100 KLD STP New-1
100 KLD STP New-1
100 KLD STP New-1
TECHNO
TECHNO-COMMERCIAL PROPOSAL
Dear Sir,
This is with the reference to your requirement of 100 KLD Sewage Treatment Plant. We are hereby
submitting our techno-commercial
commercial offer.
We have put in our best efforts to offer you accurate prices and products with all standard brands.
Please find enclosed the complete techno-commercial offer. If you need any further clarificationsor details,
please feel free to contact us.
Best regards,
Aman Srivastav
(Business Head)
7739283565,8789018155
Email: [email protected]
INDEX
1. RPGP-An Overview 04
2. Basis of Design 04
3. Advantage of MBBR/FAB 05
4. Treatment Scheme 05
5. Process Description 06
6. Equipments Data Sheet (Schedule of Quantity) 08
7. List of Civil Work (Client Scope) And List of MSEP Fabricated
tanks(RPGP Scope) 11
8. Process Flow Diagram 12
9. List of Makes 13
10. Scope Matrix-Electrical 13
11. Terms & Conditions 14
12. Commercial terms & condition 14
13. Price 16
R P GLOBAL PROJECTS-An
PROJECTS Overview
R P GLOBAL, as an expert in water economics, provide range of Products and Services for Industrial and
Municipal applications, through wide spectrum of technologies - including physical, chemical, biological and
membrane filtration - for Water treatment, Wastewater treatment, Desalination and Reuse & Recycling systems
syst -
supported by an extensive range of after Sales Services through our Customer Care cell.
We are one of the leading Engineering Companies offering projects and services in the fields of Water &
Wastewater treatment and reuse, Carbonated Soft drinks /Soda
/S Plants, Non-Carbonated
Carbonated Ready To Serve
Pulp Juice Plants, Energy Management, Automation Solutions, Asset Management and Waste
Management. Our diversified portfolio has been developed through our experience in catering to specific
requirements of our clients. Specializing in comprehensive and integrated solutions (from concept to
commissioning) our focus remains on delivering low cost, easy to operate & compact plants and achieving
maximum recycling of treated sewage.
The Company has its own manufacturing facility. That includes fabrication and pilot testing facilities within the
workstation. BWS’s team is a bunch of professionals from the industry having unmatched experience in
designing, installation, commissioning, and after sales services.
Basis of Design
OBJECT:
The proposed Sewage Treatment Plant (STP) has been designed to treat 100 KL/Day Sewage to prescribed outlet
standards. This proposal is for design, supply, installation and commissioning of the system.
Treatment Scheme
The treatment scheme for the STP plant will consist of following main equipments:-
• Bar Screen Chamber
• Oil & Grease Trap
• Equalization cum Collection Tank
• MBBR Reactor Tank 1 & 2
• Secondary tube settler Tank
• Chlorine Contact Tank
• Multi Grade Filter
• Activated Carbon Filter
• Sludge Handling Unit
3 Pneumatic Arrangements
(to provide air in EQT, Aeration and Sludge thickener)
Twin Lobe Air Blower 2 Nos. (1w+1S)
Capacity 100 m3/hr/blower
Head 4.5 meters
Air distribution Grid 1 Lot
MOC GI
Test Pressure 10 kg/cm2
Air Diffusers 1 Lot
(To equalize air distribution in EQT tank, aeration Tank & SHT Tank)
Type Coarse disc type (For EQT & SHT tank)
Fine tubular type(For aeration tank)
MOC Silicon type (Fine diffuser)
8 Multi-grade Filter
(To remove the total suspended solids, dirt, iron and reduce silt and to provide TSS
free water.)
Pressure Vessel 1 no.
MOC FRP
Dia 24”
HOS 72“
Opening Top & Bottom
Valve 1 no.
Type Multiport
Size 50 mm
Media As require
Gravels
Pebbles
Quartz Sand
Bed depth 1000 mm
Header Pipeline & Flange As require
MOC uPVC
Test Pressure 10 kg/cm2
Pressure Gauges 1 no
Range 0-7 bar
Dial Size 3 inches
Type Bourdon
9 Activated Carbon Filter
(To remove the Color and odor)
Pressure Vessel 1 no.
MOC FRP
Dia 24”
HOS 72”
Opening Top & Bottom
Valve 1 no.
Type Multiport
Size 50 mm
Media As require
Activated Carbon
Pebbles
Quartz Sand
Bed depth 1000 mm
Header Pipeline & Flange As require
MOC uPVC
Test Pressure 10 kg/cm2
Pressure Gauges 1 no.
