This document summarizes the retail supply tariffs approved for electricity distribution in Telangana state for 2022-2023. It outlines:
1) Tariff categories for low tension supply including domestic, commercial, industry, cottage industry, agriculture, street lighting, general, religious places, temporary and EV charging.
2) Tariff categories for high tension supply including general industry, poultry farms, industrial colonies, seasonal industries, time of day, and ferro alloys.
3) The fixed/demand charge and energy charge in Rs/Unit or Rs/kVAh for each category based on voltage level and consumption slab.
This document summarizes the retail supply tariffs approved for electricity distribution in Telangana state for 2022-2023. It outlines:
1) Tariff categories for low tension supply including domestic, commercial, industry, cottage industry, agriculture, street lighting, general, religious places, temporary and EV charging.
2) Tariff categories for high tension supply including general industry, poultry farms, industrial colonies, seasonal industries, time of day, and ferro alloys.
3) The fixed/demand charge and energy charge in Rs/Unit or Rs/kVAh for each category based on voltage level and consumption slab.
This document summarizes the retail supply tariffs approved for electricity distribution in Telangana state for 2022-2023. It outlines:
1) Tariff categories for low tension supply including domestic, commercial, industry, cottage industry, agriculture, street lighting, general, religious places, temporary and EV charging.
2) Tariff categories for high tension supply including general industry, poultry farms, industrial colonies, seasonal industries, time of day, and ferro alloys.
3) The fixed/demand charge and energy charge in Rs/Unit or Rs/kVAh for each category based on voltage level and consumption slab.
This document summarizes the retail supply tariffs approved for electricity distribution in Telangana state for 2022-2023. It outlines:
1) Tariff categories for low tension supply including domestic, commercial, industry, cottage industry, agriculture, street lighting, general, religious places, temporary and EV charging.
2) Tariff categories for high tension supply including general industry, poultry farms, industrial colonies, seasonal industries, time of day, and ferro alloys.
3) The fixed/demand charge and energy charge in Rs/Unit or Rs/kVAh for each category based on voltage level and consumption slab.
1 ABSTRACT OF THE RETAIL SUPPLY TARIFFS APPROVED BY
THE COMMISSION
(Applicable with effect from 01.04.2022 to 31.03.2023 in respect of the two
Distribution Licensees (TSSPDCL & TSNPDCL) in the Telangana State and the Co- operative Electric Supply Society, Sircilla)
Category Fixed/Demand Charge Energy Charge
(Rs./kWh / Unit Rs./Unit/month Rs./kVAh) Low Tension LT-I: Domestic LT-I(A): Upto 100 Units/Month 0-50 kW 10 1.95 51-100 kW 10 3.10 LT-I(B)(i): Above 100 Units/ Month & up to 200 Units/ Month 0-100 kW 10 3.40 101-200 kW 10 4.80 LT-I(B)(ii): Above 200 Units/Month 0-200 kW 10 5.10 201-300 kW 10 7.70 301-400 kW 10 9.00 401-800 kW 10 9.50 Above 800 units kW 10 10.00 LT-II: Non-Domestic/Commercial LT-II(A): Upto 50 Units/Month 0-50 kW 60 7.00 LT-II(B): Above 50 Units/Month 0-100 kW 70 8.50 101-300 kW 70 9.90 301-500 kW 70 10.40 Above 500 kW 70 11.00 LT-II(C): Advertisement kW 70 13.00 Hoardings LT-II(D): Haircutting salons consuming upto 200 units/month 0-50 kW 60 5.30 51-100 kW 60 6.60 101-200 kW 60 7.50 LT-III: Industry Industries kW 75 7.70 Seasonal Industries (off- kW 75 8.40 season) Pisciculture/Prawn culture kW 36 6.20 Sugarcane crushing kW 36 6.20 Poultry farms kW 65 7.00 Mushroom, Rabbit, Sheep and kW 75 7.30 Goat farms Category Fixed/Demand Charge Energy Charge (Rs./kWh / Unit Rs./Unit/month Rs./kVAh) For Rice Mills under LT-III Industry, the upper limit of Contract Load shall be 93 kW/125 HP; For the remaining consumers under LT-III Industry, the upper limit of Contract Load shall be 75 kW/100 HP. LT-IV: Cottage Industries 20/kW subject