10-21 JXSC Quote For Gold Wash Plant

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

JiangXi JXSC Mining Machinery Co,Ltd

Quotation for 10-20 tph alluvail gold plant


No.: JXSCSNAIL20211021 Date: 21 th Oct,2021
Buyer Information: Seller Information:

Company Name: Company Name:JiangXi JXSC Mining Machinery Co,Ltd

Add: Guzhang Industrial Park, Shicheng County, Ganzhou city,


Add: Jiangxi province, China
Tel/Email:237-673945092 Tel/whatsapp: +86-15779860839
Email:[email protected]: Contact Person: Snail Liu
Total
Qty Unit price
No. Product Name Model No. Picture Detail Descriptions Amount
(Set) (USD/Set)
(USD)

813 Mobile Trommel


Screen
1. Drum diameter(mm):
800mm,Drum length
(mm):1300
1 Trommel Screen 813 1 7500 7500
2. processing capacity:10tph
3. Screen mesh size : 3mm
4. price included water
pump,water pipe and diesel
generator

1: feeding size: 2mm


2: power: 0.5kw
3: capability: 2 tons per hr
4: rubber lining cone
2 Gold Centrifugal JXSC-1 5: Machine Dimension: 1 2500 2500
950 mm (L) X 780 mm
(W) x 1000 mm (H)
6: Cone diameter: 600 mm
7: Cone deep: 360 mm
1.Processing capacity: 10-
20T/H
2 Sluice Box 1*4m 2.Carpet included 3.Size: 1 1200 1200
4m*1m*0.3m (L*W*H)

1.Deck Size:
4450×4450×850mm
2.Max Feeding Size:-2 mm
3 Shaking Table 6S-4500 3.Feeding Density: 10-30 1 1500 1500
%
4.Processing Capacity:1-2
t/hr
5.Motor Power:1.1 kw
Model : 15A
Melting capacity : 1-2kg
Power: 2KW
4 melting furnace 15A Melting time< 5minutes
1 1000 1000
Input voltage: 220v,1
phase
FOB cost and inland transport fee from factory to Xiamen Port ($) 1000

Total FOB Amount($) 14,700

SAY TOTAL FOURTEEN THOUSAND AND SEVEN HUNDRED ONLY


1.Payment term:40% TT deposit and balance clear before loading from factorry.
2. Factory delivery time: within 20 days

You might also like