD
STEERING ROLLER COMPACTOR - 1 LOWBED
42 20220733 RC-CITISCAPE 2013 NIL WACKER NEUSON ACTIVE RD16 YANBU AREA CO:0052 GOOD
1 TON , 90 cm
10 SMALL GENERATOR + 15
JUMPER +6 ASPHALT CUTTER +10
43 PROJECT TUMPANE YANBU AREA CO:0052 NOT GOOD 2 LOWBED
DEWATREING PUMP +3 TOWER
LIGHT
TOTAL QY. OF LOWBED 21

1/1 Fleet Equipment Department


Furniture & Assets Register ( YANBU SITE Project )

Site & Office ( I.T )


QUNY.
S.R Assets No Asset Description Brand & Model Location OF UNIT
LOWBED
1 70000132 LAPTOP HP YANBU
3 70000173 LAPTOP DELL YANBU
5 70000583 LAPTOP DELL YANBU
6 70000128 PC INTEL DUAL CORE 2.7 - LG LCD MONITOR EMTEC YANBU
7 70000129 PC INTEL DUAL CORE 2.7 - VOSTRO 220 DELL YANBU
9 70000139 PC DELL , INTEL DUAL CORE 2.8 DELL YANBU
10 70000617 DESKTOP OPTIPLEX 9020 MT WITH ICD 19" PROCESSOR INTEL i7 4770 DELL YANBU
11 70000618 DESKTOP OPTIPLEX 9020 MT WITH ICD 19" PROCESSOR INTEL i7 4771 DELL YANBU
12 70000619 DESKTOP OPTIPLEX 9020 MT WITH ICD 19" PROCESSOR INTEL i7 4772 DELL YANBU
13 70000620 DESKTOP OPTIPLEX 9020 MT WITH ICD 19" PROCESSOR INTEL i7 4773 DELL YANBU
14 70000621 DESKTOP OPTIPLEX 9020 MT WITH ICD 19" PROCESSOR INTEL i7 4774 DELL YANBU
15 70000622 DESKTOP OPTIPLEX 9020 MT WITH ICD 19" PROCESSOR INTEL i7 4775 DELL YANBU
16 70000548 Dell desktop OptiPlex 7010 MT 15 With LCD DELL YANBU
17 NOT AVAILABLE DESKTOP OPTIPLEX DELL YANBU
18 70000441 Dell desktop OptiPlex 7010 MT 15 With LCD Monitor DELL YANBU
19 50000686 COPIER MACHINE, TOSHIBA DIGITAL MEP E STUDIO 3055C TOSHIBA YANBU
20 70000127 HP DESKJET 510 ploter HP YANBU
21 70000202 LAPTOP DELL YANBU
22 NOT AVAILABLE LAPTOP TOSHIBA YANBU
25 70000127 Dell desktop OptiPlex 7010 MT 15 With LCD Monitor DELL YANBU

Office Table & office Desk


S.R Assets No Asset Description Brand & Model Location
1 Manager Desk Office 1. 8 Mtr NOT AVAILABLE YANBU
60000961 With Revolving Chair, With Tea Table, With Wooden Cabenit 3 Doors NOT AVAILABLE YANBU
2 Manager Desk Office 1. 8 Mtr NOT AVAILABLE YANBU
60000960 With Revolving Chair, With Tea Table, With Wooden Cabenit 3 Doors NOT AVAILABLE YANBU
3 Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
4 60000963 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
5 60000964 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
6 60000965 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
7 60000966 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
8 60000967 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
9 60000968 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
10 60000969 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
11 60000970 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
12 60000971 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
13 60000972 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
14 60000973 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
15 60000974 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
16 60000975 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU BOX
1
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU LOWBED
17 60000976 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU

1/4 Fleet Equipment Department


QUNY. BOX
1
S.R Assets No Asset Description Brand & Model Location OF LOWBED
UNIT
LOWBED
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
18 60000977 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
19 60000978 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
20 60000979 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
21 60000980 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
22 60000981 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
Lather Sofa Sets NOT AVAILABLE YANBU
23 60000983 Sofa Sets (3) Seats + Sofa Sets (2) Seats + Two Single Sofa One Seat NOT AVAILABLE YANBU
Larg Meeting Table Wide 120 CM NOT AVAILABLE YANBU
24 60000982 With 14 Revolving Chairs NOT AVAILABLE YANBU
Desk Office 1.6 Mtr With Extension NOT AVAILABLE YANBU
25 60000962 With Revolving Chair, With Wooden Cabenit 2 Doors NOT AVAILABLE YANBU
26 60000420 WOODEN CABINET NOT AVAILABLE YANBU
27 60000421 WOODEN CABINET NOT AVAILABLE YANBU
28 60000422 WOODEN CABINET NOT AVAILABLE YANBU
29 60000423 WOODEN CABINET NOT AVAILABLE YANBU
30 60000351 TABLE NOT AVAILABLE YANBU
31 60000197 TABLE NOT AVAILABLE YANBU
32 60000196 TABLE NOT AVAILABLE YANBU
33 60000178 TABLE NOT AVAILABLE YANBU
34 60000199 TABLE NOT AVAILABLE YANBU
35 60000177 TABLE NOT AVAILABLE YANBU
36 60000198 TABLE NOT AVAILABLE YANBU
37 60000176 TABLE NOT AVAILABLE YANBU

Surveying Devices
S.R Assets No Asset Description Brand & Model Location
1 45001347 GPS Transfer to sharma Sokkia Atlas YANBU

2 45001340 Total Station Leica YANBU


3 45001353 Total Station Leica YANBU
5 45001354 Level Leica YANBU
6 45001355 Level Sokkia YANBU
7 NOT AVAILABLE Level Sokkia C330 YANBU
8 NOT AVAILABLE Total Station Tumblr s6 RIYADH
9 NOT AVAILABLE Level LeicaNA730 YANBU
10 NOT AVAILABLE Level LeicaNA731 YANBU
11 NOT AVAILABLE Level Sokkia B30 YANBU
12 NOT AVAILABLE Total Station Trimble S6 YANBU

A/C
S.R Assets No Asset Description Brand & Model Location
1 51000659 YORK TAURAS WALL MOUNTED SPLIT TYPE AC YE6HC24SC+YE6SD24OSC YORK YANBU
2 51000660 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
3 51000661 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
4 51000662 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
5 51000663 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
6 51000664 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
7 51000665 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
8 51000666 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
9 51000667 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
10 51000668 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
11 51000669 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
12 51000670 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
13 51000671 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
14 51000672 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
15 51000673 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
16 51000674 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
17 51000675 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
18 51000676 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU
19 51000677 YORK TAURAS WINDOW TYPE AC NYSR24 YORK YANBU

BOX
1
2/4 LOWBED
Fleet Equipment Department
QUNY.
S.R Assets No Asset Description Brand & Model Location OF UNIT
LOWBED
20 51000342 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
21 51000343 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU BOX
22 51000334 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU 1
LOWBED
23 51000345 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
24 51000346 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
25 51000347 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
26 51000348 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
27 51000349 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
28 51000350 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
29 51000351 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
30 51000352 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
31 51000353 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
32 51000354 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
33 51000355 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
34 51000356 WINDOW TYPE AIR CONDITION MODEL ZCB18C ZAMIL YANBU
35 50000160 WINDOW AC ZAMIL YANBU
36 51000226 WINDOW AC ZAMIL YANBU
37 51000252 WINDOW AC LG 18000 UNIT LG YANBU
38 51000236 WINDOW AC LG 18000 UNIT LG YANBU
39 51000237 WINDOW AC LG 18000 UNIT LG YANBU
40 51000240 WINDOW AC LG 18000 UNIT LG YANBU
41 51000242 WINDOW AC LG 18000 UNIT LG YANBU
42 51000245 WINDOW AC LG 18000 UNIT LG YANBU
43 51000253 WINDOW AC LG 18000 UNIT LG YANBU
44 51000254 WINDOW AC LG 18000 UNIT LG YANBU
45 51000255 WINDOW AC LG 18000 UNIT LG YANBU
46 51000256 WINDOW AC LG 18000 UNIT LG YANBU
47 NOT AVAILABLE WINDOW AC ZAMIL YANBU
48 NOT AVAILABLE WINDOW AC CLASSIS YANBU
49 NOT AVAILABLE WINDOW AC YORK YANBU
50 NOT AVAILABLE WINDOW AC FALCON YANBU
51 NOT AVAILABLE WINDOW AC SAMSUNG YANBU
52 NOT AVAILABLE WINDOW AC CLASSIS YANBU
53 NOT AVAILABLE WINDOW AC NOT AVAIABLE YANBU
54 NOT AVAILABLE WINDOW AC SAMSUNG YANBU
55 NOT AVAILABLE WINDOW AC DORA YANBU
56 NOT AVAILABLE WINDOW AC FALCON YANBU
57 NOT AVAILABLE WINDOW AC NOT AVAIABLE YANBU
58 NOT AVAILABLE WINDOW AC NOT AVAIABLE YANBU

Camp
S.R Assets No Asset Description Brand & Model Location
1 51000361 REFRAGETOR sharp YANBU
2 51000362 REFRAGETOR sharp YANBU
3 51000363 REFRAGETOR sharp YANBU
4 51000364 REFRAGETOR sharp YANBU
5 51000375 REFRAGETOR falcon YANBU
6 51000376 REFRAGETOR falcon YANBU
7 51000377 REFRAGETOR falcon YANBU
8 51000378 REFRAGETOR falcon YANBU
9 51000357 WASHING MACHINE LG YANBU BOX
1
10 51000358 WASHING MACHINE LG YANBU LOWBED
11 51000359 WASHING MACHINE LG YANBU
12 51000360 WASHING MACHINE LG YANBU
13 51000371 WASHING MACHINE MEDIA YANBU
14 51000372 WASHING MACHINE MEDIA YANBU
15 51000373 WASHING MACHINE MEDIA YANBU
16 51000374 WASHING MACHINE MEDIA YANBU
17 51000381 ELECTRIC WATER COOLER CAP. 500L NOT AVAILABLE YANBU
18 51000382 ELECTRIC WATER COOLER CAP. 500L NOT AVAILABLE YANBU

{ Remarks }
S.R Assets No Asset Description Brand & Model Location
1 NOT AVAIABLE PORTABLE CABIN HEAD OFFICE NOT AVAILABLE YANBU
2 NOT AVAIABLE PORTABLE CABIN SECURTY NOT AVAILABLE YANBU
3 NOT AVAIABLE PORTABLE CABIN SECURTY GATE SMALL NOT AVAILABLE YANBU

8 LOWBED

3/4 Fleet Equipment Department


QUNY.
S.R Assets No Asset Description Brand & Model Location OF UNIT
LOWBED
4 NOT AVAIABLE PORTABLE CABIN SECURTY GATE SMALL NOT AVAILABLE YANBU
6 NOT AVAIABLE PORTABLE CABIN MASJID NOT AVAILABLE YANBU 8 LOWBED
7 NOT AVAIABLE PORTABLE CABIN STORE NOT AVAILABLE YANBU
8 NOT AVAIABLE PORTABLE CABIN EQUIPMENT SMALL NOT AVAILABLE YANBU
9 NOT AVAIABLE PORTABLE CABIN LABETREY NOT AVAILABLE YANBU
10 NOT AVAIABLE PORTABLE CABIN WORKSHOP NOT AVAILABLE YANBU
11

4/4 Fleet Equipment Department


Materials Not in SAP ( belong to STCL )
QYN.
# Material Description Storage Location Specs Unit Qty
LOWBED
1 Metal molds(( SENTRING) form ) YANBU WORKSHOP Material Not in Sap PCS 167

Dimensions ( 4-6 m *0.14 m * 0.075


2 IRON BEAM STORE AND workshop PCS 99
m)

3
3 Scaffolding STORE AND PARKING Dimensions ( 2-3 m ) PCS 200

4 IRON BEAM YANBU WORKSHOP + near store Dimensions (4-6 m *0.14m *0.075) PCS 99

5 RUBBER SHEET YANBU STORE RUBBER SHEET ROL 3


6 Y JUNTION 160MM YANBU STORE Y JUNTION 160MM EA 4
7 STEP COUPLING 150MM YANBU STORE STEP COUPLING 150MM EA 3
8 HDPE END CAP 63MM YANBU STORE HDPE END CAP 63MM EA 10
9 HDPE END CAP 75MM YANBU STORE HDPE END CAP 75MM EA 11
10 PVC HOSE CONNECTOR YANBU STORE PVC HOSE CONNECTOR EA 1
11 STEEL STUB FLANGE 110MM YANBU STORE STEEL STUB FLANGE 110MM EA 4
12 STEEL STUB FLANGE 90MM YANBU STORE STEEL STUB FLANGE 90MM EA 3
13 HDPE REDUCER 75-63MM YANBU STORE HDPE REDUCER 75-63MM EA 9
14 HDPE REDUCER 90-75MM YANBU STORE HDPE REDUCER 90-75MM EA 3
15 HDPE REDUCER 110-75MM YANBU STORE HDPE REDUCER 110-75MM EA 3
16 HDPE REDUCER 90-50MM YANBU STORE HDPE REDUCER 90-50MM EA 3
17 HDPE REDUCER 63-32MM YANBU STORE HDPE REDUCER 63-32MM EA 2
18 HDPE ELBOW 45D-75MM YANBU STORE HDPE ELBOW 45D-75MM EA 7
19 HDPE ELBOW 45D-160MM YANBU STORE HDPE ELBOW 45D-160MM EA 1
20 UPVC ELBOW 90D 225MM YANBU STORE UPVC ELBOW 90D 225MM EA 7
21 UPVC ELBOW 45D 160MM LONG YANBU STORE UPVC ELBOW 45D 160MM LONG EA 3
22 UPVC ELBOW 45D 110MM LONG YANBU STORE UPVC ELBOW 45D 110MM LONG EA 23
23 GASKET RUBBER 63MM YANBU STORE GASKET RUBBER 63MM EA 20
24 UPVC STUB FLANGE 75MM YANBU STORE UPVC STUB FLANGE 75MM EA 38
25 UPVC STUB RING 75MM YANBU STORE UPVC STUB RING 75MM EA 28
26 UPVC TEE 160MM YANBU STORE UPVC TEE 160MM EA 4
27 WELDING MACHINE BIG YANBU STORE WELDING MACHINE BIG EA 1
28 WELDING MACHINE SMALL YANBU STORE WELDING MACHINE SMALL EA 1 3
29 ROD CUTTING MACHINE YANBU STORE ROD CUTTING MACHINE EA 1
30 UPVC STUB FLANGE 110MM YANBU STORE UPVC STUB FLANGE 110MM EA 4
31 GATE VALVE DOUBLE SOCKET 150MM YANBU STORE GATE VALVE DOUBLE SOCKET 150MM EA 2
32 UPVC TEE 200MM YANBU STORE UPVC TEE 200MM EA 3
33 CORE CUTTING MACHINE YANBU STORE CORE CUTTING MACHINE EA 1
34 WARNING TAPE SEWAGE YANBU STORE WARNING TAPE SEWAGE EA 1
35 UPVC END CAP 160MM YANBU STORE UPVC END CAP 160MM EA 8
36 MUNI BALL 200MM YANBU STORE MUNI BALL 200MM EA 2
37 TARPOLINE 10X10 YRD YANBU STORE TARPOLINE 10X10 YRD EA 3
38 BENDING WIRE YANBU STORE BENDING WIRE EA 2
39 HDPE COUPLING 300MM YANBU STORE HDPE COUPLING 300MM EA 1
40 FAN FOR MANHOLE YANBU STORE FAN FOR MANHOLE EA 1
41 HYDROTEST MACHINE YANBU STORE HYDROTEST MACHINE EA 2
42 HDPE WELDING MACHINE YANBU STORE HDPE WELDING MACHINE EA 3
43 STEEL BLADE CUTTER MACHINE YANBU STORE STEEL BLADE CUTTER MACHINE EA 1
44 WHEEL METER YANBU STORE WHEEL METER EA 1
45 WELDING ROD YANBU STORE WELDING ROD CAR 2
46 Sewage Lifting Pump YANBU STORE Sewage Lifting Pump EA 3
47 Sewage Lifting Pump YANBU STORE Sewage Lifting Pump EA 3
48 Sewage Lifting Pump YANBU STORE Sewage Lifting Pump EA 3
49 Control Panel for WBP-1; YANBU STORE Control Panel for WBP-1; EA 1
50 Control Panel for SP-1; YANBU STORE Control Panel for SP-1; EA 1
51 MANUAL INJECTOR (HILTI) YANBU STORE MANUAL INJECTOR (HILTI) EA 1
52 YANMAR RADIATOR YANBU YANMAR RADIATOR EA 1
53 SUPPORT FRT. YANBU SUPPORT FRT. EA 1
54 Oil Pump GPAOP YANBU Oil Pump GPAOP EA 2
55 PANEL (L) SIDE YANBU PANEL (L) SIDE EA 1
56 PANEL ASSY FRT DR TRIM RH MAZDA YANBU PANEL ASSY FRT DR TRIM RH MAZDA EA 1
57 PANEL ASSY. FR DR. LH HYUNDI YANBU PANEL ASSY. FR DR. LH HYUNDI EA 1
58 CONDENSOR ASSY COOLER HYUNDI YANBU CONDENSOR ASSY COOLER HYUNDI EA 1
59 BAR FRT. BUMPER YANBU BAR FRT. BUMPER EA 1

