Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the February, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: February 15- 21, 2021
4th week:
Page 1
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the February, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: February 22- 28, 2021
Page 2
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the March, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.22 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.22 month
B.8(1) Traffic Management 0.22 month
B.9 Mobilization/ Demobilization 0.50 l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 3
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the March, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.22 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.22 month
B.8(1) Traffic Management 0.22 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: March 8- 14, 2021
3rd week:
4th week:
Page 4
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the March, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.17 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard 2.00 each
B.7(1) Occupational Safety and Health Program 0.17 month
B.8(1) Traffic Management 0.17 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: March 15- 21, 2021
4th week:
Page 5
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the March, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.16 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.16 month
B.8(1) Traffic Management 0.16 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: March 22- 28, 2021
5th week:
Page 6
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the March, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.16 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.16 month
B.8(1) Traffic Management 0.16 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week: March 29- 31, 2021
Page 7
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the April, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 8
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the April, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.37 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.37 month
B.8(1) Traffic Management 0.37 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing 0.30 ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 2,255.00 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) 172.15 cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: April 5- 11, 2021
3rd week:
4th week:
Page 9
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the April, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.23 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.23 month
B.8(1) Traffic Management 0.23 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 425.00 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: April 12- 18, 2021
4th week:
5th week:
Page 10
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the April, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.23 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.23 month
B.8(1) Traffic Management 0.23 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: April 19- 25, 2021
5th week:
Page 11
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the April, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.17 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.17 month
B.8(1) Traffic Management 0.17 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week: April 26- 30, 2021
Page 12
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the May, 2021. We further certify that we have found out that the quality of
materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.07 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.07 month
B.8(1) Traffic Management 0.07 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 120.00 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 13
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the May, 2021. We further certify that we have found out that the quality of
materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.23 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.23 month
B.8(1) Traffic Management 0.23 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 200.00 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: May 3- 9, 2021
3rd week:
4th week:
Page 14
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the June, 2020. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: May 10- 16, 2021
4th week:
Page 15
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the May, 2021. We further certify that we have found out that the quality of
materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: May 17- 23, 2021
Page 16
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the May, 2021. We further certify that we have found out that the quality of
materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week: May 24- 31, 2021
Page 17
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the June, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.45 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.45 month
B.8(1) Traffic Management 0.45 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing 0.20 ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) 172.14 cu.m.
105(1)a Subgrade Preparation (Common Material) 677.00 sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 18
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the June, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.48 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.48 month
B.8(1) Traffic Management 0.48 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) 1,589.00 sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: June 7- 13, 2021
3rd week:
4th week:
Page 19
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the June, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.48 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.48 month
B.8(1) Traffic Management 0.48 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) 20.00 each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 250.00 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) 1,131.30 sq.m.
200(1) Aggregate Subbase Course 46.90 cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 234.50 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: June 14- 20, 2021
4th week:
Page 20
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the June, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.23 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.23 month
B.8(1) Traffic Management 0.23 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 250.00 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: June 21- 27, 2021
Page 21
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the June, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.10 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.10 month
B.8(1) Traffic Management 0.10 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) 102.70 sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) 10.00 lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week: June 28- 30, 2021
Page 22
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the July, 2021. We further certify that we have found out that the quality of
materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 23
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the July, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing 0.10 ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 557.65 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) 2,000.00 sq.m.
200(1) Aggregate Subbase Course 87.02 cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 347.50 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: July 5- 11, 2021
3rd week:
4th week:
Page 24
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the July, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.01 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.01 month
B.8(1) Traffic Management 0.01 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) 450.00 sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting 2,000.00 each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: July 12- 18, 2021
4th week:
Page 25
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the July, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.01 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.01 month
B.8(1) Traffic Management 0.01 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course 134.08 cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 381.90 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: July 19- 25, 2021
Page 26
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the July, 2021. We further certify that we have found out that the quality
of materials in the following items of works corresponding to the quality accomplished conforms with the
approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.01 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.01 month
B.8(1) Traffic Management 0.01 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 376.10 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week: July 26- 31, 2021
Page 27
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the August, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.05 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.05 month
B.8(1) Traffic Management 0.05 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation 957.61 cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) 1,000.00 sq.m.
