UNDP Guidance Notes on the Social and Environmental Standards (SES)
This Guidance Note is part of a set of operational guidance materials related to the UNDP Social and Environmental
Standards (SES). UNDP’s SES seek to (i) strengthen quality of programming by ensuring a principled approach; (ii)
maximize social and environmental opportunities and benefits; (iii) avoid adverse impacts to people and the
environment; (iv) minimize, mitigate, and manage adverse impacts where avoidance is not possible; (v) strengthen
UNDP partner capacities for managing social and environmental risks; and (vi) ensure full and effective stakeholder
engagement, including through
mechanisms to respond to complaints Key Elements of the SES
from project-affected people.
The SES guidance notes follow a similar
structure to assist users in finding
specific information or guidance (the
Social and Environment Screening
Procedure (SESP) Guidance Note has a
slightly different structure that focuses
on the steps of the screening process).
The set of guidance notes will develop
over time to include specific guidance
on each of the SES Programming
Principles, Project-level Standards, and
elements of the Social and
Environmental Management System
(see Key Elements of the SES). The SES
Toolkit is an on-line resource for the
guidance notes and supporting
materials.
How to Use This Guidance Note
The target users for the SES guidance
notes are staff, consultants,
stakeholders and partners who are involved in developing, assessing and implementing projects that invoke UNDP’s
SES. To facilitate use of the overall package of SES guidance, users should understand that the guidance notes:
• Are structured around the process of screening, social and environmental assessment, and management
(including monitoring).
• Assist in determining the applicability of relevant SES requirements in the screening process for all projects.
• Provide additional guidance for projects that require assessment and development of management
measures (i.e. projects with Moderate, Substantial or High Risks related to a certain Principle or Standard).
• Provide a practical resource for implementing SES requirements to address potential social and
environmental impacts within the context of the project cycle. Users do not necessarily need to read them
in full but rather may select information that is specific to their needs.
• Complement and elaborate on the SES, which must be read in conjunction with the guidance notes (SES
language is generally not repeated in the notes).
• Will continue to be developed as lessons are derived from implementation. Feedback is always welcome and
can be sent to [email protected]
i
Figure 1. SES Implementation – Screening, Assessment and Management in the Programming Cycle
Project
Integrate Human
Rights and Gender Social and Environmental
Equality, SCREENING
Sustainability and
Resilience, Determine Risk Category
Accountability in
Programming
Design & Appraise
Yes No
ASSESSMENT
MANAGEMENT Plan
MANAGEMENT Plan
Targtd. Assess. Scoped Assess. Full Assess.
Project IF ASSESSMENT
Board substantive
changes to Revised
project or MANAGEMENT Plan
context, new
Ongoing Monitoring and information
Annual Management PAC /
Quality (monitoring implementation of
Project
Assurance management plan(s), risk log, updating
Board
and adjustments to project, etc.)
Quality Conducted
Assurance (incorporate review of SES
implementation)
1 INTRODUCTION ........................................................................................................................................ 1
2 UNDERSTANDING THE BASICS OF STANDARD 7 .......................................................................................... 2
2.1 OBJECTIVES OF STANDARD 7 ................................................................................................................................. 2
2.2 KEY CONCEPTS.................................................................................................................................................... 3
2.3 CATEGORIES OF WORKERS .................................................................................................................................... 5
3 SCREENING ............................................................................................................................................... 6
4 ADDRESSING S7 REQUIREMENTS IN ASSESSMENT AND MANAGEMENT PLANNING ..................................... 9
4.1 BRIEF OVERVIEW OF KEY REQUIREMENTS AND STEPS ................................................................................................ 10
4.2 REVIEW OF RELEVANT HOST COUNTRY LABOUR LEGISLATION ...................................................................................... 10
4.3 ASSESSMENT OF LABOUR RISKS AND IMPACTS ......................................................................................................... 11
4.4 PARTNER LABOUR MANAGEMENT CAPACITY AND PROCESSES ..................................................................................... 11
4.5 NOTE ON SECTORAL RESTRUCTURING AND RETRENCHMENT ....................................................................................... 13
4.6 ADDRESSING SPECIFIC S7 REQUIREMENTS IN ASSESSMENTS AND MANAGEMENT PLANNING ............................................. 14
4.6.1 Terms and conditions of employment .................................................................................................. 14
4.6.2 Non-discrimination and equal opportunity .......................................................................................... 16
4.6.3 Workers’ organizations ........................................................................................................................ 18
4.6.4 Forced labour ....................................................................................................................................... 19
4.6.5 Child labour .......................................................................................................................................... 21
4.6.6 Occupational safety and health (OSH) ................................................................................................. 24
4.6.7 Workplace grievance mechanism ........................................................................................................ 28
4.6.8 Contractor/Third-party workers ........................................................................................................... 29
4.6.9 Primary supplier workers ..................................................................................................................... 31
4.7 ADDITIONAL CONSIDERATIONS: COMMUNITY WORKERS, INFORMAL EMPLOYMENT ........................................................ 33
5 ACTION PLAN/MITIGATION MEASURES ................................................................................................... 34
6 MONITORING ......................................................................................................................................... 34
ANNEX 1: LABOUR MANAGEMENT PROCEDURES TEMPLATE ................................................................................................. 36
ii
1 Introduction
The pursuit of inclusive and sustainable economic growth, full and productive employment and decent work for all
requires the protection of workers’ fundamental rights, their fair treatment, and the provision of safe and healthy
working conditions.
UNDP’s SES Standard 7: Labour and Working Conditions (S7) aims to ensure that UNDP projects respect the
fundamental rights of workers. This Guidance Note provides operational guidelines for addressing the requirements
of S7 throughout the UNDP programming cycle. Section 2 provides key background information on the S7 objectives
and includes necessary background information on the ILO Core Labour Standards as well as information on different
categories of workers. Section 3 discusses the S7 risk screening questions of the Social Environmental Screening
Procedure (SESP). Section 4 provides guidance on addressing the specific S7 requirements during the assessment
and management process. The note concludes with a section on relevant S7 monitoring issues (Section 5). Annex 1
provides a template of the Labour Management Procedures (LMP).
Below is a short overview of the key steps in the process for addressing the S7 requirements in the screening,
assessment and management process.
1
2 Understanding the Basics of Standard 7
Respecting labour rights is a fundamental element of Agenda 2030. Among other goals and targets, Sustainable
Development Goal 8 calls for the promotion of inclusive and sustainable economic growth, employment and decent
work for all. It includes targets for protecting labour rights and promoting safe working environments (Target 8.8)
and ending modern slavery, trafficking, and child labour (Target 8.7). Respecting labour rights is an important
element of furthering the SDG overarching principle of leaving no one behind.
In addition to the SDGs, UNDP adheres to the UNSDG Statement of Common Understanding of the Human Rights-
Based Approach to Development Cooperation (UN Common Understanding, HRBA) which outlines that development
programming should further the realization of human rights, which of course includes fundamental principles and
rights at work.1 Numerous UN human rights instruments contain provisions on labour rights and working conditions,
including but not limited to the Universal Declaration of Human Rights, the International Covenants on Civil and
Political Rights and on Economic, Social and Cultural Rights, the International Convention on the Protection of the
Rights of All Migrant Workers and Members of their Families, the Convention on the Rights of the Child, the
Convention on the Rights of Persons with Disabilities, Convention on the Elimination of All Forms of Discrimination
Against Women, the International Convention on the Elimination of All Forms of Racial Discrimination. 2 Thus, labour
rights are an integral part of the SES Programming Principle on human rights.
The International Labour Organization (ILO) has developed a broad array of conventions to protect workers’ rights
and to ensure safe and healthy working conditions (see Section 2.2). In addition, a range of good international
industry practices have also been developed, such as the general and sector-specific Environmental Health and
Safety Guidelines (EHSG) of the World Bank Group and those of the International Standards Organization (ISO),
including ISO 14001 on environmental management systems and ISO 45001 on occupational health and safety. 3
1 See the UN Common Understanding of the Human Rights-Based Approach to Development Cooperation for more information.
2See Chapter 3 of ILO, Giving Globalization a Human Face: General Survey on the fundamental Conventions concerning rights at
work in light of the ILO
Declaration on Social Justice for a Fair Globalization (2008),” International Labour Conference, 101st
Session, 2012, ILC.101/III/1B.
3 See World Bank Group Environmental Health and Safety Guidelines and the ISO Standards webpage.
4 ILO Declaration on Fundamental Principles and Rights at Work (1998).
2
The requirements contained in S7 seek to further these objectives and should be carefully reviewed in order to
inform project development and implementation.
The S7 requirements are to be addressed by the party or parties responsible for implementing the project, including
implementing partners, responsible parties, contractors and subcontractors (all referred to as “applicable parties”
in SES S7 and this Guidance Note).
(b) the elimination of all forms of forced or 3. Forced Labour Convention, 1930 (No. 29)
(178 ratifications), P029
compulsory labour - Protocol of 2014 to the Forced Labour Convention, 1930
4. Abolition of Forced Labour Convention, 1957 (No. 105)
(175
ratifications)
(c) the effective abolition of child labour 5. Minimum Age Convention, 1973 (No. 138)
(171 ratifications)
6. Worst Forms of Child Labour Convention, 1999 (No. 182)
(181
ratifications)
(d) the elimination of discrimination in respect 7. Equal Remuneration Convention, 1951 (No. 100)
(173
of employment and occupation ratifications)
8. Discrimination (Employment and Occupation) Convention, 1958
(No. 111)
(175 ratifications)
Below are some key concepts covered by the CLS and Standard 7 (see Section 4 for fuller treatment of each):
Child labour is often defined as work that deprives children of their childhood, their potential and their dignity, and
that is harmful to physical and mental development. It refers to work that is mentally, physically, socially or morally
dangerous and harmful to children; and/or interferes with their schooling by: depriving them of the opportunity to
attend school; obliging them to leave school prematurely; or requiring them to attempt to combine school
5As stated in the “ILO Declaration on Fundamental Principles and Rights at Work (1998),” at
http://www.ilo.org/declaration/lang--en/index.htm. The Declaration commits Member States to respect and promote
principles and rights related to the four core labour standards, regardless of having ratified the relevant Conventions.
3
attendance with excessively long and heavy work. The ILO standards identify age groups for which different forms
of economic activity (work) are acceptable. The key age is 15, which is established as the prevailing norm worldwide
for admission to employment. However, it is important to note that national legislation may set a higher threshold,
which typically coincides with the end of compulsory schooling.
Forced labour is defined quite broadly and often used alongside or interchangeably with modern slavery. Forced
labour is work exacted under the threat of penalty and for which the person has not offered himself or herself
voluntarily. The threat of penalty can involve practices such as threats of dismissal or physical violence, the
withholding of identity documents or wages, threats to denounce workers to immigration authorities where their
status is illegal, or entangling workers in fraudulent debt.