Range 0-7 bar
Dial Size 3 inches
Type Bourdon
Scope Matrix-Electrical
SN Description Supply Erection &
Commissioning
By RPGP By Owner By RPGP By Owner
1 Motors as per Equipment list √ X √ X
2 Local control Panel X √ X √
3 Power Feeder & Distribution X √ X √
4 Motor Control Center (MCC) √ X √ X
5 Local Push Button Station √ X √ X
6 Incoming Power Cable to MCC X √ X √
7 Power Cable from MCC to Motors √ X √ X
8 Control cables from MCC to LPBS √ X √ X
9 Control Cables from MCC to Local Control Panel √ X √ X
10 Field Cabling up to field junction boxes √ X √ X
11 Glands and Lugs √ X √ X
12 GI Cable Trays √ X √ X
13 Structural steel for cable tray supports √ X √ X
14 Plant Earthing X √ X √
15 Plant illumination System X √ X √
Legends: √: Yes X: No RPGP: R P GLOBAL PROJECTS
Terms & Condition
Scope of Work
Design Design
gn is based on the Standard domestic inlet process Parameters
Supply Supply of Mechanical equipment’s, Electrical, Piping as per the given details
Erection Erection of the units under our scope of Supply
Commissioning Commissioning of the units of Sewage Treatment Plant
Exclusions/Owner Scope
Approach to site & storage for equipment’s during the erection work
Power / Lighting / Water at the site of work on 24 hrs basis
Incoming with earthling Feeder Connection to the Panel and Energisation of the Panel
Treated water pipeline beyond the outlet of STP
Civil work in Client Scope
NOC from Civil Body if require
Boarding and lodging of erection and commissioning team
Loading and Unloading at Site
Delivery
We shall design, manufacture and supply the Electro Mechanical equipment within 15-25Day’s. The above
delivery period shall be reckoned from the date of receipt of advance and commercially and technically clear
purchase order, whichever is later.
Completion
If the completion of work is delayed beyond the contractual date for reasons under your control as listed out
hereunder but not limited to them, we shall be entitled to suitable readjustment in the period of completion by
mutual consent and the contract will stand amended to that extent
a) Delay in approval of final drawings beyond a period of 5 days from the date of submission by us.
b) Delay in inspection beyond the appointed date or delay in approval of test certificates, whenever required,
beyond a period of 5 days from the date of submission by us.
c) Delay in release of dispatch clearance or hold up of work due to your specific instructions or lack of
instruction.
d) Delay in release of advance or progress payments due to us beyond 5 days from the due date.
e) Delay attributable to Force Majeure conditions, more particularly detailed under appropriate clause
hereunder
Warranty
RPGP (R P GLOBAL PROJECTS) has a strong QMS to ensure that all the equipment is duly checked prior to
dispatch and tracked post delivery. The equipment, therefore, can be depended upon for long and trouble free
service. Our liability in respect of any defect or failure in the equipment supplied and commissioned by us or any
loss, injury or damage attributable therefore shall be limited to making good by replacement or repairs, provided
the equipment is operated and maintained in accordance with our instructions and arise totally from proven
faulty design, materials or workmanship. This warranty shall be valid for a period of 12 months date of dispatch.
Our liability in no case shall exceed the invoiced value of the equipment supplied by us, a d we shall not be liable
for any consequential damage or loss such as loss of profits, loss of business opportunit es, damage to goodwill
or business reputation or any other contractual liability or loss suffered by the purchaser to third parties. All
warranties other than title either express or implied whether arising under law or equity including warranties of
merchantability and fitness for a particular purpose are excluded from the contract. This is the essence of the
contract.
a) Bought out components are guaranteed by us only to the extent of guarantees given to us by our suppliers.
Electrical components such as, motors, contactors, etc., rubber components and instruments such as pressure
gauges, etc. are however not covered under this warranty.
b) In respect of the equipment where dispatch after readiness is delayed due to specific instructions or lack of
instructions from you, the warranty will be limited to 15 months from the date of readiness for dispatch of
equipment as notified by us.
c) No repairs or replacements, unless authorized by us in writing, will be carried out by any other party on our
equipment during the warranty period.
PRICES:
Ex- Works site.
GST: Extra
FREIGHT: Extra
PAYMENT TERMS:
30 % advance along with commercially and technically clear Purchase Order.
50 % against Performa Invoice prior to dispatch
10 % against installation
10% successful commissioning at site
VALIDITY:
60 days from the date of this offer