200(1) Aggregate Subbase Course 1,000.00 cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 603.00 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) 22.00 lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 28
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the August, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.05 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.05 month
B.8(1) Traffic Management 0.05 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course 111.33 cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 1,472.34 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: August 9- 15, 2021
3rd week:
4th week:
Page 29
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the August, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.05 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.05 month
B.8(1) Traffic Management 0.05 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) 404.20 sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 1,130.27 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: August 16- 22, 2021
4th week:
Page 30
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the August, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.05 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.05 month
B.8(1) Traffic Management 0.05 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 944.99 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry 50.00 cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: August 23- 29, 2021
Page 31
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the August, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and 0.01 month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program 0.01 month
B.8(1) Traffic Management 0.01 month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry 50.00 cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week: August 30- 31, 2021
Page 32
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the September, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) - sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) 10.00 lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 33
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the September, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: September 6- 12, 2021
3rd week:
4th week:
Page 34
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the September, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 504.00 sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) 10.00 lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week: September 13- 19, 2021
4th week:
Page 35
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the September, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry 49.67 cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week: September 20- 26, 2021
5th week:
Page 36
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the September, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) 20.00 lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week: September 27- 30, 2021
Page 37
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the October, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) 20.00 lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White - sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
Page 38
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the October, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization - l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) 22.00 lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White 100.00 sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow - sq.m.
1st week:
2nd week: October 4- 10, 2021
3rd week:
4th week:
5th week:
Page 39
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the October, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and - month
Living Quarters Building for the Engineer (Rental Basis) -
B.5 Project Billboard/ Signboard - each
B.7(1) Occupational Safety and Health Program - month
B.8(1) Traffic Management - month
B.9 Mobilization/ Demobilization 0.50 l.s.
100(1) Clearing and Grubbing - ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) - each
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) - lm.
102(2) Surplus Common Excavation - cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) - cu.m.
105(1)a Subgrade Preparation (Common Material) - sq.m.
200(1) Aggregate Subbase Course - cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) - sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) - lm.
506(1) Stone Masonry - cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) - lm.
611(1) Trees Furnishing and Transplanting - each
612(1) Reflectorized Thermoplastic Pavement Markings White 199.90 sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow 63.20 sq.m.
1st week:
2nd week:
3rd week: October 11- 15, 2021
4th week:
5th week:
Page 40
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Masbate 3rd
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE V
Dimasalang, Masbate
Project: 21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development
Program – Road Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd
– K0043+000 – K0043+618
Contractor: ARKY CONSTRUCTION AND SUPPLY
We hereby certify that we have conducted an inspection and verification on work accomplished of
the aforementioned project for the October, 2021. We further certify that we have found out that the
quality of materials in the following items of works corresponding to the quality accomplished conforms
with the approved POW Standard Specifications and special provisions of the contract viz:
Item no. Description Quality Accomplished
A.1.1(6) Provision of Combined Field Office, Laboratory and month
Living Quarters Building for the Engineer (Rental Basis)
B.5 Project Billboard/ Signboard each
B.7(1) Occupational Safety and Health Program month
B.8(1) Traffic Management month
B.9 Mobilization/ Demobilization l.s.
100(1) Clearing and Grubbing ha.
101(3)a1 Individual Removal of Trees (150- 300mm dia., small) each
101(3)c2 Removal of Actual Structures/ Obstruction (0.10 m thick ACP) sq.m.
101(4)a1 Removal of Actual Structures/ Obstruction (610mm dia. RCPC) lm.
102(2) Surplus Common Excavation cu.m.
104(1)a Embankment from Roadway Excavation (Common Soil) cu.m.
105(1)a Subgrade Preparation (Common Material) sq.m.
200(1) Aggregate Subbase Course cu.m.
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) sq.m.
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) lm.
506(1) Stone Masonry cu.m.
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) lm.