to LT-IV(A): Cottage Industries kW a minimum of 4.00 Rs.30/month 20/kW subject to LT-IV(B): Agro Based Activities kW a minimum of 4.00 Rs.30/month For LT-IV(B) Agro Based Activity, the upper limit of Connected Load for Sheep farming, Goat farming, and Dairy farming activities shall be 15 HP; For the remaining consumers under LT-IV(B) Agro Based Activity, the upper limit of Connected Load shall be 10 HP. LT-V: Agricultural LT-V(A): Agriculture (DSM Measures mandatory) Corporate Farmers HP 2.50 Other than Corporate Farmers HP 0.00 LT-V(B): Others Horticulture Nurseries with CL HP 20 4.00 upto 15 HP LT-VI: Street Lighting & PWS schemes LT-VI(A): Street Lighting Panchayats kW 32 7.10 Municipalities kW 32 7.60 Municipal Corporations kW 32 8.10 LT-VI(B): PWS Schemes 32/HP subject to Panchayats HP a minimum of 6.00 Rs.50/month 32/HP subject to Municipalities HP a minimum of 7.10 Rs.100/month 32/HP subject to Municipal Corporations HP a minimum of 7.60 Rs.100/month LT-VII: General LT-VII(A): General Purpose kW 21 8.30 LT-VII(B): Wholly Religious Places Load upto 2 kW kW 21 6.40 Load above 2 kW kW 21 7.00 LT-VIII: Temporary Supply kW 21 12.00 For LT-VIII Temporary Supply, the consumer shall be required to deposit in advance the estimated consumption charges along with other charges as stipulated in the Tariff Order. LT-IX: Electric Vehicle Charging kW 50 6.00 Station High Tension HT-I(A): Industry General 11 kV kVA 475 7.65 Category Fixed/Demand Charge Energy Charge (Rs./kWh / Unit Rs./Unit/month Rs./kVAh) 33 kV kVA 475 7.15 132 kV and above kVA 475 6.65 HT-I(A): Lights and Fans 11 kV 7.65 33 kV 7.15 132 kV and above 6.65 HT-I(A): Poultry Farms 11 kV kVA 475 7.65 33 kV kVA 475 7.15 HT-I(A): Industrial Colonies 11 kV 7.30 33 kV 7.30 132 kV and above 7.30 HT-I(A): Seasonal Industries 11 kV kVA 475 8.60 33 kV kVA 475 7.90 132 kV and above kVA 475 7.70 HT-I(A): Optional Category with CMD Up to 150 kVA 11 kV kVA 100 8.00 HT-I: Time of Day Tariffs (6 AM to 10 AM) 11 kV 8.65 33 kV 8.15 132 kV and above 7.65 HT-I: Time of Day Tariffs (6 PM to 10 PM) 11 kV 8.65 33 kV 8.15 132 kV and above 7.65 HT-I: Time of Day Tariffs (10 PM to 6 AM) 11 kV 6.65 33 kV 6.15 132 kV and above 5.65 HT-I(A): Poultry Farms - Time of Day Tariffs (6 AM to 10 AM) 11 kV 8.65 33 kV 8.15 HT-I(A): Poultry Farms - Time of Day Tariffs (6 PM to 10 PM) 11 kV 8.65 33 kV 8.15 HT-I(A): Poultry Farms - Time of Day Tariffs (10 PM to 6 AM) 11 kV 6.65 33 kV 6.15 HT-I(B): Ferro Alloys 11 kV kVA 475 7.65 33 kV kVA 475 7.15 132 kV and above kVA 475 6.65 No stipulation of Guaranteed off-take for HT-I(B) Ferro Alloy Units HT-II OTHERS Category Fixed/Demand Charge Energy Charge (Rs./kWh / Unit Rs./Unit/month Rs./kVAh) 11 kV kVA 475 8.80 33 kV kVA 475 8.00 132 kV and above kVA 475 7.80 HT-II: Time of Day Tariffs (6 AM to 10 AM) 11 kV 9.80 33 kV 9.00 132 kV and above 8.80 HT-II: Time of Day Tariffs (6 PM to 10 PM) 11 kV 9.80 33 kV 9.00 132 kV and above 8.80 HT-II: Time of Day Tariffs (10 PM to 6 AM) 11 kV 7.80 33 kV 7.00 132 kV and above 6.80 HT-III AIRPORTS, RAILWAY STATIONS AND BUS STATIONS 11 kV kVA 475 8.50 33 kV kVA 475 7.85 132 kV and above kVA 475 7.45 HT-III: Time of Day Tariffs (6 AM to 10 AM) 11 kV 9.50 33 kV 8.85 132 kV and above 8.45 HT-III: Time of Day Tariffs (6 PM to 10 PM) 11 kV 9.50 33 kV 8.85 132 kV and above 8.45 HT-III: Time of Day Tariffs (10 PM to 6 AM) 11 kV 7.50 33 kV 6.85 132 kV and above 6.45 HT-IV(A) IRRIGATION AND AGRICULTURE 11 kV kVA 275 6.30 33 kV kVA 275 6.30 132 kV and above kVA 275 6.30 HT-IV(B) CPWS Schemes 11 kV kVA 6.10 33 kV kVA 6.10 132 kV and above kVA 6.10 HT-V(A) Railway Traction kVA 475 5.05 HT-V(B) HMR kVA 475 4.95 HT-VI Townships & Residential Colonies 11 kV kVA 260 7.30 33 kV kVA 260 7.30 132 kV and above kVA 260 7.30 HT-VII: Temporary Category Fixed/Demand Charge Energy Charge (Rs./kWh / Unit Rs./Unit/month Rs./kVAh) 11 kV kVA 500 11.80 33 kV kVA 500 11.00 132 kV and above kVA 500 10.80 For HT-VII Temporary Supply, the consumer shall be required to deposit in advance the estimated consumption charges along with other charges as stipulated in the Tariff Order. HT-VIII: RESCO 11 kV 4.80 HT-IX: Electric Vehicle Charging Station 11 kV kVA 100 6.00 33 kV kVA 100 6.00 132 kV and above kVA 100 6.00 HT-IX: Time of Day Tariffs (6 AM to 10 AM) 11 kV 7.00 33 kV 7.00 132 kV and above 7.00 HT-IX: Time of Day Tariffs (6 PM to 10 PM) 11 kV 7.00 33 kV 7.00 132 kV and above 7.00 HT-IX: Time of Day Tariffs (10 PM to 6 AM) 11 kV 5.00 33 kV 5.00 132 kV and above 5.00