Freedom of association. ILO Convention No. 87 sets forth the right for workers and employers to establish and join
organizations of their own choosing without previous authorization. Workers' and employers' organizations shall
organize freely and not be liable to be dissolved or suspended by administrative authority, and they shall have the
right to establish and join federations and confederations, which may in turn affiliate with international
organizations of workers and employers. A workers’ organization is any organization of workers for the purpose of
furthering and defending their interests, in particular with regard to working conditions and terms of employment.
Workers’ organizations can be called by different terms in different countries, for example, trade unions, labor
unions, or workers’ associations.
Collective bargaining consists of discussions and negotiations among employers, employers’ organizations, and
workers’ organizations for the purpose of determining wages and other working conditions and terms of
employment by joint agreement. It also includes instructions on the implementation and administration of any
agreements that may result from collective bargaining and the resolution of issues and grievances that arise in the
employment relationship with respect to workers represented by the workers’ organization. Collective bargaining
can take place in different ways, depending on the country and industry sector. Many countries have multilevel
bargaining systems, which may include company, sectoral, and national levels.
Discrimination involves treating people differently on the basis of a personal characteristic that is unrelated to their
ability to do the job. Prohibited grounds of discrimination typically include gender, race, nationality, political opinion,
affiliation to a union, ethnic, social or indigenous origin, religion or belief, marital or family status, disability, age,
sexual orientation or gender identity. Equal opportunity is the principle of basing all employment decisions, such as
hiring and promotion, on the ability of a person to perform the work, without regard to personal characteristics that
are unrelated to the inherent work requirements (understood as genuine occupational qualifications that are
necessary to perform the work). Discrimination impairs or nullifies equality of opportunity or treatment in
employment.
Informal employment. Employees are considered to have informal jobs if their employment relationship is, in law
or in practice, not subject to national labor legislation, income taxation, social protection or entitlement to certain
employment benefits (paid annual or sick leave, etc.) for reasons such as: non-declaration of the jobs or the
employees; casual jobs or jobs of a limited short duration; jobs with hours of work or wages below a specified
threshold (e.g. for social security contributions); employment by unincorporated enterprises or by persons in
households; jobs where the employee’s place of work is outside the premises of the employer’s enterprise (e.g.
outworkers without an employment contract); or jobs for which labor regulations are not applied, not enforced, or
not complied with for any other reason. Operational criteria used by countries to define informal jobs of employees
include: lack of coverage by social security system; lack of entitlement to paid annual or sick leave; lack of written
employment contract.6
4
2.3 Categories of Workers
The S7 requirements apply to all ‘project workers’ who work on a project site or perform work related to what are
considered ‘core functions’ of the project regardless of location. Core functions of a project constitute those
production and/or service processes essential for a specific activity without which the project cannot continue.
The term ‘project workers’ encompasses different types of employment arrangements and the S7 requirements
need to be applied in a relevant and proportionate manner to each category of worker. Project workers include full-
time, part-time, temporary, seasonal and migrant workers, including those employed by third parties and the
project’s primary suppliers.
Identifying the nature of the employment relationships with project workers is important for categorizing workers
and deciding how the requirements of S7 may apply. An employment relationship exists when a person performs
work or provides services under certain conditions in return for remuneration. Determining the existence of an
employment relationship is guided primarily by the facts relating to performance and organization of the work and
the type of workers’ remuneration (see below). It is important to avoid or condone the use of disguised employment
relationships, such as contractual or other arrangements that hide the true legal status of the employment
relationship or contractual arrangements, which would have the effect of depriving project workers protections they
are due under national law and S7.
Types of project workers include the following:
• Direct workers: workers directly engaged by the applicable party to work on a project site or to perform
work essential to the project, whether permanently or on a temporary/seasonal basis. The applicable party
has a directly contracted employment relationship and specific control over the work, working conditions,
and treatment of the project worker. This may include persons employed or engaged by the responsible
party’s project implementation unit to carry out design and supervision, monitoring and evaluation, or
community engagement in relation to the project. Where government and international civil servants (e.g.
UNDP staff) 7 are working directly in connection with the project, they will remain subject to the terms and
conditions of their existing public sector employment arrangements where such arrangements exist.
Assessments of project risks and impacts should examine the consistency of such arrangements with S7
requirements and, if material gaps are found, identify measures to align with S7.
7For project workers who are employed or engaged by the United Nations and its specialized agencies, conditions of
employment are governed by the respective entity’s internal rules, in accordance with the relevant provisions of the
Convention on the Privileges and Immunities of the United Nations, 1946.
5
• The fact that such remuneration constitutes the worker’s sole or principal source of income
• Provision of payment in kind, such as food, lodging, or transport
• Recognition of entitlements such as weekly rest and annual holidays
• Payment by the party requesting the work for travel undertaken by the worker to carry out the work
• Absence of financial risk for the worker
• Contracted/third party workers: people employed or engaged through third parties (e.g. contractors,
subcontractors, brokers, agents or intermediaries) to perform work or provide services essential to the
project (i.e. core functions) regardless of location and where the third party exercises control over the work,
working conditions, and treatment of the project worker. The employment relationship is between the third
party and the project worker, even if the project worker is working on an ongoing basis on project activities.
S7 includes additional requirements regarding the selection and engagement of third parties/contractors
(see S7 paras. 29-31).
• A primary supply worker is a worker employed or engaged by a primary supplier, providing goods and
materials to the project, over whom a primary supplier exercises control for the work, working conditions,
and treatment of the person. Primary suppliers provide goods or materials directly to the project for its
core functions on an ongoing basis. This means that second, third, and further levels of the supply chain
(sometimes referred to as Tier 2 and Tier 3 suppliers) are not specifically covered by S7; however, risks in
subsequent tiers of the supply chain may also need to be considered, particularly from a human rights
perspective (see section 4. 5.9). S7 paras. 32-34 outline requirements regarding primary supply workers.
• Community workers. In addition to the above categories, projects may include the use of community
workers in a number of different circumstances, including where labor is provided by the community as a
contribution to the project (without direct remuneration), where projects are designed and conducted for
the purpose of fostering community-driven development or provision of a safety net (e.g. food-for-work
programs), or providing targeted assistance in fragile and conflict-affected situations. Although S7 does not
specifically refer to community workers, some UNDP projects may include them.
It is not always straightforward identifying types of project workers. For example, a range of third parties may be
involved in meeting the labor needs for a project. It is important to understand the nature of the relationship
between the third party and the project worker to decide how the S7 requirements apply. In some circumstances,
even where the worker is engaged on the project long term, the control of and legal responsibility for the worker
remains with the third party. In such circumstances, the worker is a “contracted worker” for the purposes of S7. This
is the case, for example, where a contractor brings its own workforce to work on a project. In other circumstances,
the third party may source and recruit the worker on behalf of the entity involved in implementing the project. In
these circumstances, such workers are “direct workers” for the purposes of S7. This is the case, for example, where
a labor broker or agent acts as an intermediary for the placement and recruitment of workers in one country to be
employed on a project in another country. Provision of labor through a broker, agent, or intermediary should not be
used to disguise the true legal status of the employment relationship.
3 Screening
Project developers utilize the UNDP Social and Environmental Screening Procedure (SESP) to screen projects for
potential social and environmental risks and impacts, including those associated with labour and working conditions.
See the SESP Guidance Note in the SES Toolkit for general guidance on the SESP.
Given that most projects will involve project workers, the screening process focuses on identifying which areas and
issues within S7 (if any) may pose risks and impacts to project workers and categorizing these risks. If Moderate,
Substantial or High risks are identified during screening, they will need to be reviewed and/or assessed and
6
benchmarked against relevant S7 requirements in more detail as part of the overall impact assessment process, and
appropriate management, mitigation and monitoring measures will need to be included in project design and
implementation.
Below are the SESP questions directly related to S7 with quick references to relevant sections of S7 and the Guidance
Note. To be noted: the requirements of S7 are interrelated and multiple requirements may apply to any one of the
UNDP screening questions. However, to facilitate addressing the screening questions, key relevant S7 concepts,
definitions and requirements are cross-referenced in the table.
When screening for labour risks and impacts, a first step is to establish key relevant parameters:
• do project-related activities involve employment/labour contracting? Often, the greatest risk for labour
standard violations is at contractor/subcontractor level. It is therefore vital that project developers and
screeners identify and flag (proposed) contracting arrangements as early as possible.
• who will be carrying out the project activities? (e.g. what kinds of project workers and who will be managing
them?)
• where and what types of project activities will take place? (e.g. areas or sectors with known labour risks
(child labour); inherently risky activities (heavy construction)
Project workers may be may be engaged in various ways, e.g. a capacity building component involving civil servants
(either office-based or working in the field); construction of physical components, possibly with several layers of sub-
contracting; or operation of one or multiple businesses. In addition, the primary supply chain of core materials
essential for the project must be screened for certain labour risks.
The screening process helps to determine the significance of identified labour risks and impacts by scoring both
impact and likelihood of the risk. The following table highlights general types of activities or situations that may
present significant labour-related risks. Of course, the context and circumstances of each project would need to be
carefully considered. For example, the status of the health sector, appropriate access to water and sanitation, history
of conflict and discrimination, and other factors may have significant implications for worker health and safety. Issues
identified in the screening for SES Standard 3 on Community Health, Safety and Security may have direct bearing.
7
Also, once potential project employers’ are known, the project proponent should also review their capacity to
manage labour issues as part of the risk assessment (see Section 4.4 below).
Examples of project-related activities that may involve labour risks:
The host country’s regulatory framework and/or practice is known • ILO core labour standards
for major gaps in protecting ILO core labour standards (e.g. no or
severely restricted freedom of association; systemic discrimination
of women or ethnic minorities; state-sponsored forced labour; high
incidences of child labour)
• Contractor management capacity
Construction activities, in particular large-scale construction
• OSH
• Forced labour, particularly among non-employee
workers provided by labour agencies
• Child labour (.e.g. carrying materials)
• Discrimination of migrant workers
• Unsafe worker accommodations
• Sexual harassment and gender-based violence
• OSH
Projects involving hazardous work (e.g. hazardous
• Emergency preparedness & response
substances/machinery/processes, explosion risks, major workplace
emissions, poisoning, contamination)
• Child labour
Labour-intensive manual processes (e.g. ready-made garment
• Forced labour
(RMG) manufacturing), primary agriculture, or other sectors in a
• Excessive working hours
country with high incidences of child labour or forced labour
• Wages/overtime
• Possibly: discrimination of migrant workers;
dormitories
The project involves labour-intensive processes and is located in a • As above, plus
Free Trade Zone/Export Processing Zone • Restriction of freedom of association/collective
bargaining
Project involves major restructuring of a large employer including • Retrenchment
(the risk of) collective redundancies • Discrimination
Projects involving hiring temporary non-employee workers via • Forced labour
labour agents, brokers, intermediaries • Discrimination
• Contractor management capacity
Project activities involve a high proportion of potentially vulnerable • Discrimination
workers (e.g. over 50% migrant workers, seasonal workers, young • Child labour
workers) • Forced labour
The workforce is/will be highly gender segregated (e.g. over 75% • Discrimination
workers women, while over 75% of managers male) • Harassment and bullying
Projects involving worker accommodation/dormitories • Issues of health, safety and security
• Child labour and informal labour of family members
• Sex trade and exploitation
Potential client’s primary supply chain is tainted by child or forced • Supply chain management (focusing on child
labour (e.g. known allegations against particular suppliers, or labour, forced labour, and health & safety threats)
8
where goods are sourced from a country or sector with high
prevalence of child labour/forced labour)
The project involves the use of armed security personnel • Safety and security
• Forced labour
• Harassment and bullying
• Gender-based violence
It must also be noted that many UNDP projects may include proactive measures that reach beyond compliance with
S7 to enhance positive labour impacts of the project. For example, employment promotion schemes, training
programmes to enable local people to apply for jobs under the project; programmes to increase the number of
female workers and/or to promote women’s careers (this could be anything from recruitment drives to mentoring
to having childcare facilities at the workplace); supporting best practices within a key supplier, systematic
approaches to help prevent child and forced labour, among other measures. Such measures would be outlined in
the Project Document.
