The document provides a bill of quantities for the construction of an access road that is 4219m long. It lists 12 items with descriptions, units, quantities, rates, and amounts for materials and work required. These include preliminary works, earthworks, drainage, pavement works, road furniture, and signage. The total cost for all items is estimated at 752,137,510.80 Naira.
The document provides a bill of quantities for the construction of an access road that is 4219m long. It lists 12 items with descriptions, units, quantities, rates, and amounts for materials and work required. These include preliminary works, earthworks, drainage, pavement works, road furniture, and signage. The total cost for all items is estimated at 752,137,510.80 Naira.
The document provides a bill of quantities for the construction of an access road that is 4219m long. It lists 12 items with descriptions, units, quantities, rates, and amounts for materials and work required. These include preliminary works, earthworks, drainage, pavement works, road furniture, and signage. The total cost for all items is estimated at 752,137,510.80 Naira.
The document provides a bill of quantities for the construction of an access road that is 4219m long. It lists 12 items with descriptions, units, quantities, rates, and amounts for materials and work required. These include preliminary works, earthworks, drainage, pavement works, road furniture, and signage. The total cost for all items is estimated at 752,137,510.80 Naira.
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 2
Bill of Quantity for Access Road to Property.
Road Length = 4219m. (Cross Section 1 = 7.8m) Lined drains at Specific Location on Site
ITEM DESCRIPTION UNIT QTY RATE AMOUNT NGN
Preliminaries , Setting out, Mobilization & 1 LS 1 lump sum 24,700,000.00 Demobilization and Project Supervision. Mobilization of Earth moving Equipment (Grader, a LS 2,000,000.00 Excavator, Roller, Low Bed etc) ai Initial 1,200,000.00 aii Monthly Months 4 200,000 800,000.00 b Demoblization from Site LS 1,000,000.00 Setting out, Rental and use of Survey Equipment for the c LS 1,500,000.00 entire project ai Initial 900,000.00 aii Monthly Months 4 150,000 600,000.00 d Mobile Toilet and Convinience Months 4 75,000 300,000.00 Mobile Site Offices & Shed (Inclusive of AC, generator, e Nos 2 1,250,000 2,500,000.00 office furniture and office staioneries) Personal Protective Equipment (Helmet, safety boots, f Nos 50 50,000 2,500,000.00 gloves etc) - for project team members g Reflective Construction safety signs Nos 10 50,000 500,000.00 Projct Sign Post (inclusive of solar power lighting at h Nos 2 200,000 400,000.00 night) i Insurance for work and Personnel LS 2,000,000.00 j Provision of facilities and meal for site meetings Months 4 100,000 400,000.00 k Site Photographs Months 6 100,000 600,000.00 l Quality Control / Testing of Materials LS 5,000,000.00 m Diversion & Temporary Access road LS 1,000,000.00 n As-built drawing development LS 1,500,000.00
Grade, shape, and compact existing subgrade in
2 m2 32098.2 350 11,234,370.00 readiness to receive regulatory fill material
Provide regulatory fill on existing ground level to
3 achieve desired shape and slope, wet and compact to m3 19744.92 10,990 216,996,670.80 give formation level
Excavate for edge kerbs, Access culverts and Cross
4 m 7438 1,050 7,809,900.00 culverts
Install New edge kerbs 150mm x 450mm rate to
5 m 7438 3,000 22,314,000.00 include haunchng and concrete bed
Repair existing edge kerbs 150mm x 450mm rate to
6 m 1000 2,500 2,500,000.00 include haunchng and concrete bed Provide and place G25 Reinforced Concrete covered 7 lined drain. ( 1.2m x 1.0m x 0.15m = 0.85m3/m) - at m 1000 95,000 95,000,000.00 specified locations by project Engineer
Provide and install guard rail with concrete base.
8 Refer to drawings for details. Locations at m 500 15,000 7,500,000.00 embankment above 2m.
Provide and Place thick Geotextile material
9 m2 32098.2 1,350 43,332,570.00 (120grams) to top of well compacted filling