1/2 Fleet Equipment Department


Materials Not in SAP ( belong to STCL )
QYN.
# Material Description Storage Location Specs Unit Qty
LOWBED
60 BUMPER ASM FRT YANBU BUMPER ASM FRT EA 1
61 CONDENSOR ASSY COOLER HYUNDI YANBU CONDENSOR ASSY COOLER HYUNDI EA 1
62 HOUSING BEARING 26185 YANBU HOUSING BEARING 26185 EA 2
63 BALL JOINT MAZDA UR 56-32250 YANBU BALL JOINT MAZDA UR 56-32250 EA 2
64 SADDLE ASSY-LWR YANBU SADDLE ASSY-LWR EA 2
65 CHAMBER ASSY-BRAKE YANBU CHAMBER ASSY-BRAKE EA 6
66 BUSH CAM SHAFT YANBU BUSH CAM SHAFT EA 5
67 KIT-ETROFIT TRAVEL CABLE YANBU KIT-ETROFIT TRAVEL CABLE EA 1
68 BRACKET ENGINE HYUNDAI YANBU BRACKET ENGINE HYUNDAI EA 1
69 STUD BOLT YANBU STUD BOLT EA 20
70 STUD NUT YANBU STUD NUT EA 17
71 LINING CAM HYUNDAI YANBU LINING CAM HYUNDAI EA 8
72 RIM DUM TRUCK YANBU RIM DUM TRUCK EA 2
73 AIR FILTER A68390 YANBU AIR FILTER A68390 EA 2
74 AIR FILTER 4736223 YANBU AIR FILTER 4736223 EA 1
75 AIR FILTER YANBU AIR FILTER EA 1
76 OIL FILTER WU630X100 YANBU OIL FILTER WU630X100 EA 3
77 AIR CLEANER 612502C YANBU AIR CLEANER 612502C EA 2
78 AIR FILTER AF437 YANBU AIR FILTER AF437 EA 1
79 OIL FILTER WU630X100 YANBU OIL FILTER WU630X100 EA 3
1 (BOX
80 AIR CLEANER 612501C YANBU AIR CLEANER 612501C EA 3
LOWBED)
81 AIR FILTER2567902 YANBU AIR FILTER2567902 EA 1
82 OIL FILTER PT8366 YANBU OIL FILTER PT8366 EA 1
83 OIL FILTER 125-1817 YANBU OIL FILTER 125-1817 EA 1
84 OIL FILTER XGH 700X10 YANBU OIL FILTER XGH 700X10 EA 4
85 OIL FILTER 075013105311 YANBU OIL FILTER 075013105311 EA 3
86 OIL FILTER P551313 YANBU OIL FILTER P551313 EA 2
87 OIL FILTER LF3000 YANBU OIL FILTER LF3000 EA 2
88 OIL FILTER 3619554 YANBU OIL FILTER 3619554 EA 1
89 OIL FILTER 4630525 YANBU OIL FILTER 4630525 EA 2
90 OIL FILTER 73300483 YANBU OIL FILTER 73300483 EA 1
91 AIR FILTER 8-97944570 YANBU AIR FILTER 8-97944570 EA 1
92 AIR FILTER 4679981 YANBU AIR FILTER 4679981 EA 1
93 OIL FILTER C5001 YANBU OIL FILTER C5001 EA 4
94 OIL FILTER 54-0110 YANBU OIL FILTER 54-0110 EA 1
95 OIL 2655001 YANBU OIL 2655001 EA 1
96 OIL FILTER P551026 YANBU OIL FILTER P551026 EA 2
97 OIL FILTER 156-1200 YANBU OIL FILTER 156-1200 EA 1
98 OIL FILTER BT-9464 YANBU OIL FILTER BT-9464 EA 1
99 OIL FILTER PF-7982 YANBU OIL FILTER PF-7982 EA 2
100 OIL FILTER 26554403 YANBU OIL FILTER 26554403 EA 1
101 OIL FILTER 107-7817 YANBU OIL FILTER 107-7817 EA 2
102 OIL FILTER 115-8189 YANBU OIL FILTER 115-8189 EA 1
103 OIL FILTER BF1212 YANBU OIL FILTER BF1212 EA 1
104 OIL FILTER FF5114 YANBU OIL FILTER FF5114 EA 1
105 OIL FILTER B161S YANBU OIL FILTER B161S EA 1
106 OIL FILTER 9Z11FS YANBU OIL FILTER 9Z11FS EA 1
107 OIL FILTER YANBU OIL FILTER EA 3
108 OIL FILTER HFE9034 YANBU OIL FILTER HFE9034 EA 1
7

2/2 Fleet Equipment Department


PROJECT EXTRA MATERIALS
QYN.
# Material Description Storage Location Specs Unit Qty Condition
LOWBED
1 HDPE WELDING MACHINE YANBU STORE EA 3 GOOD
2 HDPE REDUCER COUPLING 90-75MM YANBU STORE EA 19 GOOD
3 HDPE REDUCER COUPLING 75-63MM YANBU STORE EA 10 GOOD
4 HDPE REDUCER 110-75MM YANBU STORE EA 5 GOOD
5 HDPE REDUCER 90-63MM YANBU STORE EA 1 GOOD
6 HDPE REDUCER 160-110MM YANBU STORE EA 4 GOOD 1 (BOX
7 HDPE TEE 90MM YANBU STORE EA 10 GOOD LOWBED)
8 HDPE TEE110-90MM YANBU STORE EA 10 GOOD
9 HDPE TEE 75MM YANBU STORE EA 9 GOOD
10 HDPE TEE 63MM YANBU STORE EA 10 GOOD
11 HDPE TEE 160MM YANBU STORE EA 10 GOOD
12 HDPE ELBOW 45D 63MM YANBU STORE EA 106 GOOD
13 Air Filter YANBU STORE RS 3744 EA 3 GOOD
14 Air Filter YANBU STORE RS3745 EA 3 GOOD
15 Air Filter YANBU STORE RS3542 EA 4 GOOD
16 Air Filter YANBU STORE RS5434 EA 4 GOOD
17 Air Filter YANBU STORE RS3543 EA 4 GOOD
18 Air Filter YANBU STORE RS3704 EA 6 GOOD
19 Filter YANBU STORE BT8416 EA 14 GOOD
20 Filter YANBU STORE BT7159 EA 4 GOOD
21 Filter YANBU STORE 8.5E+07 EA 11 GOOD
22 Filter YANBU STORE 8.4E+07 EA 22 GOOD
23 Bobcat YANBU STORE 7225338 EA 2 GOOD
24 Filter YANBU STORE 7300483 EA 10 GOOD
25 Filter YANBU STORE 4.7E+07 EA 10 GOOD
26 Filter YANBU STORE 4.7E+07 EA 5 GOOD
27 Filter YANBU STORE 4430037 EA 10 GOOD
28 Filter YANBU STORE BF1390 EA 4 GOOD
29 Filter YANBU STORE BF9867-0 EA 3 GOOD
30 Filter YANBU STORE B7357 EA 1 GOOD
31 Filter YANBU STORE BF7925 EA 3 GOOD
32 Filter YANBU STORE RS3715 EA 7 GOOD
33 Filter YANBU STORE 7933 EA 10 GOOD
34 Air Filter YANBU STORE 4.7E+07 EA 2 GOOD
35 Air Filter YANBU STORE 4.7E+07 EA 2 GOOD
36 Filter YANBU STORE B7276 EA 9 GOOD
37 Filter YANBU STORE BF940 EA 13 GOOD
38 Filter YANBU STORE BF7915 EA 9 GOOD
39 Filter YANBU STORE C-5105 EA 8 GOOD
1(BOX LOWBED)
40 Tore Filter YANBU STORE 107-7817 EA 17 GOOD
41 Tore Filter YANBU STORE 54-0110 EA 7 GOOD
42 Tore Filter YANBU STORE 108-3811 EA 5 GOOD
43 Perkins YANBU STORE 2.7E+07 EA 1 GOOD
44 Cat Element YANBU STORE 1805475 EA 3 GOOD
45 Filter YANBU STORE 51601 EA 1 GOOD
46 Cat YANBU STORE 734 EA 1 GOOD
47 Cat YANBU STORE 319-0844 EA 1 GOOD
48 Cat YANBU STORE 326-1644 EA 1 GOOD
49 Cat YANBU STORE 8878 EA 1 GOOD
50 Cat YANBU STORE 228-9130 EA 1 GOOD
51 Fuel water sup YANBU STORE 326-1644 EA 2 GOOD
52 Fuel Filter YANBU STORE 3190844 EA 2 GOOD
53 Filter YANBU STORE 2655001 EA 1 GOOD
54 Air Filter YANBU STORE 183-2813 EA 3 GOOD
55 Air Filter YANBU STORE RS3542 EA 4 GOOD
56 Air Filter YANBU STORE RS3543 EA 4 GOOD
57 Isszu Air Filter YANBU STORE 8-98140266-0 EA 6 GOOD
58 Isszu Air Filter YANBU STORE 8-98194119-0 EA 6 GOOD
59 Bobcat YANBU STORE 6675517 EA 7 GOOD
60 Filter YANBU STORE BF1257 EA 8 GOOD
61 Cat YANBU STORE 228-9130 EA 2 GOOD

1/2 Fleet Equipment Department


PROJECT EXTRA MATERIALS
QYN.
# Material Description Storage Location Specs Unit Qty Condition
LOWBED
62 Oil Filter YANBU STORE C-5811 EA 3 GOOD
63 Fule Filter YANBU STORE 32/925950 EA 3 GOOD
64 ENGINE OIL 40 YANBU STORE DR 1 GOOD
65 GRASE YANBU STORE DR 4 GOOD
66 HYDROLIC 68 YANBU STORE DR 2 GOOD
2

2/2 Fleet Equipment Department


Subcontractor Plan (Sample)
Project Execution Plan I KKIA PW

KKIA PW Project

Project Execution Plan, PEP

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |1


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

KKIA PW Project
Project Execution Plan PEP – Signatures & Sign‐Off

No. Name Job Title Company Signature


1. Muntaser Kalahji JV Board AHT
2. Paul J. Redstone JV Board WETICO
3. Khaldoun Rashid Jayousi JV Board STCL
4. Mohammed Saad Abunayyan Executive Committee AHT
5. Khaled Habib Executive Committee Wetico‐STCL JV
6. Tamer Mughrabi Executive Committee Wetico‐STCL JV
7. Mitwally Muhammed Executive Committee Wetico‐STCL JV
8. Mohamed Tamimy Executive Committee Wetico‐STCL JV
9. Nimer Abu Niaaj JV Projects Director AHT
10. Khairul Rajali Project Manager Wetico‐STCL JV

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |2


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

Contents
Section Description Page
Signatures & Sign‐Off 2
Contents Page 3
1.0 Introduction 4
1.1 Overview 4
1.2 Purpose 4
1.3 Approvals and Revisions 4
2.0 Project Summary 5
2.1 KKIA PW Project Summary 5
2.2 KKIA PW Detailed Description 5–6
3.0 Project Location 7
Figure 1. KKIA PW Project – Location Map 7
Figure 2. KKIA PW Project – Location Map 7
4.0 Mission and Project Objective 8
4.1, 4.2 Mission 8
4.3, 4.3 Project Objective 8
5.0 Project Contractual Relationships 9
5.1, 5.2 Criteria 9
5.3 Contractual Arrangements 9
Figure 3. KKIA PW Project – Contractual Arrangements 9
6.0 Organisation Chart 10
Figure 4. KKIA PW Project – Organisation Chart 10
7.0 Programme 11
8.0 Design Status 12
Figure 6. KKIA PW Project – Overall Layout 13
Figure 7. KKIA PW Project – Plant Layout 14
Figure 8. KKIA PW Project – Plant Process Diagram 15
9.0 Site Mobilisation Plan 16
10.0 Cost Plan 17
11.0 Procurement Plan 18‐19
12.0 Quality Assurance Plan 20
13.0 Health & Safety Plan 21
13.1 Site Safety Commitments 21
14.0 Communication Plan 22
APPENDICES
Appendix A – Project Time Schedule
Appendix B – Payment Milestone

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |3


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

Project Execution Plan PEP


1.0 Introduction
1.1.1 This Project Execution Plan (PEP) sets out the strategy for managing the engineering design,
procurement and construction of the KKIA Portable Water Project, located at King Khaled
International Airport, Riyadh.

1.2 Overview

1.2.1 The KKIA PW Project scope of work includes for the Engineering Design, Procurement,
Construction, Commissioning and Testing of a potable water plant and associated infrastructure
to supply 25,000m3 per day of potable water at a point of delivery. The scope of work is further
defined in clause 2.2 below.

1.2.2 The aim of this project is to establish a new water treatment plant with capacity of 25,000 m³ per
day with provision and space allocation to increase to 30,000 m³ per day to produce potable
water that shall conform to the Saudi drinking water standard and GCC standard to serve King
Khaled International Airport.

1.3 Purpose

1.3.1 This PEP defines the KKIA PW Project and describes planning, assumptions, constraints, roles,
responsibilities, authorities, management interactions and interface management necessary to
successfully execute the Project.

1.4 Approvals and Revisions

1.4.1 Approval of this PEP will occur when all stakeholders sign page 2 above – Signatures & Sign‐Off.

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |4


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

2.0 Project Summary


2.1 KKIA WTP Project Summary:

No. Item Description

1 Project Name King Khaled PW Project

2 Client Riyadh Water Production Company (RWPC)

3 Client’s Employer The General Authority of Civil Aviation (GAGA)

4 Description of Works Design, Procurement, Construction, Commissioning, Testing of a potable water


plant and associated infrastructure, to supply 25,000m3 per day of potable
water at the point of delivery.

5 Plant Capacity 25,000 m3 per day

6 Contract Type Lump Sum Turnkey Fixed Price Contract (EPC Contract)

7 EPC Contractor Abunayyan Trading Company (ATC)

8 EPC Subcontractor WETICO – Saudi Tumpane Joint Venture

9 Contract Duration 16 Months


(19th January 2016 to 14th May 2017)

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |5


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

2.2 The KKIA PW Project will treat brackish water fed from existing and newly drilled deep wells as
follows:
 Drilling of new wells complete with pumps and riser pipes;
 Transferring water from new wells to a new RO Plant;
 Rehabilitation of existing well No. 108 including new pump and riser pipe;
 Rerouting of the existing wells transmission line from the existing location to the new RO
Plant;
 Design, supply and installation of two, glass lined raw water storage tanks, each with a
capacity of 12,500m3 complete with roofs;
 Design, supply and installation of a new RO Plant;
 Design, supply and installation of two, glass lined RO reject water collection tanks each with
a capacity of 500m3 complete with flat roofs;
 Design, supply and installation of reject water transfer pump station of capacity of 7,500m3
per day;
 Construction of reject water transmission line, of uPVC material from the new reject water
pump station to evaporation ponds;
 Design and construction of civil engineering structures and building works associated with
the new KKIA PW including geotechnical survey works;
 Design, supply and installation of three, glass lined product water storage tanks, each with a
capacity of 25,000m3 complete with flat roofs;
 Design, supply and installation of a main pumping station to be located at the new water
treatment plant area to supply potable water to the point of delivery to the existing KKIA
water distribution network. The point of delivery is at and within the existing water
connection chamber located at the existing water treatment works;
 Design and construction of new evaporation ponds;
 Rehabilitation of a 3 cell existing evaporation pond of total area of 360,000m2;
 Associated project related construction works including plant buildings sidewalks, roads,
plant lighting etc.;
 Testing and commissioning of the mechanical and electrical works including ancillary items.

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |6


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

3.0 Project Location

Figure 1. KKIA PW Project – Location Map

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |7


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

4.0 Mission and Project Objective


4.1. Mission

4.2 The KKIA PW Project mission is to: Provide a World class Water Treatment Plant to supply potable
water to the King Khaled International Airport in accordance with the requirements of Riyadh
Water Production Company (RWPC) and to demonstrate the capabilities of Abunayyan Trading
Company (ATC) in delivering a fully integrated solution for the water sector.

4.3 Project Objective

4.4 The objective of the KKIA PW Project is to:

 Construct a World class facility with an operational life span of 30 years;


 Ensure zero harm to all stakeholders and everyone involved in the project in terms of health
and safety and ensure the highest standards of health and safety are applied throughout the
KKIA PW Project;
 Ensure that health and safety and environmental requirements are incorporated in to the
design and properly implemented in the construction, commissioning and hand‐over of the
KKIA PW Project to Riyadh Water Production Company(RWPC);
 Complete the KKIA PW Project within budget on time (16 months) and in accordance with the
specified quality standards;
 To produce potable water that shall conform to the Saudi drinking water standard and GCC
standard to supply King Khaled International Airport.
 Plan and design the KKIA PW Project to maximise efficiency and minimise cost in use over the
30 years life cycle of the operation and maintenance period;
 Utilise Abunayyan Holding Group Companies in the design, supply and installation of the KKIA
PW Project;
 To demonstrate the capability of Abunayyan Holding Company SBU’s in delivering a fully
integrated solution for the water sector.

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |8


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

5.0 Project Contractual Relationships


5.1 Criteria

5.2 The KKIA PW Project was initially developed based on the following criteria:

 KKIA is owned and operated by GAGA on behalf of the Government;


 Build Operate Transfer [BOT] solution was offered by RWPC to GACA;
 Concession Agreement – GACA –RWPC – for 30 years – agreed tariff + O&M;
 EPC Contract – [Engineering, Procurement, and Construction] used to design and build the
project.

5.3 Contractual Arrangements – Stakeholders

Figure 3. KKIA PW Project – Contractual Arrangements

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e |9


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

6.0 Organisation Chart

Figure 4 Below KKIA PW Project – Organisation Chart

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 10


KKIA PW PEP Rev.00
KKIA PW PROJECT WETICO ‐ STCL JV ORGANISATION CHART

Date: 30.05.16

JV Projects Director
Nimer Abu Niaaj

Finance Engineering QHSE Supply Chain Project Manager Admin Mgr Commercial Project Control
(M. Sadiq) (Tamer Mugrabi) (Hesham M.) (Shahzad Khan) Khairul Rajali (K. Aldawani) (Osama Yacub) (E. Nasser)

HSE Officer Quantity Surveyor


Design Manager Purchaser Construction Mgr. E&M Manager Site Admin & HR Planning Engineer
(Ismayil (Md. Alotaibi)
(Zacaria G.) (Avadhut Shinde) (Md Sherby) (Ibrahim Yildiz) (Ataallah) (Hisham Saad)
Cheppana)

SCADA QA/QC Civil Store Keeper (Abu Sr. Site Civil Eng. Mech. Engineer Time Keeper Doc. Controller
Majed Nabolsi (Tharwat Zalama) Backer) (Muhanad Nassar) (TBA) (Puran) Johnito

Mech. Pipe Male Nurse/First Site Engineer Electrical Engineer Teaboy


(M. Kima) Aider ( M. Al Maamly) (TBA) (Ali)
(TBA) Legend:
Electrical Surveyor General Labor
Office Based
(Ghasan Salama) (Ahmed Wakeel)

Civil Design Site Surveyor


Site Based
(Mitwally) (Amin Rahman)

Civil Design Site Foreman


Consultant
Dar Al Abdah (Fayaz Ahmed)
Project Execution Plan I KKIA PW

7.0 Programme

PROJECT TIME SCHEDULE

(Refer to Appendix A)

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 11


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

8.0 Design Status


 Basic design is complete (100%)

 Electro‐Mechanical Detailed Design complete (Remaining Shop Drawing)

 Civil Structural Design for GLS Tank Foundations Complete (100%)

 Site Survey Works & Geotechnical Study Completed (100%)

 Waste Classification and analysis complete (100%)

 Detailed HAZOP Study Conducted and Finalized

 Plant Civil Structural Design is completed.

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 12


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

OVERALL LAYOUT

Figure 6. KKIA PW Project – Overall Layout

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 13


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 14


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

Figure 7. KKIA PW Project – RO Plant Layout

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 15


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

Figure 8. KKIA PW Project – Plant Process Diagram

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 16


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

9.0 Site Mobilisation Layout Plan

Site Office Plan

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 17


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

Project Emergency Evacuation Plan

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 18


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

10.0 Cost Plan (Payment Milestones)


(Refer to Appendix B)

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 19


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

11.0 Procurement Plan


Procurement Plan is to define the procurement requirements for the project and how it will be
managed from developing procurement documentation through contract closure. The Procurement
Management Plan defines the following:
 Items to be procured with justification statements and timelines
 Type of contract to be used
 Risks associated with procurement management
 How procurement risks will be mitigated through contract performance metrics, insurance, or
other means
 Determining costs and if/how they’re used as evaluation criteria
 Any standardized procurement templates or documents to be used
 How multiple suppliers will be managed if applicable
 Contract approval process
 Decision criteria
 Establishing contract deliverables and deadlines
 How procurement and contracts are coordinated with project scope, budget, and schedule
 Any constraints pertaining to procurement
 Direction to sellers on baseline requirements such as contract schedules and work breakdown
structures (WBSs)
 Vendor Management
 Identification of any prequalified sellers if applicable
 Performance metrics for procurement activities

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 20


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 21


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

12.0 Quality Assurance Plan


12.1 The term 'quality assurance' describes a set of planned, systematic actions to ensure that
products and services comply with specified requirements. It not only involves checking the final
quality of products to avoid defects, as is the case in quality control, but also checking product
quality in a planned way through all the production stages. It is the development of work and
product design procedures to prevent errors from occurring in the first place, based on planning,
backed up by quality manuals and tools.