Note on other labour-related risks and impacts: Keep in mind that the SESP also seeks to identify other potential
labour-related risks and impacts risks covered by other SES Project-level Standards. For example, SES Standard 3
on Community Health, Safety and Security addresses potential health and safety risks associated with the influx
of project workers, that is, when all or part of a labour force for a project comes from outside the area of the
project. In addition S3 addresses potential risks and impacts arising from the engagement of project security
personnel. Please refer to the S3 and supporting materials for more on these potential risks and impacts which
may include specific workforce management measures.
9
4.1 Brief overview of key requirements and steps
Before discussing the specific requirements of S7, the following table provides a brief overview of key S7 issues
regarding a project’s labour and working conditions and steps in addressing them. These elements would be
considered during the project’s environmental and social assessment process.
ASSESSMENT Where SESP screening identifies potential complex Moderate, Substantial or High project-
related labour risks, assess these risks and impacts, as relevant. Key issues include violations
of core labour standards, potential unsafe working conditions, labour risks associated with
the use of contractors and primary suppliers, gender-based violence, etc.
Benchmark key host country labour and employment regulations against S7
Assess the client’s capacity and willingness to address and manage labour risk and impacts,
and to achieve and maintain compliance with S7, by reviewing their relevant existing human
resources policies and procedures, OSH management systems, supplier policies, etc. The
review should focus on:
o terms and conditions of employment
o core labour standards
o all identified labour risks
o policies and procedures to mitigate risks relating to occupational safety and health
o worker grievance procedure
o responsibilities and training
o contractor and primary supplier management
Utilize the Labour Management Procedures (Annex 1) to facilitate labour risk assessment
Seek to avoid sectoral restructuring projects that may lead to job losses, and where
avoidance is not possible, ensure that good practices regarding retrenchment are followed
MANAGEMENT Based on the assessment, agree with the applicable party an action plan that outlines
MEASURES/ ACTION procedures needed to ensure that the project will be carried out in accordance with the
PLAN requirements of national law, collective agreements and the S7 requirements. Document
measures in the Labour Management Procedures (LMP) (stand-alone or part of ESMP)
Ensure project workers are provided clear and understandable information on terms and
conditions of their employment
MONITORING Ensure availability of workplace grievance mechanisms to receive and address in a timely
fashion specific concerns of workers about employment-related conditions and issues
Establish reporting and monitoring requirements appropriate for the level of risks and
impacts (e.g. notifications to UNDP, periodic performance reports, third party audits)
Evaluate effectiveness of contractor/subcontractor management
10
the US Department of State Country Reports on Human Rights Practices 8 , which covers labour rights; the US
Department of Labour International Child Labour and Forced Labour Reports 9, and the ITUC Global Rights Index. 10
The assessment will indicate the relevant laws and regulations applicable to the project. To the extent that provisions
of national employment and labour law satisfy the requirements of S7, the applicable party will apply national law
to the project. Where there are material gaps in national regulations compared to S7, the relevant S7 requirements
will apply in addition to national law and an action plan to achieve and maintain compliance with S7 may have to be
agreed with the partner, depending on the labour issues identified during the assessment.
8 https://www.state.gov/reports-bureau-of-democracy-human-rights-and-labor/country-reports-on-human-rights-practices/
9 https://www.dol.gov/agencies/ilab/resources/reports/child-labor
10 https://survey.ituc-csi.org/ITUC-Global-Rights-Index.html?lang=en
11
workforce of project activities. To the extent that provisions of national law and employer policies satisfy the
requirements of S7, these would be applied and the applicable party would not need to duplicate such provisions in
additional project-specific labor management procedures (e.g. an employer’s human resources policies may address
the terms and conditions elements of the LMP template). In other cases, particularly where national employment
law is not as developed, project-specific labour management procedures serve as an important tool to managing the
workforce in accordance with the S7.
The assessment should identify whether the applicable party (employer, contractor) has appropriate human
resources policies and OSH management procedures to address and manage identified labour risks and impacts and
to meet the S7 requirements. A management guidance for contractors and subcontractors (see Section 4.6.8) may
be necessary.
Examples of “red flags” indicating a lack of management capacity (and thus higher risks of S7 noncompliance) include:
• The employer does not have any human resources policies or procedures
• The employer does not have management systems for recording workforce information such as head count,
working hours, payments
• The employer has no OSH management system
• The employer employs significant numbers of workers and does not have a dedicated function responsible
for human resources, and/or occupational safety and health (OSH) (particularly for projects involving
construction)
• There is no log of workplace accidents/injuries/fatalities
• Accident/injury/fatality rates are significantly above industry average (may require focus on relevant
country/regional data)
• The project will involve multiple contractors and subcontractors (e.g. for construction) but does not have
systems in place to ensure that S7 requirements will be met by contractors
• The project will require a number of temporary worker accommodations
• There are a significant number of labour/employment-related court cases against the employer or labour
infractions
• The employer has been the subject of a labour-related complaint to an IFI/DFI complaint or accountability
mechanism (e.g. IFC CAO, FMO/DEG independent complaints mechanism)
• The employer has recently been the subject of industrial action (within 4 years)
• The employer has a history of not allowing trade unions or other form of worker representation at the
workplace
• The employer does not have experience implementing worker grievance mechanisms of any sort (e.g.
complaints box, formal grievance procedure, whistleblowing hotline)
• The employer cannot provide applicable government permits, has record for not paying government social
contribution, insurance, taxes, etc.
Lack of adequate management capacity would likely increase the level of labour risks identified at during the
screening process (see section 3 above). The more of the above indicators that are present, the greater the likelihood
of significant risks and non-compliance with S7.
On the other hand, the applicable party may have effective management systems or other risk-mitigating factors to
address potential labour risks and impacts. The following are examples of factors that may indicate such capacity.
The more that are present, the stronger the applicable party’s capacity to manage project-related labour issues:
Relevant human resources policies and procedures and OSH management system are in place which respond
to risk characteristics, with evidence of implementation
12
Designated human resources and occupational health and safety staff, with evidence of training and
appropriate competencies
Management systems for recording payroll (including the correct calculation of overtime), working hours,
worker age, or other aspects of the employment relationship
Workers orientation/induction program carried out that explain human resources policies and OSH
management
There is a culture that supports health and safety and health and safety observations (positive and negative)
are encouraged without retribution
Workplace accidents/injuries/fatalities/near misses are logged. When they occur, a root cause analysis is
undertaken and corrective actions are taken. Rates are below industry average and show a downward trend
Evidence of good social dialogue: employer engagement with independent trade unions represented at its
workplace(s); a Collective Bargaining Agreement covering all or a large majority of the workforce is in place
Worker grievance mechanism in accordance with S7 is accessible to the direct workforce (and third-party
workers where relevant), with a formally documented procedure, evidence that grievances are logged and
addressed in a timely manner
Workplace training and procedures address risks of gender-based violence (e.g. codes of conduct), including
referral pathways for survivors
Adequate contractor management system in place to ensure project contractors meet S7 requirements
Security personnel have received training in the Voluntary Principles of Security and Human Rights, 11 is
unarmed, has been vetted, and will be monitored. The use of force by security personnel is contractually
restricted
Supply chain management system, including mapping/periodical audits/monitoring is undertaken for key or
high risk suppliers, with attention to child labour, forced labour and health and safety threats
A recent independent labour and OSH audit has found the workplace to be substantially in compliance with
national law and S7.
11 For more information, see Voluntary Principles on Security and Human Rights.
13
• consult with trade unions or other workplace representatives over the proposed redundancies on measures
to avoid or reduce redundancies, the method of selection and mitigating the effects, integrating outcomes
into the final restructuring plan.
• ensure that the criteria for selection for redundancy are objective, fair and transparent and aim to be
gender-neutral; and implement a procedure which provides individuals with the right to challenge their
selection
• ensure that all outstanding back pay, social security benefits and pension contributions and benefits are
paid to those affected by retrenchment in a timely manner
• provide support for knowledge- and skills-training for workers to transition to other employment.
• notify UNDP at least one month in advance of the implementation of all redundancies, and in the case of
large-scale redundancies, also provide the UNDP with a copy of the restructuring plan in advance of any
dismissals.
12 Employers are free to offer terms and conditions that go beyond the minimum required by law, and many do.
14
Project workers need to be informed of the terms and conditions of their employment. This documentation should
be appropriate and relevant to the length and nature of the employment or engagement. For example, a public
notice of the job to be done, the number of hours, pay, and other key terms and working conditions may be adequate
provided copies of such information are available at the request of the project workers.
For longer-term employment, the material terms of the employment relationship are documented in more detail,
and a copy of the documentation (for example, the signed contract) should be provided to the project worker. In
many countries, individual contracts are a legal requirement and need to reflect national labour, employment and
social protection laws.
Where written contracts are not a statutory Box 1. Content of Terms and Conditions
requirement, S7 requires that applicable parties Information provided to workers at the start of employment
is normally covered by relevant provisions of national law.
provide a minimum level of documented information to
Documents and contracts include information on the
the employee on the terms and conditions of their following, as appropriate:
employment. This information should cover the areas,
• worker’s name, title of the position and brief job
where relevant, highlighted in Box 1, and the description
employer’s human resources policies should clearly • place of work
commit the employer to provide all workers with this
• start date of employment and, if not permanent
information. duration of contract and date of project completion
Employers should ensure that workers are familiar with • wages and remuneration (including the form and
and understand their terms and conditions of frequency of pay)
employment and any benefits. Any material changes to • benefits, pension and other welfare arrangements
applicable to the worker
the terms and conditions of employment need to be
consistent with national law. • employment injury benefits and remedies (e.g.
insurance arrangements)
Information on employment terms and conditions • working hours, rest breaks, leave entitlements, and
should be provided to project workers at the beginning other related matters
of the working relationship and when any material • provisions regarding housing, accommodation, food,
changes to the terms or conditions of employment or transportation and payment required, if any
engagement occur. The terms and conditions need to • overtime arrangements, including conditions for
be clear and understandable and provided in the overtime and compensation
language(s) spoken by the workforce; this is particularly • leave entitlements (such as for illness, parental leave,
important in workplaces that have large numbers of family leave, or holiday)
migrant workers. Varying levels of literacy among the • policies and guidelines on the respect of core labour
workforce need to be considered and oral (and if standards
appropriate, pictorial) communication and explanation • HR procedures for termination of the employment
contract, including notice requirements and severance
of working conditions and terms of employment are
important where project workers do not read or have • applicable disciplinary procedures that include list of
violations and category of penalties
difficulties understanding the documentation.
