Lira Technical Institute: Uganda Skills Development Project (Usdp) Ministry of Education and Sports - Uganda
Lira Technical Institute: Uganda Skills Development Project (Usdp) Ministry of Education and Sports - Uganda
Lira Technical Institute: Uganda Skills Development Project (Usdp) Ministry of Education and Sports - Uganda
LOT 2 : VOLUME - 4 OF 5
BILL OF QUANTITIES
LIRA TECHNICAL INSTITUTE
(Kitgum Technical Institute, Kalongo Technical Institute & Ora Technical Institutes)
FEBRUARY 2020
SUMMARY OF DOCUMENTS
VOL 3 OF 5: DRAWINGS
1 Objectives
(b) when a Contract has been entered into, to provide a priced Bill of Quantities for use in the
periodic valuation of Works executed.
In order to attain these objectives, Works have been itemized in the Bill of Quantities in
sufficient detail to distinguish between the different classes of Works, or between Works of the
same nature carried out in differently or in other circumstances which may give rise to
different considerations of cost.
Grand Summary
3 The Bills of Quantities shall be referenced and read in conjuction with clauses numbered in the
Specifications.
UTC LIRA - LOT 2 P/1 SILESHI CONSULT
PREAMBLES
4 The Contractor’s unit rates in these bills are to cover supplying of materials, taking delivery,
transporting, loading and off loading inspection, storage, stacking, landing, preparation,
installation including provision of all labour, requirement false work, temporary support,
surface preparation and testing of the works. The rates shall include all applicable taxes and
duty. The cost of testing of the materials to be used in the works unless otherwise provided is
to be included in the rates of the respective Bill items.
5 Measurement for payment shall be for the complete installation and having passed all
necessary tests.
6 “Rock” is any material which, in the opinion of the Engineer, requires for its removal the use of
explosives, sledgehammers and wedges, breaking tools or which cannot be removed by a 145
KW tractor with rear-mounted heavy duty ripper.
Individual boulders of size greater than 0.2m3 in volume shall be included in “rock” when their
nature and size are such that they cannot be removed without recourse to the stated
methods.Where their aggregate volume is 50% or more of the total volume of material
removed, the material shall be measured as rock throughout.
7 Work shall not be executed on a Day work basis unless ordered in writing by the Consultant on
approval by the Employer. The rates entered in the Day works Bill of Quantities shall apply to
any quantity of Day work instructed by the Consultant. Nominal quantities have been indicated
against each item to permit the extended total to be carried forward to the Grand Summary.
Payments for labour under Day works shall be made against records of the time of arrival of
the labour at the site of the work to be executed to the time of departure but excluding meal
breaks and rest periods. Only the time of classes of labour directly doing the work will be paid
for; charge hands (working gangers) actually working with their gangs will also be recorded for
payment but the time of foremen or other supervisory personnel will not be paid.
Payment for the classes of labour will be made at the rates entered in this Bill. These rates shall
cover all direct costs including, but not limited to, the amount of wages paid to such labour,
transportation time, overtime, subsistence allowances and such social benefits as required by
law.
The rates for labour shall also be deemed to cover the Contractor’s profit, overheads,
superintendence, administrative costs, liabilities, insurance and allowances to labour and the
use of consumable stores, water, lighting and power, workshop and stores, staging and
scaffolding, portable power tools, hand tools and equipment and any charges incidental to the
foregoing.
8 Payment for materials used in Day works shall be made at the rates entered in this Bill. These
rates shall include invoiced price, freight, insurance, handling charges, unavoidable damage
and delivery to store and / or site together with stockpiling as required. These rates shall also
include the Contractor’s profit and overheads.
Where materials other than those entered in this Bill are to be procured for use on the Works,
the basic rate shall be calculated on the invoiced purchase price plus the costs of insurance,
handling charges, unavoidable damage and delivery to store or site. Payment will be made in
the currency expended upon presentation of supporting documentation. In addition, a
percentage on the base rates will be allowed to cover the Contractor’s overheads and profit:
this percentage must be stated in this Bill.
The cost of hauling and handling materials for use on Day works from store or stockpile to the
place of usage will be paid in accordance with the labour and Contractor’s equipment rates in
this Bill.
9 Payment for equipment available at site in respect of Day works shall be made at the rates
entered in this Bill. These rates shall be deemed to include allowance for depreciation, interest,
indemnity and insurance, repair and maintenance, supplies, fuel, lubricants and other
consumables, overheads, profit and administrative costs related to the use of such equipment.
The costs of drivers, plant operators and assistants in respect of plant and equipment deployed
on Day works shall be paid for separately under the appropriate items in the labour section of
the Day works.
Payment for the Equipment shall only be made against actual hours worked except that where
applicable, and with prior agreement of the Engineer, the traveling time to and from the Day
work location shall also be included for payment.
10 “Rates and prices shall be inserted in the rate and total columns of the Bill of Quantities in
Uganda Shillings
Bills of Quantities are to be read in conjunction with the Instructions to Bidders, the Conditions
of Contract Data, the Specifications and the Drawings. The quantities stated against each item
in the Bills of Quantities, with the exception of those items specifically marked ‘sum’, are the
estimated quantities of the Work to be executed by the Contractor in fulfillment of his
obligations under the Contract.
11 The Contractor is required to check the number of the pages and should any be found to be
missing or in duplicate he must inform the Engineer at once and have the same rectified.
No liability whatever will be admitted or claim allowed in respect of errors in the Contractor’s
tender due to mistakes in the Bills of Quantities which should have been rectified in the
manner described above.
12 The contractor shall not alter or otherwise qualify the text of these Bills of Quantities. Any
alteration or qualification made without authority will be ignored and the text of the Bills of
Quantities as printed will be adhered to.
13 Each item in the Bills of Quantities is to be priced. If any items are left un-priced it will be
assumed that the value of the work described there under is elsewhere allowed for. The prices
and rates to be inserted in the Bills of Quantities are to be fully inclusive of all costs and
expenses which may be required for the construction of the work described, together with
general risks, liabilities and obligations set forth or implied in these documents.
14 In no case will any claim for expenses incurred by the Contractor in preparation of this Tender
be allowed.
15 The Contractor is solely responsible for the accurate ordering of materials in accordance with
the Specifications, Drawings and Engineer’s Instructions and no claim for any loss or expense
will be entertained for orders for materials based on the Bills of Quantities.
16 The quantities given in the Bills of Quantities are estimated and no claim by the Contractor for
the final quantities being larger or smaller than the quantities given in the Bills of Quantities
will be permitted except in accordance with Clause 38 of the Conditions of Contract.
17 “Provisional Item” designated in the Bill of Quantities for the execution of any part of the
Works may be carried out in whole or in part, or not at all on the instruction of the Engineer.
18 The dimensions given in the Drawings are generally in millimeters unless otherwise indicated.
Levels are given in meters.
19 The term ‘provide’ or ‘supply’ used for any item shall be deemed to include transport to site,
handling, storage and fixing complete, and the Bidder’s rate shall include for this.
UTC LIRA - LOT 2 P/4 SILESHI CONSULT
PREAMBLES
General Items
Unless otherwise provided there are no separate measurement items for Contractual
requirements. The Contractor is deemed to have included his costs for the Contractual
requireme
B PRELIMINARIES 2/21
CONTINGENCY (10%)
CONDITIONS OF CONTRACT
1
BILL No.1 - CONDITIONS OF CONTRACT
SUMMARY
BILL NO. 1 CONDITIONS OF CONTRACT
PRELIMINARIES
2
BILL NO. 2 : PRELIMINARIES
D DESCRIPTION OF WORKS
(i) The works involve substructures, Concrete Structural Frame, Concrete
Block Walling, Steel structure, steel roof structure, roofing sheets, Timber
or Steel Casement doors, Steel casement Windows, Tiled or Terrazo or
Screeded floor finish, Tiled or Painting to Plastered Walls, Plastered Metal
Lathe Ceiling, Plumbing and Electrical Installations, Fittings and Fixtures
and Associated External Works include.