611(1) Trees Furnishing and Transplanting each
612(1) Reflectorized Thermoplastic Pavement Markings White sq.m.
612(2) Reflectorized Thermoplastic Pavement Markings Yellow sq.m.
1st week:
2nd week:
3rd week:
4th week:
5th week:
Page 41
STATUS OF TESTS OF QUALITY CONTROL TESTS
As of February 28, 2021
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 5,994.60 sq.m. - sq.m. - sq.m. - sq.m. Design Mix, Core- 7, Q-
17, G-36, CBS-23, IR
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) 42.00 lm. - lm. - lm. - lm. IR
506(1) Stone Masonry 149.67 cu.m. - cu.m. - cu.m. - cu.m. Q-1, IR
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) 62.00 lm. - lm. - lm. - lm. IR
611(1) Trees Furnishing and Transplanting 2,000.00 each - each - each - each IR
612(1) Reflectorized Thermoplastic Pavement Markings White 299.90 sq.m. - sq.m. - sq.m. - sq.m. Q-1, IR
612(2) Reflectorized Thermoplastic Pavement Markings Yellow 63.20 sq.m. - sq.m. - sq.m. - sq.m. Q-1, IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 5,994.60 sq.m. - sq.m. - sq.m. - sq.m. Design Mix, Core- 7, Q- Design Mix, Core- 7, Q-17,
17, G-36, CBS-23, IR - - G-36, CBS-23, IR
500(1)a3 Pipe Culvert (910mm dia., Class II, RCPC) 42.00 lm. - lm. - lm. - lm. IR - - IR
506(1) Stone Masonry 149.67 cu.m. - cu.m. - cu.m. - cu.m. Q-1, IR - - Q-1, IR
603(3)a1 Metal Guardrails (Metal Beam) including Post (W-Beam) 62.00 lm. - lm. - lm. - lm. IR - - IR
611(1) Trees Furnishing and Transplanting 2,000.00 each - each - each - each IR - - IR
612(1) Reflectorized Thermoplastic Pavement Markings White 299.90 sq.m. - sq.m. - sq.m. - sq.m. Q-1, IR - - Q-1, IR
612(2) Reflectorized Thermoplastic Pavement Markings Yellow 63.20 sq.m. - sq.m. - sq.m. - sq.m. Q-1, IR - - Q-1, IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
102(2) Surplus Common Excavation 5,015.26 cu.m. - cu.m. 2,680.00 cu.m. 2,680.00 cu.m. IR IR IR IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
102(2) Surplus Common Excavation 5,015.26 cu.m. 2,680.00 cu.m. 320.00 cu.m. 3,000.00 cu.m. IR IR IR IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
102(2) Surplus Common Excavation 5,015.26 cu.m. 3,000.00 cu.m. 500.00 cu.m. 3,500.00 cu.m. IR IR IR IR
GP-6, CQ-2, FDT- 48 GP-1, CQ-1, FDT- 3 holes, GP-1, CQ-1, FDT- 3 holes, GP-5, CQ-1, FDT- 45
200(1) Aggregate Subbase Course 1,379.33 cu.m. - cu.m. 46.90 cu.m. 46.90 cu.m. holes, CBR- 1, IR CBR- 1, IR CBR- 1, IR holes, IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
102(2) Surplus Common Excavation 5,015.26 cu.m. 3,500.00 cu.m. 557.65 cu.m. 4,057.65 cu.m. IR IR IR IR
GP-6, CQ-2, FDT- 48 GP-1, CQ-1, FDT- 9 holes, GP-5, CQ-1, FDT- 39
200(1) Aggregate Subbase Course 1,379.33 cu.m. 46.90 cu.m. 221.10 cu.m. 268.00 cu.m. holes, CBR- 1, IR