• details of grievance procedures (including for
Project workers should receive written notice of harassment and bullying)
termination of employment and details of severance • collective bargaining arrangements that apply to the
payments in a timely manner as required by national worker, and details of relevant trade union represented
law or human resources policies. Terminations need to at the workplace.
be carried out in a non-discriminatory manner and,
when applicable, after consultation with workers or their trade union. All wages and earned benefits need to be paid
on termination. Where national law mandates the transfer of certain payments to specific third parties for the
benefit of the worker (for example, government agencies or institutions such as a pension fund administration or
health funds), the worker is provided with written evidence of such payment.
15
4.6.2 Non-discrimination and equal opportunity
S7 paras. 9-12 set out requirements regarding the nondiscrimination and equal opportunity in employment of
project workers, including but not limited to the following (refer to the full S7 text):
Ensure decisions regarding employment are not made on basis of personal characteristics unrelated to
inherent job requirements
Ensure no discrimination in respect to any aspects of the employment relationship
Ensure women and men receive equal remuneration for work of equal value
Set out measures to prevent and address violence,
harassment, intimidation or exploitation, Box 2. Some exceptions to nondiscrimination
including any form of gender-based violence requirements
• Distinctions based on the inherent requirements of
Adopt appropriate measures to protect and assist the particular job or task is permissible, although this
vulnerable project workers (e.g. women, persons exception should be applied narrowly. For instance,
with disabilities, migrant workers, young workers) an employer may not be able to hire a worker with a
disability if this would lead to a real risk to the health
Discrimination involves treating people differently on the or safety of the worker (or others) and it is not
basis of a personal characteristic that is unrelated to their reasonably possible for the employer to make an
ability to do the job. Prohibited grounds of discrimination adjustment to the workplace to enable the worker to
perform the job safely.
typically include gender, race, nationality, political opinion,
• Measures to address specific needs of certain
affiliation to a union, ethnic, social or indigenous origin,
workers may be permissible under international law
religion or belief, marital or family status, disability, age, (such as maternity protection for women) or under
sexual orientation or gender identity. national laws designed to meet the needs of persons
who are generally recognized to require special
Non‐discrimination measures need to apply to all workers. protection or assistance (such as preferential
Applicable parties need to ensure that there is no treatment of women in hiring in order to remedy the
discrimination with respect to any aspects of the effects of past discrimination).
employment relationship, such as recruitment and hiring, • In some countries there is legislation that prohibits
compensation (including wages and benefits), working women from doing certain types of work (such as
conditions and terms of employment, access to training, heavy lifting, hazardous work or night work).
job assignment, promotion, termination of employment or However, employers should not use this as a reason
to impose other ‘protective’ measures for women
retirement, or disciplinary practices. As noted, women and that limit their access to jobs and professional
men shall receive equal remuneration for work of equal development.
value.
Discrimination can occur in the workplace in various ways. For example, recruitment of project workers may impose
requirements that are not necessary for a job but may result in excluding a specific group. It can relate to decisions
on how much to pay a project worker, for example, a female or migrant project worker. Discrimination can also
occur in training and development, where selection may be based on criteria that are discriminatory. It can relate to
termination of employment, where a specific group may be disproportionately affected, for example, based on
considerations relating to age or gender. Finally, it can arise with respect to inappropriate treatment or harassment
of project workers related, for example, to gender, age, disability, ethnicity, or religion.
Equal opportunity is the principle of basing all employment decisions, such as hiring and promotion, on the ability
of a person to perform the work, without regard to personal characteristics that are unrelated to the inherent work
requirements (understood as genuine occupational qualifications that are necessary to perform the work).
Discrimination impairs or nullifies equality of opportunity or treatment in employment.
The extent to which national law supports implementation of the principles of equal opportunity and fair treatment
should be assessed by qualified labour experts and documented in the project’s Labour Management Procedures.
This assessment will identify measures that support equal opportunities for women and men, with emphasis on
16
equal criteria for selection, remuneration, and promotion, and equal application of these criteria. If migrant workers
are engaged by the project, the responsible partner implements appropriate measures to prevent any discriminatory
treatment of them.
Persons with disabilities. The assessment should consider, to the extent technically and financially feasible,
reasonable measures to adapt the workplace in relation to project workers with disabilities. Measures that address
working conditions, accessibility of the built environment, and communication of information for project workers
with disabilities include, for example, the provision of wheelchair ramps or elevators, or alternative formats of
communication, such as large print, Braille, accessible digital formats, or audio tape. Specific project measures would
be included in the Labour Management Procedures. It is important to make information about these measures
available to disabled workers.
People with defined disabilities may require reasonable accommodations. 13 When considering changes to physical
aspects of the workplace, the extent and cost of such changes are important factors in determining the suitability
and reasonableness of proposed measures. Such modifications are made when they are necessary and appropriate
to permit workers with disabilities to operate in the workplace. Appropriate expertise may help to identify measures
that minimize cost or disruption while still meeting the objectives of access or protection.
Measures to address vulnerabilities and to prevent harassment, intimidation, and exploitation. Where allowed by
national law, the applicable party may implement specific measures that provide for preferential treatment of
individuals or groups of project workers who have certain vulnerabilities or have been the subject of prior
discrimination or disadvantage (“affirmative action”). Such measures could include training, management schemes,
targeted outreach for recruitment, or financial assistance for specific individuals or groups. These and other
measures should not be deemed as discrimination. See Box 2. Such measures may be necessary only for specific
periods of time, depending on the worker’s circumstances and the nature of the vulnerability.
Harassment should not be tolerated in the workplace. It is often based on prohibited grounds for discrimination and
may include sexual harassment, bullying, intimidation or exploitation. Employers are responsible for providing a safe
and healthy work environment. Examples of harassment include:
• telling insulting jokes about particular racial groups
• sending explicit or sexually suggestive emails or text messages
• displaying racially offensive or pornographic posters or material on computers
• making derogatory comments or taunts about someone’s race, nationality or origin.
Sexual harassment includes any unwelcome sexual advance, request for sexual favour or other verbal, non-verbal
or physical conduct of a sexual nature that unreasonably interferes with work, alters or is made a condition of
employment, or creates an intimidating, hostile or offensive work environment. It is an extremely serious issue that
is often under‐reported but should not be ignored or underestimated.
UNDP ensures that contracts with project-employers, contractors, and suppliers include clear provisions regarding
non-discrimination and prevention of sexual harassment and sexual abuse.14 Employer policies and/or the labour
management procedures should ensure that:
13Article 2 of the Convention on the Rights of Persons with Disabilities defines reasonable accommodations as “[n]ecessary and
appropriate modification and adjustments not imposing a disproportionate or undue burden, where needed in a particular
case, to ensure to persons with disabilities the enjoyment or exercise on an equal basis with others of all human rights and
fundamental freedoms.”
14UNDP’s General Terms and Conditions for Contracts (Rev. Sept. 2017) requires all contractors to take all appropriate
measures to prevent sexual exploitation or abuse of anyone by its employees or any other persons engaged and controlled by
the Contractor to perform any services under the Contract (para. 35.2).
17
• non-discrimination and equal opportunity policies/provisions explicitly prevent harassment, intimidation
and bullying in the workplace. These policies need to be clearly communicated and accessible to
management, supervisors and workers, and managers and supervisors need to be trained on how to apply
the policies consistently and to deal with such cases in case they occur and include a referral pathway for
survivors. In order to clearly convey the message that harassment is unacceptable, employers should
consider having a stand-alone anti-harassment policy. Workplace codes of conduct should also be
considered.
• workplaces/sites are monitored to identify and quickly address any form of harassment.
• worker grievance mechanisms (see below section 4.6.7) are sufficiently discreet to allow employees to voice
concerns confidentially, and adapted to effectively deal to receive complaints for cases of sexual
harassment. It is also good practice to have both a male and female staff member available for receiving
and processing grievances so that employees can choose whom they would be most comfortable speaking
to.
Comply with national laws that recognize workers’ rights to form and to join workers’ organizations of their
choosing and to bargain collectively without interference
Where national law restricts workers’ organizations, do not restrict project workers from developing
alternative mechanisms to express grievances and to protect their rights
Ensure there is no discrimination or retaliation against workers to participate in workers’ organizations
It is important to keep in mind that the rights of workers to form unions or other workers’ organizations of their own
choosing and to bargain collectively with their employers apply in all 187 member countries of the ILO, regardless of
whether the country has ratified ILO Conventions 87 and 98.15 However, while many countries recognize and reflect
these rights in their national legislations, others restrict them.16
A workers’ organization is any organization of workers for the purpose of furthering and defending their interests,
in particular with regard to working conditions and terms of employment. Workers’ organizations can be called by
different terms in different countries, for example, trade unions, labor unions, or workers’ associations. They are
usually formed and organized by workers, and should operate without outside control or interference. Workers’
organizations should be representative of the workforce and operate pursuant to the principles of fair and
reasonable representation of workers and their interests in the context of the project.
Collective bargaining consists of discussions and negotiations among employers, employers’ organizations, and
workers’ organizations for the purpose of determining wages and other working conditions and terms of
employment by joint agreement. It also includes instructions on the implementation and administration of any
agreements that may result from collective bargaining and the resolution of issues and grievances that arise in the
employment relationship with respect to workers represented by the workers’ organization. Collective bargaining
can take place in different ways, depending on the country and industry sector. Many countries have multilevel
bargaining systems, which may include company, sectoral, and national levels.
18
The assessment and Labour Management Procedures should identify issues regarding possible restrictions on
worker’s freedom of association and collective bargaining.
Where national law recognizes the worker’s rights to form and to join workers’ organizations of their choosing,
project workers must not be discouraged from, or discriminated or retaliated against, for forming or joining (or
attempting to form or join) such organizations. Examples of discrimination or retaliation against workers who
participate, or seek to participate, in workers’ organizations and collective bargaining or alternative mechanisms
include an employer’s refusal to hire project workers who have been members or leaders of workers’ organizations
at other firms (for reasons unrelated to qualifications or job performance), dismissing, demoting, or reassigning such
project workers, or outsourcing or modifying the delivery of work, in response to worker organizational activities.
Where workers’ freedom of association and/or collective bargaining are prohibited or restricted under national law,
the applicable parties should engage with workers to address issues relating to their working conditions and terms
of employment. Applicable parties must not restrict workers from developing alternative mechanisms to express
their grievances and protect their rights regarding working conditions and terms of employment. These may include
recognizing worker committees and allowing workers to choose their own representatives for dialogue and
negotiation on terms and conditions of employment in a manner that does not contravene national law. Responsible
parties should not seek to influence or control these alternative mechanisms and should not discriminate or retaliate
against workers who participate, or seek to participate, in such workers’ organizations and collective bargaining or
alternative mechanisms.
