RST Schedule For FY 2022-23

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

1 ABSTRACT OF THE RETAIL SUPPLY TARIFFS APPROVED BY

THE COMMISSION

(Applicable with effect from 01.04.2022 to 31.03.2023 in respect of the two


Distribution Licensees (TSSPDCL & TSNPDCL) in the Telangana State and the Co-
operative Electric Supply Society, Sircilla)

Category Fixed/Demand Charge Energy Charge


(Rs./kWh /
Unit Rs./Unit/month
Rs./kVAh)
Low Tension
LT-I: Domestic
LT-I(A): Upto 100 Units/Month
0-50 kW 10 1.95
51-100 kW 10 3.10
LT-I(B)(i): Above 100 Units/ Month & up to 200 Units/ Month
0-100 kW 10 3.40
101-200 kW 10 4.80
LT-I(B)(ii): Above 200 Units/Month
0-200 kW 10 5.10
201-300 kW 10 7.70
301-400 kW 10 9.00
401-800 kW 10 9.50
Above 800 units kW 10 10.00
LT-II: Non-Domestic/Commercial
LT-II(A): Upto 50 Units/Month
0-50 kW 60 7.00
LT-II(B): Above 50 Units/Month
0-100 kW 70 8.50
101-300 kW 70 9.90
301-500 kW 70 10.40
Above 500 kW 70 11.00
LT-II(C): Advertisement
kW 70 13.00
Hoardings
LT-II(D): Haircutting salons consuming upto 200 units/month
0-50 kW 60 5.30
51-100 kW 60 6.60
101-200 kW 60 7.50
LT-III: Industry
Industries kW 75 7.70
Seasonal Industries (off-
kW 75 8.40
season)
Pisciculture/Prawn culture kW 36 6.20
Sugarcane crushing kW 36 6.20
Poultry farms kW 65 7.00
Mushroom, Rabbit, Sheep and
kW 75 7.30
Goat farms
Category Fixed/Demand Charge Energy Charge
(Rs./kWh /
Unit Rs./Unit/month
Rs./kVAh)
For Rice Mills under LT-III Industry, the upper limit of Contract Load shall be 93 kW/125 HP; For
the remaining consumers under LT-III Industry, the upper limit of Contract Load shall be 75 kW/100
HP.
LT-IV: Cottage Industries
20/kW subject to
LT-IV(A): Cottage Industries kW a minimum of 4.00
Rs.30/month
20/kW subject to
LT-IV(B): Agro Based Activities kW a minimum of 4.00
Rs.30/month
For LT-IV(B) Agro Based Activity, the upper limit of Connected Load for Sheep farming, Goat
farming, and Dairy farming activities shall be 15 HP; For the remaining consumers under LT-IV(B)
Agro Based Activity, the upper limit of Connected Load shall be 10 HP.
LT-V: Agricultural
LT-V(A): Agriculture (DSM Measures mandatory)
Corporate Farmers HP 2.50
Other than Corporate Farmers HP 0.00
LT-V(B): Others
Horticulture Nurseries with CL
HP 20 4.00
upto 15 HP
LT-VI: Street Lighting & PWS schemes
LT-VI(A): Street Lighting
Panchayats kW 32 7.10
Municipalities kW 32 7.60
Municipal Corporations kW 32 8.10
LT-VI(B): PWS Schemes
32/HP subject to
Panchayats HP a minimum of 6.00
Rs.50/month
32/HP subject to
Municipalities HP a minimum of 7.10
Rs.100/month
32/HP subject to
Municipal Corporations HP a minimum of 7.60
Rs.100/month
LT-VII: General
LT-VII(A): General Purpose kW 21 8.30
LT-VII(B): Wholly Religious Places
Load upto 2 kW kW 21 6.40
Load above 2 kW kW 21 7.00
LT-VIII: Temporary Supply kW 21 12.00
For LT-VIII Temporary Supply, the consumer shall be required to deposit in advance the estimated
consumption charges along with other charges as stipulated in the Tariff Order.
LT-IX: Electric Vehicle Charging
kW 50 6.00
Station
High Tension
HT-I(A): Industry General