12.2 A Project Quality Plan will be developed as a project‐specific quality plan that describes the
activities, standards, tools and processes necessary to achieve quality in the delivery of a project.

12.3 The Project Quality Plan should:

 Provide explanatory text describing the nature of the project and the quality expectations.
 Set out the organisations quality policies (for example if they are ISO 9001 certified) and how
these policies will apply to the project.
 Identify other quality criteria or policies that may need to be followed, such as the
requirements of clients or funders.
 Describe how quality requirements will cascade down through the supply chain.
 Describe the activities necessary to deliver the project and the order in which they will be
carried out.
 Describe the resources required.
 Set out quality roles and responsibilities.
 Identify the standards that will apply.
 Describe monitoring and reporting procedures and the process for delivering continuous
improvement.
 Describe procedures for dealing with defects.
 Describe document control procedures.
 Describe change control procedures.
 Set out any training requirements.
 Programme tools that will be used.
 List reference material.
 Commissioning and Hand‐over strategy
 As Built Drawings and Documents
 Operation & Maintenance strategy

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 22


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

13.0 Health and Safety Plan


13.1 The WETICO – STCL Joint Venture is committed to working safely throughout all its activities on
site. The safety slogan adopted for the KKIA PW Project is “All Incidents are Preventable – All
Incidents are Unacceptable”.
13.2 The WETICO – STCL Joint Venture has developed a Health, Safety Security and Environmental
Plan for the KKIA PW Project.
13.3 The WETICO – STCL Joint Venture will be responsible for induction of its own staff and
technicians, all subcontractors, consultants and client staff and other visitors who may visit or
work on the KKIA PW Project.
13.4 The WETICO – STCL Joint Venture shall hold Safety Reviews at agreed intervals.

13.5 The WETICO – STCL Joint Venture will comply with the following Site Safety Commitment:

Site Safety Commitments

Working on this site means Working Safely


1. All injuries are preventable.
2. All injuries are unacceptable.
3. Our work is never so urgent or important that we cannot take time to do it safely.
4. Everyone is obligied to work safely.
5. Everyone is obliged to raise concerns about hazards seen.
6. All Managers and Supervisors are accountable for safety performance.
7. Employee and subcontractor commitment to safety is essential to work safely.
8. Excellence in safety leads to excellence on site.

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 23


KKIA PW PEP Rev.00
Project Execution Plan I KKIA PW

14.0 Communication Strategy


 Roles, responsibilities and authorities. This might be set out in a responsibility matrix (or

project roles table), supplemented by a contractual tree and then used to develop a

schedule of services for each appointment.

 Monitoring and reporting strategies.

 Monthly Progress report will be prepared and submitted to client along with an updated

Program of Work. Progress will contain (as the case may be) the information of percentage

completion achieved compared with the planned percentage completion as set out in the

previous month’s revision of the Program of Work, for each activity; if the progress of any

activity is delayed relative to the dates indicated on the previous month’s revision of the

Program of Work, an explanation of this and the likely consequences and stating the

corrective action being taken to remedy the delay. Information on all critical aspects

influencing the progress of the Works also will be included.

 Communications strategy and standards.

WETICO – STCL JV Excellence I Quality I Innovation I Respect I Honesty & Transparency P a g e | 24


KKIA PW PEP Rev.00
APPENDIX A

Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

KKIA WATER TREATMENT PLANT PROJECT 3-4-16 UPDATED 19-Jan-16 A 14-May-17

PROJECT START 19-Jan-16 A 19-Jan-16 A


Project start A1000 100% 19-Jan-16 A Project start

MOBILIZATION 19-Jan-16 A 25-May-16


Site Accommodation And Setup A1010 100% 19-Jan-16 A 25-May-16 A1010
ENGINEERING 19-Jan-16 A 30-May-16

BASIC CONCEPT DESIGN 19-Jan-16 A 16-Feb-16 A


Review And Approval 24-Jan-16 A 16-Feb-16 A
Start Basic Concept Design Approval A2615 100% 24-Jan-16 A Start Basic Concept Design Approval
PFD & Mass Balance A2620 100% 24-Jan-16 A 26-Jan-16 A A2620
Single Line Diagram A2730 100% 25-Jan-16 A 28-Jan-16 A A2730
Well General Orientations A2680 100% 26-Jan-16 A 01-Feb-16 A A2680
Evaporation Ponds Layout A2690 100% 26-Jan-16 A 01-Feb-16 A A2690
Piping & Instrumentation Diagram A2720 100% 26-Jan-16 A 01-Feb-16 A A2720
P&ID Update A2760 100% 26-Jan-16 A 01-Feb-16 A A2760
Process Design Report A2650 100% 27-Jan-16 A 02-Feb-16 A A2650
General Layout A2660 100% 27-Jan-16 A 02-Feb-16 A A2660
Plant Survey Report A2630 100% 28-Jan-16 A 03-Feb-16 A A2630
HAZOP study & Output A2740 100% 28-Jan-16 A 03-Feb-16 A A2740
Hydraulic Profile A2710 100% 30-Jan-16 A 01-Feb-16 A A2710
Geotechnical Report A2640 100% 31-Jan-16 A 06-Feb-16 A A2640
Hydraulic Design Report A2700 100% 02-Feb-16 A 08-Feb-16 A A2700
WTP Building layout A2670 100% 03-Feb-16 A 09-Feb-16 A A2670
Civil Guide Drawings & Load List A2750 100% 10-Feb-16 A 16-Feb-16 A A2750
Finish Basic Concept Design Approval A3240 100% 16-Feb-16 A Finish Basic Concept Design Approval
Prepare And Submittal 19-Jan-16 A 09-Feb-16 A
Start Basic Concept Design Submittals A2465 100% 19-Jan-16 A Start Basic Concept Design Submittals
PFD & Mass Balance A2470 100% 19-Jan-16 A 23-Jan-16 A A2470
Plant Survey Report A2480 100% 19-Jan-16 A 27-Jan-16 A A2480

Page 1 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Geotechnical Report A2490 100% 19-Jan-16 A 30-Jan-16 A A2490


Process Design Report A2500 100% 19-Jan-16 A 26-Jan-16 A A2500
General Layout A2510 100% 19-Jan-16 A 25-Jan-16 A A2510
WTP Building layout A2520 100% 19-Jan-16 A 25-Jan-16 A A2520
Well General Orientations A2530 100% 19-Jan-16 A 25-Jan-16 A A2530
Evaporation Ponds Layout A2540 100% 19-Jan-16 A 25-Jan-16 A A2540
Piping & Instrumentation Diagram A2570 100% 19-Jan-16 A 25-Jan-16 A A2570
Single Line Diagram A2580 100% 19-Jan-16 A 24-Jan-16 A A2580
HAZOP study & Output A2590 100% 19-Jan-16 A 27-Jan-16 A A2590
P&ID Update A2610 100% 19-Jan-16 A 25-Jan-16 A A2610
Hydraulic Design Report A2550 100% 26-Jan-16 A 01-Feb-16 A A2550
Hydraulic Profile A2560 100% 26-Jan-16 A 28-Jan-16 A A2560
Civil Guide Drawings & Load List A2600 100% 26-Jan-16 A 09-Feb-16 A A2600
Finish Basic Concept Design Submittals A3220 100% 09-Feb-16 A Finish Basic Concept Design Submittals

DETAIL DESIGN 28-Jan-16 A 30-May-16


Prepare And Submittal 30-Jan-16 A 29-May-16
Electrical Hook Up Drawings A2950 100% 30-Jan-16 A 18-Feb-16 A A2950
Electrical Layout A2960 100% 30-Jan-16 A 08-Feb-16 A A2960
Control Panel Design A2970 100% 30-Jan-16 A 14-Feb-16 A A2970
Start Detailed&Construction Design Submittals
A2885 100% 30-Jan-16 A Start Detailed&Construction Design Submittals
Mechanical General Arrangement A2890 100% 02-Feb-16 A 16-Feb-16 A A2890
Control Philosophy A2900 100% 02-Feb-16 A 09-Feb-16 A A2900
Piping Layout & Pipe Sppols Details A2990 100% 02-Feb-16 A 20-Feb-16 A A2990
Mechanical Installation Drawings A2940 100% 03-Feb-16 A 03-Mar-16 A A2940
Logic Diagrams & Control Narrative A2910 100% 04-Feb-16 A 10-Feb-16 A A2910
Civil Structural Drawings A2920 93% 17-Feb-16 A 26-May-16 A2920
Site Development and Architectural A2980 93.01% 17-Feb-16 A 25-May-16 A2980
Civil Structural Design A2930 93% 01-Mar-16 A 29-May-16 A2930
Finish Detailed&Construction Design Submittals
A3300 0% 29-May-16 Finish Detailed&Construction Design Submittals
Review And Approval 28-Jan-16 A 30-May-16

Page 2 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Start Detailed&Construction Design Approvel


A3310 100% 28-Jan-16 A Start Detailed&Construction Design Approvel
Mechanical General Arrangement A3050 100% 17-Feb-16 A 23-Feb-16 A A3050
Control Philosophy A3060 100% 17-Feb-16 A 23-Feb-16 A A3060
Logic Diagrams & Control Narrative A3070 100% 17-Feb-16 A 23-Feb-16 A A3070
Civil Structural Drawings A3080 100% 19-Mar-16 A 24-Mar-16 A A3080
Civil Structural Design A3090 93% 19-Mar-16 A 30-May-16 A3090
Mechanical Installation Drawings A3100 100% 19-Mar-16 A 24-Mar-16 A A3100
Electrical Hook Up Drawings A3110 100% 19-Mar-16 A 24-Mar-16 A A3110
Electrical Layout A3120 100% 19-Mar-16 A 24-Mar-16 A A3120
Control Panel Design A3130 100% 19-Mar-16 A 24-Mar-16 A A3130
Site Development and Architectural A3140 93.01% 19-Mar-16 A 28-May-16 A3140
Piping Layout & Pipe Sppols Details A3150 100% 19-Mar-16 A 24-Mar-16 A A3150
Finish Detailed&Construction Design Approvel
A3320 0% 29-May-16 Finish Detailed&Construction Design Approvel

PROCUREMENT 17-Feb-16 A 13-May-17

Prepare And Submittal 17-Feb-16 A 26-May-16


Electrical Equipment Tech. Submittals A2780 100% 17-Feb-16 A 07-Mar-16 A A2780
Civil Material Tech. Submittals A2790 93% 17-Feb-16 A 26-May-16 A2790
Start Material Technical Submittals A2765 100% 17-Feb-16 A Start Material Technical Submittals
Mechanical Equipment Tech. Submittals A2770 100% 17-Feb-16 A 10-Mar-16 A A2770
Finish Material Technical Submittals A3260 0% 26-May-16 Finish Material Technical Submittals

ISSUE A PO MATRIALS 26-Mar-16 A 13-May-17


PO placed for GLS tank A12210 100% 26-Mar-16 A 30-Mar-16 A A12210
PO placed for Sand filtter A12230 100% 26-Mar-16 A 30-Mar-16 A A12230
PO placed for Membrane pressure vessel A12270 100% 26-Mar-16 A 02-Apr-16 A A12270
PO placed for HDPE A12390 40% 26-Mar-16 A 31-May-16 A12390
PO placed for Pumps A11920 100% 26-Mar-16 A 16-Apr-16 A A11920
PO placed for Control Valves A12120 100% 26-Mar-16 A 02-May-16 A A12120
PO placed for Steel structure A12030 50% 27-Mar-16 A 30-May-16 A12030
PO placed for deep well Pumps A11940 80% 02-Apr-16 A 01-Jun-16 A11940

Page 3 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

PO placed for cartridge and flushing filtters A12300 80% 25-Apr-16 A 01-Jun-16 A12300
PO placed for over head crane A12320 100% 25-Apr-16 A 01-May-16 A A12320
PO placed for Cooling Towers A11930 100% 26-Apr-16 A 23-Jun-16 A A11930
PO placed for Air Blowers A12470 100% 11-May-16 A 31-May-16 A A12470
PO placed for Emergency Diesel Gen Set A11980 50% 15-May-16 A 01-Nov-16 A11980
PO placed for Major Field Instruments A12010 40% 15-May-16 A 04-Sep-16 A12010
PO placed for fire pump A12310 100% 25-May-16 A 04-Jul-16 A A12310
PO placed for pipes(inside plant) A12520 0% 25-May-16 18-Jun-16 A12520
PO placed for Air Compressor A12490 0% 15-Jun-16 22-Jun-16 A12490
PO placed for external pipes A12040 0% 23-Jun-16 29-Jun-16 A12040
PO placed for wet/dry bulb temp. Sensors A12170 0% 26-Jun-16 23-Oct-16 A12170
PO placed for Soft Starters A11950 0% 26-Jun-16 07-Nov-16 A11950
PO placed for LV MCCs/VFDs A11970 0% 26-Jun-16 06-Sep-16 A11970
PO placed for UPS & Batteries A12000 0% 26-Jun-16 20-Oct-16 A12000
PO placed for Flow Meters A12130 0% 26-Jun-16 20-Oct-16 A12130
PO placed for Control Panels A12140 0% 26-Jun-16 06-Sep-16 A12140
PO placed for Automation Equipment & S/w A12150 0% 26-Jun-16 20-Oct-16 A12150
PO placed for Fleldbus Connectivity Equip. &A12160
S/w 0% 26-Jun-16 23-Oct-16 A12160
PO placed for MV & LV cables A12530 0% 11-Jul-16 04-Sep-16 A12530
PO placed for Membrane A12240 0% 03-Aug-16 01-Nov-16 A12240
PO placed for Chemical Treatment System A11990 0% 14-Aug-16 09-Oct-16 A11990
PO placed for Transformers A11960 0% 08-Oct-16 05-Jan-17 A11960
PO placed for caustic storage tank A12510 0% 27-Oct-16 15-Dec-16 A12510
PO placed for CIP and Flushing tank A12500 0% 20-Nov-16 21-Jan-17 A12500
PO placed for Chemical A12180 0% 20-Apr-17 13-May-17 A12180
Review And Approval 12-Mar-16 A 26-May-16
Mechanical Equipment Tech. A2830 100% 12-Mar-16 A 24-Mar-16 A A2830
Electrical Equipment Tech. A2840 100% 12-Mar-16 A 24-Mar-16 A A2840
Civil Material Tech. A2850 93% 12-Mar-16 A 25-May-16 A2850
Start Material Technical A2825 100% 12-Mar-16 A Start Material Technical

Page 4 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Finish Material Technical A2855 0% 26-May-16 Finish Material Technical

FREE ON BOARD (FOB) MATERIALS 25-Mar-16 A 21-Feb-17


FOB placed for Control Valves A12290 20% 25-Mar-16 A 01-Oct-16 A12290
FOB placed for deep well Pumps A12220 20% 25-Mar-16 A 13-Nov-16 A12220
FOB placed for over head crane A12380 30% 25-Mar-16 A 05-Sep-16 A12380
FOB placed for GLS tank A12350 30% 31-Mar-16 A 17-Sep-16 A12350
FOB placed for Membrane pressure vessel A12360 30% 03-Apr-16 A 20-Aug-16 A12360
FOB placed for Pumps A12190 10% 02-May-16 A 29-Oct-16 A12190
FOB placed for Air Blowers A12480 0% 25-May-16 29-Sep-16 A12480
FOB placed for cartridge and flushing filttersA12370 0% 01-Jun-16 20-Oct-16 A12370
FOB placed for Cooling Towers A12200 0% 26-Jun-16 31-Oct-16 A12200
FOB placed for external pipes A12400 0% 29-Jun-16 06-Oct-16 A12400
FOB placed for Major Field Instruments A12280 0% 04-Sep-16 07-Jan-17 A12280
FOB placed for Chemical Treatment SystemA12260 0% 09-Oct-16 08-Feb-17 A12260
FOB placed for Fleldbus Connectivity Equip. A12330
& S/w( to be deleted) 0% 23-Oct-16 21-Feb-17 A12330
FOB placed for wet/dry bulb temp. Sensors(to
A12340
be deleted) 0% 23-Oct-16 21-Feb-17 A12340
FOB placed for Emergency Diesel Gen Set A12250 0% 01-Nov-16 08-Feb-17 A12250
Fabrication And Delivery To Site 02-Apr-16 A 06-May-17
EVAPORATION PONDS 03-Apr-16 A 07-Sep-16
Fabrication And Delivery HDPE Geomembrane
A7750To Site 20% 03-Apr-16 A 07-Sep-16 A7750
RO BUILDING 02-Apr-16 A 26-Mar-17
CIVIL 02-Apr-16 A 24-Oct-16
Steel Hanger Structure A10530 36% 02-Apr-16 A 06-Sep-16 A10530
over head crane A10610 0% 05-Sep-16 24-Oct-16 A10610
MECHANICAL 16-Apr-16 A 26-Mar-17
UPVC Pipe & Valves A8310 20% 16-Apr-16 A 17-Oct-16 A8310
Sand Filter's Vessel A8340 0% 31-May-16 07-Dec-16 A8340
Pressure Vessels A8550 0% 20-Aug-16 08-Oct-16 A8550
Sand Filter Blowers A8350 0% 01-Oct-16 14-Nov-16 A8350
Pipes & Valves A8400 0% 01-Oct-16 15-Nov-16 A8400

Page 5 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

RO Skids A8300 0% 08-Oct-16 08-Jan-17 A8300


Cartridge, Blending, Flushing Filter A8330 0% 20-Oct-16 05-Dec-16 A8330
High Pressure pump A8320 0% 29-Oct-16 13-Dec-16 A8320
backwash Pumps A8360 0% 29-Oct-16 22-Feb-17 A8360
Flushing Pump A8380 0% 29-Oct-16 13-Dec-16 A8380
Membrane A8410 0% 02-Nov-16 01-Mar-17 A8410
caustic storage tank A8540 0% 17-Dec-16 15-Feb-17 A8540
CIP and Flushing Tank A8390 0% 22-Jan-17 06-Feb-17 A8390
Chemical Treatment System A8370 0% 08-Feb-17 26-Mar-17 A8370
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & cable Tray A8420 0% 05-Sep-16 08-Jan-17 A8420
Field Instrument A8430 0% 07-Jan-17 25-Feb-17 A8430
PRODUCT WATER TANK 05-Sep-16 25-Feb-17
CIVIL
MECHANICAL 17-Sep-16 01-Nov-16
GLS Tank A7900 0% 17-Sep-16 01-Nov-16 A7900
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & cable Tray A7910 0% 05-Sep-16 08-Jan-17 A7910
Field Instrument A7920 0% 07-Jan-17 25-Feb-17 A7920
RAW WATER TANK 05-Sep-16 25-Feb-17
CIVIL
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & cable Tray A8070 0% 05-Sep-16 08-Jan-17 A8070
Field Instrument A8080 0% 07-Jan-17 25-Feb-17 A8080
MECHANICAL 17-Sep-16 01-Nov-16
GLS Tanks A8040 0% 17-Sep-16 01-Nov-16 A8040
REJECT WATER TANK 05-Sep-16 25-Feb-17
CIVIL
MECHANICAL 17-Sep-16 01-Nov-16
GLS Tank A8120 0% 17-Sep-16 01-Nov-16 A8120
ELECTRICAL 05-Sep-16 25-Feb-17