17 See the Forced Labour Convention, 1930 (No.29), as well as the Protocol of 2014 to the Forced Labour Convention.
19
payments or benefits to achieve the consent of a person having control over another person, for the purpose of
exploitation. Women and children are particularly vulnerable to trafficking practices.
Modern slavery is an umbrella term that covers forced labour, human trafficking, slavery and servitude. It is
estimated that over 40 million people, mostly women, are living in situations of modern slavery in the world today,
of whom 24.9 million people are estimated to be in conditions of forced labour, including 16 million people in the
private sector. Modern slavery disproportionately impacts women who are thought to make up 71% of all modern
slavery victims.18
The risk of forced labor may be higher for certain types of projects and categories of project workers. This could be
the case, for example, where projects are located in remote places or the status of migrant workers is uncertain.
A risk assessment is the first step in detecting and preventing forced labour in projects and the supply chain, with
particular attention given to high-risk countries and sectors where forced labour is known to occur.19 S7 requires
that where cases of forced labour are identified, immediate steps must be taken by the applicable parties to correct
and remedy them.
As noted above, forced labour can take many different forms, including the following:
• Coercion in employment leading to forced labour can include: withholding, delay or non-payment of wages;
the retention of passports or other identity documents; threats to denounce a worker to the authorities;
threats of dismissal or other penalty to force workers to work overtime; locking-in of workers at the
workplace or accommodation.
Migrant workers are vulnerable to exploitation, particularly if they have no valid work permit or
employment contract, or are in breach of the terms of their visa. Often migrant workers are hired through
a recruitment agent, who may use the coercive practices described above. If trafficked workers are charged
recruitment fees this may result in debt bondage.
• Debt bondage can arise where a worker takes a loan or wage advance from an employer or labour broker
so that they can pay excessive recruitment and processing fees. The size of the loan means that the worker
is unable to pay off the loan and is effectively trapped. A similar debt trap can occur if workers are charged
exorbitant fees for accommodation, work clothes/equipment, etc.
• Prison labour carried out by prisoners for the benefit of private companies is considered forced labour
where voluntary consent is not provided and equivalent wages and conditions of employment to those
enjoyed by non-prisoners carrying out similar work are not provided.
18 CDC Group, IFC, EBRD, DIFD, Managing Risks Associated with Modern Slavery: A Good Practice Note for the Private Sector
(2018), p. 15, at https://www.ifc.org/wps/wcm/connect/topics_ext_content/ifc_external_corporate_site/sustainability-at-
ifc/publications/publications_gpn_modernslavery.
19US Department of Labor, List of Good Produced by Child or Forced Labor, at
https://www.dol.gov/agencies/ilab/reports/child-labor/list-of-goods.
20
Ensure that workers remain at all times in possession of their original passports, visas and other identification
documents. Employers should provide workers with individual secure storage facilities for their documents if
appropriate (e.g. for temporary migrant workers who may not live in securely lockable housing).
Ensure that workers are free to leave the worksite and accommodation, subject only to appropriate security or
logistical restrictions where necessary.
Ensure that any non-cash benefits (such as accommodation) are valued appropriately and do not impose a
substantial financial burden on workers.
Do not use prison labour except in exceptional circumstances and only with guarantees that it is voluntary (for
example, formal written consent from the prisoner) and such labourers are paid and treated the same as non-prison
workers.
Ensure that overtime is within the limits imposed by national legislation and is not imposed by using threats,
including the threat of dismissal.
A range of measures should be taken to avoid the use of forced labour in UNDP-supported projects (see Box 3).
Where cases of forced labour are identified, immediate steps must be taken to correct and remedy them. Employers
must refer any cases of forced labour discovered in the project’s workforce to relevant government authorities and
support services, as appropriate, to be addressed in accordance with national law. If national law is inadequate to
effectively regulate and implement prohibitions against forced labour, this risk should be flagged as part of the
assessment and the Labour Management Procedures (see Annex 1) should set out measures to address incidents of
forced labour and remedy the situation.
21
International standards on the employment of minors are set out in two international conventions established by
the International Labour Organization (ILO). These are Convention No. 138 (Minimum Age) and Convention No. 182
(Worst Forms of Child Labour). The ILO standards identify age groups for which different forms of economic activity
(work) are acceptable (see Box 4). The key age is 15, which is established as the prevailing norm worldwide for
admission to employment. However, it is important to note that national legislation may set a higher threshold,
which typically coincides with the end of compulsory schooling. The most stringent standard should be applied.
Not all work done by children should be Box 4. Minimum age for work according to ILO standard
classified as child labour that is to be targeted Age group Forms of permissible economic activity (work)
for elimination. Children’s or adolescents’
0-12 years None
participation in work that does not affect their
health and personal development or interfere 13-14 years* ‘Light work’ only,** not formal employment
with their schooling is generally regarded as 15-17 years All work except ‘hazardous work’
being something positive. This includes
activities such as helping their parents around 18 years and over All work
the home, assisting in a family business or * Check national legislation for higher thresholds
earning money during school holidays. These ** National laws may permit children aged 13 or 14 years to engage in
kinds of activities contribute to children’s ‘light work’ outside school hours or during school holidays, as long as it
development and to the welfare of their does not affect their development or schooling. A practical rule of
families; they provide them with skills and thumb is that ‘light work’ is not more than two hours per day or twelve
hours per week
experience, and help to prepare them to be
productive members of society during their adult life.
Light work. National legislation should determine which activities can be considered light work and prescribe the
number of hours and conditions in which these light work activities may be undertaken. For many countries, work
below the age of 15 is not allowed. ILO Convention No. 138 allows children to perform light work from 13 years (see
Box 4), as long as the work does not fall under the scope of the worst forms of child labour (see below) and does not
interfere with the child’s education and physical and mental development. In agriculture, for example, light work
might be work near the children’s home, under the supervision of the parents and physically not demanding – for
example, chicken-raising at household level.
Age-appropriate tasks. While child labour is by definition unacceptable, there are age-appropriate tasks that are
not harmful to children and can even be beneficial. These tasks do not interfere with the child’s education, they are
physically appropriate to the child’s development and allow sufficient time for recreation and leisure. For example,
the weight of a load carried by a child must be suitable for the child’s stage of physical development. Especially in
the context of family-based economic activities, some participation by children may be regarded as positive, since it
contributes to the intergenerational transfer of skills and children’s food security. Age-appropriate tasks become
“child labour” when children are (a) too young for the work they are undertaking; (b) work too many hours for their
age; (c) undertake work of a hazardous nature or in hazardous conditions; (d) work under slave-like conditions; or
(e) are obliged to undertake illicit activities.
Worst forms of child labour. ILO Convention 182 requires States to take immediate and effective measures to secure
the prohibition and elimination of the worst forms of child labour as a matter of urgency (Art. 1). The Convention
states (Art. 3) that the term the “worst forms of child labour” comprises:
a. all forms of slavery or practices similar to slavery, such as the sale and trafficking of children, debt bondage
and serfdom and forced or compulsory labour, including forced or compulsory recruitment of children for
use in armed conflict;
b. the use, procuring or offering of a child for prostitution, for the production of pornography or for
pornographic performances;
c. the use, procuring or offering of a child for illicit activities, in particular for the production and trafficking of
drugs as defined in the relevant international treaties;
22
d. work which, by its nature or the circumstances in which it is carried out, is likely to harm the health, safety
or morals of children (referred to as hazardous work, see below).
Hazardous work. Even when children are above the national minimum age of employment, their work can still be
classified as “child labour” if it involves hazardous conditions. Hazardous child labour is the largest category of the
worst forms of child labour with (as of 2016) an estimated 73 million children, aged 5-17, working in dangerous
conditions in a wide range of sectors, including agriculture, mining, construction, manufacturing, as well as in hotels,
bars, restaurants, markets, and domestic service.20
ILO Convention 182 also calls on national governments to define hazardous work and to set out a list of jobs that are
prohibited for children under 18. Guidance for governments on some hazardous work activities which should be
prohibited is given by Article 3 of ILO Recommendation No. 190 :
• work which exposes children to physical, psychological or sexual abuse;
• work underground, under water, at dangerous heights or in confined spaces;
• work with dangerous machinery, equipment and tools, or which involves the manual handling or transport
of heavy loads;
• work in an unhealthy environment which may, for example, expose children to hazardous substances,
agents or processes, or to temperatures, noise levels, or vibrations damaging to their health;
• work under particularly difficult conditions such as work for long hours or during the night or work where
the child is unreasonably confined to the premises of the employer.
It is important to check the national definition of hazardous work, the content of any list of hazardous work and any
restrictions on the type of work that can be carried out by children under 18 (such as in relation to work at night, or
overtime work).
There are a number of practical steps (see Box 5) that applicable parties can take to ensure that it has the appropriate
policies and procedures in place to comply with UNDP’s requirements. These also apply to third-party contractors
and labour providers, a particular risk in the context of construction activities.
23
The Labour Management Procedures should identify potential risks of child labour in the project context and, where
indicated, outline appropriate measures (see above) that seek to avoid it. Where instances of child labour are
uncovered in project activities, S7 (para. 19) requires that applicable parties take immediate steps to correct and
remedy them, including rehabilitation and social integration of the child as necessary.
Employers should refer any cases of child labour discovered in the project’s workforce to relevant government
authorities and support services, as appropriate, to be addressed in accordance with national law. If national law is
inadequate to effectively regulate and implement prohibitions against child labor, the Labour Management
Procedures (see Annex 1) needs to set out measures to address incidents of child labor and remedy the situation.
Response measures require specific knowledge of the circumstances and types of identified child labour. Simply
dismissing any child workers (who may be allowed to perform light work) may not be the answer. Context-specific
response measures should be developed and identified in the LMP. In any event, immediate intervention is required
to protect any child workers found to be engaged in any of the worst forms of child labour, including hazardous work.
Such child workers should be promptly removed from such working conditions and provided interim care and
support, including ,as noted earlier, rehabilitation and social integration of the child as necessary.
For the agriculture sector, FAO’s Handbook for monitoring and evaluation of child labour in agriculture (2015) is an
important resource for designing, assessing and monitoring projects that need to address the risks of child labour in
agricultural production and pastoral activities.
21
Additional guidance on the management of OSH issues according to Good International Industry Practice is provided in the
World Bank Group Environmental, Health and Safety Guidelines (EHS Guidelines), both general and by industry sector.
22ILO Guidelines on Occupational Safety and Health Management systems, 2001. See also United Nations Common System
Occupational Safety and Health Framework, Chief Executives Board, 31 March 2015
23 ISO 45001 at https://www.iso.org/iso-45001-occupational-health-and-safety.html.
24
o eliminating the hazard
o controlling the hazard at its source
o minimizing the hazard
o providing appropriate personal protective equipment
• document, investigate and report all accidents and occupational diseases, their causes, and implement
appropriate corrective actions
• support the submission of safety observations (positive and negative) without retribution
• develop incentive programs to promote safety culture at the project and implement disciplinary actions to
violators.
