Total
Total
Total
3. Door system
Door type Remarks
2S: 2-panel side opening
Horizontal
3S: 3-panel side opening These door types have comparatively fast operation.
sliding doors
2CO: 4-panel center opening
Vertical 2U: 2-panel upward opening These door types make it easy to align same-size entrance width and car width.
sliding doors 3U: 3-panel upward opening Note: Not applicable with 2BC operation.
1 2
Car and Entrance Designs Operation System
Signal fixtures such as Car operating panel and Hall position indicator, etc., are shown according to operation system.
The applications vary based on the model, so please confirm when ordering.
CBM-J31 CBM-C111
3 4
Specifications
•
Appearance
Flooring Checkered steel plate with black paint Necessary wires are provided in the traveling cable.
Wiring for BGM Speaker ○
Capacity of 2000kg or less Extruded hard aluminum • (Speaker: by owner)
Sill Over 2000kg Capacity Steel plate with black paint • Mitsubishi Emergency Landing Device (MELD) Upon power failure, a car equipped with this function
Operational Features
Vertical Sliding Doors Same unit as car flooring automatically moves and stops at the nearest floor using a
○
Narrow Jamb
Painted steel sheet • rechargeable battery, and the doors open to ensure passenger
Stainless steel hairline ○ safety. (Max. allowable floor-to-floor distance is 10 meters.)
Door Frame
Painted steel sheet ○ Earthquake Emergency Return (EER-P / EER-S) Upon activation of primary and/or secondary wave seismic
Splayed Jamb / Square Jamb
Stainless steel hairline ○ sensors, all cars stop at the nearest floor, and park there with ○
Entrance
Doors
Painted steel sheet • the doors open to facilitate safe evacuation of passengers.
Stainless steel hairline ○ Fire Emergency Return (FER) Upon activation of a key switch or a building’s fire sensors, all
Capacity of 2000kg or less Extruded hard aluminum • calls are canceled, all cars immediately return to a specified
○
Sill Over 2000kg Capacity Steel plate with black paint • evacuation floor and the doors open to ensure safe passenger
Vertical Sliding Doors Checkered steel plate with black paint • evacuation.
Car Operating Operation by Emergency Power Source – Upon power failure, the car uses the building’s emergency
Faceplate Stainless steel hairline
•
Signals
Panel Auto/Manual (OEPS) power supply to move to a specified floor, where the doors
Hall Position then open to facilitate the safe evacuation of passengers. ○
Indicator
Faceplate Stainless steel hairline
• After the car has arrived at the floor, normal operation will
The sensitive mechanical door edge detects the operator or be available.
Safety Door Edge (SDE)
goods upon contact during door closing. • Supervisory Panel (WP) A panel installed in a building’s supervisory room, etc., which
Horizontal Sliding Doors Car side The infrared-light beam (one or two) covers the full width of monitors and controls each elevator’s status and operations
○ ○
Operational Features
Car side the door as it opens or closes to detect the operator or goods. by remote, using indicators and switches which are provided
Safety Ray (SR)
Vertical Sliding Doors The infrared-light beam is installed in the door frame. on request.
Entrance side ○
The feature is the same as car side.
Overload Holding Stops (OLH) The elevator buzzer rings to indicate the car is overloaded. •
The doors are automatically closed after a predetermined time
Automatic Door Closing (ADC) (Only 1BF) (std. 1 min.) from full opening. The buzzer will continue to ring ○
from 8 sec. before closure until the doors are fully closed.
This feature keeps the doors open for a predetermined period
Extended Door-Open Button (DKO-TB) (Only 2BC) ○
to facilitate loading and unloading of goods.