Page 6 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Cable & cable Tray A8100 0% 05-Sep-16 08-Jan-17 A8100


Field Instrument A8110 0% 07-Jan-17 25-Feb-17 A8110
PRE-FILTRATION BUILDINGS 02-Apr-16 A 27-Feb-17
CIVIL 02-Apr-16 A 24-Oct-16
Steel Hanger Structure A10540 20% 02-Apr-16 A 04-Oct-16 A10540
over head crane A10620 0% 05-Sep-16 24-Oct-16 A10620
ELECTRICAL 05-Sep-16 27-Feb-17
Cable & cable Tray A8190 0% 05-Sep-16 08-Jan-17 A8190
PLC Panel A8210 0% 06-Sep-16 27-Feb-17 A8210
Field Instrument A8200 0% 07-Jan-17 25-Feb-17 A8200
MECHANICAL 31-May-16 13-Dec-16
Sand Filter Vessel A8130 0% 31-May-16 07-Dec-16 A8130
saturation Vessel A8150 0% 31-May-16 07-Dec-16 A8150
Air Compressor System A8160 0% 25-Jun-16 30-Oct-16 A8160
Sand Filter Blowers A8140 0% 01-Oct-16 14-Nov-16 A8140
Pipes & Valves A8180 0% 01-Oct-16 15-Nov-16 A8180
Backwash Pump A8170 0% 29-Oct-16 13-Dec-16 A8170
COOLING TOWER ( COOLED WATER TANK ) 05-Sep-16 25-Feb-17
CIVIL
MECHANICAL 01-Oct-16 15-Dec-16
Pipes and Valves A8230 0% 01-Oct-16 15-Nov-16 A8230
Cooling Tower A8220 0% 31-Oct-16 15-Dec-16 A8220
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & cable Tray A8240 0% 05-Sep-16 08-Jan-17 A8240
Field Instrument A8250 0% 07-Jan-17 25-Feb-17 A8250
Second Stage FILTER FEED PUMP STATION 02-Apr-16 A 25-Feb-17
CIVIL 02-Apr-16 A 24-Oct-16
Steel Hanger Structure A12540 20% 02-Apr-16 A 02-Oct-16 A12540
over head crane A12550 0% 05-Sep-16 24-Oct-16 A12550
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & cable Tray A8260 0% 05-Sep-16 08-Jan-17 A8260

Page 7 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Field Instrument A8270 0% 07-Jan-17 25-Feb-17 A8270


MECHANICAL 01-Oct-16 13-Dec-16
Pipes & Valves A8290 0% 01-Oct-16 15-Nov-16 A8290
Filter Feed Pump A8280 0% 29-Oct-16 13-Dec-16 A8280
PRODUCT WATER TRANSFER PUMP 02-Apr-16 A 26-Mar-17
CIVIL 02-Apr-16 A 24-Oct-16
Steel Hanger Structure A12410 15% 02-Apr-16 A 10-Oct-16 A12410
over head crane A12420 0% 05-Sep-16 24-Oct-16 A12420
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & Cable Tray A8600 0% 05-Sep-16 08-Jan-17 A8600
Field Instrument A8610 0% 07-Jan-17 25-Feb-17 A8610
MECHANICAL 25-May-16 26-Mar-17
Fire Fighting Pump A8590 0% 25-May-16 14-Jan-17 A8590
Pipes & Valves A8570 0% 01-Oct-16 15-Nov-16 A8570
Product Water Pump A8560 0% 29-Oct-16 13-Dec-16 A8560
Generator A8580 0% 08-Feb-17 26-Mar-17 A8580
REJECT WATER TRANSFER PUMP 02-Apr-16 A 25-Feb-17
CIVIL 02-Apr-16 A 24-Oct-16
Steel Hanger Structure A12430 20% 02-Apr-16 A 02-Oct-16 A12430
over head crane A12440 0% 05-Sep-16 24-Oct-16 A12440
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & Cable Tray A8520 0% 05-Sep-16 08-Jan-17 A8520
Field Instrument A8530 0% 07-Jan-17 25-Feb-17 A8530
MECHANICAL 01-Oct-16 13-Dec-16
Pipes & Valves A8510 0% 01-Oct-16 15-Nov-16 A8510
Reject Water Pumps A8500 0% 29-Oct-16 13-Dec-16 A8500
WELL PUMP 05-Sep-16 06-May-17
CIVIL 06-Oct-16 21-Nov-16
external pipes A7940 0% 06-Oct-16 21-Nov-16 A7940
MECHANICAL 14-Nov-16 28-Dec-16
Well Pumps A7820 0% 14-Nov-16 28-Dec-16 A7820

Page 8 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Riser Pipes A7830 0% 14-Nov-16 28-Dec-16 A7830


Valves- discharge Pipes A7840 0% 14-Nov-16 28-Dec-16 A7840
ELECTRICAL 05-Sep-16 06-May-17
MV and Instruments Cables A7870 0% 05-Sep-16 08-Jan-17 A7870
PLC Panel A7890 0% 06-Sep-16 27-Feb-17 A7890
control Panel A7850 0% 14-Nov-16 28-Dec-16 A7850
Flowmeter- Instruments A7880 0% 14-Nov-16 28-Dec-16 A7880
Transformer A7860 0% 05-Jan-17 06-May-17 A7860
POWER SUPPLY ELECTRICAL ROOM 27-Jul-16 09-Mar-17
CIVIL
MECHANICAL
ELECTRICAL 27-Jul-16 09-Mar-17
PVC Conduits A8470 0% 27-Jul-16 12-Nov-16 A8470
Cable & Cable Tray A8480 0% 05-Sep-16 08-Jan-17 A8480
MCC Panels A8490 0% 06-Sep-16 09-Mar-17 A8490
SCADA AND ELECTRICAL CONTROL ROOM 27-Jul-16 27-Feb-17
CIVIL
ELECTRICAL 27-Jul-16 27-Feb-17
PVC Conduits A8440 0% 27-Jul-16 12-Nov-16 A8440
Cable & Cable Tray A8450 0% 05-Sep-16 08-Jan-17 A8450
PLC Panel A8460 0% 06-Sep-16 27-Feb-17 A8460
MECHANICAL
Pre-treatment Feed PUMP STATION 02-Apr-16 A 25-Feb-17
CIVIL 02-Apr-16 A 24-Oct-16
Steel Hanger Structure A12450 20% 02-Apr-16 A 02-Oct-16 A12450
over head crane A12460 0% 05-Sep-16 24-Oct-16 A12460
ELECTRICAL 05-Sep-16 25-Feb-17
Cable & cable Tray A10680 0% 05-Sep-16 08-Jan-17 A10680
Field Instrument A10670 0% 07-Jan-17 25-Feb-17 A10670
MECHANICAL 01-Oct-16 13-Dec-16
Pipes & Valves A10660 0% 01-Oct-16 15-Nov-16 A10660

Page 9 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Raw Water Pump A10650 0% 29-Oct-16 13-Dec-16 A10650


CONSTRUCTION 05-Mar-16 A 14-May-17

WELL DRILLING 25-May-16 19-Mar-17


START WELL PUMP INSTALLATION 25-May-16 25-May-16
Start Well Pump Installation A10520 0% 25-May-16 Start Well Pump Installation
WELL DRILLING 1 25-May-16 19-Mar-17
CIVIL 25-May-16 28-Dec-16
Mobilization of drilling A10550 0% 25-May-16 14-Jun-16 A10550
Drilling A10560 0% 15-Jun-16 19-Oct-16 A10560
Install Casing Pipes A10570 0% 18-Jul-16 16-Aug-16 A10570
Cementation of casing pipes A10580 0% 17-Aug-16 30-Aug-16 A10580
Centeralizers A10590 0% 31-Aug-16 17-Sep-16 A10590
Pumping Test A10600 0% 20-Oct-16 02-Nov-16 A10600
demobilization of drilling A10910 0% 03-Nov-16 14-Nov-16 A10910
Civil Work For Well Field A10930 0% 15-Nov-16 28-Dec-16 A10930
MECHANICAL 07-Feb-17 02-Mar-17
Well Pump Installation A7930 0% 07-Feb-17 23-Feb-17 A7930
Installation Of Discharge Line A7950 0% 25-Feb-17 02-Mar-17 A7950
ELECTRICAL 07-Feb-17 19-Mar-17
Installation Of Control Panel A7960 0% 07-Feb-17 13-Feb-17 A7960
Installation Of Transformer A7970 0% 14-Feb-17 16-Feb-17 A7970
Installation Of MV Cables A7980 0% 18-Feb-17 20-Feb-17 A7980
Installation Of Field Instruments A7990 0% 04-Mar-17 06-Mar-17 A7990
Instrument Cable Pulling A8620 0% 07-Mar-17 09-Mar-17 A8620
Installation Of PLC Panel A8000 0% 11-Mar-17 13-Mar-17 A8000
Glanding and Termination Of ElectricalA8630
& Instrument Cable 0% 14-Mar-17 19-Mar-17 A8630
WELL DRILLING 2 25-May-16 19-Mar-17
START WELL PUMP INSTALLATION 25-May-16 25-May-16
Start Well Pump Installation A11720 0% 25-May-16 Start Well Pump Installation
CIVIL 25-May-16 07-Jan-17

Page 10 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Mobilization of drilling A11730 0% 25-May-16 14-Jun-16 A11730


Drilling A11740 0% 15-Jun-16 19-Oct-16 A11740
Install Casing Pipes A11750 0% 18-Jul-16 16-Aug-16 A11750
Cementation of casing pipes A11760 0% 17-Aug-16 30-Aug-16 A11760
Centeralizers A11770 0% 31-Aug-16 17-Sep-16 A11770
Pumping Test A11780 0% 20-Oct-16 02-Nov-16 A11780
demobilization of drilling A11790 0% 03-Nov-16 23-Nov-16 A11790
Civil Work For Well Feild A11800 0% 24-Nov-16 07-Jan-17 A11800
MECHANICAL 07-Feb-17 02-Mar-17
Well Pump Installation A11630 0% 07-Feb-17 23-Feb-17 A11630
Installation Of Discharge Line A11640 0% 25-Feb-17 02-Mar-17 A11640
ELECTRICAL 07-Feb-17 19-Mar-17
Installation Of Control Panel A11650 0% 07-Feb-17 13-Feb-17 A11650
Installation Of Transformer A11660 0% 14-Feb-17 16-Feb-17 A11660
Installation Of MV Cables A11670 0% 18-Feb-17 20-Feb-17 A11670
Installation Of Field Instruments A11680 0% 04-Mar-17 06-Mar-17 A11680
Instrument Cable Pulling A11700 0% 07-Mar-17 09-Mar-17 A11700
Installation Of PLC Panel A11690 0% 11-Mar-17 13-Mar-17 A11690
Glanding and Termination Of ElectricalA11710
& Instrument Cable 0% 14-Mar-17 19-Mar-17 A11710
REHABILITATION WELL DRILLING 15-Jun-16 19-Mar-17
CIVIL 15-Jun-16 21-Jul-16
Removing Existing Well A11900 0% 15-Jun-16 20-Jun-16 A11900
Rehabilitation Existing Well A11910 0% 21-Jun-16 21-Jul-16 A11910
MECHANICAL 07-Feb-17 02-Mar-17
Well Pump Installation A11810 0% 07-Feb-17 23-Feb-17 A11810
Installation Of Discharge Line A11820 0% 25-Feb-17 02-Mar-17 A11820
ELECTRICAL 07-Feb-17 19-Mar-17
Installation Of Control Panel A11830 0% 07-Feb-17 13-Feb-17 A11830
Installation Of Transformer A11840 0% 14-Feb-17 16-Feb-17 A11840
Installation Of MV Cables A11850 0% 18-Feb-17 20-Feb-17 A11850

Page 11 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Installation Of Field Instruments A11860 0% 04-Mar-17 06-Mar-17 A11860


Instrument Cable Pulling A11880 0% 07-Mar-17 09-Mar-17 A11880
Installation Of PLC Panel A11870 0% 11-Mar-17 13-Mar-17 A11870
Glanding and Termination Of ElectricalA11890
& Instrument Cable 0% 14-Mar-17 19-Mar-17 A11890
EVAPORATION PONDS 15-May-16 A 12-Mar-17
REHABILITATION OF EXISTING EVAPORATION POND 15-May-16 A 12-Mar-17
Removing Sludge material A3360 30% 15-May-16 A 08-Oct-16 A3360
Start Rehabilitation Of Existing Evaporation
A3355
Pond 0% 01-Aug-16 Start Rehabilitation Of Existing Evaporation Pond
Excavation A3350 0% 09-Oct-16 07-Nov-16 A3350
Pipe Work A3400 0% 23-Oct-16 13-Dec-16 A3400
HDPE installation and backfilling (50cm) A10640 0% 08-Nov-16 04-Jan-17 A10640
Concrete A3380 0% 13-Dec-16 12-Mar-17 A3380
Finish Rehabilitation Of Existing Evaporation
A10630
Pond 0% 12-Mar-17 Finish Rehabilitation Of Exi
NEW EVAPORATION POND 25-May-16 A 26-Feb-17
Rerouting the existing road A8090 27.5% 25-May-16 A 02-Aug-16 A8090
Start New Evaporation Pond A7755 0% 25-May-16 Start New Evaporation Pond
Excavation Pond A7760 0% 03-Aug-16 21-Sep-16 A7760
Embankment A7770 0% 22-Sep-16 24-Dec-16 A7770
HDPE Lining Pond and backfilling (50cm)A7780 0% 04-Oct-16 17-Dec-16 A7780
Concrete A7790 0% 01-Dec-16 26-Feb-17 A7790
Pipe Work A8060 0% 25-Dec-16 14-Feb-17 A8060
Finish New Evaporation Pond A8050 0% 26-Feb-17 Finish New Evaporation Pon
GENERAL WORKS 24-Nov-16 24-Dec-16
Lagoon FENCE A7800 0% 24-Nov-16 24-Dec-16 A7800
Lagoon ROADS Repair A7810 0% 13-Dec-16 24-Dec-16 A7810
WATER TRANSFER LINES 21-Nov-16 09-Apr-17
route 1 (new well 1 ) A2420 0% 21-Nov-16 20-Feb-17 A2420
route 2 (new well 2 ) A2430 0% 05-Jan-17 20-Feb-17 A2430
route 3 (from reject pump to evaporation pond
A2460
) 0% 05-Jan-17 09-Apr-17 A2460
route 4 ( product water pump station to existing
A2440
valve chamber) 0% 20-Feb-17 06-Apr-17 A2440

Page 12 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

route 5 (Raw water tank to existing valve chamber


A2450 ) 0% 20-Feb-17 21-Mar-17 A2450
PRODUCT WATER TANK 05-Mar-16 A 15-Feb-17
START PRODUCT WATER TANK 26-May-16 26-May-16
Start Product Water Tank A10440 0% 26-May-16 Start Product Water Tank
CIVIL 05-Mar-16 A 15-Feb-17
PRODUCT WATER TANK CIVIL (1) 05-Mar-16 A 15-Feb-17
Excavation Works A10360 100% 05-Mar-16 A 13-Apr-16 A A10360
Backfilling Works A10370 100% 14-Apr-16 A 25-Apr-16 A A10370
Plain Concrete Works A10380 100% 26-Apr-16 A 02-May-16 A A10380
water proofing Works A10390 100% 28-Apr-16 A 14-May-16 A A10390
R.C Footing Works A10400 100% 20-May-16 A 25-May-16 A A10400
internal linning A10760 0% 02-Jun-16 16-Jun-16 A10760
Epoxy Painting A10410 0% 01-Feb-17 15-Feb-17 A10410
PRODUCT WATER TANK CIVIL (2) 20-Mar-16 A 12-Feb-17
Excavation Works A10770 100% 20-Mar-16 A 14-Apr-16 A A10770
Backfilling Works A10780 100% 25-Apr-16 A 25-May-16 A A10780
Plain Concrete Works A10790 0% 26-Jun-16 12-Jul-16 A10790
water proofing Works A10800 0% 12-Jul-16 02-Aug-16 A10800
R.C Footing Works A10810 0% 02-Aug-16 27-Aug-16 A10810
Internal linning A10830 0% 03-Sep-16 20-Sep-16 A10830
Epoxy Painting A10820 0% 29-Jan-17 12-Feb-17 A10820
PRODUCT WATER TANK CIVIL (3) 10-Mar-16 A 12-Feb-17
Excavation Works A10840 100% 10-Mar-16 A 31-Mar-16 A A10840
Backfilling Works A10850 100% 25-Apr-16 A 25-May-16 A A10850
Plain Concrete Works A10860 100% 18-May-16 A 25-May-16 A A10860
water proofing Works A10870 100% 20-May-16 A 25-May-16 A A10870
R.C Footing Works A10880 0% 28-Jul-16 22-Aug-16 A10880
Internal linning A10900 0% 29-Aug-16 12-Sep-16 A10900
Epoxy Painting A10890 0% 29-Jan-17 12-Feb-17 A10890
ELECTRICAL 29-Jan-17 12-Feb-17

Page 13 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Installation Of cable Tray A8020 0% 29-Jan-17 01-Feb-17 A8020


Installation Of Field Instrument A8030 0% 01-Feb-17 05-Feb-17 A8030
Electrical and Instrument Cable Pulling A8660 0% 05-Feb-17 08-Feb-17 A8660
Glanding and Termination Of Electrical & Instrument
A8670 Cable 0% 08-Feb-17 12-Feb-17 A8670
MECHANICAL 13-Nov-16 29-Jan-17
Installation Of Product Tank (1) A8010 0% 13-Nov-16 29-Jan-17 A8010
Installation Of Product Tank (2) A8640 0% 13-Nov-16 29-Jan-17 A8640
Installation Of Product Tank (3) A8650 0% 13-Nov-16 29-Jan-17 A8650
COOLING TOWER ( COOLED WATER TANK ) 18-Apr-16 A 12-Mar-17
START COOLING TOWER 04-Jun-16 04-Jun-16
Start Cooling Tower A10430 0% 04-Jun-16 Start Cooling Tower
CIVIL 18-Apr-16 A 18-Sep-16
Excavation Works A9550 100% 18-Apr-16 A 04-Jun-16 A A9550
Plain Concrete Works A9570 100% 24-May-16 A 25-May-16 A A9570
Insulation Works A9590 0% 04-Jun-16 18-Jun-16 A9590
Reinforcement Concrete Works (foundation)
A9580 0% 18-Jun-16 11-Jul-16 A9580
Backfilling Works A9560 0% 11-Jul-16 25-Jul-16 A9560
Walls & Columns A9650 0% 11-Jul-16 01-Aug-16 A9650
Roof A9660 0% 01-Aug-16 22-Aug-16 A9660
Internal linning and epoxy paint A9670 0% 22-Aug-16 18-Sep-16 A9670
ELECTRICAL 02-Feb-17 12-Mar-17
Installation Of cable Tray A8970 0% 02-Feb-17 16-Feb-17 A8970
Installation Of Field Instrument A8980 0% 25-Feb-17 28-Feb-17 A8980
Electrical and Instrument Cable Pulling A8990 0% 28-Feb-17 07-Mar-17 A8990
Glanding and Termination Of Electrical & Instrument
A9000 Cable 0% 07-Mar-17 12-Mar-17 A9000
MECHANICAL 15-Jan-17 07-Mar-17
Installation Of Cooling Tower A8940 0% 15-Jan-17 02-Feb-17 A8940
Installation Of Pipes and Valves A8950 0% 02-Feb-17 07-Mar-17 A8950
Installation Of Steel Support A8960 0% 02-Feb-17 07-Mar-17 A8960
PRE-FILTRATION BUILDINGS 15-May-16 A 25-Mar-17