OSH Management is typically a distinct function with dedicated specialist staff, policies and processes, separate
from human resources management. In small businesses, responsibilities for OSH and environmental matters are
sometimes combined.
OSH is an area where collaboration between workers and management is particularly beneficial, and in some
countries even mandated by law. A number of methods can be used to collaborate and consult with project workers
regarding OSH, and to facilitate an awareness and understanding of, and support for, OSH requirements. These
include, for example, inviting project workers to appoint safety officers or representatives, or forming health and
safety committees to support collaboration in achieving safety and effective communication of information, workers’
listening tours, HSE (health, safety, environment) campaigns, etc. In designing and implementing these methods, it
is important to consider the experience of the project workers, their level of knowledge, their familiarity with OSH
requirements, and the languages in which they communicate.
Hazard identification. Hazards may arise from materials (for example, chemical, physical, and biological substances
and agents), environmental or working conditions (for example, working at heights or in confined spaces, excessive
hours of work, night work, mental or physical factors, oxygen-deficient environments, excessive temperatures,
improper ventilation, poor lighting, faulty electrical systems or trenches), or work processes (for example, tools,
machinery, and equipment).
The project’s environmental and social assessment needs to identify potential OSH risks related to supported
employment activities. Employers of project workers should undertake a comprehensive job safety or job hazard
analysis to assess OSH risks and demonstrate that appropriate OSH measures are incorporated into the design and
implementation of the project to prevent and protect workers from occupational injuries and illness. This would
typically be encompassed and implemented through the applicable party’s occupational safety and health
management system. The relevant sector-specific Environmental Health and Safety Guidelines of the World Bank
Group should be utilized.
Hazard avoidance and control. Avoiding or eliminating sources of hazards is the first priority rather than simply
addressing the hazard through preventive and protective measures such as personal protective equipment. However,
when this is not feasible, appropriate control and protective measures need to be included in the project’s OSH
measures, such as controlling the hazard at its source through the use of protective solutions (for example, exhaust
ventilation systems, isolation rooms, machine guarding, acoustic insulation), and providing adequate personal
protective equipment at no cost to the project worker.
Project sites need to provide adequate first aid facilities and relevant training. Protective measures would include
hazard labeling in languages understandable to the project workers, and training and equipment to prevent
occupational exposure to hazardous materials. Further details are set out in the WBG EHS Guidelines.
Some OSH risks may be specific to female workers. It is recommended to include a balanced representation of
women on OSH committees to help design policies and practices responding to the needs of female project workers.
25
Training. All project workers (including those employed by contractors and subcontractors) should receive OSH
training at the start of their employment or engagement, and thereafter on a regular basis and when changes are
made in the workplace, with records of the training kept on file. Training should cover the relevant aspects of OSH
associated with daily work, including the ability to stop work without retaliation in situations of imminent danger
and emergency arrangements. Training should also include specifics as to health issues endemic to the area workers
could be exposed to and where to access testing and
treatment services. Training records should include a Box 6. Elements contained in workplace/site emergency
description of the training provided, the number of and response plans
hours of training provided, training attendance records, Emergency plans should address the following aspects of
and results of evaluations. Where project workers carry emergency preparedness and response:
out potentially hazardous activities, more specific • Identification of the emergency scenarios
training may be appropriate. In industries where it is • Specific emergency response procedures
recognized that activities can be highly hazardous, for • Emergency contacts and communication
example, in the construction or chemicals industry, systems/protocols
managers should be provided with specific training and, • Procedures for interaction with government
where appropriate, required to achieve accreditation. It authorities (emergency, health, environmental
is important for OSH briefings to be conducted for all authorities)
visitors and other third parties accessing the project • Permanently stationed emergency equipment and
facilities (e.g., first aid stations, firefighting equipment,
site.
spill response equipment, personal protection
Services and accommodations. Services provided to equipment for the emergency response teams)
project workers (for example, canteen facilities, nursing • Protocols for the use of the emergency equipment and
facilities, or a camp store on a construction site), facilities
whether directly or through a contractor, will be • Clear identification of evacuation routes and muster
provided in a nondiscriminatory manner, and comply points
with national law and these requirements, particularly • Emergency drills and their periodicity based on
assigned emergency levels or tiers
in relation to quality, security, and safety. Where there
are charges to project workers for such services, these • Decontamination procedures and means to proceed
with urgent remedial measures to contain, limit and
should be reasonable with reference to local market reduce pollution within the physical boundaries of the
prices and, unless the context of the project makes it project property and assets to the extent possible
necessary, project workers are not required to use the • Establish protocols for emergency control of
services. pandemics and other communicable illnesses
Where employers provide accommodation for project
workers, the accommodation shall be appropriate for its location and be clean, safe and, at a minimum, meet the
basic health and safety needs of workers. The IFC/EBRD guidance note on workers’ accommodations should be
followed. 24
In particular, the provision of accommodation needs to meet national legislation and international good practice in
relation, but not restricted, to the following: the provision of minimum amounts of space for each worker; provision
of sanitary, laundry and cooking facilities and potable water; the location of accommodation in relation to the
workplace; any health, fire safety or other hazards or disturbances and local facilities; the provision of first aid and
medical facilities; and heating and ventilation. Workers’ freedom of movement to and from the employer-provided
accommodation shall not be unduly restricted. For projects involving multiple temporary accommodations an audit
system should be implemented to ensure conformance to international OSH standards for worker accommodations.
Emergencies. Whereas off-site impacts of emergencies on surrounding communities are largely covered in Standard
3 on Community Health, Safety and Security, S7 addresses the OSH (on-site) aspects of emergencies. An effective
24 See IFC/EBRD, Workers’ Accommodation: Process and Standards – A Guidance Note by IFC and EBRD (2009).
26
emergency preparedness and response plan is essential to help the applicable party prepare for the best outcomes
while assuming the worst possible scenarios.
As part of the preparation it is essential to understand the local area’s emergency preparedness and response
capacity. The plan should define clearly assigned responsibilities for the assessment of risks to life, property and
environment, with procedures on who and with whom to communicate regarding different types of emergencies.
The level of planning and communication should be commensurate with the potential impacts. The plan should
define specific procedures designed based on the emergency level classification (emergency tiers). Procedures for
shutting down equipment and production processes and for evacuations, including a designated meeting place (i.e.
muster point) outside the project site, should be part of the emergency preparedness and response plans. See Box
6.
In emergency situations, it is important that both project workers and the community understand their roles and
responsibilities. The responsible party should communicate with other parties who may be involved in prevention,
preparedness, and response arrangements, for example, local authorities and services, so that they understand their
roles and responsibilities and can identify and mobilize the resources that may be required. If resources are
inadequate, the project, depending on the risk scenarios, may need to support this aspect. See also the emergency
preparedness/response provisions of S3.
Documenting, reporting, investigating, remedy. A system for reviewing and responding to identified hazards and
risks normally includes a procedure for documenting specific incidents such as project-related occupational injuries,
illnesses, and lost-time accidents. The responsible party maintains such records, and requires all third parties and
primary suppliers to maintain them. Such records form an input into the regular review of OSH performance and
working conditions and other actions.
Workplace mechanisms need to be made available for workers to report work situations that they believe are not
safe or healthy and to remove themselves from a work situation they have reasonable justification to believe
presents an imminent and serious danger to their life or health. Workers who remove themselves from such
situations should not be required to return to work until necessary remedial action to correct the situation has been
taken. Retaliation against workers who raise health and safety concerns is prohibited.
In the event of an occupational fatality or serious injury, the applicable party (e.g. employer, contractor)
reports to UNDP as soon as becoming aware of the fatality or serious injury, and informs government
authorities in accordance with national reporting requirements. Similar reporting obligations need to apply
to third parties and primary suppliers (reporting to the applicable party).
In case of a project-related incident or accident, corrective actions must be identified and implemented, including
where appropriate by third parties, including contractors. The relevant party may conduct and upon request, share
with UNDP a root cause analysis, to be used as the basis for designing and implementing further corrective actions.
Employment injury benefits and/or remedies for adverse impacts such as occupational injuries, disability, ill health
or disease and death must be provided (S7, para. 20f). This includes:
• having the necessary insurance arrangements that ensure access to health benefits and replacement of loss
of earnings in case of a work-related injury, namely in case of death or an illness due to work. The right to
protection against employment injury is enshrined in international human rights law 25, and most countries
have legislation on employment injury benefits (typically as part of social security legislation) that either
requires employers to contribute to a public compensation fund or to take out private employers liability
insurance.
25 Universal Declaration of Human Rights (UDHR), 1948; International Covenant on Economic, Social and Cultural Rights
(ICESCR), 1966; ILO Conventions 102 (Social Security – Minimum Standards) and 121 (Employment Injury Benefits Convention).
27
• facilitating the compensation payment if an accident occurs. This may mean, e.g. immediately notifying the
competent authority of the accident or filing an insurance claim.
In case of projects with a high risk of serious injuries or fatalities, UNDP staff should review relevant national
legislation26 and if compensation levels are found to be grossly inadequate, a supplementary compensation policy
should be agreed with the applicable party.
26 The ILO has developed an assessment tool that can be used when reviewing legislation :
https://www.ilo.org/global/topics/geip/publications/WCMS_712248/lang--en/index.htm. More information on employment
injury protection is available at https://www.ilo.org/global/topics/geip/lang--en/index.htm.
27UNDP, Prevention and Response to Sexual Misconduct. UNDP OAI provides an online referral form, worldwide telephone
numbers, an email address ([email protected]) and mail address to report sexual misconduct.
28
Workplace grievance mechanisms need to be accessible to all direct and contracted workers, taking into account
their different characteristics, for example, female workers, migrant workers, or workers with disabilities. Where
appropriate, consideration can be given to allowing concerns to be raised anonymously and/or to a person other
than an immediate supervisor, and to allow complainants to be accompanied to meetings by a co-worker or trade
union representative of their choice.
Workplace grievance mechanisms do not replace or impede access to other judicial or administrative remedies
that might be available under the law or through existing arbitration procedures.
Grievance mechanism for sexual harassment. To protect workers from all forms of harassment, employers should
(i) have a clear policy against harassment, including sexual harassment, and (ii) ensure that their workplace grievance
mechanism is adequate for complaints against harassment. Confidentiality, discretion and non‐retribution are
particularly important for cases of sexual harassment, as well as the ability to lodge grievances anonymously. Victims
of sexual harassment may feel too intimidated to lodge a grievance in person. Gender should be taken into
consideration and it is good practice to have a male and female staff member available to receive and process
grievances, so that employees can choose to whom they wish to speak.
It may be necessary to have a stand-alone policy and procedure (including a code of conduct) for sexual
harassment.28 An effective sexual harassment complaints procedure:
• conveys the message that the employer takes all cases of harassment seriously and is able to prevent
harassment
• enables the complainant to report harassment to the most appropriate point of contact – preferably
anonymously – from a choice of management liaison points and, wherever possible, enables the
complainant to report harassment to a supervisor or manager of the same sex.