11 kV kVA 475 7.65
Category Fixed/Demand Charge Energy Charge
(Rs./kWh /
Unit Rs./Unit/month
Rs./kVAh)
33 kV kVA 475 7.15
132 kV and above kVA 475 6.65
HT-I(A): Lights and Fans
11 kV 7.65
33 kV 7.15
132 kV and above 6.65
HT-I(A): Poultry Farms
11 kV kVA 475 7.65
33 kV kVA 475 7.15
HT-I(A): Industrial Colonies
11 kV 7.30
33 kV 7.30
132 kV and above 7.30
HT-I(A): Seasonal Industries
11 kV kVA 475 8.60
33 kV kVA 475 7.90
132 kV and above kVA 475 7.70
HT-I(A): Optional Category with CMD Up to 150 kVA
11 kV kVA 100 8.00
HT-I: Time of Day Tariffs (6 AM to 10 AM)
11 kV 8.65
33 kV 8.15
132 kV and above 7.65
HT-I: Time of Day Tariffs (6 PM to 10 PM)
11 kV 8.65
33 kV 8.15
132 kV and above 7.65
HT-I: Time of Day Tariffs (10 PM to 6 AM)
11 kV 6.65
33 kV 6.15
132 kV and above 5.65
HT-I(A): Poultry Farms - Time of Day Tariffs (6 AM to 10 AM)
11 kV 8.65
33 kV 8.15
HT-I(A): Poultry Farms - Time of Day Tariffs (6 PM to 10 PM)
11 kV 8.65
33 kV 8.15
HT-I(A): Poultry Farms - Time of Day Tariffs (10 PM to 6 AM)
11 kV 6.65
33 kV 6.15
HT-I(B): Ferro Alloys
11 kV kVA 475 7.65
33 kV kVA 475 7.15
132 kV and above kVA 475 6.65
No stipulation of Guaranteed off-take for HT-I(B) Ferro Alloy Units
HT-II OTHERS
Category Fixed/Demand Charge Energy Charge
(Rs./kWh /
Unit Rs./Unit/month
Rs./kVAh)
11 kV kVA 475 8.80
33 kV kVA 475 8.00
132 kV and above kVA 475 7.80
HT-II: Time of Day Tariffs (6 AM to 10 AM)
11 kV 9.80
33 kV 9.00
132 kV and above 8.80
HT-II: Time of Day Tariffs (6 PM to 10 PM)
11 kV 9.80
33 kV 9.00
132 kV and above 8.80
HT-II: Time of Day Tariffs (10 PM to 6 AM)
11 kV 7.80
33 kV 7.00
132 kV and above 6.80
HT-III AIRPORTS, RAILWAY STATIONS AND BUS STATIONS
11 kV kVA 475 8.50
33 kV kVA 475 7.85
132 kV and above kVA 475 7.45
HT-III: Time of Day Tariffs (6 AM to 10 AM)
11 kV 9.50
33 kV 8.85
132 kV and above 8.45
HT-III: Time of Day Tariffs (6 PM to 10 PM)
11 kV 9.50
33 kV 8.85
132 kV and above 8.45
HT-III: Time of Day Tariffs (10 PM to 6 AM)
11 kV 7.50
33 kV 6.85
132 kV and above 6.45
HT-IV(A) IRRIGATION AND AGRICULTURE
11 kV kVA 275 6.30
33 kV kVA 275 6.30
132 kV and above kVA 275 6.30
HT-IV(B) CPWS Schemes
11 kV kVA 6.10
33 kV kVA 6.10
132 kV and above kVA 6.10
HT-V(A) Railway Traction kVA 475 5.05
HT-V(B) HMR kVA 475 4.95
HT-VI Townships & Residential Colonies
11 kV kVA 260 7.30
33 kV kVA 260 7.30
132 kV and above kVA 260 7.30
HT-VII: Temporary
Category Fixed/Demand Charge Energy Charge
(Rs./kWh /
Unit Rs./Unit/month
Rs./kVAh)
11 kV kVA 500 11.80
33 kV kVA 500 11.00
132 kV and above kVA 500 10.80
For HT-VII Temporary Supply, the consumer shall be required to deposit in advance the estimated
consumption charges along with other charges as stipulated in the Tariff Order.
HT-VIII: RESCO
11 kV 4.80
HT-IX: Electric Vehicle Charging Station
11 kV kVA 100 6.00
33 kV kVA 100 6.00
132 kV and above kVA 100 6.00
HT-IX: Time of Day Tariffs (6 AM to 10 AM)
11 kV 7.00
33 kV 7.00
132 kV and above 7.00
HT-IX: Time of Day Tariffs (6 PM to 10 PM)
11 kV 7.00
33 kV 7.00
132 kV and above 7.00
HT-IX: Time of Day Tariffs (10 PM to 6 AM)
11 kV 5.00
33 kV 5.00
132 kV and above 5.00