Page 14 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

START PRE-FILTRATION BUILDINGS 04-Jul-16 04-Jul-16


Start Pre-Filtration Buildings A10420 0% 04-Jul-16 Start Pre-Filtration Buildings
CIVIL 15-May-16 A 21-Dec-16
Excavation A11260 50% 15-May-16 A 13-Jul-16 A11260
Plain Concrete A11270 0% 13-Jul-16 20-Jul-16 A11270
R.C Footing & Trench Footing A11280 0% 20-Jul-16 03-Aug-16 A11280
Column Neck A11290 0% 03-Aug-16 17-Aug-16 A11290
Foundation and Column neck Damp Proofing
A11300 0% 17-Aug-16 24-Aug-16 A11300
Backfilling Upto bottom G.Level A11310 0% 24-Aug-16 18-Sep-16 A11310
Ground Beam A11320 0% 18-Sep-16 02-Oct-16 A11320
Slab On Grade A11360 0% 02-Oct-16 16-Oct-16 A11360
Steel Hanger Installation A11370 0% 16-Oct-16 15-Nov-16 A11370
Over head crane installation A12050 0% 15-Nov-16 21-Nov-16 A12050
Finishing Floor A11350 0% 21-Nov-16 21-Dec-16 A11350
ELECTRICAL 23-Jan-17 25-Mar-17
MECHANICAL 17-Dec-16 20-Mar-17
Installation Of Sand Vessel A8850 0% 17-Dec-16 20-Dec-16 A8850
Installation Of Saturation Vessels A8900 0% 17-Dec-16 20-Dec-16 A8900
Installation Of Sand Filter Blowers A8890 0% 21-Dec-16 08-Jan-17 A8890
Installation Of Air Compressor System A8910 0% 21-Dec-16 27-Dec-16 A8910
Installation Of Backwash Pump A8920 0% 28-Dec-16 08-Jan-17 A8920
Installation Pipes & Valves A8860 0% 09-Jan-17 01-Mar-17 A8860
Installation Of Steel Support A8870 0% 09-Jan-17 01-Mar-17 A8870
Filling Of Sand Filter's Media A8880 0% 02-Mar-17 20-Mar-17 A8880
RO BUILDING 20-May-16 A 02-May-17
START RO BUILDING 04-Jun-16 04-Jun-16
Start RO Building A10220 0% 04-Jun-16 Start RO Building
CIVIL 20-May-16 A 13-Feb-17
Excavation A10120 50% 20-May-16 A 14-Jun-16 A10120
Plain Concrete A10130 0% 14-Jun-16 28-Jun-16 A10130

Page 15 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

R.C Footing & Trench Footing A10140 0% 28-Jun-16 21-Jul-16 A10140


Column Neck & Trench Wall A10150 0% 21-Jul-16 04-Aug-16 A10150
Foundation Damp Proofing A10160 0% 04-Aug-16 18-Aug-16 A10160
Backfilling Upto bottom G. Level A10170 0% 18-Aug-16 08-Sep-16 A10170
Ground Beam A10180 0% 08-Sep-16 26-Sep-16 A10180
Slab On Grade A10230 0% 26-Sep-16 10-Oct-16 A10230
Steel Hanger Installation A10300 0% 10-Oct-16 23-Nov-16 A10300
Mezzanine Concrete Salb For Rooms A10200 0% 23-Nov-16 07-Dec-16 A10200
Finishings A10210 0% 23-Nov-16 13-Feb-17 A10210
Over head crane installation A10310 0% 23-Nov-16 01-Dec-16 A10310
MECHANICAL 16-Jan-17 02-May-17
Installation of R.O Skids A9080 0% 16-Jan-17 22-Jan-17 A9080
Installation of UPVC pipe & Valves A9090 0% 22-Jan-17 31-Jan-17 A9090
Installation of Cartridge Filters A9100 0% 31-Jan-17 06-Feb-17 A9100
Installation of Sand filter Vessels A9110 0% 06-Feb-17 11-Feb-17 A9110
Installation of Piping & Valves A9120 0% 11-Feb-17 09-Mar-17 A9120
Installation of Steel Supports A9130 0% 11-Feb-17 09-Mar-17 A9130
Installation of Sand Filter's Blowers A9150 0% 11-Feb-17 15-Feb-17 A9150
Installation of Back Wash Pumps A9160 0% 22-Feb-17 26-Feb-17 A9160
Installation of Piping & Valves- Backwash pump
A9170 0% 26-Feb-17 05-Mar-17 A9170
Filling of Sand Filter's Media A9140 0% 09-Mar-17 28-Mar-17 A9140
Installation of dosing System A9180 0% 26-Mar-17 06-Apr-17 A9180
Installation of Flushing pump A9190 0% 06-Apr-17 10-Apr-17 A9190
Installation of Pipes and Tanks flushing pumps
A9200 0% 10-Apr-17 15-Apr-17 A9200
Installation of Membrane A9540 0% 15-Apr-17 02-May-17 A9540
ELECTRICAL 11-Feb-17 01-May-17
Installation Of cable Tray A9210 0% 11-Feb-17 06-Mar-17 A9210
Installation Of Field Instrument A9220 0% 03-Apr-17 15-Apr-17 A9220
Electrical and Instrument Cable Pulling A9230 0% 03-Apr-17 19-Apr-17 A9230
Glanding and Termination Of Electrical & Instrument
A9240 Cable 0% 19-Apr-17 01-May-17 A9240

Page 16 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

RAW WATER TANK 23-Apr-16 A 08-May-17


START RAW WATER TANK 28-Aug-16 03-Sep-16
Start Raw Water Tank A10490 0% 28-Aug-16 03-Sep-16 A10490
CIVIL 23-Apr-16 A 08-May-17
RAW WATER TANK CIVIL (1) 15-May-16 A 08-May-17
Excavation Works A10980 100% 15-May-16 A 27-May-16 A A10980
Backfilling Works A10990 50% 15-May-16 A 16-Feb-17 A10990
Plain Concrete Works A11000 0% 16-Feb-17 02-Mar-17 A11000
Insulation Works A11010 0% 02-Mar-17 23-Mar-17 A11010
Epoxy Painting A11030 0% 22-Mar-17 05-Apr-17 A11030
R.C Footing Works A11020 0% 23-Mar-17 17-Apr-17 A11020
Internal linning A11040 0% 24-Apr-17 08-May-17 A11040
RAW WATER TANK CIVIL (2) 23-Apr-16 A 05-Apr-17
Excavation Works A11060 100% 23-Apr-16 A 25-May-16 A A11060
Backfilling Works A11070 90% 18-May-16 A 08-Oct-16 A11070
Plain Concrete Works A11080 0% 08-Oct-16 22-Oct-16 A11080
Insulation Works A11090 0% 22-Oct-16 12-Nov-16 A11090
R.C Footing Works A11100 0% 12-Nov-16 06-Dec-16 A11100
Internal linning A11110 0% 13-Dec-16 27-Dec-16 A11110
Epoxy Painting A11050 0% 22-Mar-17 05-Apr-17 A11050
MECHANICAL 29-Jan-17 22-Mar-17
Installation Of Raw Water Tank (1) A8680 0% 29-Jan-17 22-Mar-17 A8680
Installation Of Raw Water Tank (2) A8690 0% 29-Jan-17 22-Mar-17 A8690
ELECTRICAL 05-Apr-17 15-Apr-17
Installation Of cable Tray A8700 0% 05-Apr-17 08-Apr-17 A8700
Installation Of Field Instrument A8710 0% 08-Apr-17 10-Apr-17 A8710
Electrical and Instrument Cable Pulling A8720 0% 10-Apr-17 12-Apr-17 A8720
Glanding and Termination Of Electrical & Instrument
A8730 Cable 0% 12-Apr-17 15-Apr-17 A8730
REJECT WATER TANK 06-Nov-16 14-Mar-17
START REJECT WATER TANK 06-Nov-16 06-Nov-16

Page 17 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Start Reject Water Tank A10500 0% 06-Nov-16 Start Reject Water Tank
CIVIL 06-Nov-16 12-Mar-17
REJECT WATER TANK CIVIL (2) 20-Nov-16 12-Mar-17
Excavation Works A11190 0% 20-Nov-16 27-Nov-16 A11190
Backfilling Works A11200 0% 27-Nov-16 04-Dec-16 A11200
Plain Concrete Works A11210 0% 04-Dec-16 07-Dec-16 A11210
Insulation Works A11220 0% 07-Dec-16 21-Dec-16 A11220
R.C Footing Works A11230 0% 21-Dec-16 11-Jan-17 A11230
Internal linning A11250 0% 18-Jan-17 25-Jan-17 A11250
Epoxy Painting A11240 0% 05-Mar-17 12-Mar-17 A11240
REJECT WATER TANK CIVIL (1) 06-Nov-16 22-Feb-17
Excavation Works A11120 0% 06-Nov-16 13-Nov-16 A11120
Backfilling Works A11130 0% 13-Nov-16 19-Nov-16 A11130
Plain Concrete Works A11140 0% 19-Nov-16 23-Nov-16 A11140
Insulation Works A11150 0% 23-Nov-16 07-Dec-16 A11150
R.C Footing Works A11160 0% 07-Dec-16 28-Dec-16 A11160
Internal linning A11180 0% 04-Jan-17 11-Jan-17 A11180
Epoxy Painting A11170 0% 15-Feb-17 22-Feb-17 A11170
MECHANICAL 29-Jan-17 05-Mar-17
Installation Of Reject Water Tank (1) A8740 0% 29-Jan-17 15-Feb-17 A8740
Installation Of Reject Water Tank (2) A8750 0% 15-Feb-17 05-Mar-17 A8750
ELECTRICAL 05-Mar-17 14-Mar-17
Installation Of cable Tray A8760 0% 05-Mar-17 07-Mar-17 A8760
Installation Of Field Instrument A8770 0% 07-Mar-17 09-Mar-17 A8770
Electrical and Instrument Cable Pulling A8780 0% 09-Mar-17 12-Mar-17 A8780
Glanding and Termination Of Electrical & Instrument
A8790 Cable 0% 12-Mar-17 14-Mar-17 A8790
Second stage FILTER FEED PUMP STATION 18-Sep-16 16-Apr-17
START FILTER FEED PUMP STATION 18-Sep-16 18-Sep-16
Start Filter Feed Pump Station A10470 0% 18-Sep-16 Start Filter Feed Pump Station
CIVIL 18-Sep-16 16-Mar-17

Page 18 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Excavation Works A9850 0% 18-Sep-16 25-Sep-16 A9850


Concrete Works A9880 0% 25-Sep-16 25-Oct-16 A9880
Foundation Damp Proofing A9890 0% 25-Oct-16 27-Oct-16 A9890
Backfilling Works A9860 0% 27-Oct-16 02-Nov-16 A9860
finishing works A9870 0% 23-Jan-17 16-Mar-17 A9870
ELECTRICAL 07-Mar-17 16-Apr-17
Installation Of cable Tray A9040 0% 07-Mar-17 19-Mar-17 A9040
Installation Of Field Instrument A9050 0% 19-Mar-17 25-Mar-17 A9050
Electrical and Instrument Cable Pulling A9060 0% 25-Mar-17 06-Apr-17 A9060
Glanding and Termination Of Electrical & Instrument
A9070 Cable 0% 06-Apr-17 16-Apr-17 A9070
MECHANICAL 12-Jan-17 07-Mar-17
Installation Of Feed Pump A9010 0% 12-Jan-17 02-Feb-17 A9010
Installation Of Pipes and Valves A9020 0% 02-Feb-17 07-Mar-17 A9020
Installation Of Steel Support A9030 0% 02-Feb-17 07-Mar-17 A9030
POWER SUPPLY ELECTRICAL ROOM 04-Jun-16 20-Apr-17
START POWER SUPPLY ELECTRICAL ROOM 04-Jun-16 09-Jun-16
Start Power Supply Electrical Room A10460 0% 04-Jun-16 09-Jun-16 A10460
CIVIL
MECHANICAL
ELECTRICAL 22-Nov-16 20-Apr-17
Installation of PVC Conduits (Fiber optic cables
A9280by Civil) 0% 22-Nov-16 24-Dec-16 A9280
Installation of cable trays A9290 0% 18-Dec-16 24-Dec-16 A9290
Installation of MCC Panels (MDP1,MDP2,MDP3)
A9300 0% 09-Mar-17 20-Apr-17 A9300
GUARD ROOM 04-Jun-16 25-Sep-16
START POWER SUPPLY ELECTRICAL ROOM 04-Jun-16 09-Jun-16
Start Guard Room A11440 0% 04-Jun-16 09-Jun-16 A11440
CIVIL 09-Jun-16 25-Sep-16
Excavation Works A11410 0% 09-Jun-16 16-Jun-16 A11410
Backfilling Works A11420 0% 16-Jun-16 22-Jun-16 A11420
Concrete Works A11430 0% 22-Jun-16 08-Aug-16 A11430
Finishing Works A11450 0% 08-Aug-16 25-Sep-16 A11450
Page 19 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

MECHANICAL
ELECTRICAL
First stage Feed PUMPING STATION 04-Jun-16 24-Apr-17
Start first stage Filter Feed Pump Station 04-Jun-16 04-Jun-16
Start Filter Feed Pump Station A11510 0% 04-Jun-16 Start Filter Feed Pump Station
CIVIL 04-Jun-16 24-Apr-17
Excavation Works A11460 0% 04-Jun-16 11-Jun-16 A11460
Backfilling Works A11470 0% 11-Jun-16 25-Jun-16 A11470
Concrete Works A11490 0% 25-Jun-16 27-Jul-16 A11490
Foundation Water Proofing A11500 0% 27-Jul-16 27-Aug-16 A11500
Steel Hanger installation A12060 0% 06-Nov-16 06-Dec-16 A12060
Over head crane A12070 0% 06-Dec-16 14-Dec-16 A12070
Epoxy Works A11480 0% 03-Apr-17 24-Apr-17 A11480
MECHANICAL 11-Jan-17 06-Mar-17
Installation Of first stage feed Pump A10690 0% 11-Jan-17 01-Feb-17 A10690
Installation Of Pipes and Valves A10700 0% 01-Feb-17 06-Mar-17 A10700
Installation Of Steel Support A10710 0% 01-Feb-17 06-Mar-17 A10710
ELECTRICAL 27-Jul-16 03-Apr-17
Installation Of cable Tray A10720 0% 27-Jul-16 08-Aug-16 A10720
Installation Of Field Instrument A10730 0% 06-Mar-17 12-Mar-17 A10730
Electrical and Instrument Cable Pulling A10740 0% 12-Mar-17 25-Mar-17 A10740
Glanding and Termination Of Electrical & Instrument
A10750 Cable 0% 25-Mar-17 03-Apr-17 A10750
REJECT WATER TRANSFER PUMP 04-Jun-16 05-Apr-17
START RREJECT WATER TRANSFER PUMP 04-Jun-16 04-Jun-16
Start Reject Water Transfer Pump A11570 0% 04-Jun-16 Start Reject Water Transfer Pump
CIVIL 04-Jun-16 05-Apr-17
Excavation Works A11520 0% 04-Jun-16 11-Jun-16 A11520
Backfilling Works A11530 0% 11-Jun-16 25-Jun-16 A11530
Concrete Works A11550 0% 25-Jun-16 27-Jul-16 A11550
Foundation Water Proofing A11560 0% 27-Jul-16 27-Aug-16 A11560
Installation steel hanger A12090 0% 02-Oct-16 13-Oct-16 A12090
Page 20 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Over head crane installation A12100 0% 24-Oct-16 30-Oct-16 A12100


Epoxy Works A11540 0% 15-Mar-17 05-Apr-17 A11540
MECHANICAL 31-Dec-16 22-Jan-17
Installation of Reject Water Pump A9310 0% 31-Dec-16 07-Jan-17 A9310
Installation of pipes and valves A9320 0% 07-Jan-17 22-Jan-17 A9320
Installation of Steel Supports A9330 0% 07-Jan-17 22-Jan-17 A9330
ELECTRICAL 22-Jan-17 15-Mar-17
Installation of cable trays A9340 0% 22-Jan-17 29-Jan-17 A9340
Installation of Field Instruments A9350 0% 25-Feb-17 27-Feb-17 A9350
Electrical and instrument Cable Pulling A9360 0% 27-Feb-17 07-Mar-17 A9360
Glanding and Termination of Electrical & Instrument
A9370 cable 0% 07-Mar-17 15-Mar-17 A9370
PRODUCT WATER TRANSFER PUMP 04-Jun-16 17-Apr-17
START PRODUCT WATER TRANSFER PUMP 04-Jun-16 04-Jun-16
Start Product Water Transfer Pump A10510 0% 04-Jun-16 Start Product Water Transfer Pump
CIVIL 04-Jun-16 01-Jan-17
Excavation Works A11580 0% 04-Jun-16 11-Jun-16 A11580
Concrete Works A11610 0% 11-Jun-16 13-Jul-16 A11610
Foundation Water Proofing A11620 0% 13-Jul-16 13-Aug-16 A11620
Backfilling Works A11590 0% 13-Aug-16 27-Aug-16 A11590
Installation of steel hanger A12020 0% 06-Sep-16 01-Oct-16 A12020
Over head crane installation A12080 0% 24-Oct-16 01-Nov-16 A12080
Epoxy Works A11600 0% 11-Dec-16 01-Jan-17 A11600
MECHANICAL 12-Jan-17 17-Apr-17
Installation of Product Water Pumps A9380 0% 12-Jan-17 24-Jan-17 A9380
Installation of pipes and valves A9390 0% 24-Jan-17 28-Feb-17 A9390
Installation of Steel Supports A9400 0% 24-Jan-17 28-Feb-17 A9400
Installation of Generator A9410 0% 26-Mar-17 03-Apr-17 A9410
Installation of Fire Fighting Pump A9420 0% 03-Apr-17 17-Apr-17 A9420
ELECTRICAL 02-Mar-17 08-Apr-17
Installation of cable trays A9430 0% 02-Mar-17 11-Mar-17 A9430