SUFFICIENCY OF BID
A The Contractor shall be deemed to have satisfied himself before bidding
as to the correctness and sufficiency of his bid for the Works and of the
rates and prices stated in the Bills of Quantities which rates and prices
shall cover all his obligations under the Contract and all matters and
things necessary for the proper completion and maintenance of the works
GENERAL MATTERS
B Plant, Tools and Vehicles.
The Contractor shall be responsible for the provision of all materials,
tools, plants, staging, access gangways, tackle, tarpaulins, tools, moulds,
templates, cranes, pulleys and transport required for the Works except
insofar as may be stated otherwise herein and he shall allow for the
provision of the foregoing except for such items specifically and only
required for the use of the Nominated Sub-Contractors as described
herein.
A Fair wages
The Contractor shall pay rates of wages and observe hours and conditions
of labour not less favourable than the minimum rates of remuneration
and minimum conditions of employment applicable in the district in
which the works is carried out. The relevant notice must be posted up and
kept posted upon the Site where it can conveniently be read by the
employees concerned.
ii) The Contractor shall allow for providing the necessary waterborne toilets
and abolutions for the labour employed on the Works, including labour
employed by Sub-Contractors, to the satisfaction of the Local Health and
Medical Authorities and for maintaining the same in a thoroughly clean
and sanitary condition and paying all conservancy fees.
iii) The Contractor shall allow for removing the said Water borne toilets and
abolutions, filling pits with hardcore and murram and leaving the ground
clean, free from pollution upon completion of the Works to the
satisfaction of the Health and Medical Authorities.
The Contractor shall comply and ensure that all persons and organisations
involved in executing the works (including sub Contractors and those not
directly employed) comply with the relevant current Uganda government
labour regulations, acts and orders regarding emoluments, working hours
and working conditions.
The Contractor shall include in his prices for the transport of materials,
workmen and other inputs to and from the Site of the proposed Works, at
such hours and such routes as are permitted by the Project Manager and
the Authorities.
C Working hours
i) No work shall be carried out at night or gazzetted holidays unless the
Project Manager shall so direct.
ii) If the Contractor decides for purposes of expediting the works or any
other reason to permit the working of overtime or night work necessary
so that the works or any part shall be completed in the contract, then he
will be deemed to have included for the same in his bid as no extra
payment will be allowed for this in the settlement of accounts.
iii) In the event the Project Manager directs the Contractor in writing to
carry out work outside working hours, the Contractor will be reimbursed
the net difference in cost between the operatives normal rate of pay and
the enhanced overtime rate.
E Fire Precaution
The Contractor shall take all precautions necessary to prevent loss or
damage by fire to works or to the adjacent property.
iv) The office and the closets shall be completed before the Contractor is
permitted to commence the Works.
A Scaffolding
Allowance for providing, adapting from time to time as may be necessary,
maintaining and subsequent removal of all scaffolding boards and
temporary shuttering necessary for the execution of the works. No wood
pole scaffolding shall be allowed. The Contractor must allow here or in
his rates for providing all special scaffolding required by his Sub-
Contractors and Nominated Sub-Contractors carrying out works for which
P.C. sums are included in these Bills of Quantities.
ii) The Method of Measurements herein used must be accepted and will be
strictly adhered to for the adjustments of variations or for
remeasurements as necessary. The whole of the quantities in these Bills,
unless expressly otherwise stated, have been arrived at by taking the net
measurements of various items of completed Works from the Drawings.
iii) All the Works in this Contract is liable to adjustment, and no excavation or
foundation work or other works shall be filled in or covered up until all
measurement needed for the Adjustments of Variations have been made
by the Quantity Surveyor.
iv) The rates set out by the Contractor against each item shall, unless
otherwise expressly provided to the contrary, or unless there is a separate
item for extra labour, cutting or waste, be held to include for waste on
materials, carriage and cartage, carrying in and return of empties,
hoisting, setting, fitting and fixing in position, making good and all other
labours and everything else necessary for the completion of each item
and for establishment charges and profit.
vi) The Contractor shall be deemed to have made allowance in his rates
generally to cover items of Preliminaries expenses in connection with P.C
Sums or other items if these have not been priced against the respective
items.
B Allow for prepare and submit to the Project manager a complete set of
Shop Drawings, as required to the specified scale(s), giving all details, as
required by the Project manager, for the work executed. Submission shall
be in 3 sets as hard copies, colour printed on A1 size paper and 01 set of
soft copies in AutoCAD compatible version in a compact disc.
C Allow for prepare and submit to the Project manager a complete set of As
Built Drawings as required, to the specified scale(s), giving all details, as
required by the Project manager, for the work executed. Submission shall
be in 3 sets as hard copies, colour printed on A1 size paper and 01 set of
soft copies in AutoCAD compatible version in a compact disc.
The contractor shall enter into a binding contract with all his workers
E Occupation Permit
The Contractor shall apply for, provide all transport necessary for, and pay
all costs and charges in connection with the Occupation Certificate. Any
other supporting documentation required for such certificate will be
provided by the Project Manager but the Contractor shall be responsible
for producing as-built drawings required for this process in accordance
with the Conditions of Contract and the Contract Data.
GIRL'S HOSTEL
3
BILL No. 3- GIRL'S HOSTEL
GIRL'S HOSTEL
GROUND FLOOR
3.1
BILL No. 3.1 - GROUND FLOOR - GIRL'S HOSTEL
Hardcore
B 200mm thick hardcore filling using approved Sm 520
hard stone ballast or quarry waste of maximum
size of 150mm, compacted / rolled with a
vibrating roller (minimum 2 tonne) or 10 tonne
yard roller. Where rolling is not accessible,
compaction shall be by hand or mechanical
tampers)
C 50mm thick stone dust blinding over surfaces of Sm 520
hardcore
Insitu cast plain normal weight concrete class
15, (20mm aggregate) in;
D 50mm blinding layer below: pad foundations Sm 276
and strip foundations
Insitu cast vibrated mass normal weight
concrete class 20, 20mm aggregates
(maximum) as described: in:
E Strip foundations Cm 30
Insitu cast vibrated reinforced normal weight
concrete class 25, 20mm aggregates
(maximum) cast into formworks and vibrated
around rod reinforcement bars.(MS) In:
F Pad foundations Cm 60
G Starter columns Cm 7
H Ground beams Cm 25
I 100mm thick ground floor slab Sm 505
J 100mm thick Ground access ramp with broom Sm 15
swept finish
Maintenance of excavation
B Allow for keeping the whole of the excavation Item 1
free from silt and general water by bailing,
pumping or otherwise as approved by the
Project Manager
C Allow for provision and subsequent removal of Item 1
Planking and strutting to uphold the sides of
excavations as per approved Contractor's work
methodology
Sundries
M 20 SWG hoop iron wall tie 25mm wide x 450mm No 576
long, cast 75mm into concrete and built into
joints of block walling after every two courses.
COLLECTION
A Columns Cm 11
B Beams Cm 25
C 200mm Thick Solid suspended slabs SM 12
D 200mm Thick overall composite hollow clay SM 433
maxpan suspended slab comprising
300x300x150mm high hollow pots at 450mm
centres; with concrete grade 25 in 150mm thick
margins and 50mm thick concrete topping
including filling to ends; all to structural
engineers detail drawings.