• ensures that complaints are dealt with consistently and within a specified period of time
• alerts an employer to patterns of unacceptable conduct
• highlights the need for prevention strategies in particular areas.
Ascertain that contractors/third parties are legitimate and reliable entities with appropriate policies,
processes and systems to operate in accordance with the S7 requirements
28UNDP’s General Terms and Conditions for Contracts (Rev. Sept. 2017) requires contractors to take all appropriate measures
to prevent sexual exploitation or abuse of anyone by its employees or any other persons engaged and controlled by the
Contractor to perform any services under the Contract (paras. 35.1-2)
29
Manage and monitor performance of contractors/third parties, including incorporation of S7 requirements
into contracts (and in subcontracting arrangements)
Provide contractor workers with access to grievance mechanism
The applicable party needs to develop and implement contractor management procedures to manage and monitor
performance of third parties who engage workers in association with the project. Most national laws address
contract labor, though the terms vary widely among countries and types of contract labor. A management guidance
matrix for contractors and subcontractors may be necessary.
Non-compliance by contractors with S7 Box 7. Assessing third parties
requirements is a significant project risk, Depending on the nature of the project and the potential risks and
particularly in high-risk sectors and when there are impacts, information provided by the third party or otherwise
obtained may include:
multiple layers of sub-contracting. To minimize this
• Information in public records, for example, corporate
risk, the following steps should be taken:
registers and public documents relating to violations of
(a) The specific labor risks and impacts associated applicable labor law, including reports from labor
with the work being contracted out should be inspectorates and other enforcement bodies;
identified by UNDP staff at project screening or, if • Business licenses, registrations, permits, and approvals;
this is not possible, during assessment. If • Documents relating to a labor management system, including
procurement of works is planned in a later phase of OSH issues
the project the applicable party will need to assess • Identification of labor management, safety, and health
personnel, their qualifications and certifications;
associated labour risks and impacts before drafting
tender documents. • Workers’ certifications/permits/training to perform required
work;
(b) If procurement of works is part of the project, • Records of safety and health violations and responses;
the applicable party should Incorporate in the terms • Accident and fatality records and notifications to authorities;
of reference for tenderers/employer’s • Records of legally required worker benefits and proof of
requirements that contractors and all works carried workers’ enrollment in the related programs;
out under the contract must meet S7 requirements. • Worker payroll records, including hours worked and pay
received;
(c) Applicable parties need to ascertain that
contractors engaged in connection with the project • Identification of safety committee members and records of
meetings; and
are legitimate and reliable enterprises, and have
• Copies of previous contracts with contractors and suppliers
appropriate policies, procedures and systems that
allow them to operate in accordance with S7.
Assessing the legitimacy and reliability of third parties requires reviewing their track record, including an
examination of the past and current labour practices of the contractor/third party.
This should include assessing whether contractors have the willingness and capacity to comply with national labour
and OSH laws and S7 requirements covering but not limited to minimum wage, hours of work, overtime payments,
health and safety conditions, contributions to health insurance and pension schedules, and other legally mandated
employment terms with regard to all workers engaged by third parties.
In the context of procurement, prospective contractors should be asked to demonstrate, in the tender, their ability
to comply with national law and with S7.
UNDP’s General Terms and Conditions for Contracts (Rev. Sept 2017) requires contractors to comply with the SES
(of course including S7) as well as the UN Supplier Code of Conduct (Rev.06–December 2017) which also calls for
adherence to the ILO core labour standards.
Box 7 lists potential ways for contractors to demonstrate compliance and for applicable parties to assess their track
record.
30
(d) Applicable procedures and requirements, including those contained in this Standard, need to be incorporated
into contractual agreements with such third parties, together with appropriate and effective noncompliance
remedies. Third parties are also required to include equivalent requirements and remedies in their contractual
agreements with subcontractors.
In projects involving construction or agriculture, the use of labour agents to provide temporary workers is common.
In order to reduce the risk of forced labour or trafficking, all relevant parties should be required not to use labour
agencies that charge workers recruitment or travel fees that are excessive and lead to a debt which it is difficult for
the worker to repay.
(e) Applicable parties need to put a system in place to monitor contractor compliance with S7 during project
implementation. This may include periodic audits, inspections, and/or spot checks of project locations or work sites
and/or of labor management records and reports compiled by third parties.
(f) If a grievance mechanism is provided by the third party for contracted workers, the third party reports regularly
on concerns raised by the contracted workers, and the way in which the grievances were resolved. If a third party is
not able to provide a grievance mechanism, the project’s grievance mechanism is made available to the contracted
workers and the responsible party brings any concerns received through the project grievance mechanism to the
attention of the third party for resolution.
In cases where third parties are small and medium enterprises or have limited resources and capacity, the applicable
party will assess the type of support it can provide to improve such third party performance, which may include the
use or extension of the applicable party’s systems or services to supplement those of the third party, in relation to
the requirements under this Standard. If third party performance cannot be improved over a reasonable timeframe,
the applicable party will need to evaluate alternative sources to these services.
Establish roles and responsibilities for monitoring potential violations of primary supplier workers’
fundamental rights and safety and health
Require primary supplier to address breaches of fundamental rights, including cases of child labour or forced
labour
Require procedures to address serious safety and health risks among primary supplier workers
Halt operations that present an imminent danger of serious injury, ill health or death to workers
Where prevention and remedy are not possible, shift the project’s primary suppliers
A primary supply worker is a worker employed or engaged by a primary supplier, providing goods and materials to
the project, over whom a primary supplier exercises control for the work, working conditions, and treatment of the
person. Primary suppliers provide goods or materials directly to the project for its core functions on an ongoing basis.
31
The environmental and social assessment identifies, to the extent possible, the types of goods and materials to be
obtained from primary suppliers (Tier 1 suppliers). The supply may be local in nature or come from other parts of
the country or from outside the country. Where potential risks of violations of primary workers’ fundamental rights
– freedom of association and collective bargaining,
nondiscrimination and equal opportunity, child labour, Box 8. Addressing child and forced labour in supply chains
forced labour29 – and serious safety risks are identified or Examples of good practice in addressing the risk of child
are prevalent or known to exist in a specific sector, labour and forced labour in supply chains include:
industry, or region in connection with the supply of such • putting in place a clear and transparent company
goods and materials, a mapping exercise should be policy that sets out measures to prevent child labour
conducted to identify possible suppliers and the extent to and forced labour and trafficking in the supply chain
which they may present such risks. • providing training for human resources staff and
procurement teams in identifying child labour and
Where it is not possible to assess specific primary forced labour and seeking appropriate remedies
suppliers, the risk assessment should review general • mapping the company’s supply chains and identify
industry labour issues and risks relating to the supply of primary suppliers
such goods and materials, with particular attention given • carrying out initial screenings of potential suppliers,
to high-risk countries and sectors. The US Department of including checking conditions and practices at their
Labor’s list of goods produced by child or forced labour premises and their use of labour recruiters
can help to identify products and countries that present a • making new and existing suppliers aware that
particular risk in this regard.30 violations of core labour standards [the use of child
labour and forced labour] will not be tolerated and
It is also useful to periodically update the assessment of providing clear information about what constitutes
potential risks that may arise in relation to primary either
suppliers of the project during project implementation. • including in supplier contracts requirements with
Tracking of suppliers’ performance helps inform whether regard to child labour and forced labour
procedures and mitigation measures are being • working with suppliers to improve conditions
appropriately implemented and provide feedback on • dropping suppliers that fail to make serious efforts to
performance and any new areas of risk. solve child labour and forced labour issues. However,
this should be preceded by clear warnings that state
All purchasing orders and contracts with suppliers should the consequences of continued non-compliance.
include requirements on compliance with core labour
standards and work safety issues.31 Other good practices
are noted in Box 8.
Where there is imminent danger of serious injury, ill health or death to workers, the applicable party shall exercise
its control or influence to stop the operation concerned until such time as the primary supplier can demonstrate
that it can control the hazard in a manner consistent with the requirements in this Standard.
The ability of the applicable party to influence its primary suppliers depends on the terms and conditions of contracts
with the primary supplier, that is, the applicable party’s level of control or influence over its primary suppliers. Where
the supplier depends on the applicable party for their business viability, both the risk from and the leverage over the
supplier will be high. The leverage should enable the applicable party to engage with the supplier and work with
them to correct core labor standard violations or safety threats found during the assessment. The applicable party
should seek professional advice on the appropriate steps to take. Conversely, without leverage, the supplier might
32
ignore the applicable party’s requirements in which case the only solution might be for the applicable party to sever
its ties with this supplier.
Where violations of the fundamental rights of primary supply workers are discovered, the applicable party should
seek professional advice on the appropriate steps to take to address this issue. Where prevention and remedy are
not possible, the applicable party will shift (as stipulated in S7) over an agreed period of time to suppliers that can
demonstrate that they are able to comply with the requirements of this Standard.
Further supply chain risks. While S7 only refers to primary suppliers, it is not uncommon that the highest risks of
core labour standard violations are found not in the first tier, but in subsequent tiers, further down the supply chain.
For example, in the cotton textile industry the worst instances of child or forced labour may be in cotton farming.
Therefore, from a human rights perspective, it may be important to review the entire supply chain(s) for risks of
grave CLS violations or safety threats. In situations where there is an integrated chain of suppliers that depend on
the applicable party for their business viability, this leverage as well as risk from supplier nonperformance will be
high. As the supply chain extends into commodity markets where the applicable party’s operation has little
significance, the supply chain review will simply reflect sectoral issues, rather than opportunities for project-specific
mitigation. Where the applicable party has complex operations with multiple tiers of suppliers, its leverage will
diminish toward the more distant tiers of suppliers. Where serious violations are discovered in the supply chain
beyond the first tier, the applicable party should seek professional advice on the appropriate steps to take to address
this issue, including shifting suppliers where prevention and remedy are not possible.
33
204 Transition from the Informal to the Formal Economy, which provides strategies and practical guidance on
policies and measures that can facilitate the transition from the informal to the formal economy.
6 Monitoring
UNDP requires that key documents be submitted to UNDP, including the project environmental and social
assessment, Labour Management Procedures, and, where applicable, sector restructuring plans.
UNDP also requires prompt notification and sharing of information regarding the following project-related issues
concerning labour and working conditions, including: (a) when child labour and/or forced labour is identified in
project activities and/or value chains; (b) in the event of serious occupational safety and health issues, including
serious injury and/or death; (c) incidences of sexual harassment or sexual exploitation and abuse involving UNDP
personnel, including direct contractors. Applicable partners will undertake immediate corrective actions and
remedial steps to address such incidences, and inform UNDP accordingly.
The project’s environmental and social assessment and/or Labour Management Procedures (LMP, Annex 1) will
provide a framework for monitoring identified risk areas over the course of project implementation. Projects
categorized as Substantial or High Risk will typically have an Environmental and Social Management Plan (ESMP) that
provides monitoring indicators (integrating relevant criteria from Annex 1). Monitoring arrangements need to be
appropriately scaled to the nature of the project and its associated social and environmental risks and impacts.