Page 21 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Installation of Field Instruments A9440 0% 11-Mar-17 15-Mar-17 A9440


Installation MDP-4 A9450 0% 15-Mar-17 20-Mar-17 A9450
Installation PLC Panels A9460 0% 15-Mar-17 20-Mar-17 A9460
Electrical and instrument Cable Pulling A9470 0% 20-Mar-17 29-Mar-17 A9470
Glanding and Termination of Electrical & Instrument
A9480 cable 0% 29-Mar-17 08-Apr-17 A9480
GENERAL SITE WORKS 25-May-16 14-May-17
Excavation Work A9750 0% 25-May-16 29-May-16 A9750
Backfilling Work A9760 0% 26-May-16 30-May-16 A9760
Backfilling A3390 0% 07-Aug-16 22-Aug-16 A3390
Columns A11330 0% 08-Sep-16 22-Sep-16 A11330
Concrete Work A9780 0% 10-Oct-16 15-Oct-16 A9780
networks (water,sewerage,,,, ) A1040 0% 22-Nov-16 23-Mar-17 A1040
interconnecting piping between process buildings
A1650 0% 22-Nov-16 31-Jan-17 A1650
Finishing Work A9770 0% 07-Jan-17 12-Jan-17 A9770
fencing &gates works A1050 0% 16-Jan-17 17-Apr-17 A1050
road works & Landscape A1020 0% 31-Jan-17 14-May-17 A1020
Installation of Pipes & Valves A8930 0% 04-Feb-17 15-Feb-17 A8930
Loop testing & Commissioning of SCADA System
A9510 0% 11-Apr-17 27-Apr-17 A9510
SCADA WORKS 22-Nov-16 12-Apr-17
CIVIL
MECHANICAL
ELECTRICAL 22-Nov-16 12-Apr-17
Installation of PVC Conduits (Fiber optic cables
A9250by Civil) 0% 22-Nov-16 24-Dec-16 A9250
Installation of cable trays A9260 0% 09-Feb-17 14-Feb-17 A9260
Installation of PLC Panel(RO) A9270 0% 27-Feb-17 12-Apr-17 A9270
TESTING AND COMMISSIONING 20-Apr-17 14-May-17
Precommissioning 20-Apr-17 01-May-17
Electrical Panel Energization A9490 0% 20-Apr-17 26-Apr-17 A9490
Hydro Testing A9500 0% 20-Apr-17 01-May-17 A9500
Precomisining Works A9520 0% 20-Apr-17 01-May-17 A9520

Page 22 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
Activity Name Activity ID Activity % Complete Start Finish J F M A M J J A S O N D J F M A M

Commissioning 01-May-17 14-May-17


Loop testing and Commissioning of ScadaA12560
System 0% 01-May-17 14-May-17 A12560
Commissioning of R.O Plant A9530 0% 01-May-17 14-May-17 A9530
HANDOVER AND DEMOBILIZATION 17-Apr-17 29-Apr-17
Demobilization A1430 0% 17-Apr-17 29-Apr-17 A1430
PROJECT FINISH 14-May-17 14-May-17
project finish A1220 0% 14-May-17 project finish

Page 23 of 23
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
25-May-16
APPENDIX B
Month Milestone Task Description Task Final Value of Final Payment
Drawdown Drawdown Payment (SAR)
Activity ID Profile Profile (SAR)
0 Month 0 10.00% 17,350,000
Advance Payment 1 10.00% 17,350,000
1 Month 1 1.27% 2,208,436
A2470 PFD & Mass Balance 0.06% 101,142
A2480 Plant Survey Report 0.03% 49,200
A2490 Geotechnical Report 0.03% 49,200
A2500 Process Design Report 0.03% 49,200
A2510 General Layout 0.03% 49,200
A2520 WTP Building layout 0.03% 49,200
A2530 Well General Orientations 0.03% 49,200
A2540 Evaporation Ponds Layout 0.03% 49,200
A2570 Piping & Instrumentation Diagram 0.03% 49,200
A2580 Single Line Diagram 0.03% 49,200
A2590 HAZOP study & Output 0.03% 49,200
A2610 P&ID Update 0.03% 49,200
A2550 Hydraulic Design Report 0.03% 49,200
A2560 Hydraulic Profile 0.03% 49,200
A2600 Civil Guide Drawings & Load List 0.03% 49,200
A2950 Electrical Hook Up Drawings 0.11% 188,190
A2960 Electrical Layout 0.11% 188,600
A2970 Control Panel Design 0.11% 188,600
A2890 Mechanical General Arrangement 0.11% 188,600
A2900 Control Philosophy 0.11% 188,600
A2990 Piping Layout & Pipe Sppols Details 0.10% 165,025
A2940 Mechanical Installation Drawings 0.05% 94,300
A2910 Logic Diagrams & Control Narrative 0.11% 188,600
A2920 Civil Structural Drawings 0.00% 7,254
A2930 Civil Structural Design 0.00% 7,254
A2980 Site Development and Architectural 0.01% 13,471
2 Month 2 1.87% 3,238,843
A2950 Electrical Hook Up Drawings 0.01% 11,070
A2990 Piping Layout & Pipe Sppols Details 0.01% 23,575
A2940 Mechanical Installation Drawings 0.05% 94,300
A2920 Civil Structural Drawings 0.10% 181,346
A2930 Civil Structural Design 0.10% 181,346
A2980 Site Development and Architectural 0.10% 175,129
A3360 Removing Sludge material 0.58% 1,004,417
A7760 Excavation Pond 0.54% 929,554
A10550 Mobilization of drilling 0.24% 408,422
A10560 Drilling 0.13% 229,684
3 Month 3 11.10% 19,260,246
Advance Payment 2 8.00% 13,880,000
A3360 Removing Sludge material 0.58% 1,004,417
A7760 Excavation Pond 0.54% 929,554
A10560 Drilling 0.43% 746,474
A2420 route 1 (new well 1 ) 0.30% 524,116
A2430 route 2 (new well 2 ) 0.28% 480,440
A8300 RO Skids ( Pressure Vessels ) 0.15% 260,909
A7750 Fabrication And Delivery HDPE Geomembrane To Site 0.24% 413,942
A10530 Steel Hanger Structure 0.11% 198,692
A10540 Steel Hanger Structure 0.07% 118,375
A10360 Excavation Works 0.09% 164,428
A10570 Install Casing Pipes 0.30% 527,418
A8310 UPVC Pipe & Valves 0.01% 11,480
4 Month 4 7.87% 13,648,485
A7760 Excavation Pond 0.54% 929,554
A10560 Drilling 0.45% 775,185
A2420 route 1 (new well 1 ) 0.26% 449,242
A2430 route 2 (new well 2 ) 0.36% 617,709
A8300 RO Skids ( Pressure Vessels ) 0.19% 335,455
A7750 Fabrication And Delivery HDPE Geomembrane To Site 0.31% 532,212
A10530 Steel Hanger Structure 0.15% 255,462
A10540 Steel Hanger Structure 0.09% 152,196
A10360 Excavation Works 0.03% 54,809
A10570 Install Casing Pipes 0.68% 1,186,690
A8310 UPVC Pipe & Valves 0.06% 103,320
A3350 Excavation 0.58% 1,004,417
A10370 Backfilling Works 0.17% 303,560
A8130 Sand Filter Vessel 0.23% 393,600
A8340 Sand Filter's Vessel 0.23% 393,600
A7900 GLS Tank 0.96% 1,660,123
A8120 GLS Tank 0.04% 65,600
A8040 GLS Tanks 0.32% 562,289
A11920 PO placed for Pumps 0.58% 1,006,077
A11930 PO placed for Cooling Towers 0.10% 173,462
A11980 PO placed for Emergency Diesel Gen Set 0.04% 69,385
A11990 PO placed for Chemical Treatment System 0.05% 86,731
A12010 PO placed for Major Field Instruments 0.03% 52,038
A12120 PO placed for Control Valves 0.03% 60,712
A12160 PO placed for Fleldbus Connectivity Equip. & S/w 0.07% 130,096
A12170 PO placed for wet/dry bulb temp. Sensors 0.07% 130,096
A3390 Backfilling 0.33% 579,471
A7770 Backfilling Pond (25CM) 0.56% 965,306
A8140 Sand Filter Blowers 0.01% 22,364
A8150 saturation Vessel 0.03% 44,727
A8350 Sand Filter Blowers 0.02% 29,818
A10770 Excavation Works 0.11% 182,697
A9550 Excavation Works 0.02% 34,167
A10580 Cementation of casing pipes 0.18% 306,316

STCL - WETICO (Payment Milestone Schedule) rev 4.0


5 Month 5 9.40% 16,304,194
A10560 Drilling 0.43% 746,474
A2430 route 2 (new well 2 ) 0.34% 594,831
A8300 RO Skids ( Pressure Vessels ) 0.19% 323,030
A7750 Fabrication And Delivery HDPE Geomembrane To Site 0.30% 512,500
A10530 Steel Hanger Structure 0.14% 246,000
A10540 Steel Hanger Structure 0.08% 146,560
A8310 UPVC Pipe & Valves 0.06% 99,493
A10370 Backfilling Works 0.01% 25,297
A8130 Sand Filter Vessel 0.27% 465,164
A8340 Sand Filter's Vessel 0.27% 465,164
A7900 GLS Tank 1.13% 1,961,963
A8120 GLS Tank 0.04% 77,527
A8040 GLS Tanks 0.38% 664,523
A11920 PO placed for Pumps 0.11% 182,923
A11930 PO placed for Cooling Towers 0.02% 31,538
A11980 PO placed for Emergency Diesel Gen Set 0.01% 12,615
A11990 PO placed for Chemical Treatment System 0.01% 15,769
A12010 PO placed for Major Field Instruments 0.01% 9,462
A12120 PO placed for Control Valves 0.01% 11,038
A12160 PO placed for Fleldbus Connectivity Equip. & S/w 0.01% 23,654
A12170 PO placed for wet/dry bulb temp. Sensors 0.01% 23,654
A3390 Backfilling 0.24% 424,946
A7770 Backfilling Pond (25CM) 0.41% 707,891
A8140 Sand Filter Blowers 0.03% 58,145
A8150 saturation Vessel 0.07% 116,291
A8350 Sand Filter Blowers 0.04% 77,527
A10770 Excavation Works 0.02% 36,539
A9550 Excavation Works 0.00% 6,833
A10580 Cementation of casing pipes 0.06% 102,105
A10380 Plain Concrete Works 0.13% 219,237
A10780 Backfilling Works 0.17% 303,560
A9560 Backfilling Works 0.02% 41,000
A10590 Centeralizers 0.24% 408,422
A8330 Cartridge, Blending, Flushing Filter 0.02% 32,214
A12190 FOB placed for Pumps 0.77% 1,341,436
A12200 FOB placed for Cooling Towers 0.13% 231,282
A12250 FOB placed for Emergency Diesel Gen Set 0.05% 92,513
A12260 FOB placed for Chemical Treatment System 0.07% 115,641
A12280 FOB placed for Major Field Instruments 0.04% 69,385
A12290 FOB placed for Control Valves 0.05% 80,949
A12330 FOB placed for Fleldbus Connectivity Equip. & S/w 0.10% 173,462
A12340 FOB placed for wet/dry bulb temp. Sensors 0.10% 173,462
A7820 Well Pumps 0.27% 464,226
A7830 Riser Pipes 0.05% 81,622
A7840 Valves- discharge Pipes 0.02% 40,811
A7850 control Panel 0.10% 170,046
A7860 Transformer 0.01% 17,005
A7870 MV and Instruments Cables 0.01% 10,203
A7880 Flowmeter- Instruments 0.01% 13,604
A7890 PLC Panel 0.01% 11,415
A8060 Pipe Work 0.96% 1,673,197
A3400 Pipe Work 0.87% 1,506,626
A10390 Insulation Works 0.13% 219,237
A9570 Plain Concrete Works 0.05% 82,000
A10840 Excavation Works 0.11% 182,697
A11260 Excavation 0.11% 189,432
A9590 Insulation Works 0.02% 41,000
A10640 Lining Pond and backfilling (50cm) 0.04% 70,623
A7780 Lining Pond and backfilling (50cm) 0.05% 78,431
6 Month 6 7.93% 13,760,502
A10560 Drilling 0.28% 488,079
A2430 route 2 (new well 2 ) 0.05% 91,512
A8300 RO Skids ( Pressure Vessels ) 0.18% 310,606
A7750 Fabrication And Delivery HDPE Geomembrane To Site 0.28% 492,788
A10530 Steel Hanger Structure 0.14% 236,538
A10540 Steel Hanger Structure 0.08% 140,923
A8310 UPVC Pipe & Valves 0.06% 95,667
A8130 Sand Filter Vessel 0.26% 447,273
A8340 Sand Filter's Vessel 0.26% 447,273
A7900 GLS Tank 1.09% 1,886,503
A8120 GLS Tank 0.04% 74,545
A8040 GLS Tanks 0.37% 638,965
A8140 Sand Filter Blowers 0.03% 55,909
A8150 saturation Vessel 0.06% 111,818
A8350 Sand Filter Blowers 0.04% 74,545
A10780 Backfilling Works 0.01% 25,297
A8330 Cartridge, Blending, Flushing Filter 0.02% 36,607
A12190 FOB placed for Pumps 0.60% 1,036,564
A12200 FOB placed for Cooling Towers 0.10% 178,718
A12250 FOB placed for Emergency Diesel Gen Set 0.04% 71,487
A12260 FOB placed for Chemical Treatment System 0.05% 89,359
A12280 FOB placed for Major Field Instruments 0.03% 53,615
A12290 FOB placed for Control Valves 0.04% 62,551
A12330 FOB placed for Fleldbus Connectivity Equip. & S/w 0.08% 134,038
A12340 FOB placed for wet/dry bulb temp. Sensors 0.08% 134,038
A7820 Well Pumps 0.37% 644,758
A7830 Riser Pipes 0.07% 113,364
A7840 Valves- discharge Pipes 0.03% 56,682
A7850 control Panel 0.14% 236,175

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A7860 Transformer 0.01% 23,618
A7870 MV and Instruments Cables 0.01% 14,171
A7880 Flowmeter- Instruments 0.01% 18,894
A7890 PLC Panel 0.01% 15,854
A10390 Insulation Works 0.06% 109,618
A10840 Excavation Works 0.02% 36,539
A11260 Excavation 0.02% 35,519
A9590 Insulation Works 0.02% 41,000
A10640 Lining Pond and backfilling (50cm) 0.34% 588,526
A7780 Lining Pond and backfilling (50cm) 0.38% 653,593
A11270 Plain Concrete 0.06% 112,477
A10790 Plain Concrete Works 0.13% 219,237
A10850 Backfilling Works 0.17% 290,912
A2440 route 3 (from existing to new plant) 0.53% 912,752
A8160 Air Compressor System 0.01% 24,059
A8200 Field Instrument 0.03% 45,920
A8110 Field Instrument 0.00% 2,296
A8080 Field Instrument 0.00% 2,870
A10400 R.C Footing Works 0.46% 793,429
A9580 Reinforcement Concrete Works 0.09% 164,000
A11280 R.C Footing & Trench Footing 0.13% 224,953
A10800 Insulation Works 0.12% 200,967
A10120 Excavation 0.08% 142,231
A8170 Backwash Pump 0.01% 13,120
A8180 Pipes & Valves 0.02% 35,782
A8320 High Pressure pump 0.01% 18,040
A8360 backwash Pumps 0.00% 6,560
A8380 Flushing Pump 0.00% 4,920
A8400 Pipes & Valves 0.00% 5,740
A8430 Field Instrument 0.00% 5,788
A8490 MCC Panels 0.01% 24,600
A8280 Filter Feed Pump 0.00% 6,560
A8290 Pipes & Valves 0.00% 3,976
A8270 Field Instrument 0.00% 1,312
A8560 Product Water Pump 0.01% 24,600
A8570 Pipes & Valves 0.01% 23,855
A8590 Fire Fighting Pump 0.00% 6,560
A8610 Field Instrument 0.01% 8,747
A8220 Cooling Tower 0.01% 21,867
A8230 Pipes and Valves 0.01% 11,714
A8250 Field Instrument 0.00% 2,187
A10650 Raw Water Pump 0.01% 12,300
A10660 Pipes & Valves 0.00% 7,952
A8500 Reject Water Pumps 0.00% 2,460
A8510 Pipes & Valves 0.00% 1,988
A8530 Field Instrument 0.00% 1,093
A7920 Field Instrument 0.00% 2,315
A10600 Pumping Test 0.16% 272,281
A11290 Column Neck 0.03% 46,865
A10980 Excavation Works 0.02% 38,575
A9650 Walls & Columns 0.01% 9,111
7 Month 7 8.61% 14,939,012
A8300 RO Skids ( Pressure Vessels ) 0.19% 335,455
A7750 Fabrication And Delivery HDPE Geomembrane To Site 0.06% 98,558
A10530 Steel Hanger Structure 0.15% 255,462
A10540 Steel Hanger Structure 0.09% 152,196
A8310 UPVC Pipe & Valves 0.06% 103,320
A8130 Sand Filter Vessel 0.28% 483,055
A8340 Sand Filter's Vessel 0.28% 483,055
A7900 GLS Tank 1.17% 2,037,423
A8120 GLS Tank 0.05% 80,509
A8040 GLS Tanks 0.40% 690,082
A8140 Sand Filter Blowers 0.03% 60,382
A8150 saturation Vessel 0.07% 120,764
A8350 Sand Filter Blowers 0.05% 80,509
A8330 Cartridge, Blending, Flushing Filter 0.02% 39,536
A7820 Well Pumps 0.40% 696,339
A7830 Riser Pipes 0.07% 122,433
A7840 Valves- discharge Pipes 0.04% 61,217
A7850 control Panel 0.15% 255,069
A7860 Transformer 0.01% 25,507
A7870 MV and Instruments Cables 0.01% 15,304
A7880 Flowmeter- Instruments 0.01% 20,406
A7890 PLC Panel 0.01% 17,122
A10640 Lining Pond and backfilling (50cm) 0.37% 635,608
A7780 Lining Pond and backfilling (50cm) 0.41% 705,880
A10850 Backfilling Works 0.02% 37,945
A2440 route 3 (from existing to new plant) 0.45% 782,359
A8160 Air Compressor System 0.02% 30,932
A8200 Field Instrument 0.03% 59,040
A8110 Field Instrument 0.00% 2,952
A8080 Field Instrument 0.00% 3,690
A10400 R.C Footing Works 0.05% 83,519
A10800 Insulation Works 0.07% 127,888
A10120 Excavation 0.08% 142,231
A8170 Backwash Pump 0.03% 44,280
A8180 Pipes & Valves 0.07% 120,764
A8320 High Pressure pump 0.04% 60,885
A8360 backwash Pumps 0.01% 22,140
A8380 Flushing Pump 0.01% 16,605
A8400 Pipes & Valves 0.01% 19,373