Mesh fabric reinforcement reference A 142 to
BS 4483:2005 anti-crack; weighing 2.22kg per
square meter: 200mm laps of 48.00x2.40 m
size with 6mm dia wires
E In suspended slabs Sm 433
High yield tensile reinforcement bars to BS
4449:2005 as described including cutting to
lengths, bending, hoisting and fixing including
all necessary tying wire and spacing blocks
WALLING
Pompeii vents
Burnt clay pompeii vent bricks from approved
supplier bedded, jointed and pointed with
cement and sand (1:3) mortar as described
COLLECTION
COLLECTION
Floor Finishes
Cement and washed sand screed mix ratio
(1:3).
A 15mm thick to receive tiles Sm 35
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
B Floors Sm 496
C Ditto: 100 x 10mm thick Skirting Lm 291
Tilling
300 x 300 x 8mm size glazed ceramic floor tiles
fixed with adhesive in strict accordance with
manufacturer's instruction on cement sand
mortar backing (MS) with fine butt joints
pointed and grouted in matching colour
including washing and polishing on
completion: to
D Floor surfaces. Sm 35
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to wall and concrete Sm 783
surfaces.
F 15mm Thick screed finished to receive tiles Sm 168
CEILING FINISHES
Cement sand mortar mix ratio (1:4) finished to:
C 15mm thick plaster to soffits of suspended slabs. Sm 459
Staircase Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Staircase landings sm 14
B Treads 225 - 300mm wide Lm 103
C Risers 150 - 225mm high Lm 109
D 100 x 10mm Skirting Lm 42
Guard rail
I 1100mm High balustrade to staircase Lm 28
comprising 40x20x2mm rectangular hollow
section (RHS) vertical main balusters at 600mm
centres pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with approved painting; all to
architects detail drawings.
COLLECTION
Total brought forward from page 3.1/13
Total brought forward from page 3.1/14
Total brought forward from page 3.1/15
Total brought forward from page 3.1/16
Wall Finishes
Cement and washed sand external rendering
mix ratio (1:4), trowelled smooth in two coats:
to
F 15mm thick to walls and concrete surfaces Sm 281
COLLECTION
STUDY TABLE
B Cast in position for study table; 4No. 100mm NO 8
thick reinforced concrete walls 800mm long x
660mm high reinforced with BRC - A142 and
finished with plaster and approved paint; 75mm
thick concrete topping 3500mm long x 800mm
wide reinforced with BRC -A142 and finished
smooth with 25mm thick terrazzo on 20mm
cement sand (1:3) screed for worktop, plaster
and paint soffits of worktop ; all to architect's
detailed drawings.
Concrete Benche
C Cast in position for concrete benches overall NO 6
1850mm long x 690mm wide x 640mm high;
2No. reinforced concrete grade 25 seat suports
overall girth 1030mm and finished with plaster
and approved paint; 1No. back rest and 2No.
seats 1850mm long x 215mm wide x 30mm
thick each in well seasoned and treated
hardwood fixed onto seat supports with 20mm
dia x 75mm long (2No.) raw bolts drilled to flash
with the timber pieces and painted with 1
undercoat and 2 coats of approved varnish; all
to architect's detailed drawings.
Concrete Table
A Cast in position for concrete table overall NO 3
1000mm long x 860mm wide x 500mm high;
2No. reinforced concrete grade 25 table top
suports overall size 690mm long x 170mm thick
x 500mm high and finished with plaster and
approved paint; 4No. table tops 1000mm long x
215mm wide x 30mm thick each in well
seasoned and treated hardwood fixed onto
concrete supports with 20mm dia x 75mm long
(2No.) raw bolts drilled to flash with the timber
pieces and painted with 1 undercoat and 2 coats
of approved varnish; all to architect's detailed
drawings.
COLLECTION
GIRL'S HOSTEL
FIRST FLOOR
3.2
BILL No. 3.2 - FIRST FLOOR - GIRL'S HOSTEL
FIRST FLOOR
A Columns Cm 11
B Beams Cm 25
C 200mm Thick Solid suspended slabs SM 12
D 200mm Thick overall composite hollow clay SM 433
maxpan suspended slab comprising
300x300x150mm high hollow pots at 450mm
centres; with concrete grade 25 in 150mm thick
margins and 50mm thick concrete topping
including filling to ends; all to structural
engineers detail drawings.
Mesh fabric reinforcement reference A 142 to
BS 4483:2005 anti-crack; weighing 2.22kg per
square meter: 200mm laps of 48.00x2.40 m
size with 6mm dia wires
E In suspended slabs Sm 433
High yield tensile reinforcement bars to BS
4449:2005 as described including cutting to
lengths, bending, hoisting and fixing including
all necessary tying wire and spacing blocks
WALLING
Pompeii vents
COLLECTION
Floor Finishes
Cement and washed sand screed mix ratio
(1:3).
A 15mm thick to receive tiles Sm 35
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
B Floors Sm 424
C Ditto: 100 x 10mm thick Skirting Lm 455
Tilling
300 x 300 x 8mm size glazed ceramic floor tiles
fixed with adhesive in strict accordance with
manufacturer's instruction on cement sand
mortar backing (MS) with fine butt joints
pointed and grouted in matching colour
including washing and polishing on
completion: to
D Floor surfaces. Sm 35
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to wall and concrete Sm 1,195
surfaces.
F 15mm Thick screed finished to receive tiles Sm 168
CEILING FINISHES
Cement sand mortar mix ratio (1:4) finished to:
C 15mm thick plaster to soffits of suspended slabs. Sm 459
A Staircase landings sm 11
B Treads 225 - 300mm wide Lm 103
C Risers 150 - 225mm high Lm 109
D 100 x 10mm Skirting Lm 42
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to sloping soffits of Sm 33
staircase.
F 15mm Thick plastering to soffits of landings. Sm 27
G 15mm Thick plastering to stringers of staircases Sm 48
COLLECTION
Total brought forward from page 3.2/8
Total brought forward from page 3.2/9
Total brought forward from page 3.2/10
Total brought forward from page 3.2/11
STORAGE WARDROBE
A Wardrobe over all size 1000mm long x 600mm No 32
wide x 2100mm high made from well seasoned
and treated hardwood; 1No. Vertical division,
3No. Horizontal shelves 400mm apart starting
at the bottom and 2No. 35mm thick wadrobe
angular 90⁰ door size 490mm x 2100mm high
each with 4no. hinges at 500mm centers and 70
x 130 x 5mm thick wooden handle; fixed in
position and varnished to a shiny finish with
approved varnish all to architect's detailed
drawing.
STUDY TABLE
B Cast in position for study table; 4No. 100mm NO 16
thick reinforced concrete walls 800mm long x
660mm high reinforced with BRC - A142 and
finished with plaster and approved paint; 75mm
thick concrete topping 3500mm long x 800mm
wide reinforced with BRC -A142 and finished
smooth with 25mm thick terrazzo on 20mm
cement sand (1:3) screed for worktop, plaster
and paint soffits of worktop ; all to architect's
detailed drawings.
GIRL'S HOSTEL
SECOND FLOOR
3.3
BILL No. 3.3 - SECOND FLOOR - GIRL'S HOSTEL
SECOND FLOOR
A Columns Cm 11
B Ring Beam Cm 25
C 150mm Thick Solid suspended slabs SM 12
WALLING
Pompeii vents
Metal work
B 750mm girth, Gauge 26 wall flushing bent to m 36
shape one side fixed into walling and the other
side overlapping the roof covering complete
with all accessories.
C 3mm thick plate fascia; welded onto steel SM 34
rafters; complete with one coat of antirust, two
coats of approved metal paint and with all
accessories.
