GENERALLY
A All Prime Cost and Provisional Sums are to be expended at the discretion
and under the direction of the Architect and may be deducted wholly or in
part if not required. The Contractor shall have no claim on these sums.
B The Employer reserves the right to omit any work including any
attendance and profits priced therein (ie. forming part of Prime Cost or
Provisional Sums) from the Contract and let out such omitted works as
direct contracts.
D The Contractor will be responsible for all work carried out by Designated
and Nominated Sub-Contractors or materials supplied by Designated and
Nominated Suppliers whether subject to prime cost allowance or
otherwise.
F An amount of not less than 10% of the value of each sub-contract must
be held by the Contractor in the form of a banker's / insurance's
guarantee or performance bond against defects in respect of each
designated and nominated sub-contractor or supplier for which the
Contractor will he held responsible under the terms of the Contract.
2/1
BILL NO 2 - P.C & PROVISIONAL SUMS
A The Contract shall be deemed to include the cost of the provision by the
Contractor of attendance upon every designated and nominated sub-
contractor. The term "attendance" shall mean such attendance and
facilities as listed herein, all of which will be provided by the Contractor
unless otherwise stated :
9) Provision of artificial lighting and water for the works including payment
of all fees and charges in connection therewith.
10) Removal of rubbish from all locations including final removal from the
site.
2/2
BILL NO 2 - P.C & PROVISIONAL SUMS
11) The cutting and formation of holes/openings, recesses, etc. for ropes,
ductwork, pipes, conduits and fittings through walls, floors, ceilings, roofs,
etc. and making good after the electrical and mechanical works is
sufficiently advanced. Cutting of holes through false ceilings and special
partitions shall be by the respective specialist sub-contractors. The sub-
contractor shall be responsible for chasing of walls for pipes, conduits
and fittings but making good shall be by the Contractor.
12) The formation of concrete bases, plinths, inertia blocks, etc. for plant
and equipment, door louvre, exhaust discharge (external) grilles and
fresh air intake louvre, unless otherwise stated in the Specification or
Drawings. Steel framework for concrete inertia blocks shall be provided
by the respective sub-contractor.
13) The building of manholes, pits, trenches, floor wastes for cables,
pipes, ducts, etc., unless otherwise stated in the Specification or
Drawings.
14) Full responsibility for loss or damage to the subcontract works which
have been fully, finally and properly incorporated into the works.
2/3
BILL NO 2 - P.C & PROVISIONAL SUMS
1) Unloading getting in, storing and all handling and hoisting of his
materials, plant and tools into required positions.
5) Full responsibility for loss or damage to his plant, tools, equipment and
other property on the site.
B The amounts inserted by the Contractor against the time "Add for Profit"
& "Add for Attendance" shall be on a percentage basis. This percentage
will be used to adjust the profit in the final account.
D The Contractor shall not be entitled to any profit and attendance for works
executed by the Authorities for which Provisional Sums are provided.