Scenarios of Incidents For Trade Test Practices at HVTC (18-9-2021)
Scenarios of Incidents For Trade Test Practices at HVTC (18-9-2021)
Scenarios of Incidents For Trade Test Practices at HVTC (18-9-2021)
PC in HV Engineering (EG424408P)
Assuming you are a Responsible Person of Grade H REW responsible for issuing PTW to a
Person-in-charge, Mr. CHAN Tai-man, of the ABC Electrical Engineering Company for
replacing a damaged section of an 11 kV feeder cable no. “9”, which is in a ring circuit
connected between the CB “6” of 11 kV “SCHNEIDER” 2SIS-1 Switchboard in the Lee Wai
Lee Substation and between the CB “3” of 11 kV “Siemens” GIS-2 Switchboard in the Hiu
Ming Street Substation (see Fig 2). All switchgear panels in the above substations are of
non-withdrawable type.
You are assigned a job to carry out a planned outage at night for the above job. After the
cable replacement, you are required to cancel PTW and issue SFT before and for carrying
out related site tests on the HV cables, and associated MC40 relay. After a site survey, you
found that the cable trench outside the substation would be on a pedestrian road along a
busy traffic road. When you prepare to go to the site for the outage at 9:00pm, it starts to
rain intermittently.
Students Time
Part Description of Test
A or B Allowed
(1) Work Plan A&B
A 30 min
(2) Pre-Work Risk Assessment (PWRA) Form A&B
(1) To carry out the switching operation for open CB, A
isolation, prove dead and earthing
(2) Issue PTW and checking A
B (3) Check site clearance and cancel PTW B
(4) Issue SFT B
(5) Check site clearance and cancel SFT A
(6) Energisation B
(7) To carry out the following site tests on the cable
before cable termination work and energisation:
60 min
Core identification of HV cable between 2SIS-
A
1-6 and GIS-2-3,
IR tests, and VLF HV dielectric test at 2SIS-1-6
C Transformer oil dielectric test
(8) To carry out the following site tests on CTs in Test Kit
No. 1:
Secondary current injection test on MC40 relay B
Flick test
PCTs magnetizing current test
Total : 90 min
Page 1 of 7
Trade Test for PD in Power Engineering (EG424410P) /
PC in HV Engineering (EG424408P)
Assuming you are a Responsible Person of Grade H REW responsible for issuing PTW to a
Person-in-charge, Mr. CHAN Tai-man, of the ABC Electrical Engineering Company. Mr. Chan
are assigned a job to carry out a planned outage in daytime for maintenance work on the
Local Power Transformer No. 4 and its associated P122 protective relay, which is
connected to the CB “2” of 11 kV “SCHNEIDER” 2SIS-1 Switchboard in the Lee Wai Lee
Substation (see Fig 2). After the maintenance work on the local transformer and visual
inspection, you are required to cancel PTW and issue SFT before and for carrying out related
site tests on the PCTs and P122 protective relay of feeder panel no. 2. After a site survey,
you found that the substation is beside a busy pedestrian road along a narrow traffic road.
When you prepare to go to the site for the outage at 7:00am, you find that it is a raining day.
In addition, the substation is equipped with CO2 fire extinguishing system.
Students Time
Part Description of Test
A or B Allowed
(1) Work Plan A&B
A 30 min
(2) Pre-Work Risk Assessment (PWRA) Form A&B
(3) To carry out the switching operation for open A
CB, isolation, prove dead and earthing
(4) Issue PTW and checking A
(5) Check site clearance and cancel PTW B
(6) Issue SFT B
(7) Check site clearance and cancel SFT A
B (8) Energisation B
(9) To carry out the following site tests on the
Local Power Transformer No. 4 before
60 min
energisation:
A
Vector group test
IR test
HV AC pressure test
(10) To carry out the following site tests on CTs:
Secondary current injection test on P122
C relay B
DC resistance measurement
PCT Ratio test
Total : 90 min
Page 2 of 7
Trade Test for PD in Power Engineering (EG424410P) /
PC in HV Engineering (EG424408P)
Assuming you are a Responsible Person of Grade H REW responsible for issuing PTW to a
Person-in-charge, Mr. CHAN Tai-man, of the ABC Electrical Engineering Company. Mr. Chan
are assigned a job to carry out a planned outage in daytime for Left-hand-side (LHS) busbar
extension by adding one more feeder panel adjacent to the Panel No. 1 of the 11 kV “TAMCO”
AIS Switchboard in the Haking Wong-Waterfront Annex “B” Substation (see Fig 2).
After the insertion of one feeder panel, you are required to cancel PTW and issue SFT before
and for carrying out related site tests on LHS busbar of the switchboard. After a site survey,
you found that the substation is in the basement of an industrial building, where is a car park,
with poor ventilation. When you prepare to go to the site for the outage at 7:00am, you find
that it is a hot and humid day.
