Din8782 Oee Opi
Din8782 Oee Opi
Din8782 Oee Opi
Contents
Scope of rating Losses in production General time model DIN 8782 OEE OPI Example Perspective of filling line manufacturer
Scope of rating
Depending on the perspective of the person asking for a certain figure the scope of rating differs tremendously:
Scope of rating
Based on the perspective and the sector of industry many terms and figures are determined, e.g.: Efficiency Effectiveness Utilization factor Availability Performance efficiency Overall Equipment Effectiveness Overall Performance Indicator
Losses in production
Reasons for losses in production can be split up generally: Not scheduled time Unscheduled time Scheduled downtime Prod. changeover Breakdown
Weekend, public holiday, ... No order, No activity (NoNa) Training, maintenance, overhaul, cleaning, ... Clearing production, set up of machines, ... - Machine breakdowns (malfunction) - NON-machine breakdowns (maloperation of personnel, missing utilities, poor quality of material to be processed, ...) Reduced speed of master machine due to lack of product Faulty fill height / label position, damaged packaging, ...
5
Rejects
Operating time (Betriebszeit) General running time (Allgemeine Laufzeit) Effective running time
Rejects (master) - Breakdown (machine) - Red. speed Breakdown (NON- machine)
Scheduled downtime
Product changeover
Extended OEE:
10
11
12
Status Production Not scheduled time Unscheduled time Scheduled downtime Prod. changeover Breakdown Reduced speed Rejects
13
14
Conclusion
Qualification of index: DIN 8782:
Tender documents, acceptance test of filling line (line efficiency)
OEE:
Convenient index for ongoing technical controlling by owner/operator
OPI:
Comprehensive concept for benchmark of different production facilities applied by owner/operator
15
16