Eve in

Download as pdf
Download as pdf
You are on page 1of 8
5 _Test before every start-up 5.2 Test list Device ype: ls: Iwata how [rarcer [ACTUAL (Operating manual [The operating manual is part ofthe deviee [Manuals present. o land must always be kept withthe device icas |Visual check of colorcoding of gus types [ISO cotor code |Gas connection lines Or (oxygen), white | [Unique mechanical festures of the angled Jo, oxygen) =) | connector and gas connections (0; pressurized gas cylinders Leak ighiness a ce Residual pressure a [Mains power supply visual eheck ofthe mains connection [Undamaged o [Mains switch »Ow/Off« to "On" | 1 One button illuminated a Ipatiem connections [Check the patent tbe system [Connected properly a (All patient components [Check the SpO, sensor (optional) [Connected properly a fms be connected proper) Ick the CO, sensor (options) (Connected properly o [Check the flow sensor (PNT) |Connected properly QO [Check the expiration valve [Connected properly a [Marval breathing bg [Selling prosent, within reach Functions crzectly o [(EVEre) bracket [Function test [coreect funtion a ‘Switch on the device Selftest Perform softest Seitest completed successfully | T] “Internal energy supply [Disconnect the device from the external _| Battery sufficiently charged a lneray supply [Acoust alarm (Chock ifthe acoustic alara is wiggered [Acoustic larm is twiggered |] uring the seftest during the stitest \Alarm: [Disconnect the device from the external Powersupply?” notification a Power failure lenergy supply lappears ‘Alarm: [Disconnect the patient tube system from the "Disconnection!!!" HP alarm | [) [Disconnection ventilator lappeas ‘ala Close 0: pressure regulator, sO; level |After30s,"O2 town” MP | (0: level ow 0%. alarm appears ‘Alarm: [Connect test hung, et PAW UL to [Airway pressure hightt! HP | [High pressure minimum, rigger peak pressuro alarm appears. Tab. 10; Test list 58 $A-070-0616V2.1-HAO-DE © Fritz Stephan GmbH 9 Inspection protocols SAFETY CHECK INSPECTION PROTOCOL. DEVE DEVE Product combinations: 1 | Visual ‘Visual appearance inspecti 11 [Housing | Nameplate Visual check for oo Approval number Completeness ola sag eee and defects role ‘ontamination that impairs ‘Lines (gas) ates ” olgd Actuators: adhesive residue, and wear g/;a Display features og;a Labeling o;a entifiation of ola actuators Wear parts 5/0 126 $A-070-0616V2.1-HAO-DE, © Fritz Stephan GmbH STAN Inspection protocols "| Visual appearance CO, sensor Serial no. Power cable/PSU Operating manual Device book (optional) 1.3 [Gas supply | Connectors at supply hoses | CGS standard, type: ‘Coding according to: Color coding: Ooo coblo Oo Qo} ao} a ajobla Connector according to: Electrical safety check of main device according to DIN EN 62353 2.1 |Equipotentiat | Equipotemial bonding | Check bonding connected 22 | insulation resistance | Actual value > set value | Actual value Ma =7Ma 23 [Barth leakage | Actual value

You might also like