COLLECTION
Total brought forward from page 3.3/5
Total brought forward from page 3.3/6
COLLECTION
Floor Finishes
Cement and washed sand screed mix ratio
(1:3).
A 15mm thick to receive tiles Sm 35
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
B Floors Sm 424
C Ditto: 100 x 10mm thick Skirting Lm 455
Tilling
300 x 300 x 8mm size glazed ceramic floor tiles
fixed with adhesive in strict accordance with
manufacturer's instruction on cement sand
mortar backing (MS) with fine butt joints
pointed and grouted in matching colour
including washing and polishing on
completion: to
D Floor surfaces. Sm 35
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to wall and concrete Sm 1,203
surfaces.
F 15mm Thick screed finished to receive tiles Sm 168
CEILING FINISHES
C 50 x 75mm sawn softwood brandering Lm 792
D 100 x 50mm wrot softwood wall bearers Lm 794
plugged and ceiling joists.
E Extra over do. For forming 600 x 600mm access No 2
door with 50 x 100mm wrot softwood frame all
round including cover strips pair of 100mm
steel butt hinges.
F 9 x 24 SWG galvanized expanded metal lathing Sm 459
U-nailed to timber brandering (m/s)
G 20mm cement and sand (1:4) pricking course to Sm 459
metal lathing.
H 20mm thick cement sand (1:4) plaster steel Sm 459
troweled to ceiling soffits
Prepare and apply two coats plaster primer
and three coats first grade ceiling paint all in
accordance with an approved manufacturer's
instructions on:
I Plastered ceiling soffits Sm 459
Staircase Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Staircase landings sm 7
B Treads 225 - 300mm wide Lm 37
C Risers 150 - 225mm high Lm 37
D 100 x 10mm Skirting Lm 14
Guard rail
H 1100mm High balustrade to staircase Lm 7
comprising 40x20x2mm rectangular hollow
section (RHS) vertical main balusters at 600mm
centres pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
STORAGE WARDROBE
A Wardrobe over all size 1000mm long x 600mm No 32
wide x 2100mm high made from well seasoned
and treated hardwood; 1No. Vertical division,
3No. Horizontal shelves 400mm apart starting
at the bottom and 2No. 35mm thick wadrobe
angular 90⁰ door size 490mm x 2100mm high
each with 4no. hinges at 500mm centers and 70
x 130 x 5mm thick wooden handle; fixed in
position and varnished to a shiny finish with
approved varnish all to architect's detailed
drawing.
STUDY TABLE
B Cast in position for study table; 4No. 100mm NO 16
thick reinforced concrete walls 800mm long x
660mm high reinforced with BRC - A142 and
finished with plaster and approved paint; 75mm
thick concrete topping 3500mm long x 800mm
wide reinforced with BRC -A142 and finished
smooth with 25mm thick terrazzo on 20mm
cement sand (1:3) screed for worktop, plaster
and paint soffits of worktop ; all to architect's
detailed drawings.
GIRL'S HOSTEL
ROOF LEVEL
3.4
BILL No. 3.4 - ROOF LEVEL - GIRL'S HOSTEL
ROOF LEVEL
A Columns Cm 2
B Intermediate beams and Ring Beam Cm 4
C 150mm Thick Solid suspended slabs Sm 31
Sundries
K 20 SWG hoop iron wall tie 25mm wide x 450mm No 180
long, cast 75mm into concrete and built into
joints of block walling after every two courses.
Pompeii vents
COLLECTION
Water proofing
A Spread light weight concrete on top of RC slab m2 31
with and average thickness of 100mm with a 2%
slope towards down pipe
B Spread 30mm thick Cement screed over light m2 31
weight concrete.
2
C Supply and apply 4mm APP Torch on m 31
waterproofing membrane or other equal and
approved ; laid in two layers in different
directions and as per manufacturers instruction
as shown on the drawing.
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to Internal surfaces. Sm 118
CEILING FINISHES
Cement sand mortar mix ratio (1:4) finished to:
A 15mm thick plaster to soffits of suspended slabs. Sm 30
COLLECTION
GIRL'S HOSTEL
ELECTRO MECHANICAL
INSTALLATIONS
3.5
BILL No. 3.5 - ELECTRO MECHANICAL INSTALLATIONS - GIRL'S HOSTEL
MECHANICAL INSTALLATIONS
A ELEMENT NO. 1 : GROUND FLOOR 3.5/10
B ELEMENT NO. 2 : FIRST FLOOR 3.5/16
C ELEMENT NO. 3 : SECOND FLOOR 3.5/22
ELECRTICAL INSTALLATIONS
D ELEMENT NO. 4 : GROUND FLOOR 3.5/27
E ELEMENT NO. 5 : FIRST FLOOR 3.5/31
F ELEMENT NO. 6 : SECOND FLOOR 3.5/35
COLLECTION
COLLECTION
G 50 mm Diameter No 58
H 80 mm Diameter No 28
I 110 mm Diameter No 80
COLLECTION
COLLECTION
COLLECTION
COLLECTION
COLLECTION
COLLECTION
COLLECTION
COLLECTION
BOY'S HOSTEL
4
BILL No. 4- BOY'S HOSTEL
4/S
BILL NO. 4.1
BOY'S HOSTEL
GROUND FLOOR
4.1
BILL No. 4.1 - GROUND FLOOR - BOY'S HOSTEL
Hardcore
B 200mm thick hardcore filling using approved Sm 520
hard stone ballast or quarry waste of maximum
size of 150mm, compacted / rolled with a
vibrating roller (minimum 2 tonne) or 10 tonne
yard roller. Where rolling is not accessible,
compaction shall be by hand or mechanical
tampers)
C 50mm thick stone dust blinding over surfaces of Sm 520
hardcore
Insitu cast plain normal weight concrete class
15, (20mm aggregate) in;
D 50mm blinding layer below: pad foundations Sm 276
and strip foundations
Insitu cast vibrated mass normal weight
concrete class 20, 20mm aggregates
(maximum) as described: in:
E Strip foundations Cm 30
Insitu cast vibrated reinforced normal weight
concrete class 25, 20mm aggregates
(maximum) cast into formworks and vibrated
around rod reinforcement bars.(MS) In:
F Pad foundations Cm 60
G Starter columns Cm 7
H Ground beams Cm 25
I 100mm thick ground floor slab Sm 505
J 100mm thick Ground access ramp with broom Sm 15
swept finish
Maintenance of excavation
B Allow for keeping the whole of the excavation Item 1
free from silt and general water by bailing,
pumping or otherwise as approved by the
Project Manager
C Allow for provision and subsequent removal of Item 1
Planking and strutting to uphold the sides of
excavations as per approved Contractor's work
methodology
Sundries
M 20 SWG hoop iron wall tie 25mm wide x 450mm No 576
long, cast 75mm into concrete and built into
joints of block walling after every two courses.
COLLECTION
A Columns Cm 11
B Beams Cm 25
C 200mm Thick Solid suspended slabs SM 12
D 200mm Thick overall composite hollow clay SM 433
maxpan suspended slab comprising
300x300x150mm high hollow pots at 450mm
centres; with concrete grade 25 in 150mm thick
margins and 50mm thick concrete topping
including filling to ends; all to structural
engineers detail drawings.
Mesh fabric reinforcement reference A 142 to
BS 4483:2005 anti-crack; weighing 2.22kg per
square meter: 200mm laps of 48.00x2.40 m
size with 6mm dia wires
E In suspended slabs Sm 433
High yield tensile reinforcement bars to BS
4449:2005 as described including cutting to
lengths, bending, hoisting and fixing including
all necessary tying wire and spacing blocks
WALLING
Pompeii vents
Burnt clay pompeii vent bricks from approved
supplier bedded, jointed and pointed with
cement and sand (1:3) mortar as described
COLLECTION
COLLECTION
Floor Finishes
Cement and washed sand screed mix ratio
(1:3).