FDT- 6 holes, IR
CBR- 1, IR holes, IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
102(2) Surplus Common Excavation 5,015.26 cu.m. 4,057.65 cu.m. 957.61 cu.m. 5,015.26 cu.m. IR IR IR -
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
105(1)a Subgrade Preparation (Common Material) 1,095.12 sq.m. 1,050.00 sq.m. - sq.m. 1,050.00 sq.m. FDT- 9 - FDT- 8 FDT- 1
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 910.00 sq.m. 670.00 sq.m. - sq.m. 670.00 sq.m. Design Mix, CBS-4, Design Mix, CBS-3, CBS-1,
Q- 9, G-6, Core- 3 & IR - Q- 6, G-5, Core- 3 & IR Q- 3, G-1 & IR
404(1)a Reinforcing Steel (Grade 40) 10,012.64 kg. 9,503.79 kg. - kg. 9,503.79 kg. Q-3 & IR - Q-2 & IR Q-1 & IR
404(1)b Reinforcing Steel (Grade 60) 111,875.94 kg. 110,250.52 kg. - kg. 110,250.52 kg. Q-12 & IR - Q-12 & IR IR
405(1)a2 Structural Concrete (20.68 Mpa, Class A, 14 days) 25.18 cu.m. 9.00 cu.m. 9.00 cu.m. 18.00 cu.m. G-3, Q-2, CCS-1 & IR - G-3, Q-2, CCS-1 & IR IR
405(1)b2 Structural Concrete (27.58 Mpa, Class A, 14 days) 838.22 cu.m. 808.79 cu.m. 27.17 cu.m. 835.96 cu.m. G-18, Q-6, CCS-12 & IR - G-18, Q-6, CCS-12 & IR CCS-1 & IR
411(2) Paint 658.19 sq.m. - sq.m. - sq.m. - sq.m. Q-1 & IR - - Q-1 & IR
413(6)b Asphaltic Plug Joints (APJ) for Bridges 62.00 l.m. 50.00 l.m. 10.00 l.m. 60.00 l.m. CCS-1 & IR - CCS-1 & IR IR
505(2)a Grouted Riprap (Class A) 1,172.98 cu.m. 1,150.00 cu.m. 10.00 cu.m. 1,160.00 cu.m. G-4, Q-2 & IR - G-4, Q-2 & IR IR
508(1) Handlaid Rock Embankment 2,336.64 cu.m. 2,320.32 cu.m. 10.00 cu.m. 2,330.32 cu.m. IR - IR IR
511(2) Mattresses (PVC Coated) 178.81 cu.m. 170.00 cu.m. 2.00 cu.m. 172.00 cu.m. Q-1 & IR - Q-1 & IR IR
1712(2) Concrete (Slope Protection) 358.68 cu.m. 358.68 cu.m. - cu.m. 358.68 cu.m. G-9 & Q-4 - G-9 & Q-4 -
517(1)a Drain Pipes, Galvanized 30.00 ln.m. 30.00 ln.m. - ln.m. 30.00 ln.m. IR - IR IR
603(3)a1 Metal Guardrails (Metal Beam) incl. Conc. Post, Single W- Beam 260.00 ln.m. 227.00 ln.m. 13.00 ln.m. 240.00 ln.m. G-3, Q-1 & IR - G-3, Q-1 & IR IR
603(4)a Metal Beam End Piece (Fish Tail) 14.00 each 7.00 each 3.00 each 10.00 each IR - IR IR
612(1) Reflectorized Thermoplastic Pavement Markings White 68.38 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
612(2) Reflectorized Thermoplastic Pavement Markings Yellow 63.60 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
624(1)a1 Single Arm Post, with Street Light (8m, LED, 130W) 16.00 each 11.00 each 2.00 each 13.00 each IR - IR IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
105(1)a Subgrade Preparation (Common Material) 1,095.12 sq.m. 1,050.00 sq.m. - sq.m. 1,050.00 sq.m. FDT- 9 - FDT- 8 FDT- 1