Terms and Conditions
1. Fuel Surcharge Adjustment (FSA) is applicable in accordance with the provisions of the Electricity Act, 2003. 2. The tariffs are exclusive of Electricity Duty payable as per the provisions of the Telangana Electricity Duty Act as adopted by the Government of Telangana State. 3. Voltage Surcharge: The voltage surcharge withdrawal stands continued even for FY 2022-23. 4. Additional Charges for Maximum Demand exceeding the Contracted Demand In case, in any month the Recorded Maximum Demand (RMD) of the consumer exceeds his Contracted Demand with the Licensee, the consumer shall pay the following charges on excess demand recorded and on the entire energy consumed. RMD over CMD Demand charges on Energy charges on full excess demand energy 100 to 120% 2 times of normal charge Normal Above 120% and up 1.15 times of normal 2 times of normal charge charge to 200% 1.20 times of normal More than 200% 2 times of normal charge charge In case of HT-V(A) and HT-V(B): Railway Traction and HMR, the energy charges shall be computed at 1.05 times of normal charges on the entire consumption, if RMD exceeds 120% of Contracted Demand. 5. Minimum charges Category Rates for FY 2022-23 LT-categories LT-I(A) Domestic Contracted Load of 1000 Watts and below Single Phase Rs.25/month LT-I(B)(i) Contracted Load of above 1000 Watts Single Phase Rs.50/month LT-I(B)(ii) Three Phase Rs.150/month LT-II(A) & II(B) Non-Domestic / Single Phase Rs.65/month Commercial Three Phase Rs.200/month LT-II(C) Advertisement Rs.300/month Hoardings LT-II(D) Single Phase Rs.65/month Three Phase Rs.200/month LT-VI(A) Street Lighting Panchayats Rs.2/point/month Municipalities and Rs.6/point/month Municipal Corporations LT-VII(A) General Purpose Single Phase Rs.50/month Three Phase Rs.150/month LT-VIII Temporary Supply Rs.125 per kW or part thereof of the contracted load for first 30 days or part thereof and for every subsequent period of 15 days or part thereof a charge of Rs.75 per kW. LT-IX Electric Vehicle Single Phase Rs.65/month Charging station Three Phase Rs.200/month HT Categories Billing Demand Billing Demand shall be maximum demand recorded during the month or 80% of the contracted demand whichever is higher except HT-IV(A) and HT-VI. For HT-IV(A) (Lift Irrigation), during the operational months July to November, Billing Demand shall be maximum demand recorded during the month or 80% of the contracted demand whichever is higher and, during the non-operational months December to June, Billing Demand Category Rates for FY 2022-23 shall be maximum demand recorded during the month or 25% of the contracted demand whichever is higher For HT-VI (Township and Residential Colonies), the billing demand is Actual Demand Recorded) Minimum Energy Charges HT-I(A) Industry-General 50 kVAh per kVA of billing demand per month HT-I(B) Ferro Alloys 50 kVAh per kVA of billing demand per month HT-II Others 25 kVAh per kVA of billing demand per month HT-III Airports, Bus Stations 50 kVAh per kVA of billing demand and Railway Stations per month HT-V(A) & Railway Traction & 32 kVAh per kVA of Contracted V(B) HMR Demand per month HT-VI Townships & Billing Demand shall be Actual Residential Colonies Recorded Demand. 25 kVAh per kVA of contracted demand per month. HT-IX Electric Vehicle 25 kVAh per kVA of contracted Charging station demand per month. 