A 15mm thick to receive tiles Sm 35
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
B Floors Sm 496
C Ditto: 100 x 10mm thick Skirting Lm 291
Tilling
300 x 300 x 8mm size glazed ceramic floor tiles
fixed with adhesive in strict accordance with
manufacturer's instruction on cement sand
mortar backing (MS) with fine butt joints
pointed and grouted in matching colour
including washing and polishing on
completion: to
D Floor surfaces. Sm 35
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to wall and concrete Sm 783
surfaces.
F 15mm Thick screed finished to receive tiles Sm 168
CEILING FINISHES
Cement sand mortar mix ratio (1:4) finished to:
C 15mm thick plaster to soffits of suspended slabs. Sm 459
Staircase Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Staircase landings sm 14
B Treads 225 - 300mm wide Lm 103
C Risers 150 - 225mm high Lm 109
D 100 x 10mm Skirting Lm 42
Guard rail
I 1100mm High balustrade to staircase Lm 28
comprising 40x20x2mm rectangular hollow
section (RHS) vertical main balusters at 600mm
centres pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
Total brought forward from page 4.1/13
Total brought forward from page 4.1/14
Total brought forward from page 4.1/15
Total brought forward from page 4.1/16
Wall Finishes
Cement and washed sand external rendering
mix ratio (1:4), trowelled smooth in two coats:
to
F 15mm thick to walls and concrete surfaces Sm 281
COLLECTION
STUDY TABLE
B Cast in position for study table; 4No. 100mm NO 8
thick reinforced concrete walls 800mm long x
660mm high reinforced with BRC - A142 and
finished with plaster and approved paint; 75mm
thick concrete topping 3500mm long x 800mm
wide reinforced with BRC -A142 and finished
smooth with 25mm thick terrazzo on 20mm
cement sand (1:3) screed for worktop, plaster
and paint soffits of worktop ; all to architect's
detailed drawings.
Concrete Benche
C Cast in position for concrete benches overall NO 6
1850mm long x 690mm wide x 640mm high;
2No. reinforced concrete grade 25 seat suports
overall girth 1030mm and finished with plaster
and approved paint; 1No. back rest and 2No.
seats 1850mm long x 215mm wide x 30mm
thick each in well seasoned and treated
hardwood fixed onto seat supports with 20mm
dia x 75mm long (2No.) raw bolts drilled to flash
with the timber pieces and painted with 1
undercoat and 2 coats of approved varnish; all
to architect's detailed drawings.
Concrete Table
A Cast in position for concrete table overall NO 3
1000mm long x 860mm wide x 500mm high;
2No. reinforced concrete grade 25 table top
suports overall size 690mm long x 170mm thick
x 500mm high and finished with plaster and
approved paint; 4No. table tops 1000mm long x
215mm wide x 30mm thick each in well
seasoned and treated hardwood fixed onto
concrete supports with 20mm dia x 75mm long
(2No.) raw bolts drilled to flash with the timber
pieces and painted with 1 undercoat and 2 coats
of approved varnish; all to architect's detailed
drawings.
COLLECTION
BOY'S HOSTEL
FIRST FLOOR
4.2
BILL No. 4.2 - FIRST FLOOR - BOY'S HOSTEL
FIRST FLOOR
A Columns Cm 11
B Beams Cm 25
C 200mm Thick Solid suspended slabs SM 12
D 200mm Thick overall composite hollow clay SM 433
maxpan suspended slab comprising
300x300x150mm high hollow pots at 450mm
centres; with concrete grade 25 in 150mm thick
margins and 50mm thick concrete topping
including filling to ends; all to structural
engineers detail drawings.
Mesh fabric reinforcement reference A 142 to
BS 4483:2005 anti-crack; weighing 2.22kg per
square meter: 200mm laps of 48.00x2.40 m
size with 6mm dia wires
E In suspended slabs Sm 433
High yield tensile reinforcement bars to BS
4449:2005 as described including cutting to
lengths, bending, hoisting and fixing including
all necessary tying wire and spacing blocks
WALLING
Pompeii vents
COLLECTION
Floor Finishes
Cement and washed sand screed mix ratio
(1:3).
A 15mm thick to receive tiles Sm 35
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
B Floors Sm 424
C Ditto: 100 x 10mm thick Skirting Lm 455
Tilling
300 x 300 x 8mm size glazed ceramic floor tiles
fixed with adhesive in strict accordance with
manufacturer's instruction on cement sand
mortar backing (MS) with fine butt joints
pointed and grouted in matching colour
including washing and polishing on
completion: to
D Floor surfaces. Sm 35
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to wall and concrete Sm 1,195
surfaces.
F 15mm Thick screed finished to receive tiles Sm 168
CEILING FINISHES
Cement sand mortar mix ratio (1:4) finished to:
C 15mm thick plaster to soffits of suspended slabs. Sm 459
A Staircase landings sm 11
B Treads 225 - 300mm wide Lm 103
C Risers 150 - 225mm high Lm 109
D 100 x 10mm Skirting Lm 42
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to sloping soffits of Sm 33
staircase.
F 15mm Thick plastering to soffits of landings. Sm 27
G 15mm Thick plastering to stringers of staircases Sm 48
COLLECTION
STORAGE WARDROBE
A Wardrobe over all size 1000mm long x 600mm No 32
wide x 2100mm high made from well seasoned
and treated hardwood; 1No. Vertical division,
3No. Horizontal shelves 400mm apart starting
at the bottom and 2No. 35mm thick wadrobe
angular 90⁰ door size 490mm x 2100mm high
each with 4no. hinges at 500mm centers and 70
x 130 x 5mm thick wooden handle; fixed in
position and varnished to a shiny finish with
approved varnish all to architect's detailed
drawing.
STUDY TABLE
B Cast in position for study table; 4No. 100mm NO 16
thick reinforced concrete walls 800mm long x
660mm high reinforced with BRC - A142 and
finished with plaster and approved paint; 75mm
thick concrete topping 3500mm long x 800mm
wide reinforced with BRC -A142 and finished
smooth with 25mm thick terrazzo on 20mm
cement sand (1:3) screed for worktop, plaster
and paint soffits of worktop ; all to architect's
detailed drawings.
BOY'S HOSTEL
SECOND FLOOR
4.3
BILL No. 4.3 - SECOND FLOOR - BOY'S HOSTEL
SECOND FLOOR
A Columns Cm 11
B Ring Beam Cm 25
C 150mm Thick Solid suspended slabs SM 12
WALLING
Pompeii vents
Metal work
B 750mm girth, Gauge 26 wall flushing bent to m 36
shape one side fixed into walling and the other
side overlapping the roof covering complete
with all accessories.
C 3mm thick plate fascia; welded onto steel SM 34
rafters; complete with one coat of antirust, two
coats of approved metal paint and with all
accessories.
COLLECTION
Total brought forward from page 4.3/5
Total brought forward from page 4.3/6
COLLECTION
Floor Finishes
Cement and washed sand screed mix ratio
(1:3).
A 15mm thick to receive tiles Sm 35
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
B Floors Sm 424
C Ditto: 100 x 10mm thick Skirting Lm 455
Tilling
300 x 300 x 8mm size glazed ceramic floor tiles
fixed with adhesive in strict accordance with
manufacturer's instruction on cement sand
mortar backing (MS) with fine butt joints
pointed and grouted in matching colour
including washing and polishing on
completion: to
D Floor surfaces. Sm 35
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to wall and concrete Sm 1,203
surfaces.
