S/N Description Status

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 40

S/N Description Status

1 Code & Standard 50%

1 Scope of Work 30%


2 Special Requirement 30%
3 Input Info 30%

1 System Concept
2 Cooling Load Estimation
3 AC Zoning
4 Eqipment Sizing
5 Equipment Schedule
6 Material Specification
7 Control
8 Drawing

Full List of Equipments and ACcessories

Record
0
1
2
3
4
5
6
Remarks
Elec.
Y/N Ph

Column1 Column12 Column2 Column4 Column5

CR Air Shower Y 1ф
Pass Box Y 1ф
Auto Sliding Door Y 1ф

HVAC - W Chiller Y 3ф
Cooling Tower Y 3ф
Chilled Water Pump Y 3ф
Condenser Water Pump Y 3ф
Make up Water Pump Y 3ф
Auto Tube Cleaning System Y 1ф
Vacuum Degassing System Y ?
Refrigerant Leak Detection System Y ?
Side Stream Filtration System Y ?
Water Treatment System for ( CHW & CW Loop ) Y ?
CHW Pr Maintaining & Makeup Unit Y ?
Heat Exchanger N
CHWExpansion Water Tank N
CT Makeup Water Tank N
Condensate Water Tank N
Piping System N
Manual Valves & Accessories N
Balancing Valve N
Suction Guide, Suction Diffuser N
Flo Trex Valve N
Dirt Separator N
Acoustic & Virbration Control System - Spring Isolator N

HVAC - A FCU, AHU, MAU Y 1ф / 3ф


MV Fan Y 1ф / 3ф
VAV Boxes Y
UVC Emitter Y
Electric Air Filter Y
CDA Compressor Y
Dryer Y
Air Reciver Tank N
Filter N
After Cooler Y

PCW Heat Exchanger N


PCW Pump Y
Filter Housing N
PCW Tank N

Exh Proc. Exh Fan Y


Scrubber Y
Carbon Filter N

Ctrl DDC Controller Y


Column52 Column6

Electrical Type Interlock System


S/N Ref. No

A ACMV
SS-530
SS 553
SS 552
SS 554
SS 564
SS 641

Fire Code CH 1
Fire Code CH 2
Fire Code CH 3
Fire Code CH 4
Fire Code CH 5
Fire Code CH 6
Fire Code CH 7
Fire Code CH 8
Fire Code CH 9
Fire Code CH 10
Fire Code CH 11

NEA
NEA-02
NEA-03
NEA-05

DW-144
ASHRAE

EN 12237
EN 1507
EN 17192
EN 1751
EN 1886
AMCA 500-D

ARI
BS
SMACNA
SPRING
BCA
FSSD
FM UL

B Utility

AMCA 210
AMCA 300
AMCA 99

C General
Description

Energy Efficiency Standard for Building Services and Equipment - 2006


Air Conditioning and Mechanical Ventilation in Buildings
the Storage of Flammable Liquid
Indoor air quality for AC bldgs
Green Data Center_Energy and Environment Management System
Fire safety for laboratories using chemicals

ELECTRICAL POWER SUPPLIES


FIREFIGHTING SYSTEMS
MECHANICAL VENTILATION & SMOKE CONTROL SYSTEMS
EMERGENCY LIGHTING & VOICE COMMUNICATION SYSTEMS
ADDITIONAL REQUIREMENTS FOR EACH PURPOSE GROUP
REQUIREMENTS FOR SPECIAL INSTALLATIONS
REGULATED FIRE SAFETY PRODUCTS & MATERIALS

Environmental Health
STD-NEA-02 Code of Practice on Pollution Control
The control of legionella bacterial in air-conditioning cooling towers in singapore
Guidelines for Good Indoor Air Quality in Office Premises

Ductwork - Strength and leakage of circular sheet metal ducts


Ductwork - Strength and leakage of Rectangular sheet metal ducts
Ductwork - Requirement and Test Methods for Non-metallic Ductwork
Air terminal devices - Aerodynamic testing of damper and valves
Air handling units - Mechanical performance
Laboratory Methods of Testing Dampers
fans Performance Ratings
fans Sound Ratings
fan fabrication
Local
2017 Local
Local
2016 Local
Local
Local