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 910.00 sq.m. 670.00 sq.m. - sq.m. 670.00 sq.m. Design Mix, CBS-4, Design Mix, CBS-3, CBS-1,
Q- 9, G-6, Core- 3 & IR - Q- 6, G-5, Core- 3 & IR Q- 3, G-1 & IR
404(1)a Reinforcing Steel (Grade 40) 10,012.64 kg. 9,503.79 kg. - kg. 9,503.79 kg. Q-3 & IR - Q-2 & IR Q-1 & IR
404(1)b Reinforcing Steel (Grade 60) 111,875.94 kg. 110,250.52 kg. - kg. 110,250.52 kg. Q-12 & IR - Q-12 & IR IR
405(1)a2 Structural Concrete (20.68 Mpa, Class A, 14 days) 25.18 cu.m. 9.00 cu.m. 9.00 cu.m. 18.00 cu.m. G-3, Q-2, CCS-1 & IR - G-3, Q-2, CCS-1 & IR IR
405(1)b2 Structural Concrete (27.58 Mpa, Class A, 14 days) 838.22 cu.m. 808.79 cu.m. 27.17 cu.m. 835.96 cu.m. G-18, Q-6, CCS-12 & IR - G-18, Q-6, CCS-12 & IR CCS-1 & IR
411(2) Paint 658.19 sq.m. - sq.m. - sq.m. - sq.m. Q-1 & IR - - Q-1 & IR
413(6)b Asphaltic Plug Joints (APJ) for Bridges 62.00 l.m. 50.00 l.m. 10.00 l.m. 60.00 l.m. CCS-1 & IR - CCS-1 & IR IR
505(2)a Grouted Riprap (Class A) 1,172.98 cu.m. 1,150.00 cu.m. 10.00 cu.m. 1,160.00 cu.m. G-4, Q-2 & IR - G-4, Q-2 & IR IR
508(1) Handlaid Rock Embankment 2,336.64 cu.m. 2,320.32 cu.m. 10.00 cu.m. 2,330.32 cu.m. IR - IR IR
511(2) Mattresses (PVC Coated) 178.81 cu.m. 170.00 cu.m. 2.00 cu.m. 172.00 cu.m. Q-1 & IR - Q-1 & IR IR
1712(2) Concrete (Slope Protection) 358.68 cu.m. 358.68 cu.m. - cu.m. 358.68 cu.m. G-9 & Q-4 - G-9 & Q-4 -
517(1)a Drain Pipes, Galvanized 30.00 ln.m. 30.00 ln.m. - ln.m. 30.00 ln.m. IR - IR IR
603(3)a1 Metal Guardrails (Metal Beam) incl. Conc. Post, Single W- Beam 260.00 ln.m. 227.00 ln.m. 13.00 ln.m. 240.00 ln.m. G-3, Q-1 & IR - G-3, Q-1 & IR IR
603(4)a Metal Beam End Piece (Fish Tail) 14.00 each 7.00 each 3.00 each 10.00 each IR - IR IR
612(1) Reflectorized Thermoplastic Pavement Markings White 68.38 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
612(2) Reflectorized Thermoplastic Pavement Markings Yellow 63.60 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
624(1)a1 Single Arm Post, with Street Light (8m, LED, 130W) 16.00 each 11.00 each 2.00 each 13.00 each IR - IR IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
105(1)a Subgrade Preparation (Common Material) 1,095.12 sq.m. 1,050.00 sq.m. - sq.m. 1,050.00 sq.m. FDT- 9 - FDT- 8 FDT- 1
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 910.00 sq.m. 670.00 sq.m. - sq.m. 670.00 sq.m. Design Mix, CBS-4, Design Mix, CBS-3, CBS-1,
Q- 9, G-6, Core- 3 & IR - Q- 6, G-5, Core- 3 & IR Q- 3, G-1 & IR
404(1)a Reinforcing Steel (Grade 40) 10,012.64 kg. 9,503.79 kg. - kg. 9,503.79 kg. Q-3 & IR - Q-2 & IR Q-1 & IR
404(1)b Reinforcing Steel (Grade 60) 111,875.94 kg. 110,250.52 kg. - kg. 110,250.52 kg. Q-12 & IR - Q-12 & IR IR
