Well Yield Final
Well Yield Final
Well Yield Final
The well yield may be found in the well log created when the well was drilled and its pump
installed. Many communities also require a yield test when a property is bought or sold.
The test requires the continuous pumping of the well for an extended period of time. During the
pumping period, measurements are made of 1) the rate at which water is being pumped out of
the well and 2) the distance the water level is lowered in the well as a result of the pumping,
known as the drawdown.
Balance, or equilibrium, is achieved when the water level within the well stops dropping for a
given discharge rate. Once equilibrium is achieved, less pumping results in less drawdown.
Water well professionals rely on the yield pump test to set the well pump at the correct level.
It is common to maintain the water level in the well at least 25 feet above the top of the
submersible pump. This depth of water over the pump provides a reasonable level of safety for
dry conditions and provides for full cooling of the pump’s electrical motor.
Don’t be fooled by water pressure in the home. Pressure at the tap is not necessarily
dependent on ample well yield. Proper sizing of the well pump, pressure tank and
distribution lines by a water well professional can increase pressure when yields are quite
low.
Many communities set minimum levels. Contact your local health department or ask your water
well professional for minimum well yield requirements in your area.
For a new well, a yield test can be performed immediately after the drilling has been completed,
but before the well is connected to the house. A yield estimate can be conducted by blowing
compressed air into the well or a temporary pump can be used to measure yield.
Determining 2003
the Yield of
wellcare® information on Determining the Yield of a Well June 2014
a
Well
September
wellcare® information on Determining the Yield of a Well Page 2
For an existing well already in use, a water well professional can create an artificial water
demand on the home’s plumbing system so that the well pump runs continuously and water
discharges from exterior faucets. Measurements can be taken during this constant pumping.
In either case, the yield test will generate lots of water that must be discharged to an appropriate
location. Take care not to let the water flow towards or back into the well being pumped. Try to
direct the water to a stream, pond or wetlands.
For new wells, piping can be used to direct water away from the well being tested. For testing of
existing wells, lengths of garden hose can be connected to outside faucets to direct the water to
an appropriate location.
For more information on managing well levels see our wellcare® information sheets on Coping with
Low Water Levels, Water Conservation, and What to Do if the Well Runs Dry.
FOR MORE INFORMATION to help you maintain your well and protect your water supply
This publication is one in a series of wellcare® information sheets. There are more than 90
information sheets available FREE at www.watersystemscouncil.org.
Well owners and others with questions about wells or groundwater can also contact the FREE
wellcare® Hotline at 1-888-395-1033 or visit www.wellcarehotline.org.