Terms and Conditions


1. Fuel Surcharge Adjustment (FSA) is applicable in accordance with the
provisions of the Electricity Act, 2003.
2. The tariffs are exclusive of Electricity Duty payable as per the provisions of
the Telangana Electricity Duty Act as adopted by the Government of
Telangana State.
3. Voltage Surcharge: The voltage surcharge withdrawal stands continued
even for FY 2022-23.
4. Additional Charges for Maximum Demand exceeding the Contracted
Demand
In case, in any month the Recorded Maximum Demand (RMD) of the
consumer exceeds his Contracted Demand with the Licensee, the consumer
shall pay the following charges on excess demand recorded and on the entire
energy consumed.
RMD over CMD Demand charges on Energy charges on full
excess demand energy
100 to 120% 2 times of normal charge Normal
Above 120% and up 1.15 times of normal
2 times of normal charge charge
to 200%
1.20 times of normal
More than 200% 2 times of normal charge
charge
In case of HT-V(A) and HT-V(B): Railway Traction and HMR, the energy
charges shall be computed at 1.05 times of normal charges on the entire
consumption, if RMD exceeds 120% of Contracted Demand.
5. Minimum charges
Category Rates for FY 2022-23
LT-categories
LT-I(A) Domestic Contracted Load of 1000 Watts and
below
Single Phase Rs.25/month
LT-I(B)(i) Contracted Load of above 1000
Watts
Single Phase Rs.50/month
LT-I(B)(ii) Three Phase Rs.150/month
LT-II(A) & II(B) Non-Domestic / Single Phase Rs.65/month
Commercial Three Phase Rs.200/month
LT-II(C) Advertisement Rs.300/month
Hoardings
LT-II(D) Single Phase Rs.65/month
Three Phase Rs.200/month
LT-VI(A) Street Lighting Panchayats Rs.2/point/month
Municipalities and Rs.6/point/month
Municipal
Corporations
LT-VII(A) General Purpose Single Phase Rs.50/month
Three Phase Rs.150/month
LT-VIII Temporary Supply Rs.125 per kW or part thereof of the
contracted load for first 30 days or
part thereof and for every subsequent
period of 15 days or part thereof a
charge of Rs.75 per kW.
LT-IX Electric Vehicle Single Phase Rs.65/month
Charging station Three Phase Rs.200/month
HT Categories
Billing Demand Billing Demand shall be maximum
demand recorded during the month or
80% of the contracted demand
whichever is higher except HT-IV(A)
and HT-VI.
For HT-IV(A) (Lift Irrigation), during
the operational months July to
November, Billing Demand shall be
maximum demand recorded during
the month or 80% of the contracted
demand whichever is higher and,
during the non-operational months
December to June, Billing Demand
Category Rates for FY 2022-23
shall be maximum demand recorded
during the month or 25% of the
contracted demand whichever is
higher
For HT-VI (Township and Residential
Colonies), the billing demand is Actual
Demand Recorded)
Minimum Energy Charges
HT-I(A) Industry-General 50 kVAh per kVA of billing demand
per month
HT-I(B) Ferro Alloys 50 kVAh per kVA of billing demand
per month
HT-II Others 25 kVAh per kVA of billing demand
per month
HT-III Airports, Bus Stations 50 kVAh per kVA of billing demand
and Railway Stations per month
HT-V(A) & Railway Traction & 32 kVAh per kVA of Contracted
V(B) HMR Demand per month
HT-VI Townships & Billing Demand shall be Actual
Residential Colonies Recorded Demand.
25 kVAh per kVA of contracted
demand per month.
HT-IX Electric Vehicle 25 kVAh per kVA of contracted
Charging station demand per month.
6. Customer Charges
Consumer Category Rs./month
Low Tension
LT-I: Domestic (Units/month)
0-50 40
51-100 70
101-200 90
201-300 100
301-400 120
401-800 140
Above 800 units 160
LT-II(A&B):Non-Domestic/Commercial (Units/month)
0-50 50
51-100 90
101-300 105
301-500 120
Above 500 units 160
LT-II(C): Advertisement Hoardings 160
LT-II(D): Haircutting Salons with consumption upto
200 units per month
0-50 45
51-100 55
101-200 65