2018 Local
2018 Local
2018 Local
2018 Local
2018 Local
2018 Local
2018 Local
2018 Local
2018 Local
2018 Local
2018 Local

2021 Local
2004
2001

2003
2006
2018
2014
2007
2018
System & Type
1 Cleanroom
Electronics SemiConductor
GMP CR
Pharmaceuticals
Lab
Manufacturing
Food and Beverage

2 HVAC
Upgrading Chiller Plant, CT, ….
AHU Replacement
ACMV Services

3 Utility
CDA - Compressed Dry Air System
PCW - Process Cooling Water System
PEXH - Process Exhaust System
UPW - Ultra Pure Water System
WW - Waste Water System
BG - Bulk Gas System

4 BMS

5 Electrical
Scope of Work

Nitrogen, Oxygen, Argon, Carbon Dioxide, and Hydrogen


Special Requirement & Spec
GreenMark
Green Mark Certification Gold+ / Platinum / SLE
Performance - Air Side 0.24 kW/RT
Performance - Water Side 0.58 kW/RT
Performance - Total ( Air + Water ) 0.82 kW/RT
PAHU > 4 kW 0.30 kW/ CMH
PFCU < 4 kW 0.12 W/ CMH
Pump - CHWP & CWP 0.03 kW/RT
AHU - CAV > 4 kW 1.7 kW/m3/s
AHU - VAV > 4 kW 2.4 kW/m3/s
FCU < 4 kW
Noise

Performance Guarantee
Input Info

Archi Layout
Mode of Ventilations AC, MV, NV
Fire Compartmentation

Utility Matrix
Tool Layout
System Concept

CR AC System
Dry Coil ( no bypass air )
Wet Coil ( no bypass air )
Wet Coil ( some air will be bypass the cooling coil )
Ducted FFU/ HEPA box
Cooling Load Estimation
Floor Area
Ceiling Ht.
Ventilation Mode AC, MV, NV
Room Exhaust
Temp & RH
ACH & Filter Coverage TTE HB or Others Ref.
Room Pressurization
CR Class
Temp & RH
Ceiling Grid 4' x 2' or 4' x 4'
Sensible Load/m2
AC Zoning
Equipment Selection & Schedule
ACMV - Equipment
UTT - Equipment
CR - Equipment
Remark for Long Lead Items

Pipe Sizing
Duct Sizing
Fan Static Estimation
Pump Head Estimation
Material Specification
ACMV - Ducting, Piping
UTT - Ducting, Piping
CR - Ceiling, Partition, Flooring, etc.,
Control Logic
Point List
Field Devices List Ctrl Valve, FM,
Control Architecture
Drawing Schedule
ACMV - Ducting, Piping
UTT - Ducting, Piping
CR - Ceiling, Partition, Flooring, etc.,
System Concept

Cooling Load Estimation


Floor Area
Ceiling Ht.
Ventilation Mode AC, MV, NV
Room Exhaust
Temp & RH
ACH & Filter Coverage TTE HB or Others Ref.
Room Pressurization
CR Class
Temp & RH
Ceiling Grid 4' x 2' or 4' x 4'
Sensible Load/m2

AC Zoning

Equipment Selection & Schedule


ACMV - Equipment
UTT - Equipment
CR - Equipment
Remark for Long Lead Items

Pipe Sizing
Duct Sizing
Fan Static Estimation
Pump Head Estimation

Material Specification
ACMV - Ducting, Piping
UTT - Ducting, Piping
CR - Ceiling, Partition, Flooring, etc.,

Control Logic
Point List
Field Devices List Ctrl Valve, FM,
Control Architecture

Drawing Schedule
Schematic ( P&ID )
Layout
Section/ Elevation
Detail
Notes

Sample
Sample
Sample
Sample
Sample
Sample

You might also like