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A8430 Field Instrument 0.01% 19,535
A8490 MCC Panels 0.05% 83,025
A8280 Filter Feed Pump 0.01% 22,140
A8290 Pipes & Valves 0.01% 13,418
A8270 Field Instrument 0.00% 4,428
A8560 Product Water Pump 0.05% 83,025
A8570 Pipes & Valves 0.05% 80,509
A8590 Fire Fighting Pump 0.01% 22,140
A8610 Field Instrument 0.02% 29,520
A8220 Cooling Tower 0.04% 73,800
A8230 Pipes and Valves 0.02% 39,536
A8250 Field Instrument 0.00% 7,380
A10650 Raw Water Pump 0.02% 41,513
A10660 Pipes & Valves 0.02% 26,836
A8500 Reject Water Pumps 0.00% 8,303
A8510 Pipes & Valves 0.00% 6,709
A8530 Field Instrument 0.00% 3,690
A7920 Field Instrument 0.00% 7,814
A10600 Pumping Test 0.08% 136,141
A11290 Column Neck 0.04% 65,612
A10980 Excavation Works 0.04% 77,151
A9650 Walls & Columns 0.09% 154,889
A10860 Plain Concrete Works 0.13% 219,237
A10910 demobilization of drilling 0.24% 408,422
A8440 PVC Conduits 0.04% 73,448
A8450 Cable & Cable Tray 0.15% 262,400
A8460 PLC Panel 0.39% 670,057
A8190 Cable & cable Tray 0.04% 65,600
A8210 PLC Panel 0.04% 65,600
A8370 Dosing System 0.02% 30,067
A8420 Cable & cable Tray 0.04% 65,600
A8470 PVC Conduits 0.04% 70,156
A8480 Cable & Cable Tray 0.02% 42,033
A8260 Cable & cable Tray 0.01% 11,693
A8600 Cable & Cable Tray 0.04% 71,435
A8240 Cable & cable Tray 0.01% 16,400
A10670 Field Instrument 0.01% 18,040
A10680 Cable & cable Tray 0.02% 38,939
A8520 Cable & Cable Tray 0.00% 4,015
A7910 Cable & cable Tray 0.01% 11,345
A8100 Cable & cable Tray 0.00% 5,701
A8070 Cable & cable Tray 0.00% 4,100
A11300 Foundation Water Proofing 0.06% 112,477
A10810 R.C Footing Works 0.48% 835,189
A10760 Epoxy First Layer 0.06% 109,618
A10990 Backfilling Works 0.07% 126,885
A10130 Plain Concrete 0.08% 142,231
A11310 Backfilling Upto G.W Level 0.05% 87,482
A10870 Insulation Works 0.13% 219,237
A11730 Mobilization of drilling 0.14% 249,591
A9660 Roof 0.08% 136,667
A2450 route 4 (product tank to main pump station ) 0.11% 196,609
A2460 route 5 (from reject pump to evaporation bond ) 0.05% 92,051
A10140 R.C Footing & Trench Footing 0.05% 94,821
A3380 Concrete 0.05% 88,107
A7790 Concrete 0.06% 97,848
A11060 Excavation Works 0.03% 48,219
A10930 Civil Work For Well Feild 0.01% 10,789
8 Month 8 7.51% 13,037,548
A8300 RO Skids ( Pressure Vessels ) 0.18% 310,606
A10530 Steel Hanger Structure 0.02% 37,846
A10540 Steel Hanger Structure 0.01% 22,548
A8310 UPVC Pipe & Valves 0.06% 95,667
A8130 Sand Filter Vessel 0.10% 178,909
A8340 Sand Filter's Vessel 0.10% 178,909
A7900 GLS Tank 1.09% 1,886,503
A8120 GLS Tank 0.04% 74,545
A8040 GLS Tanks 0.37% 638,965
A8140 Sand Filter Blowers 0.03% 49,200
A8150 saturation Vessel 0.06% 98,400
A8350 Sand Filter Blowers 0.04% 65,600
A8330 Cartridge, Blending, Flushing Filter 0.02% 36,607
A7820 Well Pumps 0.37% 644,758
A7830 Riser Pipes 0.07% 113,364
A7840 Valves- discharge Pipes 0.03% 56,682
A7850 control Panel 0.14% 236,175
A7860 Transformer 0.01% 23,618
A7870 MV and Instruments Cables 0.01% 14,171
A7880 Flowmeter- Instruments 0.01% 18,894
A7890 PLC Panel 0.01% 15,854
A10640 Lining Pond and backfilling (50cm) 0.12% 211,869
A7780 Lining Pond and backfilling (50cm) 0.14% 235,293
A8160 Air Compressor System 0.02% 28,641
A8200 Field Instrument 0.03% 54,667
A8110 Field Instrument 0.00% 2,733
A8080 Field Instrument 0.00% 3,417
A8170 Backwash Pump 0.02% 41,000
A8180 Pipes & Valves 0.06% 111,818
A8320 High Pressure pump 0.03% 56,375
A8360 backwash Pumps 0.01% 20,500
A8380 Flushing Pump 0.01% 15,375

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A8400 Pipes & Valves 0.01% 17,938
A8430 Field Instrument 0.01% 18,088
A8490 MCC Panels 0.04% 76,875
A8280 Filter Feed Pump 0.01% 20,500
A8290 Pipes & Valves 0.01% 12,424
A8270 Field Instrument 0.00% 4,100
A8560 Product Water Pump 0.04% 76,875
A8570 Pipes & Valves 0.04% 74,545
A8590 Fire Fighting Pump 0.01% 20,500
A8610 Field Instrument 0.02% 27,333
A8220 Cooling Tower 0.04% 68,333
A8230 Pipes and Valves 0.02% 36,607
A8250 Field Instrument 0.00% 6,833
A10650 Raw Water Pump 0.02% 38,438
A10660 Pipes & Valves 0.01% 24,848
A8500 Reject Water Pumps 0.00% 7,688
A8510 Pipes & Valves 0.00% 6,212
A8530 Field Instrument 0.00% 3,417
A7920 Field Instrument 0.00% 7,235
A8440 PVC Conduits 0.05% 83,464
A8450 Cable & Cable Tray 0.17% 298,182
A8460 PLC Panel 0.44% 761,429
A8190 Cable & cable Tray 0.04% 74,545
A8210 PLC Panel 0.04% 74,545
A8370 Dosing System 0.02% 34,167
A8420 Cable & cable Tray 0.04% 74,545
A8470 PVC Conduits 0.05% 79,722
A8480 Cable & Cable Tray 0.03% 47,765
A8260 Cable & cable Tray 0.01% 13,288
A8600 Cable & Cable Tray 0.05% 81,176
A8240 Cable & cable Tray 0.01% 18,636
A10670 Field Instrument 0.01% 20,500
A10680 Cable & cable Tray 0.03% 44,249
A8520 Cable & Cable Tray 0.00% 4,563
A7910 Cable & cable Tray 0.01% 12,892
A8100 Cable & cable Tray 0.00% 6,479
A8070 Cable & cable Tray 0.00% 4,659
A10810 R.C Footing Works 0.02% 41,759
A10990 Backfilling Works 0.03% 46,747
A11310 Backfilling Upto G.W Level 0.01% 24,995
A10870 Insulation Works 0.06% 109,618
A11730 Mobilization of drilling 0.09% 158,831
A9660 Roof 0.02% 27,333
A2450 route 4 (product tank to main pump station ) 0.31% 546,136
A2460 route 5 (from reject pump to evaporation bond ) 0.15% 255,698
A10140 R.C Footing & Trench Footing 0.11% 189,642
A3380 Concrete 0.25% 440,534
A7790 Concrete 0.28% 489,239
A11060 Excavation Works 0.04% 67,507
A10930 Civil Work For Well Feild 0.03% 53,947
A9670 Outside and Inside Waterproofing 0.04% 72,538
A11320 Ground Beam 0.06% 112,477
A8580 Generator 0.01% 20,259
A10880 R.C Footing Works 0.46% 793,429
A10830 Epoxy First Layer 0.06% 109,618
A11000 Plain Concrete Works 0.07% 115,726
A11070 Backfilling Works 0.07% 120,207
A11740 Drilling 0.22% 374,867
A10150 Column Neck & Trench Wall 0.08% 142,231
A7810 ROADS 0.35% 613,650
A11360 Slab On Grade 0.10% 171,058
A11010 Insulation Works 0.03% 57,863
A11120 Excavation Works 0.00% 6,681
A10160 Foundation Water Proofing 0.01% 11,853
9 Month 9 9.51% 16,500,938
A8300 RO Skids ( Pressure Vessels ) 0.10% 173,939
A8310 UPVC Pipe & Valves 0.04% 65,053
A7900 GLS Tank 1.17% 2,037,423
A8120 GLS Tank 0.05% 80,509
A8040 GLS Tanks 0.40% 690,082
A8330 Cartridge, Blending, Flushing Filter 0.02% 39,536
A7820 Well Pumps 0.40% 696,339
A7830 Riser Pipes 0.07% 122,433
A7840 Valves- discharge Pipes 0.04% 61,217
A7850 control Panel 0.15% 255,069
A7860 Transformer 0.01% 25,507
A7870 MV and Instruments Cables 0.01% 15,304
A7880 Flowmeter- Instruments 0.01% 20,406
A7890 PLC Panel 0.01% 17,122
A8160 Air Compressor System 0.02% 30,932
A8200 Field Instrument 0.03% 59,040
A8110 Field Instrument 0.00% 2,952
A8080 Field Instrument 0.00% 3,690
A8170 Backwash Pump 0.03% 44,280
A8180 Pipes & Valves 0.07% 120,764
A8320 High Pressure pump 0.04% 60,885
A8360 backwash Pumps 0.01% 22,140
A8380 Flushing Pump 0.01% 16,605
A8400 Pipes & Valves 0.01% 19,373
A8430 Field Instrument 0.01% 18,088
A8490 MCC Panels 0.05% 83,025

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A8280 Filter Feed Pump 0.01% 22,140
A8290 Pipes & Valves 0.01% 13,418
A8270 Field Instrument 0.00% 4,428
A8560 Product Water Pump 0.05% 83,025
A8570 Pipes & Valves 0.05% 80,509
A8590 Fire Fighting Pump 0.01% 22,140
A8610 Field Instrument 0.02% 29,520
A8220 Cooling Tower 0.02% 41,000
A8230 Pipes and Valves 0.02% 39,536
A8250 Field Instrument 0.00% 7,380
A10650 Raw Water Pump 0.02% 41,513
A10660 Pipes & Valves 0.02% 26,836
A8500 Reject Water Pumps 0.00% 8,303
A8510 Pipes & Valves 0.00% 6,709
A8530 Field Instrument 0.00% 3,690
A7920 Field Instrument 0.00% 7,235
A8440 PVC Conduits 0.05% 90,141
A8450 Cable & Cable Tray 0.19% 322,036
A8460 PLC Panel 0.47% 822,343
A8190 Cable & cable Tray 0.05% 80,509
A8210 PLC Panel 0.05% 80,509
A8370 Dosing System 0.02% 36,900
A8420 Cable & cable Tray 0.05% 80,509
A8470 PVC Conduits 0.05% 86,100
A8480 Cable & Cable Tray 0.03% 51,586
A8260 Cable & cable Tray 0.01% 14,351
A8600 Cable & Cable Tray 0.05% 87,670
A8240 Cable & cable Tray 0.01% 20,127
A10670 Field Instrument 0.01% 22,140
A10680 Cable & cable Tray 0.03% 47,788
A8520 Cable & Cable Tray 0.00% 4,928
A7910 Cable & cable Tray 0.01% 13,923
A8100 Cable & cable Tray 0.00% 6,997
A8070 Cable & cable Tray 0.00% 5,032
A2450 route 4 (product tank to main pump station ) 0.23% 393,218
A2460 route 5 (from reject pump to evaporation bond ) 0.16% 276,154
A3380 Concrete 0.27% 475,777
A7790 Concrete 0.30% 528,378
A10930 Civil Work For Well Feild 0.01% 17,263
A9670 Outside and Inside Waterproofing 0.01% 9,462
A8580 Generator 0.02% 26,047
A10880 R.C Footing Works 0.05% 83,519
A11070 Backfilling Works 0.03% 53,425
A11740 Drilling 0.32% 562,300
A7810 ROADS 0.87% 1,506,231
A11360 Slab On Grade 0.03% 53,895
A11010 Insulation Works 0.07% 115,727
A11120 Excavation Works 0.00% 3,341
A10160 Foundation Water Proofing 0.08% 130,379
A7800 FENCE 1.22% 2,119,881
A11130 Backfilling Works 0.01% 15,033
A11330 Columns 0.13% 224,953
A1040 networks (water,sewerage,,,, ) 0.13% 219,734
A9850 Excavation Works 0.01% 15,711
A11460 Excavation Works 0.01% 25,090
A11520 Excavation Works 0.01% 10,587
A11580 Excavation Works 0.02% 27,420
A10900 Epoxy First Layer 0.06% 109,618
A11080 Plain Concrete Works 0.07% 115,726
A11190 Excavation Works 0.01% 10,022
A9750 Excavation Works 0.00% 4,100
A11410 Excavation Works 0.00% 4,100
A11750 Install Casing Pipes 0.72% 1,252,617
A9860 Backfilling Works 0.01% 15,711
A11470 Backfilling Works 0.01% 25,090
A11530 Backfilling Works 0.01% 10,587
A11590 Backfilling Works 0.02% 27,420
A10170 Backfilling Upto G.W Level 0.07% 126,428
A11020 R.C Footing Works 0.19% 330,647
A11140 Plain Concrete Works 0.01% 10,022
A11200 Backfilling Works 0.01% 15,033
A9760 Backfilling Works 0.00% 4,100
A11420 Backfilling Works 0.00% 4,100
A9780 Concrete Works 0.01% 10,358
A11430 Concrete Works 0.01% 10,358
A11090 Insulation Works 0.04% 67,507
A11150 Insulation Works 0.01% 8,769
A11370 Steel Hanger Slab 0.08% 132,484
A9880 Concrete Works 0.03% 43,528
A11490 Concrete Works 0.04% 69,481
A11550 Concrete Works 0.02% 29,318
A11610 Concrete Works 0.04% 75,932
A11210 Plain Concrete Works 0.00% 1,670
10 Month 10 5.51% 9,562,856
A7900 GLS Tank 0.48% 830,061
A8120 GLS Tank 0.02% 38,764
A8040 GLS Tanks 0.16% 281,145
A8330 Cartridge, Blending, Flushing Filter 0.01% 20,500
A7820 Well Pumps 0.39% 670,548
A7830 Riser Pipes 0.07% 117,899
A7840 Valves- discharge Pipes 0.03% 58,949

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A7850 control Panel 0.14% 245,622
A7860 Transformer 0.01% 24,562
A7870 MV and Instruments Cables 0.01% 14,737
A7880 Flowmeter- Instruments 0.01% 19,650
A7890 PLC Panel 0.01% 16,488
A8160 Air Compressor System 0.01% 11,456
A8200 Field Instrument 0.03% 56,853
A8110 Field Instrument 0.00% 2,843
A8080 Field Instrument 0.00% 3,553
A8170 Backwash Pump 0.01% 21,320
A8180 Pipes & Valves 0.07% 116,291
A8320 High Pressure pump 0.02% 29,315
A8360 backwash Pumps 0.01% 10,660
A8380 Flushing Pump 0.00% 7,995
A8400 Pipes & Valves 0.01% 9,328
A8490 MCC Panels 0.02% 39,975
A8280 Filter Feed Pump 0.01% 10,660
A8290 Pipes & Valves 0.01% 12,921
A8270 Field Instrument 0.00% 4,264
A8560 Product Water Pump 0.02% 39,975
A8570 Pipes & Valves 0.04% 77,527
A8590 Fire Fighting Pump 0.01% 10,660
A8610 Field Instrument 0.02% 28,427
A8230 Pipes and Valves 0.02% 38,071
A8250 Field Instrument 0.00% 7,107
A10650 Raw Water Pump 0.01% 19,988
A10660 Pipes & Valves 0.01% 25,842
A8500 Reject Water Pumps 0.00% 3,998
A8510 Pipes & Valves 0.00% 6,461
A8530 Field Instrument 0.00% 3,553
A8440 PVC Conduits 0.03% 53,417
A8450 Cable & Cable Tray 0.18% 310,109
A8460 PLC Panel 0.46% 791,886
A8190 Cable & cable Tray 0.04% 77,527
A8210 PLC Panel 0.04% 77,527
A8370 Dosing System 0.00% 1,367
A8420 Cable & cable Tray 0.04% 77,527
A8470 PVC Conduits 0.03% 51,022
A8480 Cable & Cable Tray 0.03% 49,676
A8260 Cable & cable Tray 0.01% 13,819
A8600 Cable & Cable Tray 0.05% 84,423
A8240 Cable & cable Tray 0.01% 19,382
A10670 Field Instrument 0.01% 21,320
A10680 Cable & cable Tray 0.03% 46,018
A8520 Cable & Cable Tray 0.00% 4,745
A7910 Cable & cable Tray 0.01% 13,407
A8100 Cable & cable Tray 0.00% 6,738
A8070 Cable & cable Tray 0.00% 4,845
A2460 route 5 (from reject pump to evaporation bond ) 0.15% 265,926
A8580 Generator 0.01% 25,082
A11740 Drilling 0.31% 541,474
A1040 networks (water,sewerage,,,, ) 0.14% 238,045
A11750 Install Casing Pipes 0.27% 461,490
A10170 Backfilling Upto G.W Level 0.01% 15,803
A11020 R.C Footing Works 0.08% 132,259
A9780 Concrete Works 0.02% 33,663
A11430 Concrete Works 0.02% 33,663
A11090 Insulation Works 0.06% 106,083
A11150 Insulation Works 0.00% 6,264
A11370 Steel Hanger Slab 0.25% 429,899
A9880 Concrete Works 0.08% 145,095
A11490 Concrete Works 0.13% 231,603
A11550 Concrete Works 0.06% 97,726
A11610 Concrete Works 0.15% 253,108
A11210 Plain Concrete Works 0.00% 8,352
A10180 Ground Beam 0.08% 142,231
A11160 R.C Footing Works 0.02% 40,089
A11220 Insulation Works 0.01% 15,033
A11760 Cementation of casing pipes 0.24% 408,422
A8680 Installation Of Raw Water Tank (1) 0.05% 79,950
A11100 R.C Footing Works 0.19% 330,647
A11040 Epoxy First Layer 0.03% 57,863
A10230 Slab On Grade 0.16% 284,463
A11230 R.C Footing Works 0.01% 20,044
A11770 Centeralizers 0.14% 238,246
A11900 Removing Existing Well 0.09% 158,831
A10720 Installation Of cable Tray 0.01% 12,300
A11350 Finishing Floor 0.03% 51,912
A9890 Foundation Water Proofing 0.01% 10,882
A11500 Foundation Water Proofing 0.01% 17,370
A11560 Foundation Water Proofing 0.00% 7,329
A11620 Foundation Water Proofing 0.01% 18,983
11 Month 11 3.59% 6,235,576
A7820 Well Pumps 0.39% 670,548
A7830 Riser Pipes 0.07% 117,899
A7840 Valves- discharge Pipes 0.03% 58,949
A7850 control Panel 0.14% 245,622
A7860 Transformer 0.01% 24,562
A7870 MV and Instruments Cables 0.01% 14,737
A7880 Flowmeter- Instruments 0.01% 19,650
A7890 PLC Panel 0.01% 16,488