LT-III: Industry up to 20 HP 100
Consumer Category Rs./month
LT-III: Industry 21-50 HP 350
LT-III: Industry 51-125 HP 1200
LT-IV: Cottage Industries 50
LT-V: Agricultural 30
LT-VI: Street Lighting & PWS 120
LT-VII: General Purpose 100
LT-VIII: Temporary Supply 100
LT-IX: Electric Vehicle Charging station 120
High Tension
HT consumers at 11 kV 2000
HT consumers at 33 kV 3500
HT consumers at 132 kV and above 5000
7. Delayed Payment Surcharge (DPS)
LT-Category
a) In case of LT-I(A), LT-I(B), LT-II(A), LT-II(D), LT-IV and LT-V(B), if
payment is made after due date, the consumers are liable to pay,
Delayed Payment Surcharge (DPS) per month on the bill amount at the
rates given in table below:
LT-I(A) Rs.10 per month
LT-I(B), LT-II(A), LT-II(D), LT-IV and LT-V(B) Rs.25 per month
b) In case of LT-II(B), LT-II(C), LT-III, LT-VI, and LT-VII, and LT-IX the
Licensee shall levy Delayed Payment Surcharge (DPS) on the bill
amount at the rate of 5 paise/Rs.100/day calculated from the due date
mentioned on the bill, up to the date of payment or Rs.150 whichever is
higher. In case of grant of installments, the Licensees shall levy interest
at the rate of 18% per annum on the outstanding amounts
compounded annually and the two (DPS and interest) shall not be
levied at the same time.
HT Category
a) The Licensees shall charge the Delayed Payment Surcharge (DPS)
per month on the bill amount at the rate of 5 paise/ Rs.100/ day or
Rs.550 whichever is higher. In case of grant of installments, the
Licensee shall levy interest at the rate of 18% per annum on the
outstanding amounts, compounded annually and the two charges shall
not be levied at the same time.
8. Reconnection charges
Low Tension services
LT-I(A) Rs.25
Overhead LT services Rs.75
U.G. services Rs.200
High Tension service
11 kV Rs.1000
33 kV Rs.2000
132 kV and above Rs.3000
9. Testing charges
Installation LT HT
The first test and inspection of a new installation Nil Nil
or of an extension to an existing installation
Charges payable by the consumer in advance for Rs.20 Rs.200
each subsequent test and/or inspection if found
necessary owing to any fault in the installation or
to non-compliance of the conditions of supply
Meter
A.C. Single Phase Energy meter Rs.100
A.C. Three Phase Energy meter Rs.300
LT Tri Vector meter Rs.2000
11 kV Rs.3000
33 kV Rs.3000
132 kV and above Rs.3000
Transformer oil
Each sample of oil Rs.150 per sample
10. Supervision/Inspection and checking charges
For LT-I(A) Domestic Rs.100
For LT-I(B) Domestic Rs.100
LT-V Agricultural Rs.100
For all other LT Categories Rs.100
For all HT Categories Rs.600
11. Low Power Factor Charges: For all consumer categories where kVAh billing
is done, no Low Power Factor surcharge shall be levied.
12. Capacitor Surcharge: LT consumers (except LT-I Domestic) having
connected loads mentioned in table below shall pay capacitor surcharge (as
per rules in vogue) at the rate of 25% of the billed amount, if capacitors are
found defunct.
Category Connected Load
LT-II and LT-VII(A) < 10 kW
LT-III and LT-VI(B) < 20 HP
13. Fixed Charges – Seasonal Industries:
LT-III: Rs.50/HP/month on 30% contracted load.
HT: Demand Charges – 30% of CMD or recorded demand whichever is
higher.
14. Temporary Supply for LT and HT Consumers: Temporary supply can be
given initially for a period up to one year as per the tariff applicable under
temporary supply category. After the expiry of one year, the consumer is at
liberty to seek further extension.
15. Green Tariff: Green Tariff can be opted by a HT consumer availing normal
supply under HT-I or HT-II categories. Green Tariff of Rs.0.66/unit, which is
over and above the normal tariff of the respective category, shall be levied on
the energy consumption for the period for which the consumer has opted for
Green Tariff.