405(1)a2 Structural Concrete (20.68 Mpa, Class A, 14 days) 25.18 cu.m. 9.00 cu.m. 9.00 cu.m. 18.00 cu.m. G-3, Q-2, CCS-1 & IR - G-3, Q-2, CCS-1 & IR IR
405(1)b2 Structural Concrete (27.58 Mpa, Class A, 14 days) 838.22 cu.m. 808.79 cu.m. 27.17 cu.m. 835.96 cu.m. G-18, Q-6, CCS-12 & IR - G-18, Q-6, CCS-12 & IR CCS-1 & IR
411(2) Paint 658.19 sq.m. - sq.m. - sq.m. - sq.m. Q-1 & IR - - Q-1 & IR
413(6)b Asphaltic Plug Joints (APJ) for Bridges 62.00 l.m. 50.00 l.m. 10.00 l.m. 60.00 l.m. CCS-1 & IR - CCS-1 & IR IR
505(2)a Grouted Riprap (Class A) 1,172.98 cu.m. 1,150.00 cu.m. 10.00 cu.m. 1,160.00 cu.m. G-4, Q-2 & IR - G-4, Q-2 & IR IR
508(1) Handlaid Rock Embankment 2,336.64 cu.m. 2,320.32 cu.m. 10.00 cu.m. 2,330.32 cu.m. IR - IR IR
511(2) Mattresses (PVC Coated) 178.81 cu.m. 170.00 cu.m. 2.00 cu.m. 172.00 cu.m. Q-1 & IR - Q-1 & IR IR
1712(2) Concrete (Slope Protection) 358.68 cu.m. 358.68 cu.m. - cu.m. 358.68 cu.m. G-9 & Q-4 - G-9 & Q-4 -
517(1)a Drain Pipes, Galvanized 30.00 ln.m. 30.00 ln.m. - ln.m. 30.00 ln.m. IR - IR IR
603(3)a1 Metal Guardrails (Metal Beam) incl. Conc. Post, Single W- Beam 260.00 ln.m. 227.00 ln.m. 13.00 ln.m. 240.00 ln.m. G-3, Q-1 & IR - G-3, Q-1 & IR IR
603(4)a Metal Beam End Piece (Fish Tail) 14.00 each 7.00 each 3.00 each 10.00 each IR - IR IR
612(1) Reflectorized Thermoplastic Pavement Markings White 68.38 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
612(2) Reflectorized Thermoplastic Pavement Markings Yellow 63.60 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
624(1)a1 Single Arm Post, with Street Light (8m, LED, 130W) 16.00 each 11.00 each 2.00 each 13.00 each IR - IR IR
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road Widening
– Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY
105(1)a Subgrade Preparation (Common Material) 1,095.12 sq.m. 1,050.00 sq.m. - sq.m. 1,050.00 sq.m. FDT- 9 - FDT- 8 FDT- 1
311(1)e1 PCCP (Unreinforced, 280mm thk., 14 days) 910.00 sq.m. 670.00 sq.m. - sq.m. 670.00 sq.m. Design Mix, CBS-4, Design Mix, CBS-3, CBS-1,
Q- 9, G-6, Core- 3 & IR - Q- 6, G-5, Core- 3 & IR Q- 3, G-1 & IR
404(1)a Reinforcing Steel (Grade 40) 10,012.64 kg. 9,503.79 kg. - kg. 9,503.79 kg. Q-3 & IR - Q-2 & IR Q-1 & IR
404(1)b Reinforcing Steel (Grade 60) 111,875.94 kg. 110,250.52 kg. - kg. 110,250.52 kg. Q-12 & IR - Q-12 & IR IR
405(1)a2 Structural Concrete (20.68 Mpa, Class A, 14 days) 25.18 cu.m. 9.00 cu.m. 9.00 cu.m. 18.00 cu.m. G-3, Q-2, CCS-1 & IR - G-3, Q-2, CCS-1 & IR IR
405(1)b2 Structural Concrete (27.58 Mpa, Class A, 14 days) 838.22 cu.m. 808.79 cu.m. 27.17 cu.m. 835.96 cu.m. G-18, Q-6, CCS-12 & IR - G-18, Q-6, CCS-12 & IR CCS-1 & IR
411(2) Paint 658.19 sq.m. - sq.m. - sq.m. - sq.m. Q-1 & IR - - Q-1 & IR