F 15mm Thick screed finished to receive tiles Sm 168
CEILING FINISHES
C 50 x 75mm sawn softwood brandering Lm 792
D 100 x 50mm wrot softwood wall bearers Lm 794
plugged and ceiling joists.
E Extra over do. For forming 600 x 600mm access No 2
door with 50 x 100mm wrot softwood frame all
round including cover strips pair of 100mm
steel butt hinges.
F 9 x 24 SWG galvanized expanded metal lathing Sm 459
U-nailed to timber brandering (m/s)
G 20mm cement and sand (1:4) pricking course to Sm 459
metal lathing.
H 20mm thick cement sand (1:4) plaster steel Sm 459
troweled to ceiling soffits
Prepare and apply two coats plaster primer
and three coats first grade ceiling paint all in
accordance with an approved manufacturer's
instructions on:
I Plastered ceiling soffits Sm 459
Staircase Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Staircase landings sm 7
B Treads 225 - 300mm wide Lm 37
C Risers 150 - 225mm high Lm 37
D 100 x 10mm Skirting Lm 14
Guard rail
H 1100mm High balustrade to staircase Lm 7
comprising 40x20x2mm rectangular hollow
section (RHS) vertical main balusters at 600mm
centres pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
STORAGE WARDROBE
A Wardrobe over all size 1000mm long x 600mm No 32
wide x 2100mm high made from well seasoned
and treated hardwood; 1No. Vertical division,
3No. Horizontal shelves 400mm apart starting
at the bottom and 2No. 35mm thick wadrobe
angular 90⁰ door size 490mm x 2100mm high
each with 4no. hinges at 500mm centers and 70
x 130 x 5mm thick wooden handle; fixed in
position and varnished to a shiny finish with
approved varnish all to architect's detailed
drawing.
STUDY TABLE
B Cast in position for study table; 4No. 100mm NO 16
thick reinforced concrete walls 800mm long x
660mm high reinforced with BRC - A142 and
finished with plaster and approved paint; 75mm
thick concrete topping 3500mm long x 800mm
wide reinforced with BRC -A142 and finished
smooth with 25mm thick terrazzo on 20mm
cement sand (1:3) screed for worktop, plaster
and paint soffits of worktop ; all to architect's
detailed drawings.
BOY'S HOSTEL
ROOF LEVEL
4.4
BILL No. 4.4 - ROOF LEVEL - BOY'S HOSTEL
ROOF LEVEL
A Columns Cm 2
B Intermediate beams and Ring Beam Cm 4
C 150mm Thick Solid suspended slabs Sm 31
Sundries
K 20 SWG hoop iron wall tie 25mm wide x 450mm No 180
long, cast 75mm into concrete and built into
joints of block walling after every two courses.
Pompeii vents
COLLECTION
Water proofing
A Spread light weight concrete on top of RC slab m2 31
with and average thickness of 100mm with a 2%
slope towards down pipe
B Spread 30mm thick Cement screed over light m2 31
weight concrete.
2
C Supply and apply 4mm APP Torch on m 31
waterproofing membrane or other equal and
approved ; laid in two layers in different
directions and as per manufacturers instruction
as shown on the drawing.
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
E 15mm Thick plastering to Internal surfaces. Sm 118
CEILING FINISHES
Cement sand mortar mix ratio (1:4) finished to:
A 15mm thick plaster to soffits of suspended slabs. Sm 30
COLLECTION
BOY'S HOSTEL
ELECTRO MECHANICAL
INSTALLATIONS
4.5
BILL No. 4.5 - ELECTRO MECHANICAL INSTALLATIONS - BOY'S HOSTEL
MECHANICAL INSTALLATIONS
A ELEMENT NO. 1 : GROUND FLOOR 4.5/10
B ELEMENT NO. 2 : FIRST FLOOR 4.5/16
C ELEMENT NO. 3 : SECOND FLOOR 4.5/22
ELECRTICAL INSTALLATIONS
D ELEMENT NO. 4 : GROUND FLOOR 4.5/27
E ELEMENT NO. 5 : FIRST FLOOR 4.5/31
F ELEMENT NO. 6 : SECOND FLOOR 4.5/35
COLLECTION
COLLECTION
G 50 mm Diameter No 58
H 80 mm Diameter No 28
I 110 mm Diameter No 80
COLLECTION
2 Water Reservoir
COLLECTION
COLLECTION
COLLECTION
COLLECTION
COLLECTION
COLLECTION
COLLECTION
GENERATOR HOUSE
5
BILL No.5- GENERATOR HOUSE
COLLECTION
Total brought forward from Page 5/2
A Columns Cm 1
B Ring Beams Cm 2
Sundries
G 20 SWG hoop iron wall tie 25mm wide x 450mm No 144
long, cast 75mm into concrete and built into joints
of block walling after every two courses.
Plates
E 200x280x5mm slotted with 4No. 18mm dia hole No 8
to receive 16mm dia bolt.
F 200x280x5mm slotted with 4No. 18mm dia hole No 8
to receive 16mm dia bolt.
G 200x40x3mm with 1No. 10mm dia hole to receive No 32
8mm dia bolt
H 140x300x40x5 No 16
I Splice plate with 4no 18mmDia holes to receive No 8
16mm dia bolts
J bolt with nut - Grade 4.6
J Dia. 16mm (length=250mm) No 32
K 40x40x3 angle iron welded to purlin and bolted to No 32
metal plate
Bolts with nuts and washers
L Dia. 8mm No 32
M Dia. 16mm No 32
ROOF COVERING
N 26 Gauge prepainted IT4 steel Roof covering fixed Sm 60
to Z- purlin with proprietary fixings.
O Ditto but ridge cover galvanized metal sheet fixed m 11
to Z- purlin including RHS supports and all
necessary fixing accessories.
Metal work
B 3mm thick plate fascia; welded onto steel rafters; SM 4
complete with one coat of antirust and two coats
of approved metal paint.
Rainwater goods as described:-
Mild steel; Grade GJ
C 3mm Thick galvanised mild steel gutters bent four m 21
times bent; 1065mm girth; one side dressed
under roofing sheets; fixed with 20mm x 6mm
thick metallic steel brakets at 2000mm centres. as
per structural drawings, complete with one coat
of antirust, two coats of approved metal paint and
all necessary accessories.
COLLECTION
DOORS
STEEL CASEMENT DOORS
Supply and fix steel panelled doors comprising
40x40x2mm thick steel framing; mildsteel
lourvered; including hinges, door locks, door
handles (all iron mongery as approved by project
manager) and one coat red oxide primer all to
Architect's drawings and specifications in;
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
A 15mm Thick plastering to wall and concrete Sm 130
surfaces.