For projects with significant risks regarding labour and working conditions, knowledgeable independent experts
should be engaged to assist with monitoring throughout the duration of the project cycle, e.g. by conducting periodic
labour audits.
Project documentation should provide a detailed description of the format and timing for monitoring, (e.g. annual,
mid-term, closure, when there are significant changes in implementation, etc.)
The extent of monitoring will be proportionate to the nature of the project, the project’s social and environmental
risks and impacts, and compliance requirements.
Monitoring implementation of the SES includes the following:
i. progress of implementation of mitigation/management plans required by the SES
ii. review of complaints and grievances from workers and project-affected stakeholders
34
iii. follow-up on any identified corrective actions, and
iv. completion and disclosure of any required monitoring reports on SES implementation (including on-going
reporting to project-affected stakeholders).
S7 monitoring indicators will cover measuring progress with implementing any actions agreed in the ESMP/LMP to
improve labour performance. Other typical indicators include:
• progress with labour and OSH management system, e.g. certification
• employee turnover rate; workforce breakdown, including non-employee, temporary and seasonal workers–
all segregated by gender; any collective redundancies
• wage levels
• summary of the findings of labour and OSH inspections by the regulatory authorities, fines or penalties
imposed, and how problems found were resolved
• accidents and fatalities
• summary of grievances received from workers in the reporting period, and how they were resolved
• report on social dialogue, including level of unionization, strikes and any changes to collective agreements
• summary of worker training conducted e.g. on OSH, anti-harassment policy, etc.
• supply chain management activities.
Findings from monitoring should be integrated into an adaptive management framework where management
responses are adapted as necessary to ensure that project risks and impacts associated with labour and working
conditions are properly addressed. When appropriate the findings from monitoring should be verified with project-
affected workers’ representatives, applicable parties (e.g. employers and contractors), independent experts, and
other key stakeholders.
Where monitoring indicates a potential lack of compliance with project commitments, including in addressing SES
requirements, the implementing partner informs UNDP which works with the partner to bring the project back into
compliance.
If there are substantive changes to the project during implementation or changes in the project context that alters
the project’s risk profile, then rescreening, assessment and revised management measures may be needed.
UNDP’s review activities should be appropriate to the type and scope of the requirements, and may include:
• reviewing monitoring reports, conducting site visits and reviewing project-related information
• reviewing compliance with SES requirements
• advising partners on how to manage issues related to the SES
• communicating risks and probable consequences of failure to comply with the SES requirements, and
initiating remedies if the partner fails to (re)establish compliance.
35
Annex 1: Labour Management Procedures Template
The Labour Management Procedures (LMP) facilitates planning and assists responsible parties to ensure that project
implementation adheres to the requirements of SES Standard 7 on Labour and Working Conditions. The LMP (a) sets
out the written labour procedures for the project, (b) identifies the main labour requirements and risks associated
with the project, and (c) helps the project developer to determine the resources necessary to address project labour
issues and risks and sets out an action plan.
The LMP summarizes key labour-related risks and issues and may be supplemented by more targeted analyses and
plans (e.g. such as an occupational safety and health action plan, WBG EHS sector specific guidelines, ISO standards,
contractor management matrices, etc.). The LMP (as with supporting analyses) should be undertaken by experts
with relevant expertise.
The LMP may be prepared as a stand-alone document, or form part of other environmental and social management
documents. The LMP is a living document, which is initiated early in project preparation, and is reviewed and
updated throughout development and implementation of the project.
In preparing and updating the LMP, project developers should refer to the requirements of national law and S7 and
its Guidance Note. The content of the LMP is indicative: some issues may not be relevant to the project while some
projects may have other issues that need to be captured from a planning perspective. Where national law addresses
requirements of S7 this should be noted in the LMP.
Where project workers under a single project may be engaged under significantly different circumstances (e.g.
different regions of a country, different employment arrangements), it may be necessary to ensure that these
differences are appropriately addressed in the LMP, or separate LMPs may need to be developed.
For projects utilizing an ESMF given that specific activities and/or subprojects have yet to be defined, the
development of the LMP may need to be deferred. The ESMF should address as many potential issues outlined in
the LMP as is feasible during project development, and the ESMF should include procedures for undertaking a
specific LMP once locations and activities are defined.
A concise and up to date LMP will enable different project-related parties, for example, staff of the project
implementing unit, contractors and sub-contractors and project workers, to have a clear understanding of what is
required on a specific labour issue. The level of detail contained in the LMP will depend on the type of project and
information available. Where relevant information is not available, this should be noted and the LMP should be
updated as soon as possible.
Below is an indicative outline of the LMP.
1. Overview of Labour Use in the Project: This section describes the following, based on available information:
a. Number of Project Workers: The total number of workers to be employed on the project, and the
different types of workers: direct workers, contracted workers, temporary or seasonal workers and
community workers. Where numbers are not yet firm, an estimate should be provided.
b. Characteristics of Project Workers: To the extent possible, a broad description and an indication of the
likely characteristics of the project workers e.g. local workers, national or international migrants,
female workers, workers between the minimum age and 18.
c. Timing of Labour Requirements: The timing and sequencing of the project’s labour requirements in
terms of numbers, locations, types of jobs and skills required.
d. Contracted Workers: The anticipated or known contracting structure for the project, with numbers and
types of contractors/subcontractors and the likely number of project workers to be employed or
engaged by each contractor/subcontractor. If it is likely that project workers will be engaged through
brokers, intermediaries or agents, this should be noted together with an estimate of the number of
workers that are expected to be recruited in this way.
36
e. Migrant Workers: If it is likely that migrant workers (either domestic or international) are expected to
work on the project, this should be noted and details provided.
2. Assessment of Key Potential Labour Risks: This section describes the following, based on available
information:
a. Project activities: The type and location of the project, and the different activities the project workers
will carry out, including primary supplier(s)
b. Key Labour Risks: The key labour risks that may be associated with the project (see, for example, those
identified in S7 and the GN). These could include, for example:
o the conduct of hazardous work, such as working at heights or in confined spaces, use of heavy
machinery, or use of hazardous materials
o likely incidents of child labour or forced labour, with reference to the sector or locality
o discriminatory policies or practices that deny equal opportunity
o restrictions on freedom of association and collective bargaining
o likely presence of migrants or seasonal workers
o risks of labour influx or gender based violence
o possible accidents or emergencies, with reference to the sector or locality
o general understanding and implementation of occupational health and safety requirements
3. Brief overview of labour legislation, agreements and potential gaps with Standard 7:
• Core Labour Standards: This section sets out the key aspects of national legislation implementing the
ILO fundamental rights at work, i.e. prohibition of child labour/minimum working age; prohibition of
forced labour, non-discrimination/equal opportunity; and freedom of association and collective
bargaining. The overview should highlight any material gaps between national law and S7.9-19.
• Terms and Conditions: This section sets out the key aspects of national labour legislation with regards
to term and conditions of work, and how national legislation applies to different categories of workers
identified in Section 1. The overview focuses on legislation which relates to the items set out in S7,
paras.5-8 (i.e. wages, deductions and benefits) and any material gaps with S7. The section should also
identify the terms of any existing collective agreements that stipulate workplace terms and conditions.
• Occupational Safety and Health (OSH): This section sets out the key aspects of the national labour
legislation with regards to occupational health and safety, and how national legislation applies to the
different categories of workers identified in Section 1. The overview focuses on legislation that relates
to the items set out in S7, paras. 20-25 and any material gaps with S7.
4. Responsible Staff: This section identifies the functions and/or individuals within the project responsible for
(as relevant):
• engagement and management of project workers
• engagement and management of contractors/subcontractors
• occupational safety and health (OSH)
• training of workers
• addressing worker grievances
In some cases, this section will identify functions and/or individuals from contractors or subcontractors,
particularly in projects where project workers are employed by third parties.
5. Policies and Procedures: This section sets out :
• Management systems: Relevant management systems in place to implement S7, e.g. human resources
policy, anti-harassment policy, staff handbook, grievance procedure, OSH management system, etc.
These can be referenced or annexed to the LMP, together with any other supporting documentation.
Where relevant, it identifies applicable national legislation.
37
• Age of Employment: Details regarding (see S7 paras. 16-19 and GN):
o the minimum age for employment on the project
o the process that will be followed to verify the age of project workers
o the procedure that will be followed if underage workers are found working on the project
o the procedure for conducting risk assessments for workers aged between the minimum age and
18
o Where incidences of child labour are identified, describe how these will be remediated
• Forced Labour: Where the risk of forced labour has been identified, this section outlines how this risk
will be mitigated, and how any instances of forced labour will be addressed (see S7 para. 14 and GN).
• Occupational safety and health: Where significant health and safety risks have been identified,
summarize how these will be addressed in a manner consistent with national labour and employment
regulations and the requirements of S7. (Note that a specific OSH plan may be necessary.)
• Terms and Conditions: This section sets out details regarding (see S7 paras. 5-8):
o specific wages, hours and other provisions that apply to the project
o maximum number of hours that can be worked on the project
o any collective agreements that apply to the project. When relevant, provide a list of agreements
and describe key features and provisions
o other specific terms and conditions (e.g. benefits)
o “Beyond compliance” initiatives e.g. to promote local employment or the hiring of traditionally
underrepresented groups
• Grievance Mechanism: This section sets out details of the grievance mechanism that will be provided
for direct and contracted workers, and describes the way in which these workers will be made aware
of the mechanism (S7, paras. 26-28).
• Contractor Management: This section sets out details regarding (see S7, paras. 29-31 and GN):
o the selection process for contractors/third parties
o the contractual provisions that will be put in place relating to contractors for the management
of labour issues, including OSH
o the procedure for managing and monitoring the performance of contractors
• Community Workers: Where community workers will be involved in the project, this section sets out
details of the terms and conditions of work, and identifies measures to check that community labour
is provided on a voluntary basis. It also provides details of the type of agreements that are required
and how they will be documented. This section sets out details of the grievance mechanism for
community workers and the roles and responsibilities for monitoring such workers.
• Primary Supply Workers: Where a significant risk of violations of core labour standards 32 or serious
safety issues in relation to primary suppliers has been identified, this section sets out the procedure
for monitoring and reporting on primary supply workers (S7 paras. 32-34)
7. Action Plan This section sets out details of actions required to achieve and maintain compliance with national law
and S7, including responsibilities, timelines and cost/resource estimates. The Plan will also include monitoring and
reporting requirements appropriate to the nature of the project and associated labour risks and impacts. The Action
Plan includes the following elements:
• Summary of required measures identified in above sections of the LMP.
32 Child labour, forced labour, non-discrimination and equal opportunity, freedom of association and collective bargaining.
38
• Describe schedule, institutional arrangements, and responsibilities and mechanisms for carrying out
the identified measures, indicating who is responsible and when actions will be undertaken.
• Describe the monitoring framework for the project and key indicators for measuring progress in
implementing the identified measures.
• Budget and Financing: Include an appropriately costed plan, with itemized budget sufficient to
satisfactorily undertake the identified measures.
39