Students Time
Part Description of Test
A or B Allowed
(1) Work Plan A&B
A 30 min
(2) Pre-Work Risk Assessment (PWRA) Form A&B
(3) To carry out the switching operation for open CB, A
isolation, prove dead and earthing
(4) Issue PTW and checking A
B (5) Check site clearance and cancel PTW B
(6) Issue SFT B
(7) Check site clearance and cancel SFT A
(8) Energisation B
(9) To carry out the following site tests on the RHS
busbar before energisation:
60 min
IR tests and AC HV dielectric test A
Ductor test on earth bar
Total : 90 min
Page 3 of 7
Trade Test for PD in Power Engineering (EG424410P) /
PC in HV Engineering (EG424408P)
Assuming you are a Responsible Person of Grade H REW responsible for issuing PTW to a
Person-in-charge, Mr. CHAN Tai-man, of the ABC Electrical Engineering Company. Mr. Chan
are assigned a job to carry out a planned outage in daytime for busbar replacement work of
the 11 kV “SIEMENS” GIS-2 Switchboard in the Hiu Ming Street Substation (see Fig 2)
and testing the PCTs of the CB “2”. After the busbar replacement work and PCT testing,
you are required to cancel PTW and issue SFT before and for carrying out related site tests
on the busbar and PCTs. After a site survey, you found that the substation was very dirty
and stuffy. When you prepare to go to the site for the outage at 9:00am, you found there
are quite a lot of obstacles, e.g. boxes of goods, parked motor bikes, etc., along the side lane
leading to the main entrance of the substation. In addition, the substation is equipped with
CO2 fire extinguishing system.
Students Time
Part Description of Test
A or B Allowed
(1) Work Plan A&B
A 30 min
(2) Pre-Work Risk Assessment (PWRA) Form A&B
(3) To carry out the switching operation for open CB, A
isolation, prove dead and earthing
(4) Issue PTW and checking A
B (5) Check site clearance and cancel PTW B
(6) Issue SFT B
(7) Check site clearance and cancel SFT A
(8) Energisation B
(9) To carry out the following site tests on the busbar
replacement work before energisation:
IR tests and AC HV dielectric test 60 min
A
Ductor test on main busbar
PCT ratio test on GIS-2-2
C
(10) To carry out the following site tests on CTs of
GIS-2 CB No. 1:
Flick test
B
PCT magnetizing current test
Secondary current injection test on P122 at
Protection Replay Panel No. 1.
Total : 90 min
Page 4 of 7
Trade Test for PD in Power Engineering (EG424410P) /
PC in HV Engineering (EG424408P)
Assuming you are a Responsible Person of Grade H REW responsible for issuing PTW to a
Person-in-charge, Mr. CHAN Tai-man, of the ABC Electrical Engineering Company. Mr. Chan
are assigned a job to carry out a planned outage at night for replacing a faulty Local Power
Transformer No. 3 together with the old HV cables, which is connected to the CB “3” of
11 kV “SCHNEIDER” 2SIS-2 Switchboard in the Hing Shing Road Substation (see Fig 1).
After the replacement works, you are required to cancel PTW and issue SFT before and for
carrying out related site tests on the new local transformer, PCTs, and the HV cables
separately. After a site survey, you found that the substation is beside a busy pedestrian
road along a narrow traffic road. When you prepare to go to the site for the outage at 7:00am,
you find that it is a hot and sunny day.
Students Time
Part Description of Test
A or B Allowed
(1) Work Plan A&B
A 30 min
(2) Pre-Work Risk Assessment (PWRA) Form A&B
(3) To carry out the switching operation for open CB, A
isolation, prove dead and earthing
(4) Issue PTW and checking A
B (5) Check site clearance and cancel PTW B
(6) Issue SFT B
(7) Check site clearance and cancel SFT A
(8) Energisation B
(9) To carry out the following site tests on the cable before
energization: 60 min
IR tests, and VLF HV dielectric test A
PCT magnetizing current test
Flick test
C
(10) To carry out the following site tests on the Local
Power Transformer No. 3 before energisation:
Impedance voltage test B
Ratio test
Vector group test
Total : 90 min
Page 5 of 7
Trade Test for PD in Power Engineering (EG424410P) /
PC in HV Engineering (EG424408P)
NO
Point
630 A
VCB
No. 1
GIS-1-1
Haking Wong-
Waterfront Annex A GIS-
黃克競海旁 變電站 A 1-2
Local
Tx 1
Bus-section Switch
分隔開關 GIS-1-3
2
Hing Shing Road S/S
興盛路 配電站
GIS-1-5
GIS-1-4
Local
Tx 2 IVE (Tsing Yi)
IVE (青衣)
Siemens GIS-1
3
2SIS-2-1
Figure 1
Page 6 of 7
Trade Test for PD in Power Engineering (EG424410P) /
PC in HV Engineering (EG424408P)
TAMCO AIS-2
Bulk Supply No. 2A
大量供電2A
Bulk Supply No. 2B
AIS-2-2 AIS-2-3 大量供電2B
AIS-2-4
8
Lee Wai Lee S/S 10
李惠利 配電站 Haking Wong-
Waterfront Annex B
黃克競海旁變電站 B
2SIS-1-1
2SIS-
1-2
Local
Tx 4
Bus-section Switch
分隔開關 Hiu Ming Street S/S
曉明街 配電站
2SIS-1-3
GIS-2-2
9
2SIS-1-5
Local Haking Wong-
Tx 5 IVE(Lee Wai Lee) Waterfront Annex B
2SIS-1-6 GIS-2-3 黃克競海旁 變電站 B
IVE (李惠利)
Schneider 2SIS-1
Figure 2
Page 7 of 7