Painting and Decorating
Prepare and apply two coats plaster primer and
three coats first grade vinyl silk paint all in
accordance with an approved manufacturer's
instructions internally on:
B Plastered walls and concrete surfaces Sm 130
Kerbs
C Provide, lay and joint in cement mortar (1:3), LM 32
150mm x 230mm precast concrete class 20
splayed kerbs on splash apron edge
Cement and washed sand external rendering mix
ratio (1:4), trowelled smooth in two coats: to
Wall Finishes
Cement and washed sand external rendering mix
ratio (1:4), trowelled smooth in two coats: to
COLLECTION
Total brought forward from page 5/13
Total brought forward from page 5/14
STAFF HOUSING
6
BILL No.6 - STAFF HOUSING
STAFF HOUSING
GROUND FLOOR
6.1
BILL No.6.1 - GROUND FLOOR - STAFF HOUSING
GROUND FLOOR
Hardcore
B 200mm thick hardcore filling using approved Sm 204
hard stone ballast or quarry waste of maximum
size of 150mm, compacted / rolled with a
vibrating roller (minimum 2 tonne) or 10 tonne
yard roller. Where rolling is not accessible,
compaction shall be by hand or mechanical
tampers)
C 50mm thick stone dust blinding over surfaces of Sm 204
hardcore
Insitu cast plain normal weight concrete class
15, (20mm aggregate) in;
D 50mm blinding layer below: pad foundations Sm 143
and strip foundations
Insitu cast vibrated mass normal weight
concrete class 20, 20mm aggregates
(maximum) as described: in:
E Strip foundations Cm 17
Insitu cast vibrated reinforced normal weight
concrete class 25, 20mm aggregates
(maximum) cast into formworks and vibrated
around rod reinforcement bars.(MS) In:
F Pad foundations Cm 27
G Starter columns Cm 3
H Ground beams Cm 8
I 150mm thick ground floor slab. Sm 197
J 150mm thick Ground access ramp with broom Sm 7
swept finish
Maintenance of excavation
B Allow for keeping the whole of the excavation Item 1
free from silt and general water by bailing,
pumping or otherwise as approved by the
Project Manager
C Allow for provision and subsequent removal of Item 1
Planking and strutting to uphold the sides of
excavations as per approved Contractor's work
methodology
Sundries
N 20 SWG hoop iron wall tie 25mm wide x 450mm No 264
long, cast 75mm into concrete and built into
joints of block walling after every two courses.
COLLECTION
A Columns Cm 5
B Beams Cm 10
C 200mm Thick overall composite hollow clay SM 161
maxpan suspended slab comprising
300x300x150mm high hollow pots at 450mm
centres; with concrete grade 25 in 150mm thick
margins and 50mm thick concrete topping
including filling to ends; all to structural
engineers detail drawings.
WALLING
Pompeii vents
COLLECTION
Floor Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Floors Sm 196
B Ditto: 100 x 10mm thick Skirting Lm 260
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
C 15mm Thick plastering to wall and concrete Sm 433
surfaces.
D 15mm Thick screed to receive tiles Sm 84
Painting and Decorating
Prepare and apply two coats plaster primer
and three coats first grade vinyl silk paint all
in accordance with an approved
manufacturer's instructions internally on:
Staircase Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
C Staircase landings Sm 4
D Treads 225 - 300mm wide Lm 27
E Risers 150 - 225mm high Lm 30
F 100 x 10mm Skirting Lm 13
Guard rail
G 1100mm High balustrade to staircase Lm 8
comprising 40x20x2mm rectangular hollow
section (RHS) vertical main balusters at 600mm
centres pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
Total brought forward from page 6.1/12
Total brought forward from page 6.1/13
Total brought forward from page 6.1/14
Guard rail
E 1100mm High balustrade comprising m 13
40x20x2mm rectangular hollow section (RHS)
vertical main balusters at 600mm centres
pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
Total carried forward from page 6.1/15
Total carried forward from page 6.1/16
COLLECTION
STAFF HOUSING
FIRST FLOOR
6.2
BILL No.6.2 - FIRST FLOOR - STAFF HOUSING
FIRST FLOOR
A Columns Cm 5
B Beams Cm 10
C 200mm Thick overall composite hollow clay SM 161
maxpan suspended slab comprising
300x300x150mm high hollow pots at 450mm
centres; with concrete grade 25 in 150mm thick
margins and 50mm thick concrete topping
including filling to ends; all to structural
engineers detail drawings.
Mesh fabric reinforcement reference A 142 to
BS 4483:2005 anti-crack; weighing 2.22kg per
square meter: 200mm laps of 48.00x2.40 m
size with 6mm dia wires
D In suspended slabs Sm 161
High yield tensile reinforcement bars to BS
4449:2005 as described including cutting to
lengths, bending, hoisting and fixing including
all necessary tying wire and spacing blocks
WALLING
Pompeii vents
COLLECTION
Floor Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Floors Sm 181
B Ditto: 100 x 10mm thick Skirting Lm 260
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
C 15mm Thick plastering to wall and concrete Sm 433
surfaces.
D 15mm Thick screed to receive tiles Sm 84
Painting and Decorating
Prepare and apply two coats plaster primer
and three coats first grade vinyl silk paint all
in accordance with an approved
manufacturer's instructions internally on:
Staircase Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
C Staircase landings sm 4
D Treads 225 - 300mm wide m 27
E Risers 150 - 225mm high m 30
F 100 x 10mm Skirting m 13
Guard rail
G 1100mm High balustrade to staircase m 8
comprising 40x20x2mm rectangular hollow
section (RHS) vertical main balusters at 600mm
centres pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
Total brought forward from page 6.2/8
Total brought forward from page 6.2/9
Total brought forward from page 6.2/10
Guard rail
D 1100mm High balustrade comprising m 25
40x20x2mm rectangular hollow section (RHS)
vertical main balusters at 600mm centres
pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
STAFF HOUSING
SECOND FLOOR
6.3
BILL No.6.3 - SECOND FLOOR - STAFF HOUSING
SECOND FLOOR
A Columns Cm 5
B Beams Cm 10
C 200mm Thick overall composite hollow clay SM 161
maxpan suspended slab comprising
300x300x150mm high hollow pots at 450mm
centres; with concrete grade 25 in 150mm thick
margins and 50mm thick concrete topping
including filling to ends; all to structural
engineers detail drawings.
Mesh fabric reinforcement reference A 142 to
BS 4483:2005 anti-crack; weighing 2.22kg per
square meter: 200mm laps of 48.00x2.40 m
size with 6mm dia wires
D In suspended slabs Sm 161
High yield tensile reinforcement bars to BS
4449:2005 as described including cutting to
lengths, bending, hoisting and fixing including
all necessary tying wire and spacing blocks
WALLING
Pompeii vents
COLLECTION
Floor Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Floors Sm 181
B Ditto: 100 x 10mm thick Skirting Lm 260
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
C 15mm Thick plastering to wall and concrete Sm 433
surfaces.
D 15mm Thick screed to receive tiles Sm 84
Painting and Decorating
Prepare and apply two coats plaster primer
and three coats first grade vinyl silk paint all
in accordance with an approved
manufacturer's instructions internally on:
Staircase Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
C Staircase landings sm 4
D Treads 225 - 300mm wide m 27
E Risers 150 - 225mm high m 30
F 100 x 10mm Skirting m 13
Guard rail
G 1100mm High balustrade to staircase m 8
comprising 40x20x2mm rectangular hollow
section (RHS) vertical main balusters at 600mm
centres pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
Total brought forward from page 6.3/8
Total brought forward from page 6.3/9
Total brought forward from page 6.3/10
Guard rail
D 1100mm High balustrade comprising m 25
40x20x2mm rectangular hollow section (RHS)
vertical main balusters at 600mm centres
pluged into concrete and welded onto
50x25x3mm RHS top hand rail, 50X50X2mm
(SHS) newel vertical edge mambers,
30x20x2mm RHS bottom and intermediate
balusters at 280mm centres horizontally;
complete with painting; all to architects detail
drawings.
COLLECTION
STAFF HOUSING
THIRD FLOOR
6.4
BILL No.6.4 - THIRD FLOOR - STAFF HOUSING
THIRD FLOOR
A Columns Cm 5
B Ring Beam Cm 10
Sundries
I 20 SWG hoop iron wall tie 25mm wide x 450mm No 440
long, cast 75mm into concrete and built into
joints of block walling after every two courses.