413(6)b Asphaltic Plug Joints (APJ) for Bridges 62.00 l.m. 50.00 l.m. 10.00 l.m. 60.00 l.m. CCS-1 & IR - CCS-1 & IR IR
505(2)a Grouted Riprap (Class A) 1,172.98 cu.m. 1,150.00 cu.m. 10.00 cu.m. 1,160.00 cu.m. G-4, Q-2 & IR - G-4, Q-2 & IR IR
508(1) Handlaid Rock Embankment 2,336.64 cu.m. 2,320.32 cu.m. 10.00 cu.m. 2,330.32 cu.m. IR - IR IR
511(2) Mattresses (PVC Coated) 178.81 cu.m. 170.00 cu.m. 2.00 cu.m. 172.00 cu.m. Q-1 & IR - Q-1 & IR IR
1712(2) Concrete (Slope Protection) 358.68 cu.m. 358.68 cu.m. - cu.m. 358.68 cu.m. G-9 & Q-4 - G-9 & Q-4 -
517(1)a Drain Pipes, Galvanized 30.00 ln.m. 30.00 ln.m. - ln.m. 30.00 ln.m. IR - IR IR
603(3)a1 Metal Guardrails (Metal Beam) incl. Conc. Post, Single W- Beam 260.00 ln.m. 227.00 ln.m. 13.00 ln.m. 240.00 ln.m. G-3, Q-1 & IR - G-3, Q-1 & IR IR
603(4)a Metal Beam End Piece (Fish Tail) 14.00 each 7.00 each 3.00 each 10.00 each IR - IR IR
612(1) Reflectorized Thermoplastic Pavement Markings White 68.38 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
612(2) Reflectorized Thermoplastic Pavement Markings Yellow 63.60 sq.m. - sq.m. 40.00 sq.m. 40.00 sq.m. Q-1 & IR - Q-1 & IR IR
624(1)a1 Single Arm Post, with Street Light (8m, LED, 130W) 16.00 each 11.00 each 2.00 each 13.00 each IR - IR IR
deleted
deducted
March 1- 7, March 8- March 15, March 16- March 22- March 29- April 1- 4, April 5- 11,
2021 14, 2021 2021 21, 2021 28, 2021 31, 2021 2021 2021
2.000
0.219 0.219 0.032 0.138 0.161 0.161 0.366
0.219 0.219 0.032 0.138 0.161 0.161 0.366
0.500
0.300
2,255.000
172.150
April 12- April 16- April 19- April 26- 30, May 1- 2, May 3- 9, May 10- 15, May 16,
15, 2021 18, 2021 25, 2021 2021 2021 2021 2021 2021
0.200
20.000
250.000 250.000
172.140
677.000 1,589.000 731.300 400.000
46.900
234.500
June 28- 30, July 1- 4, July 5- 11, July 12- 15, July 16- 18, July 19- 25, July 26- 31, August 1,
2021 2021 2021 2021 2021 2021 2021 2021
0.100
557.650 157.610
2,000.000
August 2- 8, August 9- August 16- August 23- August 30- September September September
2021 15, 2021 22, 2021 29, 2021 31, 2021 1- 5, 2021 6- 12, 2021 13- 15, 2021
-
-
10.000
800.000
1,000.000 404.200
1,000.000 111.330
603.000 1,472.340 1,130.270 944.990 504.000
50.000 50.000
September September September October 1- October 4- October 11- October 16- October 18-
16- 19, 2021 20- 26, 2021 27- 30, 2021 3, 2021 10, 2021 15, 2021 17, 2021 24, 2021
0.500
10.000
49.670
20.000 20.000 22.000
100.000 199.900
63.200
October 25- Original V.O.# 1 V.O.#
31, 2021
NAME OF PROJECT:
21FJ0027 - OO1: Ensure Safe and Reliable National Road System, Network Development Program – Road
Widening – Secondary Roads, Road Widening – Buenavista – Kawayan Rd – K0043+000 – K0043+618
CONTRACTOR: ARKY CONSTRUCTION AND SUPPLY