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A8200 Field Instrument 0.03% 52,480
A8110 Field Instrument 0.00% 2,624
A8080 Field Instrument 0.00% 3,280
A8180 Pipes & Valves 0.07% 116,291
A8290 Pipes & Valves 0.01% 12,921
A8270 Field Instrument 0.00% 4,264
A8570 Pipes & Valves 0.04% 77,527
A8610 Field Instrument 0.02% 28,427
A8230 Pipes and Valves 0.02% 38,071
A8250 Field Instrument 0.00% 7,107
A10660 Pipes & Valves 0.01% 25,842
A8510 Pipes & Valves 0.00% 6,461
A8530 Field Instrument 0.00% 3,553
A8450 Cable & Cable Tray 0.07% 119,273
A8460 PLC Panel 0.46% 791,886
A8190 Cable & cable Tray 0.02% 29,818
A8210 PLC Panel 0.04% 77,527
A8420 Cable & cable Tray 0.02% 29,818
A8480 Cable & Cable Tray 0.01% 19,106
A8260 Cable & cable Tray 0.00% 5,315
A8600 Cable & Cable Tray 0.02% 32,471
A8240 Cable & cable Tray 0.00% 7,455
A10670 Field Instrument 0.01% 21,320
A10680 Cable & cable Tray 0.01% 17,699
A8520 Cable & Cable Tray 0.00% 1,825
A7910 Cable & cable Tray 0.00% 5,157
A8100 Cable & cable Tray 0.00% 2,592
A8070 Cable & cable Tray 0.00% 1,864
A2460 route 5 (from reject pump to evaporation bond ) 0.10% 173,875
A8580 Generator 0.01% 10,612
A11740 Drilling 0.31% 541,474
A1040 networks (water,sewerage,,,, ) 0.14% 238,045
A9780 Concrete Works 0.00% 5,179
A11430 Concrete Works 0.00% 5,179
A8680 Installation Of Raw Water Tank (1) 0.08% 138,580
A11100 R.C Footing Works 0.08% 132,259
A11230 R.C Footing Works 0.01% 20,044
A11770 Centeralizers 0.10% 170,176
A11900 Removing Existing Well 0.14% 249,591
A10720 Installation Of cable Tray 0.00% 8,200
A11350 Finishing Floor 0.10% 173,041
A9890 Foundation Water Proofing 0.02% 36,274
A11500 Foundation Water Proofing 0.03% 57,901
A11560 Foundation Water Proofing 0.01% 24,432
A11620 Foundation Water Proofing 0.04% 63,277
A8410 Membrane 0.09% 152,286
A10190 Columns 0.08% 142,231
A1050 fencing &gates works 0.14% 241,208
A11180 Epoxy First Layer 0.00% 5,011
A9770 Finishing Works 0.01% 14,242
A11450 Finishing Works 0.01% 14,242
A11910 Rehabilitation Existing Well 0.21% 359,443
A11110 Epoxy First Layer 0.03% 57,863
A10200 Roof Concrete Salb For Rooms 0.16% 284,463
A11250 Epoxy First Layer 0.00% 5,011
A8850 Installation Of Sand Vessel 0.05% 92,250
A9870 Epoxy Works 0.01% 15,719
A11480 Epoxy Works 0.01% 25,090
A11540 Epoxy Works 0.01% 10,587
A11600 Epoxy Works 0.02% 27,420
A10300 Steel Hanger Slab 0.02% 29,943
12 Month 12 3.51% 6,088,741
A7820 Well Pumps 0.40% 696,339
A7830 Riser Pipes 0.07% 122,433
A7840 Valves- discharge Pipes 0.04% 61,217
A7850 control Panel 0.15% 255,069
A7860 Transformer 0.01% 25,507
A7870 MV and Instruments Cables 0.01% 15,304
A7880 Flowmeter- Instruments 0.01% 20,406
A7890 PLC Panel 0.01% 17,122
A8180 Pipes & Valves 0.07% 116,291
A8290 Pipes & Valves 0.01% 12,921
A8270 Field Instrument 0.00% 1,804
A8570 Pipes & Valves 0.04% 77,527
A8610 Field Instrument 0.01% 12,027
A8230 Pipes and Valves 0.00% 1,464
A8250 Field Instrument 0.00% 3,007
A10660 Pipes & Valves 0.01% 25,842
A8510 Pipes & Valves 0.00% 6,461
A8530 Field Instrument 0.00% 1,503
A8460 PLC Panel 0.25% 426,400
A8210 PLC Panel 0.05% 80,509
A10670 Field Instrument 0.01% 19,680
A11740 Drilling 0.08% 145,781
A1040 networks (water,sewerage,,,, ) 0.14% 247,201
A8680 Installation Of Raw Water Tank (1) 0.03% 47,970
A8410 Membrane 0.09% 158,143
A1050 fencing &gates works 0.16% 271,359
A9770 Finishing Works 0.01% 10,358
A11450 Finishing Works 0.01% 10,358
A11910 Rehabilitation Existing Well 0.37% 646,998

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A8850 Installation Of Sand Vessel 0.09% 153,750
A9870 Epoxy Works 0.02% 31,437
A11480 Epoxy Works 0.03% 50,181
A11540 Epoxy Works 0.01% 21,174
A11600 Epoxy Works 0.03% 54,840
A10300 Steel Hanger Slab 0.23% 404,237
A8010 Installation Of Product Tank (1) 0.21% 364,684
A8940 Installation Of Cooling Tower 0.09% 164,000
A9080 Installation of R.O Skids 0.14% 246,000
A11780 Pumping Test 0.24% 408,422
A8690 Installation Of Raw Water Tank (2) 0.06% 95,940
A11030 Epoxy Painting 0.03% 57,863
A8930 Installation Of Pipes and Valves 0.04% 61,500
A9090 Installation of UPVC pipe & Valves 0.05% 82,000
A9310 Installation of Reject Water Pump 0.01% 16,400
A10690 Installation Of Raw Pump 0.04% 68,333
A9010 Installation Of Feed Pump 0.01% 18,222
A8950 Installation Of Pipes and Valves 0.01% 10,250
A11790 demobilization of drilling 0.10% 181,521
A9100 Installation of Cartridge Filters 0.02% 41,000
A8870 Installation Of Steel Support 0.01% 10,250
A8390 Flushing Tank 0.00% 1,734
A9320 Installation of pipes@valves 0.00% 315
A9110 Installation of Sand filter Vessels 0.00% 7,688
13 Month 13 2.13% 3,687,330
A7820 Well Pumps 0.24% 412,645
A7830 Riser Pipes 0.04% 72,553
A7840 Valves- discharge Pipes 0.02% 36,276
A7850 control Panel 0.09% 151,152
A7860 Transformer 0.01% 15,115
A7870 MV and Instruments Cables 0.01% 9,069
A7880 Flowmeter- Instruments 0.01% 12,092
A7890 PLC Panel 0.01% 10,146
A8210 PLC Panel 0.02% 35,782
A1040 networks (water,sewerage,,,, ) 0.01% 9,156
A8410 Membrane 0.08% 146,429
A1050 fencing &gates works 0.14% 251,258
A11910 Rehabilitation Existing Well 0.35% 599,072
A10300 Steel Hanger Slab 0.08% 134,746
A8010 Installation Of Product Tank (1) 0.10% 168,316
A8690 Installation Of Raw Water Tank (2) 0.08% 133,250
A10690 Installation Of Raw Pump 0.01% 13,667
A9010 Installation Of Feed Pump 0.01% 14,578
A8950 Installation Of Pipes and Valves 0.01% 10,250
A11790 demobilization of drilling 0.13% 226,901
A8870 Installation Of Steel Support 0.02% 30,750
A8390 Flushing Tank 0.02% 43,342
A9320 Installation of pipes@valves 0.00% 3,785
A9110 Installation of Sand filter Vessels 0.07% 115,313
A1650 interconnecting piping between process buildings 0.17% 288,132
A10700 Installation Of Pipes and Valves 0.01% 25,771
A8880 Filling Of Sand Filter's Media 0.05% 82,000
A9020 Installation Of Pipes and Valves 0.00% 4,979
A9380 Installation of Product Water Pumps 0.05% 82,000
A10210 Finishing and Roof Insulation 0.05% 87,527
A8960 Installation Of Steel Support 0.00% 8,200
A8970 Installation Of cable Tray 0.02% 41,000
A11800 Civil Work For Well Feild 0.02% 32,368
A9330 Installation of Steel Supports 0.00% 1,640
A9340 Installation of cable trays 0.00% 1,640
A8640 Installation Of Product Tank (2) 0.11% 182,342
A10410 Epoxy Painting 0.06% 109,618
A9120 Installation of Piping & Valves 0.02% 27,333
A9390 Installation of pipes@valves 0.01% 18,450
A9350 Installation of Field Instruments 0.00% 1,640
A9360 Electrical and instrument Cable Pulling 0.00% 1,171
A8890 Installation Of Sand Filter Blowers 0.01% 15,375
A8980 Installation Of Field Instrument 0.01% 20,500
14 Month 14 3.07% 5,335,120
A8410 Membrane 0.09% 158,143
A1050 fencing &gates works 0.01% 20,101
A11910 Rehabilitation Existing Well 0.37% 646,998
A8690 Installation Of Raw Water Tank (2) 0.02% 37,310
A8390 Flushing Tank 0.00% 6,935
A1650 interconnecting piping between process buildings 0.19% 324,148
A10700 Installation Of Pipes and Valves 0.00% 7,029
A9020 Installation Of Pipes and Valves 0.00% 3,221
A10210 Finishing and Roof Insulation 0.09% 147,702
A11800 Civil Work For Well Feild 0.03% 49,632
A8640 Installation Of Product Tank (2) 0.20% 350,658
A9120 Installation of Piping & Valves 0.01% 13,667
A9390 Installation of pipes@valves 0.01% 22,550
A9360 Electrical and instrument Cable Pulling 0.00% 469
A8890 Installation Of Sand Filter Blowers 0.04% 66,625
A8990 Electrical and Instrument Cable Pulling 0.01% 24,600
A7930 Well Pump Installation 0.28% 492,000
A7960 Installation Of Control Panel 0.07% 123,000
A11630 Well Pump Installation 0.28% 492,000
A11650 Installation Of Control Panel 0.07% 123,000
A11810 Well Pump Installation 0.28% 492,000
A11830 Installation Of Control Panel 0.07% 123,000

STCL - WETICO (Payment Milestone Schedule) rev 4.0


A9370 Glanding and Termination of Electrical & Instrument cable 0.00% 836
A9130 Installation of Steel Supports 0.02% 41,000
A9150 Installation of Sand Filter's Blowers 0.04% 61,500
A10730 Installation Of Field Instrument 0.00% 2,460
A10710 Installation Of Steel Support 0.00% 4,100
A9000 Glanding and Termination Of Electrical & Instrument Cable 0.00% 8,200
A7970 Installation Of Transformer 0.02% 41,000
A8740 Installation Of Reject Water Tank (1) 0.02% 32,800
A11050 Epoxy Painting 0.03% 57,863
A11660 Installation Of Transformer 0.02% 41,000
A11840 Installation Of Transformer 0.02% 41,000
A9160 Installation of Back Wash Pumps 0.02% 41,000
A7980 Installation Of MV Cables 0.01% 10,250
A11670 Installation Of MV Cables 0.01% 10,250
A11850 Installation Of MV Cables 0.01% 10,250
A9400 Installation of Steel Supports 0.01% 16,400
A9430 Installation of cable trays 0.02% 41,000
A10740 Electrical and Instrument Cable Pulling 0.00% 2,460
A9030 Installation Of Steel Support 0.00% 4,100
A9170 Installation of Piping & Valves- Backwash pump 0.02% 41,000
A9210 Installation Of cable Tray 0.09% 153,750
A8900 Installation Of Saturation Vessels 0.07% 123,000
A9140 Filling of Sand Filter's Media 0.04% 71,750
A9410 Installation of Generator 0.04% 61,500
A7950 Installation Of Discharge Line 0.04% 61,500
A11640 Installation Of Discharge Line 0.04% 61,500
A11820 Installation Of Discharge Line 0.04% 61,500
A9420 Installation of Fire Fighting Pump 0.04% 61,500
A9440 Installation of Field Instruments 0.01% 16,400
A9180 Installation of dosing System 0.04% 73,800
A8910 Installation Of Air Compressor System 0.05% 82,000
A8700 Installation Of cable Tray 0.00% 8,200
A8710 Installation Of Field Instrument 0.01% 12,300
A9040 Installation Of cable Tray 0.01% 9,840
A7990 Installation Of Field Instruments 0.01% 10,250
A9450 Installation MDP-4 0.01% 20,500
A9460 Installation PLC Product 0.01% 20,500
A8750 Installation Of Reject Water Tank (2) 0.01% 10,933
A10750 Glanding and Termination Of Electrical & Instrument Cable 0.00% 3,268
A11170 Epoxy Painting 0.00% 4,176
A11680 Installation Of Field Instruments 0.01% 10,250
A11860 Installation Of Field Instruments 0.01% 10,250
A8720 Electrical and Instrument Cable Pulling 0.01% 12,300
A8920 Installation Of Backwash Pump 0.04% 61,500
A8620 Instrument Cable Pulling 0.00% 6,833
A9470 Electrical and instrument Cable Pulling 0.00% 4,686
A8730 Glanding and Termination Of Electrical & Instrument Cable 0.00% 7,888
A8650 Installation Of Product Tank (3) 0.02% 28,053
A10820 Epoxy Painting 0.01% 18,270
A11700 Instrument Cable Pulling 0.00% 6,833
A11880 Instrument Cable Pulling 0.00% 6,833
15 Month 15 1.50% 2,607,015
A8410 Membrane 0.09% 152,286
A11910 Rehabilitation Existing Well 0.11% 191,703
A1650 interconnecting piping between process buildings 0.03% 49,234
A10210 Finishing and Roof Insulation 0.01% 12,005
A9210 Installation Of cable Tray 0.04% 61,500
A9140 Filling of Sand Filter's Media 0.00% 3,417
A9180 Installation of dosing System 0.01% 11,714
A9040 Installation Of cable Tray 0.01% 21,867
A8750 Installation Of Reject Water Tank (2) 0.00% 6,560
A10750 Glanding and Termination Of Electrical & Instrument Cable 0.00% 1,961
A11170 Epoxy Painting 0.01% 10,250
A8920 Installation Of Backwash Pump 0.00% 8,200
A8620 Instrument Cable Pulling 0.03% 51,250
A9470 Electrical and instrument Cable Pulling 0.21% 364,684
A8650 Installation Of Product Tank (3) 0.05% 91,349
A10820 Epoxy Painting 0.00% 835
A11700 Instrument Cable Pulling 0.00% 3,417
A11880 Instrument Cable Pulling 0.00% 3,417
A1020 road works & Landscape 0.05% 82,000
A8000 Installation Of PLC Panel 0.04% 73,800
A9190 Installation of Flushing pump 0.02% 30,750
A11690 Installation Of PLC Panel 0.00% 7,519
A11870 Installation Of PLC Panel 0.01% 18,142
A8860 Installation Pipes & Valves 0.00% 2,460
A8630 Glanding and Termination Of Electrical & Instrument Cable 0.00% 1,640
A9050 Installation Of Field Instrument 0.00% 1,640
A9200 Installation of Pipes and Tanks flushing pumps 0.00% 1,875
A11710 Glanding and Termination Of Electrical & Instrument Cable 0.00% 1,640
A11890 Glanding and Termination Of Electrical & Instrument Cable 0.00% 1,640
A9480 Glanding and Termination of Electrical & Instrument cable 0.00% 1,842
A9220 Installation Of Field Instrument 0.02% 41,000
A9060 Electrical and Instrument Cable Pulling 0.02% 41,000
A9280 Installation of PVC Conduits (Fiber optic cables by Civil) 0.04% 68,592
A9250 Installation of PVC Conduits (Fiber optic cables by Civil) 0.02% 27,333
A8760 Installation Of cable Tray 0.02% 38,722
A11240 Epoxy Painting 0.06% 103,259
A8770 Installation Of Field Instrument 0.00% 5,011
A8800 Installation Of cable Tray 0.02% 30,750
A8780 Electrical and Instrument Cable Pulling 0.00% 7,519
A8790 Glanding and Termination Of Electrical & Instrument Cable 0.02% 30,750
A9230 Electrical and Instrument Cable Pulling 0.00% 7,519
A9070 Glanding and Termination Of Electrical & Instrument Cable 0.54% 934,965

STCL - WETICO (Payment Milestone Schedule) rev 4.0


16 Month 16 0.00% 1.15% 2,002,265
A8410 Membrane 0.01% 20,500
A8650 Installation Of Product Tank (3) 0.03% 52,714
A1020 road works & Landscape 0.08% 140,263
A9280 Installation of PVC Conduits (Fiber optic cables by Civil) 0.56% 972,363
A9250 Installation of PVC Conduits (Fiber optic cables by Civil) 0.01% 22,778
A8800 Installation Of cable Tray 0.04% 60,741
A9230 Electrical and Instrument Cable Pulling 0.03% 49,200
A9070 Glanding and Termination Of Electrical & Instrument Cable 0.01% 13,667
A9240 Glanding and Termination Of Electrical & Instrument Cable 0.00% 614
A8810 Installation Of Field Instrument 0.01% 20,500
A8820 Electrical and Instrument Cable Pulling 0.05% 89,380
A9540 Installation of Membrane 0.04% 61,500
A9290 Installation of cable trays 0.01% 20,500
A9260 Installation of cable trays 0.02% 41,000
A8020 Installation Of cable Tray 0.02% 32,800
A10890 Epoxy Painting 0.06% 109,618
A8030 Installation Of Field Instrument 0.01% 16,400
A9300 Installation of MCC Panels (MDP1,MDP2,MDP3) 0.03% 44,441
A9270 Installation of PLC Panel(RO) 0.10% 172,624
A8660 Electrical and Instrument Cable Pulling 0.02% 32,800
A8670 Glanding and Termination Of Electrical & Instrument Cable 0.01% 15,562
A8830 Glanding and Termination Of Electrical & Instrument Cable 0.01% 12,300
17 Month 17 0.36% 619,394
A1020 road works & Landscape 0.02% 37,399
A9300 Installation of MCC Panels (MDP1,MDP2,MDP3) 0.06% 109,082
A9270 Installation of PLC Panel(RO) 0.24% 423,713
A8830 Glanding and Termination Of Electrical & Instrument Cable 0.00% 8,200
A8840 Installation Of PLC Panel 0.02% 41,000
18 Month 18 4.10% 7,113,500
A9490 Electrical Panel Energization 0.41% 711,350
A9500 Hydro Testing 0.82% 1,422,700
A9510 Loop testing and Commissioning of Scada System 0.41% 711,350
A9520 Precomisining Works 1.64% 2,845,400
A9530 Commissioning of R.O Plant 0.82% 1,422,700
Total 100.00% 100.00% 173,500,000 173,500,000

STCL - WETICO (Payment Milestone Schedule) rev 4.0