WALLING
Pompeii vents
COLLECTION
COLLECTION
Floor Finishes
In-Situ Terrazzo flooring
50mm Thick Polished Terrazzo; comprising of
first coat of 25mm Thick water proofed cement
and sand (1:3) Screed, Second coat 25 mm
thick coloured cement and approved marble
aggregates 1:2:4 (1 cement : 2 coarse sand : 4
graded marble aggregate 1 - 4 mm nominal
size) flooring rubbed and polished to
granolithic finish complete with 25 x 6mm
plastic dividing strips at 1200mm centre on:
A Floors Sm 181
B Ditto: 100 x 10mm thick Skirting Lm 260
Wall Finishes
Cement sand mortar mix ratio (1:4) finished to:
C 15mm Thick plastering to wall and concrete Sm 433
surfaces.
D 15mm Thick screed to receive tiles Sm 84
Painting and Decorating
Prepare and apply two coats plaster primer
and three coats first grade vinyl silk paint all
in accordance with an approved
manufacturer's instructions internally on:
COLLECTION
Total brought forward from page 6.4/9
Total brought forward from page 6.4/10
COLLECTION
STAFF HOUSING
ELECTRO MECHANICAL
INSTALLATIONS
6.5
BILL No.6.5 - ELECTRO MECHANICAL INSTALLATIONS - STAFF HOUSING
MECHANICAL INSTALLATIONS
ELECRTICAL INSTALLATIONS
COLLECTION
COLLECTION
B 80 mm Diameter M 228
COLLECTION
COLLECTION
COLLECTION
Total carried from page 6.5/12
Total carried from page 6.5/13
COLLECTION
COLLECTION
Total carried from page 6.5/17
Total carried from page 6.5/18
COLLECTION
COLLECTION
Total carried from page 6.5/22
Total carried from page 6.5/23
COLLECTION
Total brought forward from page 6.5/25
Total brought forward from page 6.5/26
Total brought forward from page 6.5/27
Total brought forward from page 6.5/28
COLLECTION
COLLECTION
COLLECTION
Total brought forward from page 6.5/35
Total brought forward from page 6.5/36
Total brought forward from page 6.5/37
7
BILL No.7- HEAVY DUTY MACHINE SHED
Hardcore
B 200mm thick hardcore filling using approved Sm 500
hard stone ballast, compacted / rolled with a
vibrating roller (minimum 2 tonne) or 10 tonne
yard roller. Where rolling is not accessible,
compaction shall be by hand or mechanical
tampers)
C 50mm thick stone dust blinding over surfaces Sm 500
of hardcore
Insitu cast plain normal weight concrete class
15, (20mm aggregate) in;
D 50mm blinding layer below: pad foundations Sm 89
and strip foundations
Insitu cast vibrated mass normal weight
concrete class 20, 20mm aggregates
(maximum) as described: in:
E Strip foundations Cm 15
Insitu cast vibrated reinforced normal weight
concrete class 25, 20mm aggregates
(maximum) cast into formworks and vibrated
around rod reinforcement bars.(MS) In:
F Pad foundations Cm 6
G Starter columns Cm 3
H Ground beams Cm 6
I 150mm thick ground floor slab finished with a Sm 375
powerfloat and hardener.
J 150mm thick Ground access ramp with a Sm 125
broom swept finish.
Grout
K 25mm thick grout Sm 2
Water proofing membrane
L 1000 Gauge polythene water-proof sheet Sm 500
membrane laid on blinded hard-core (MS)
Fabric Mesh reinforcement reference A 142 to
BS 4483:2005 anti-crack; weighing 2.22kg per
square meter: 200mm laps of 48.00x2.40 m
size with 6mm dia wires
M In surface beds Sm 500
Total Carried to Collection
EXPANSION JOINT
D Supply and insert 100mm x 25mm Styrofoam Lm 79
insulation expansion joint; all according to size
and shape specified on the detail drawing.
Price shall include fixing accessories, approved
sealant material 50mm deep and all other
necessary works.
E 16mm Diameter x 600mm long round Mild No. 158
steel dowel bars at 500mm c/c to structural
engineer's detailed drawing.
COLLECTION
Total brought forward from Page 7/2
Metal work
D 3mm thick plate fascia; welded onto steel SM 27
rafters; complete with one coat of antirust, two
coats of metal paint and all accessories.
Rainwater goods as described:-
Mild steel; Grade GJ
E 3mm Thick galvanised mild steel gutters bent m 65
four times bent; 1065mm girth; one side
dressed under roofing sheets; fixed with 50mm
x 50mm x 6mm thick RSA steel brakets at
2000mm centres. as per structural drawings,
complete with one coat of antirust, two coats
of metal paint and all accessories.
COLLECTION
Total brought forward from page 7/7
Total brought forward from page 7/8
DOORS
STEEL CASEMENT DOORS
Supply and fix steel doors comprising 2mm
thick steel framing, infill and burglur proof;
including hinges, door locks, door handles (all
iron mongery as approved by project
manager) sliding rails, all necessary
accessories and one coat red oxide primer all
to Architect's drawings and specifications in;
Floor Finishes
Cement and washed sand screed mix ratio
(1:3).
A 15mm thick to skirting Lm 55
Wall Finishes
Cement sand screed mix ratio (1:4) finished to:
B 15mm Thick to wall and concrete surfaces. Sm 83
Wall Finishes
Cement and washed sand external rendering
mix ratio (1:3), trowelled smooth in two
coats: to
A 15mm thick to walls and concrete surfaces Sm 83
B Rendered surfaces Sm 83
COLLECTION
EXTERNAL WORKS
8
BILL NO.8 - EXTERNAL WORKS
3 FENCING 8/5
4 LANDSCAPING 8/6
Kerbs
F Provide, lay and joint in cement mortar LM 731
(1:3), 150mm x 230mm precast concrete
class 20 splayed kerbs on
140mmx350mm concrete grade 15 bed
and haunched on both sides including
earthworks.
G Do. But curved LM 25
Painting
H Do. But gloss oil paint in multi colours to LM 756
kerbs 200-300mm girth
Acess
A Excavate in soft material for pipe culverts CM 25
and lay 100mm thick hardcore filling to
receive blinding layer concrete 1:3:6 to
receive culvert pipes (M.S)
Supply, deliver and install concrete pipes
laid on concrete bed and with concrete
cover as per drawings and technical
specifications provided; bed and cover
of class 25/20 concrete
B 600 mm internal diameter culverts, 100 m 21
mm thickness made in concrete of class
30/20 reinforced with a double cage of
6mm diameter steel bars (A142 BRC;
200x100) at a circular spacing of 100 mm
C/C and a longitudinal spacing of 200 mm
C/C per cage.
C Culvert End Structures: Construct 300mm CM 9
thick concrete grade 25 reinforced with
BRC 142 for headwalls, wing walls and
outlet structures as per drawing and
Technical specifications provided.
COLLECTION
TO COLLECTION
COLLECTION
Total carried from page 8/8
Total carried from page 8/9
COLLECTION
TO COLLECTION
COLLECTION
MECHANICAL SYSTEMS
SUMMARY
COLLECTION
DAY WORKS
9
BILL No.9 - DAY WORKS
Labour
B Payment of labour authorised by the Engineer to
be employed on Dayworks will be the net
amount of such labour in accordanc with the
Contractor, plus the percentage addition also to
be inserted by the Contractor.
C The rates inserted against each category of
labour will be deemed to be the hourly wages
paid to workmen and change hands, working
with their gangs, inclusive of allowances for
Housing, Holidays with pay, Annual Leave, Sick
Leave, Safari Allowance and allowances required
by Government enactments concerning
regulations of wages and conditions of
employment.
D The Percentage Addition net amount of wages
defined above will be deemed to cover:-
SUB-TOTAL