6. Customer Charges Consumer Category Rs./month Low Tension LT-I: Domestic (Units/month) 0-50 40 51-100 70 101-200 90 201-300 100 301-400 120 401-800 140 Above 800 units 160 LT-II(A&B):Non-Domestic/Commercial (Units/month) 0-50 50 51-100 90 101-300 105 301-500 120 Above 500 units 160 LT-II(C): Advertisement Hoardings 160 LT-II(D): Haircutting Salons with consumption upto 200 units per month 0-50 45 51-100 55 101-200 65 LT-III: Industry up to 20 HP 100 Consumer Category Rs./month LT-III: Industry 21-50 HP 350 LT-III: Industry 51-125 HP 1200 LT-IV: Cottage Industries 50 LT-V: Agricultural 30 LT-VI: Street Lighting & PWS 120 LT-VII: General Purpose 100 LT-VIII: Temporary Supply 100 LT-IX: Electric Vehicle Charging station 120 High Tension HT consumers at 11 kV 2000 HT consumers at 33 kV 3500 HT consumers at 132 kV and above 5000 7. Delayed Payment Surcharge (DPS) LT-Category a) In case of LT-I(A), LT-I(B), LT-II(A), LT-II(D), LT-IV and LT-V(B), if payment is made after due date, the consumers are liable to pay, Delayed Payment Surcharge (DPS) per month on the bill amount at the rates given in table below: LT-I(A) Rs.10 per month LT-I(B), LT-II(A), LT-II(D), LT-IV and LT-V(B) Rs.25 per month b) In case of LT-II(B), LT-II(C), LT-III, LT-VI, and LT-VII, and LT-IX the Licensee shall levy Delayed Payment Surcharge (DPS) on the bill amount at the rate of 5 paise/Rs.100/day calculated from the due date mentioned on the bill, up to the date of payment or Rs.150 whichever is higher. In case of grant of installments, the Licensees shall levy interest at the rate of 18% per annum on the outstanding amounts compounded annually and the two (DPS and interest) shall not be levied at the same time. HT Category a) The Licensees shall charge the Delayed Payment Surcharge (DPS) per month on the bill amount at the rate of 5 paise/ Rs.100/ day or Rs.550 whichever is higher. In case of grant of installments, the Licensee shall levy interest at the rate of 18% per annum on the outstanding amounts, compounded annually and the two charges shall not be levied at the same time. 8. Reconnection charges Low Tension services LT-I(A) Rs.25 Overhead LT services Rs.75 U.G. services Rs.200 High Tension service 11 kV Rs.1000 33 kV Rs.2000 132 kV and above Rs.3000 9. Testing charges Installation LT HT The first test and inspection of a new installation Nil Nil or of an extension to an existing installation Charges payable by the consumer in advance for Rs.20 Rs.200 each subsequent test and/or inspection if found necessary owing to any fault in the installation or to non-compliance of the conditions of supply Meter A.C. Single Phase Energy meter Rs.100 A.C. Three Phase Energy meter Rs.300 LT Tri Vector meter Rs.2000 11 kV Rs.3000 33 kV Rs.3000 132 kV and above Rs.3000 Transformer oil Each sample of oil Rs.150 per sample 10. Supervision/Inspection and checking charges For LT-I(A) Domestic Rs.100 For LT-I(B) Domestic Rs.100 LT-V Agricultural Rs.100 For all other LT Categories Rs.100 For all HT Categories Rs.600 11. Low Power Factor Charges: For all consumer categories where kVAh billing is done, no Low Power Factor surcharge shall be levied. 12. Capacitor Surcharge: LT consumers (except LT-I Domestic) having connected loads mentioned in table below shall pay capacitor surcharge (as per rules in vogue) at the rate of 25% of the billed amount, if capacitors are found defunct. Category Connected Load LT-II and LT-VII(A) < 10 kW LT-III and LT-VI(B) < 20 HP 13. Fixed Charges – Seasonal Industries: LT-III: Rs.50/HP/month on 30% contracted load. HT: Demand Charges – 30% of CMD or recorded demand whichever is higher. 14. Temporary Supply for LT and HT Consumers: Temporary supply can be given initially for a period up to one year as per the tariff applicable under temporary supply category. After the expiry of one year, the consumer is at liberty to seek further extension. 15. Green Tariff: Green Tariff can be opted by a HT consumer availing normal supply under HT-I or HT-II categories. Green Tariff of Rs.0.66/unit, which is over and above the normal tariff of the respective category, shall be levied on the energy consumption for the period for which the consumer has opted for Green Tariff.