CP 300 (A) - QCP-036 Construction of Hospital Transformer Room
CP 300 (A) - QCP-036 Construction of Hospital Transformer Room
CP 300 (A) - QCP-036 Construction of Hospital Transformer Room
M ET H O D CP 300(a)-QCP-036
S T AT E M E N T
J&P (O) Ltd. /
Page: 1 of 6
J&P–AVAX S.A. J.V.
Document Title:
METHOD STATEMENT
CONSTRUCTION OF HOSPITAL TRANSFORMER ROOM WALL USING REVERSE
FORMWORK
F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-036
S T AT E M E N T
J&P (O) Ltd. /
Page: 2 of 6
J&P–AVAX S.A. J.V.
1. SCOPE
2. FIELD OF APPLICATION
3. REFERENCES
F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-036
S T AT E M E N T
J&P (O) Ltd. /
Page: 3 of 6
J&P–AVAX S.A. J.V.
4. MATERIALS
5. TOOLS/EQUIPMENTS
5.1 Crane
6. RESPONSIBILITIES ON SITE
6.2 The responsible Site Engineer shall raise the necessary Request
for Inspections (RFI) for Blinding Concrete, Reinforcement
Inspection, Concreting, Bitumen Application and Waterproofing
Membrane Installation.
7. WORK PROCEDURE
F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-036
S T AT E M E N T
J&P (O) Ltd. /
Page: 4 of 6
J&P–AVAX S.A. J.V.
F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-036
S T AT E M E N T
J&P (O) Ltd. /
Page: 5 of 6
J&P–AVAX S.A. J.V.
7.10 Cast Mat Foundation, taking care not to damage the exposed
vertical waterproofing membrane.
8. SAFETY PROCEDURES
F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-036
S T AT E M E N T
J&P (O) Ltd. /
Page: 6 of 6
J&P–AVAX S.A. J.V.
8.1 The Site Engineer shall physically inspect the working area to
confirm that it is cleared of any hazard and/or obstructions that
may hinder access or proper execution of the work.
8.2 The Site Engineer shall ensure that all personnel engaged in
column demolition works and related activities are wearing the
required Personal Protective Equipments (PPE).
9. REVISIONS
F-P.810/1-0