5 6
Layout Drawings and Dimensions for One Gate (1D1G)
For JIS Code
AA
AA
AA 45 13 1250 4450 139.2 103
F-2000-2S 2000 3600 ✕ 4250 2S 3150 ✕ 3400 2800 121.6 63.7
60 18.5 1550 4650 150 109.8
45 18.5 1250 4850 192.2 144.2
Y
Y
BB
45 18.5 1250 4850 192.2 144.2
F-2500-2U*4 2500 4000 ✕ 4400 2U 3600 ✕ 3700 4500 155.9 80.4
60 22 1550 5050 206 154
45 18.5 1250 4850 192.2 144.2
JJ JJ JJ F-2500-3U*4 4000 ✕ 4400 3U 3600 ✕ 3700 3950 155.9 80.4
60 22 1550 5050 206 154
X X X
45 18.5 1250 4850 208 154
F-3000-3S 4100 ✕ 4800 3S 3750 ✕ 4100 3300 166.7 92.2
60 26 1800 5050 223 165
45 18.5 1250 4850 208 154
F-3000-2U*4 3000 4100 ✕ 4800 2U 3750 ✕ 4100 4500 174.5 92.2
60 26 1800 5050 223 165
45 18.5 1250 4850 208 154
F-3000-3U*4 4100 ✕ 4800 3U 3750 X 4100 3950 174.5 92.2
Machine Room Plan Hoistway Section 60 26 1800 5050 223 165
*1: Since required motor power varies according to the specifications, such as elevator cage weight, etc., please consult our sales agency for details.
*2: Since reaction load varies according to the specifications, please consult our sales agency for details.
Min. clear
machine
height
*3: In cases where capacity exceeds 3000kg, please consult our sales agency for details.
room
Cinder concrete
finish (by owner) *4: 2U, 3U door type can not be applied for EN-81-1 or GB code.
Ventilating fan (by owner)
100
Overhead OH
R1
R2
Y
BM
Control
panel
Access door
Min. floor height
Entrance height HH
W1200XH2000
Ventilation
hole (by owner)
X
AM
Pit depth
PD
7 8
Layout Drawings and Dimensions for Two Gates (1D2G & 2D2G)
For JIS Code
3S
Y
F-2500-3S 4000 ✕ 4400 3600 ✕ 3970 3300 163.8 84.3
Y
BB
BB
60 22 1550 5050 219 168
BB
*1: Since required motor power varies according to the specifications, such as elevator cage weight, etc., please consult our sales agency for details.
*2: Since reaction load varies according to the specifications, please consult our sales agency for details.
*3: In cases where capacity exceeds 3000kg, please consult our sales agency for details.
Min. clear
machine
height
room
Cinder concrete *4: 2U, 3U door type can not be applied for EN-81-1 or GB code.
Ventilating fan (by owner) finish (by owner)
100
Overhead
OH
R1
Y
BM
R2
Max. Travel 30m
Control
Min. floor height
panel
Entrance height HH
Access door
W1200×H2000
Ventilation
hole (by owner)
X
Pit depth
AM
PD
9 10
Entrance Layouts
70
30
132
Entrance height HH
137
135
thickness 28
Jamb depth JD
Wall
(100)
70
Entrance width JJ 100
Finish
150
100 200
Entrance height HH
30
60
132
137
135 200
28
thickness
Jamb depth JD
135 30
(50 or 100)
Wall
60
100 200 2-panel upward opening door
200
(2U)
It can not be applied for EN-81-1 or GB code.
135 30
Sill width
140 *1
30 *1
Entrance height HH
140 *1
Jamb depth JD
Entrance width JJ
(100)
100
3-panel side opening door 100 200
(3S)
60
140 *1 30 *1
70
30
Entrance height HH
175
Sill width
200 *1
Jamb depth JD
60
(100)
Wall
Entrance height HH
Entrance width JJ 100
Finish
200 *1
150
100 200
60
Jamb depth JD
240
Entrance width JJ
(100)
100
100 200
175 30
60
*1: Since dimensions for vertical sliding doors vary according to the entrance width, entrance height 60
and floor height, please consult our sales agency for details.
200 *1
11 12
Electrical Installation Important Information on Elevator Planning
Electrical Equipment Required for Elevator Operation Work Not Included in Elevator Contract
The following items are excluded from our elevator
Elevator Site Requirements
•The temperature of the machine room and elevator
installation work, and are therefore the hoistway shall be below 40°C.
ELECTRICAL ROOM
ELEVATOR MACHINE ROOM responsibility of the building owner or general contractor: •The following conditions are required for maintaining
NF breaker *2
Vent. fan
Celling-lighting equipment •Construction of the elevator machine room with proper elevator performance.
a. The relative humidity shall be below 90% on a monthly
Control panel Traction beams and slabs, equipped with a lock, complete with
Traction-machinery power supply motor illumination, ventilation and waterproofing. average and below 95% on a daily average.
3-phase Ground wire *1 Receiving box •Access to the elevator machine room sufficient to allow b. The machine room and the elevator hoistway shall be
finished with mortar or other materials so as to prevent
transformer passage of the control panel and traction machine.
Power outlet Ventilation
•Architectural finishing of the machine room floor, and the concrete dust.
Lighting power supply
window
walls and floors in the vicinity of the entrance hall after •Voltage fluctuation shall be within a range of +5% to -10%.
1-phase
transformer Receiving
installation has been completed.
box •Construction of an illuminated, ventilated and Ordering Information
Inter waterproofed elevator hoistway. Please include the following information when ordering or
Communication •A ladder to the elevator pit. requesting estimates:
System
•The provision of cutting the necessary openings and joists. •The desired number of units, speed and loading capacity.
*1: The minimum size of ground wire is determined according to the ampere •Separate beams, when the hoistway dimensions markedly •The number of stops or number of floors to be served.
rating of the NF breaker installed at the power source side.
Supervisor's Car
exceed the specifications, and intermediate beams when •The total elevator travel and each floor-to-floor height.
*2: The current rating of the power-source NF breaker should be of one level room two or more elevators are installed. •Operation system.
larger than that of the receiving-box NF breaker installed in the elevator Pit •All other work related to building construction. •Selected design and size of car.
machine room.
power outlet
•The machine room power-receiving panel and the •Entrance design.
electrical wiring for illumination, plus the electrical wiring •Signal equipment.
Inter Communication System (where necessary)
from the electrical room to the power-receiving panel. •A sketch of the part of the building where the elevators are
Traction-Machinery Power Supply •The laying of conduits and wiring between the elevator pit to be installed.
It is necessary to install power-supply equipment of This is essential for establishing communication between and the terminating point for the devices installed outside •The voltage, number of phases, and frequency of the
sufficient capacity to ensure the elevators accelerating elevator operator or passengers and outside in case of the hoistway,such as the emergency bell, intercom, power source for the motor and lighting.
smoothly and landing accurately. The power supply should emergency. The master station transceiver is usually in a monitoring and security devices, etc.
be kept within a voltage- fluctuation range of +5 ~ -10%, and a location readily accessible to the supervisor, in the central •The power consumed in installation work and test
voltage-imbalance factor of 5%. When selecting protective supervisor's room or elevator lobby. The wiring work operations.
breakers on the power-supply side, be guided by voltage between the master station and the elevator machine room •All the necessary building materials for grouting in of
ratings of the no-fuse breakers supplied with the elevators. is not included in the elevator contract. To facilitate piping brackets, bolts, etc.
and wiring, it is desirable to decide on the position of the •The test provision and subsequent alteration as required,
Power Supply for Lighting master station at the earliest stage of building design. and eventual removal of the scaffolding as required by the
Lighting for the elevator cars and indicators should, where elevator contractor, and any other protection of the work
possible, be supplied via a separate circuit that will not be Lighting Equipment as may be required during the process.
affected by power failures elsewhere. The machine room should be fitted with good lighting for •The provision of a suitable, locked space for the storage of
maintenance work. The light switch should be positioned elevator equipment and tools during elevator installation.
Ventilation Equipment close to the machine-room entrance. •The security system, such as a card reader, connected to
A machine-room ventilating fan of a capacity to keep the our elevator controller, when supplied by the building
room below 40˚C is required. A ventilation window should Inspection Power Outlets owner or general contractor.
also be installed opposite the ventilation fan. These should be installed in the machine room and pit for * Work responsibilities in installation and construction shall be
use during inspections and maintenance. determined according to local laws. Please consult our local
agents for details.
13 14
Our elevators and escalators are currently operating in approximately 90 countries around the globe. Built placing priority on safety, our
elevators, escalators and building system products are renowned for their excellent efficiency, energy savings and comfort.
The technologies and skills cultivated at the Inazawa Building Systems Works in Japan and 12 global manufacturing factories are utilized
in a worldwide network that provides sales, installation and maintenance in support of maintaining and improving product quality.
As a means of contributing to the realization of a sustainable society, we consciously consider the environment in business operations,
proactively work to realize a low-carbon, recycling-based society, and promote the preservation of biodiversity.
Mitsubishi Electric Building Solutions Corporation Inazawa Building Systems Works has acquired ISO 9001 certification from the International
Organization for Standardization based on a review of quality management. The plant has also acquired environmental management system
standard ISO 14001 certification.
www.MitsubishiElectric.com/elevator
L-170-2-C5812-N INA-2209 Printed in Japan (IP) 2022 Mitsubishi Electric Building Solutions Corporation